Determination 425621

Cash settlement amount for storm damage to home and temporary accommodation

FirmFinancial Firm (Unknown - Insurer)
Decided2017-01-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$132,266
Non-financial loss—
Amount claimed$318,000
SourceAFCA PDF

Summary

After April 2015 storm damage, the FSP cash settled repairs and paid some temporary accommodation, and the applicant sought the full $318,000 sum insured. AFCA ordered repair cash settlement of $113,465.70, temporary accommodation of $18,800 less amounts paid, interest and reimbursement of her building consultant's report fee, but refused non-financial loss compensation.

The FSP's cash settlement was reasonable given pre-existing damage, but the repair amount had to be increased by 10 per cent for variations and further damage, and temporary accommodation was payable for the full 52-week benefit period given the property was uninhabitable.

Issues

Subjects and remedies

home or building damagemental healthnatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 425621 Determination Page 1 of 11 Case number: 425621 22 December 2016 1 Overview 1.1 Dispute The applicant lodged a claim under her home insurance policy with the financial services provider (FSP) after her home was damaged during severe storms in April 2015. The FSP accepted the applicant’s claim and offered to cash settle her for the estimated cost of repairing the damage to her home, based on a quotation provided by its builder. The FSP also paid the applicant an allowance for temporary accommodation during the repair period. The applicant says the cash settlement offered by the FSP is not sufficient to restore all of the damage to her property caused by the storm. She seeks payment of the full sum insured ($318,000) so the property can be demolished and rebuilt, and considers the FSP should be required to undertake the necessary works. The applicant also seeks payment of additional benefits for temporary accommodation, together with compensation for stress and inconvenience suffered during the claims process. 1.2 Issues and key findings Is the FSP entitled to cash settle the claim? The FSP acted reasonably in offering to cash settle the claim, given the pre-existing condition of the property and the partially completed repairs. Is the FSP required to increase the settlement for building repairs? The cash settlement should be increased by an additional amount of $10,315.06 to ensure that the applicant has sufficient funds to carry out the necessary repairs to the property. Is the applicant entitled to additional accommodation benefits? Given the protracted repair period and the applicant’s actions in continuing to reside at the property under trying circumstances, the FSP is required to pay the applicant additional accommodation benefits (reflecting the costs it would have incurred had the applicant chosen to move into alternative accommodation). Case No: 425621 Determination Page 2 of 11 Is the applicant entitled to compensation? The applicant is entitled to reimbursement fees incurred in obtaining her building consultant’s report, but is not otherwise entitled to compensation. 1.3 Determination This determination is partly in favour of the applicant. The FSP is required to pay the applicant the following amounts in full and final settlement of her claim:  $113,465.70 for the costs of repairing the damage to her property caused by the storm in April 2015 (to the extent the cash settlement amount of building repairs has not previously been paid); and  $18,800, less the total amount of temporary accommodation benefits paid under the claim to date. The FSP is to pay interest on the outstanding settlement amount as set out in section 2.3 below. The FSP is to reimburse the applicant for costs incurred in obtaining a report from her building consultant, subject to provision of an appropriate invoice. Case No: 425621 Determination Page 3 of 11 2 Reasons for determination 2.1 Is the FSP entitled to cash settle the claim? Policy sets out how claims will be settled Under the terms of the policy, the FSP may settle a claim for damage to the applicant’s home by:  arranging for its contractors to repair the damage, so as to restore the property to the condition it was in before the damage occurred; or  paying the applicant the cost (to the FSP) of doing so. It is clear from the terms of the policy that the FSP has the discretion to decide which settlement method to adopt. FSP is entitled to cash settle claim The storm in April 2015 resulted in rainwater run-off coursing down the sloping site at the applicant’s property, inundating the rear section of her home. During the storm, the drains at the property became blocked, causing raw sewerage to discharge into the property through the bathroom fixtures. The FSP elected to cash settle the app licant’s claim after its assessor (BH) advised that the property was in poor condition prior to the storm and had a number of outstanding maintenance issues. The available information establishes that there was pre-existing damage and partially completed repairs to the property at the time of the storm in April 2015. The applicant had lodged a prior claim under the policy following a n earlier storm in November 2014. At the time, the FSP accepted liability for internal water damage to various rooms at the property and cash settled the applicant for the estimated cost of the repairs. However, the FSP declined cover for repairs to the roof, which required replacing due to extensive corrosion and deterioration over a prolonged period. The FSP’s builder also noted pre-existing termite damage to the walls of the enclosed verandah and the timber decking. Following its assessment of the applicant’s claim for damage caused by the November 2014 storm, the FSP advised the applicant that, in order for cover to be renewed, she would need to undertake the repairs to the roof, the verandah and the deck. When the FSP’s assessor (BH) inspected the property following the subsequent storm in April 2015, he confirmed that the repairs to the verandah and deck had been partially completed and the roof repairs were due to commence the following week. BH recommended that these repairs be put on hold until the second claim had been finalised. In circumstances where there were outstanding maintenance repairs to the property at the time of the storm in April 2015, the panel considers the FSP acted reasonably Case No: 425621 Determination Page 4 of 11 in deciding to cash settle the claim. The nature of the pre-existing issues with the prop erty meant that the FSP’s builders were unlikely to be able to guarantee the claim-related works. While the approach taken by the FSP is consistent with the terms of the policy, it left the applicant with the responsibility of arranging building repairs herself, in somewhat challenging circumstances. The applicant was living alone in a relatively isolated, rural area and experienced significant stress as a result of the damage to her home caused by the storm, which exacerbated a pre-existing psychological condition. In these circumstances, the FSP was obliged to ensure that the cash settlement amount paid for building repairs was sufficient to allow the applicant to engage a builder directly to complete the necessary repairs. 2.2 Is the FSP required to increase the settlement for building repairs? Applicant says cash settlement offer underestimates repairs required The cash settlement amount of $100,903.17 initially offered by the FSP in January 2016 included an amount of $92,503.17 for the repair of the damage to the applicant’s home caused by the storm in April 2015. This amount was determined based on quotations provided by the FSP’s builder (DW) based on a scope of works prepared by the FSP’s assessor (BH) following the storm. DW quoted an amount of $9,128 for the strip out and deodorising of the damaged sections of the building and an amount of $83,375.17 for the reinstatement of the damaged areas. The FSP had previously paid an additional amount of $17,600 to the applicant’s representative (SK), to remove damaged contents items and undertake initial sanitising of the property to enable the repairs to commence. This amount was paid to SK at the applicant’s request, although it is unclear to what extent he actually carried out the relevant works. The applicant disputed the FSP’s cash settlement offer for the building repairs, on the basis that it did not fully provide for the cost of repairing all of the damage caused by the storm in April 2015. Among other things, the applicant says that additional damage to the property has occurred after it was inspected by the FSP’s contractors, due to the ongoing effects of the inundation experienced during the storm. The applicant has provided a copy of a report and scope of works prepared by her building consultant (DL), which outlines additional damage to various parts of the property which are not included in the scope of works approved by the FSP. DL estimated the total cost of the repairs set out in his scope of works at $138,477.10 (including the strip out of the damaged building materials). Following review of DL’s scope of works, the FSP agreed to increase the cash settlement amount for the building repairs to $103,150.64. Case No: 425621 Determination Page 5 of 11 This increased cash settlement offer for the building repairs was based on the amount quoted by DL for the repair of the damage for which the FSP had accepted liability (including damage to the rear entry which had been omitted from the FSP’s scope of works). However, the FSP says it is not liable for the remainder of the damage to the building outlined in DL’s report, on the basis that this damage pre -existed the storm in April 2015 and/or has been separately addressed under the applicant’s contents claim . Approved scope of works for building repairs is generally appropriate As outlined above, the cash settlement amount for the building repairs was based on quotations provided by the FSP’s builder (DW) based on a scope of works prepared by the FSP’s assessor (BH). Having reviewed the available information, the panel is satisfied that BH’s sco pe of works generally provides an accurate assessment of the damage to the property caused by the storm in April 2015 and a breakdown of the works required to repair that damage. The repairs included in the scope of works are generally consistent with the claim- related damage to the property, as identified in the reports provided and photographs taken during BH’s initial inspection of the property in May 2015 (and his subsequent reinspection in August 2015). There is no independent information to support the applicant’s position that the FSP should cash settle her for the full sum of insured of $318,000 on the basis that the house needs to be demolished and rebuilt. The applicant’s own building consultant (DL) has confirmed that the claim-related damage can be effectively repaired. Having carefully reviewed the alternative scope of works prepared by the applicant’s builder (DL), the panel considers that it includes a number of items for which the FSP is not liable. In particular, the panel notes that DL appears to have attributed all of the cracking and movement damage at the property (including uneven flooring) to the effects of water inundating the property during the storm in April 2015. DL’s conclusions were in part based on the assumption that the flo ors were level prior to the storm, given the brick piers under the property had been replaced several years earlier. However, the applicant has acknowledged that the floors were not level and there was pre-existing cracking damage to the walls at the time of the storm (although she says the unevenness and the cracking has worsened significantly since that time). The pho tographs taken by the FSP’s assessor in May 2015 (shortly after the storm) indicate that the cracking was pre-existing, given the debris contained within the cracks. It is quite possible that (as suggested by BH), the unevenness of the floors reflects the fact that they were not properly re-levelled when the new piers were installed. Case No: 425621 Determination Page 6 of 11 Accordingly, the panel considers that the FSP is not liable for all of the additional cracking and movement damage included in DL’s scope of works, as not all of this damage was caused by the storm in April 2015. DL’s scope of works and quotation also provide for the replacement of damaged items such as carpets and electrical appliances which do not form part of the insured building for the purposes of the policy. The FSP has ad vised that these items were included in the amount of $28,950 paid to the applicant in settlement of her contents claim. For the reasons outlined above, the panel is satisfied that the FSP’s approved scope of works is generally appropriate to address the d amage to the applicant’s property caused by the storm in April 2015. The panel is also satisfied that the quotations for the cost of the necessary repairs are generally consistent. In this regard, the panel notes that:  after adjustment for items of damage in respect of which liability is disputed, the total repair cost as estimated by the applicant’s building consultant (DL) is not dissimilar to the quotations provided by the two builders engaged by the FSP; and  in making its revised settlement offer, the FSP has effectively agreed to base the settlement amount on DL’s pricing, after excluding the disputed items. Cash settlement should be increased by 10% to allow for extra repair costs For the reasons outlined above, the panel considers that the FSP has generally acted reasonably in determining the cash settlement amount for the building repairs. However, the panel considers that the cash settlement amount should be increased, in order to allow for any additional damage to the applicant’s property which w as not apparent at the time of the FSP’s most recent inspection and/or to provide for reasonable variations during the repair process. When he inspected the property following the storm, the FSP’s engineer (DW) confirmed that the brick piers were susceptible to differential movement (particularly in the context of severe storm events). DW observed scouring of the soil under the sub-floor caused by the flow of water during the storm and noted that minor differential movement had most likely occurred. Further, DW recommended that internal repairs to the property be delayed for a period of up to nine months in order to allow sufficient time for the foundation soils to dry out and any ongoing differential movement to cease. While there was pre-existing movement damage to the property prior to the storm, in light of DW’s advice, it is likely that additional movement occurred over subsequent months, as advised by the applicant. After the applicant raised concerns about additional damage, the FSP was provided with an opportunity to reinspect the property in mid-2016 but declined to do so. A further inspection by the FSP at this time might have assisted in determining the existence and extent of any further damage. Case No: 425621 Determination Page 7 of 11 In addition, the panel considers that an increase in the settlement amount is appropriate in the circumstances, given that:  the quotations provided do not appear to include any provisional allowance (or “buffer”) to take into account any variations to the scope which may be required as a result of further damage which may become apparent during the course of the repairs; and  the applicant has advised on a number of occasions that further water entry to the property has occurred during the course of the claim. The panel accepts that this additional damage was most likely due to the pre-existing deteriorated condition of the roof, for which the FSP is not liable. However, the panel also notes that the applicant relied on the advice of the FSP’s assessor in May 2015 not to progress the roof repairs until the current claim had been settled. Having regard to the matters outlined above, the panel considers it fair in all the circumstances that the FSP’s cash settlement offer of $103,150.64 be increased by 10% (ie $10,315.06). 2.3 Is the applicant entitled to additional accommodation costs? Policy provides for payment of certain accommodation costs The applicant’s policy provides for payment of reasonable temporary accommodation costs where she is unable to live in her home due to damage resulting from an insured event. The policy also provides for the payment of related costs, including:  utility connection costs at the applicant’s temporary residence;  relocation of the applicant’s contents to and from her temporary residence; and  temporary accommodation for her pets in a commercial boarding establishment. Under the policy, temporary accommodation costs are payable for the time it takes to repair the applicant’s property to a liveable condition. However, the total benefits payable are capped at 20% of the building sum insured and a maximum of 52 weeks. The policy provides a separate benefit for the costs of storing undamaged contents which cannot be kept at the insured property, until such time as they are above to be returned. The maximum amount payable under this benefit is 5% of the contents sum insured. Applicant seeks payment of additional temporary accommodation costs Based on the information provided, it appears that the FSP paid the applicant temporary accommodation benefits for a period of approximately seven months between May 2015 and December 2015. When the applicant was initially advised to vacate the property for health reasons, the FSP offered to arrange temporary accommodation. However, the applicant did not want to leave the property, due to concern about the welfare of her elderly pets. The FSP initially funded the cost of a rented caravan ($800 per month) so the applicant could remain at the property. However, due to issues erecting temporary Case No: 425621 Determination Page 8 of 11 fencing for her pets, the applicant moved into the garage instead, after it was modified by her representative (SK). The FSP subsequently paid the applicant temporary accommodation benefits of $1,400 per month ($350 per week), based on the estimated rental cost of an equivalent property (even though the applicant continued to live in her garage during this period). The FSP’s cash settlement offer includes an amount of $ 7,000, being 20 weeks of additional temporary accommodation costs at the rate of $350 per week. The period of 20 weeks was determined based on an estimated repair period of 16 weeks, plus an additional 4 weeks to enable the applicant to locate an appropriate rental property. The applicant seeks payment of additional temporary accommodation benefits. She says she has incurred significant additional costs in order to make her garage habitable (including electricity connection and ongoing usage charges). The applicant says she has also incurred storage costs for her undamaged contents items. FSP is required to increase settlement for accommodation costs As outlined above, the FSP’s engineer (DW) advised that the repairs to the applicant’s property should be delayed by up to nine months, in order to allow sufficient time for the soil to dry out. The available information suggests that the property would not have been inhabitable during that period, due to the nature and extent of the damage resulting from the inundation and sewerage backflow during the storm. On this basis, and taking into account the estimated time to comple te the repairs, the applicant’s property would have been uninhabitable for the maximum period of 12 months for which benefits are payable under the policy (regardless of any delays experienced during the claim process). Accordingly, under the terms of the policy, the applicant would have been entitled to payment of reasonable temporary accommodation costs for herself and her six pets (four dogs and two cats) during this period, as well as the costs of storing her undamaged contents items. The panel acknowledges that the actual costs incurred by the applicant are significantly less than the amount to which she would have been entitled, as she has chosen to live in her garage at the property rather than move into alternative accommodation. However, the panel also recognises that the applicant has suffered significant inconvenience as a result. Among other things, she has continued to use the dirty and damaged shower and bathroom in the main residence, which remains subject to ongoing sewerage discharge issues. By continuing to live at the property during this period, the applicant has effectively mitigated the need for the FSP to incur temporary accommodation costs to the full extent for which it would otherwise have been liable. Case No: 425621 Determination Page 9 of 11 In light of this, the panel considers it is fair in all the circumstances that the FSP be required to pay the applicant the amount of $18,800 (being 52 weeks of temporary accommodation benefits at the rate of $350 per week), less the total amount of temporary accommodation costs paid under the claim to date. Given the amount to be paid for temporary accommodation, the panel does not consider that any additional award in respect of storage costs is justified (noting that the quotation provided by the applicant’s builder (DL) includes an allowance for the removal and storage of contents items). FSP is required to pay interest on settlement amount It is unclear whether the FSP has paid the applicant the undisputed portion of the cash settlement amount for building repairs and temporary accommodation and, if so, when this was paid. While it appears the applicant initially rejected the FSP’s settlement offer, it is also unclear whether the FSP advised her that she could accept the undisputed amount without prejudicing the ultimate outcome of her dispute. In these circumstances, the panel considers the FSP should be required to pay interest on the whole of the outstanding settlement amount at the rate calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), from 2 March 2016 until the payment date. 2.4 Is the applicant entitled to compensation? Applicant is entitled to reimbursement of professional costs Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial services provider to contribute to legal costs incurred by an applicant in the course of their dispute. The applicant is entitled to reimbursement of fees paid to her building consultant (DL) for his report dated 19 September 2016, subject to providing an invoice evidencing the costs incurred. The report prepared by DL was of assistance to the panel in establishing the extent of any additional damage to the property which had occurred following the most recent inspection by the FSP’s assessor. The FSP had previously declined the opportunity to arrange for an independent expert to provide an updated assessment of the damage to the property. Applicant is not otherwise entitled to compensation Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation for non-financial loss (capped at $3,000) where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The panel acknowledges that it has a taken a significant period of time to resolve the applicant’s claim. Further, the claim process has been difficult for the applicant, in Case No: 425621 Determination Page 10 of 11 part because the usual stress and inconvenience associated with an insurance claim has been exacerbated by her personal circumstances and the FSP’s decision to cash settle rather than undertake repairs. However, having carefully reviewed the claim history, the panel is satisfied that the FSP managed the claim reasonably overall. The claim process was complicated by factors including the pre-existing damage to the property (and the partially completed repairs) and the applicant’s desire to remain at the property during the repair period, as well as the involvement of her previous representative (who the applicant now believes has withheld funds paid for her benefit). To the extent that the issues experienced during the claim process were attributable to the conduct of the FSP and its contractors, the panel is satisfied that the applicant has been adequately compensated by the payment of additional temporary accommodation costs as outlined above. Accordingly, the circumstances are not such as to justify the award of compensation. Case No: 425621 Determination Page 11 of 11 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this case based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. During the course of this dispute, the applicant has been represented by a consumer advocate. For the purposes of this determination, submissions made by the applicant’s advocate have been treated as if they had been made by the applicant herself.