Text of the determination
Determination
Case No: 425333 Determination Page 1 of 14
Case number: 425333 28 March 2017
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP) for damage to his home following a storm in January 2012.
The FSP accepted the claim and arranged for repairs to be carried out by its
authorised builder (EN).
In March 2014, the applicant advised the FSP that the property had suffered further
damage due to water entry through the lounge room ceiling during a storm. The
applicant considers this damage was caused by inadequate repairs to the roof
carried out by EN in 2012.
The FSP disputes that the initial roof repairs were inadequate. The FSP has offered
to cash settle the applicant for the additional damage caused by the storm in March
2014 but says it is not liable for any further repairs to the roof.
1.2 Issues and key findings
Is the FSP entitled to rely on the terms of the policy?
The available information establishes that the FSP provided the applicant with a copy
of the Product Disclosure Statement (PDS) setting out the terms of the policy.
Accordingly, the FSP is able to rely on the terms of the policy for the purpose of
settling the applicant‟s claim .
Is the FSP liable for the disputed damage?
The available information ( including the various consultants‟ reports and the claim
history) establishes that, on the balance of probabilities, some of the disputed
damage was caused by the storm in March 2012 and/or the inadequate repairs
carried out by the FSP‟s builder. Accordingly, the FSP is liable for some of the
additional damage claimed.
However, under the terms of the policy, the FSP is not required to replace
undamaged roof tiles for matching purposes.
How should this dispute be settled?
The cash settlement should be increased to reflect the reasonable cost of repairing
the additional damage for which the FSP is liable, including a buffer to reflect the time
which has passed and the possibility that further, related damage has occurred.
Case No: 425333 Determination Page 2 of 14
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is to pay the applicant the amount of $16,493.75 in full and final settlement
of his claim. The FSP is to pay the applicant an additional amount of $750 as
settlement for non-financial loss.
Case No: 425333 Determination Page 3 of 14
2 Reasons for determination
2.1 Can the FSP rely on the terms of the policy?
FSP is entitled to rely on the terms of the policy
In considering its liability for the applicant‟s claim, the FSP has sought to rely on the
terms of the policy as set out in the Product Disclosure Statement (PDS) dated
March 2011 (being the PDS in force at the time the original claim arose).
The applicant says the FSP is not entitled to rely on the terms of the policy (as set
out in the PDS) because he was never provided with a copy of this document.
The FSP has provided copies of records extracted from its databases and those of its
contractors which indicate that policy renewal documentation (including a copy of the
PDS) addressed to the applicant‟s nominated address was lodged with Australia Post
on 20 November 2011.
Based on the information provided, I am satisfied that, on the balance of probabilities,
the FSP sent the applicant a copy of the PDS in November 2011.
Accordingly, the FSP is entitled to rely on the terms and conditions of the policy (as
set out in the PDS), for the purpose of determining its liability for the appl icant‟s
claim.
2.2 Is the FSP liable for the disputed damage?
FSP’s liability depends on cause of damage
The applicant‟s policy provides cover for damage caused by the events listed in the
policy (including the insured event of storm), subject to the conditions and exclusions
set out in the policy.
However, the policy contains general exclusions for damage arising from faulty
design or construction, wear or tear and/or gradual deterioration.
Under the policy, the FSP provides a lifetime guarantee of the workma nship of any
claim-related repairs carried out by its preferred repairers, and undertakes to fix any
defects caused by poor workmanship.
The applicant says the issues with his roof which resulted in internal water damage to
the property in March 2014 were caused by the inadequate repairs carried out by the
FSP‟s builder (EN) following the previous storm claim in January 2012.
The FSP has accepted liability for the additional damage it considers was caused by
the storm in March 2014, on the basis that this is treated as a separate claim.
However, the FSP denies that the previous repairs were inadequate.
The FSP says the additional damage claimed by the applicant was not caused by
either the storms or the previous repairs, but by factors which are excluded under the
policy, such as the faulty design and construction of the roof and the gradual
deterioration of the roof tiles.
Case No: 425333 Determination Page 4 of 14
Disputed damage includes a number of separate items
As outlined above, the FSP has accepted liability for some of the repairs required to
the property, including the replacement of approximately 30 roof tiles, the removal
and reinstatement of ridge caps above one of the valley irons and the repair of
internal water damage to the lounge room ceiling.
The additional damage for which the applicant seeks cover comprises a number of
separate items, including:
further issues with the top ridge and the valley area (including the use of
ineffective weep holes and metal patching), which have been contributing to
ongoing water entry issues;
the replacement of a significant number of roof tiles, which the applicant says
have been dislodged or are broken, cracked or pitted by hail;
the replacement of additional roof tiles in order to ensure a uniform appearance;
and
the repair of internal water damage to the skirting in the ground floor games
room.
The parties have provided extensive information (including numerous consultants‟
reports, scopes of work and photographs) in relation to the disputed items of
damage.
I have carefully reviewed this information (whether or not expressly referred to in this
determination) for the purpose of identifying whether the FSP is liable for each
disputed item.
Property has been the subject of prior storm claims
The property is approximately 20 years old and has been insured with the FSP for a
number of years.
In December 2007, the applicant lodged a claim for damage to the roof and other
areas of the property caused by a hail storm. Based on a report provided by its
builder (HD), the FSP accepted liability for damage including the replacement of
approximately 20 roof tiles.
The report prepared by the FSP‟s builder (HD) identified damage to the rear hip due
to poor previous repairs (namely, the application of new pointing over old pointing).
Accordingly, the FSP denied liability for this aspect of the damage.
The FSP cash settled the applicant‟s claim and the applicant appointed his own
builder to complete the repairs.
The applicant did not make any further claims for storm damage until January 2012,
when he notified the FSP that storm water had entered through the lounge room
ceiling. The FSP accepted the claim and appointed its builder (EN) to carry out the
necessary repairs.
The reports prepared by the various contractors confirm that the main area of water
entry during the storm in March 2014 was the same as during the earlier storm in
Case No: 425333 Determination Page 5 of 14
January 2012 – that is, through the section of the roof directly above the lounge room
ceiling.
Initial repairs carried out in 2012 required rectification
As outlined above, the applicant says the ongoing water entry issues with the roof
are due to the inadequate repairs carried out by the FSP‟s builder (EN) in 2012.
The applicant says there were no water entry issues at the property before the storm
in March 2012 (as shown by the absence of any lodged claims other than the hail
claim in 2007).
The applicant says EN had to return to the property on several occasions to
undertake rectification works, as the initial repairs were inadequate. He says the
property has suffered from ongoing water entry issues since that time.
The initial scope of works for the 2012 repairs was limited to the replacement of one
broken roof tile, the reinstallation of a slipped valley tile cut and the repair of internal
damage to the lounge room ceiling. These repairs were completed in February 2012.
The FSP‟s claim records indicate that a plasterer was engaged to rectify the repairs
to the lounge room ceiling in May 2012.
In Fe bruary 2013, the applicant‟s wife called the FSP to advise of ongoing water
entry issues affecting the property, with water regularly leaking through the roof tiles
into the lounge room during periods of heavy rain. The applicant‟s wife noted that she
beli eved these issues were due to EN‟s failure to complete the initial repairs properly.
The FSP arranged for EN to re-attend the property and assess whether rectification
was required. The FSP‟s records reflect that EN submitted a variation for additional
works comprising the replacement of one broken tile, drilling of weep holes and the
repair of further water damage to the lounge room ceiling.
The additional repairs were completed at a cost of $1,665 in or around May 2013,
following which the FSP‟s claim records do not reflect any further activity until the
storm in January 2014.
The applicant says the roofing repairs carried out to by the FSP‟ s builder (EN) in
2012 and 2013 were more significant than is reflected in the FSP‟s claim records.
The applicant says that, among other matters, EN carried out repairs to the top ridge
and replaced approximately 30 damaged roof tiles (using spare tiles the applicant
had on hand, supplemented by several additional, non-matching tiles).
There is conflicting information about the condition of the roof
As noted above, both parties have provided numerous contractors‟ reports regarding
the condition of the ro of at the applicant‟s property. The conclusions expressed in
these reports vary significantly, even as between experts engaged by the same
party.
Among other things, the various contractors have expressed divergent views in
relation to:
the underlying factors which are causing the ongoing water entry issues ; and
Case No: 425333 Determination Page 6 of 14
the nature and extent of the damage to the roof tiles.
In relation to the ongoing water entry issues, the contractors generally agree that
these issues have been caused by the condition of the top ridge and roof valley,
exacerbated by broken tiles in the surrounding areas.
The FSP says these issues occurred primarily as a result of the inadequate design
and construction of the top ridge and roof valley when the roof was first installed.
However, the applicant says the issues were due to EN‟s inadequate repairs.
As regards the roof tiles, there is disagreement between the experts about the
number of damaged tiles, as well as the extent to which the observed damage was
caused by hail (and/or foot traffic), as opposed to the gradual deterioration of the tile
coating in the ordinary course of events.
FSP is liable for costs of addressing water entry issues
As outlined above, it appears that the initial repairs carried out by EN in 2012 did not
resolve the water entry issues and EN was required to return to the property in early
2013 to carry out further works.
Further, it appears that at least some of these repairs were not completed to an
adequate standard, even after rectification had occurred.
Th e FSP‟s roofer (SN) who inspected the roof in September 2014 advised that the
patching of the valleys undertaken by EN in 2013 had not been performed correctly
and the weep holes drilled by EN were ineffective.
SN also noted that one tile which had been replaced under the top ridge had the top
missing, which was providing another avenue for water entry.
Based on the information available, it is difficult to determine with certainty the exact
scope of the repairs carried out by the FSP‟s builder (EN) in 20 12 and 2013 (and
therefore the extent to which the FSP is liable for the ongoing issues with the roof) .
While the FSP‟s claim records reflect that the repairs carried out by EN were
relatively limited, it is quite possible that EN carried out at least some of the additional
works described by the applicant.
The FSP has accepted liability for rectifying some of the repairs carried out by EN,
including the replacement of the patched metal roof valleys. However, the FSP says
it is not liable for the remainder of the issues with the top ridge and the valleys which
are allowing water entry.
Based on the findings of its roofer (SN) and builder (DW), the FSP says the top ridge
and roof valley were not installed correctly at the time of construction. Among other
issues, SN advised that the tiles had not been installed high enough up under the top
ridge.
The applicant says the roof was designed and constructed in accordance with all
applicable building requirements.
The applicant has provided a report from his roofer (MW) (a member of the Roofing
Industry Association of New South Wales), which does not identify any design or
Case No: 425333 Determination Page 7 of 14
construction issues with the roof, In his report, MW states that the original tiles were
soundly fixed, the laps were to standard, the valleys were cut to open cut channel
and the original cement work was fixed in accordance with applicable requirements.
While MW identifies issues with the patching of the valley irons and the fixing of the
surrounding tiles, these issues occurred in the area of the roof which EN repaired in
2012 and 2013.
The applicant has also provided a report from the manufacturer of the roof tiles (B),
which confirmed that his inspection of the roof did not identify any design or
construction issues.
Further, it does not appear that any such issues were identified by the FSP‟s builder
(HD) who assessed the roof in 2007 (other than the isolated issue referred to above,
regarding the previous repairs to the pointing of the rear hip).
Having carefully reviewed the available information, I consider the FSP should be
responsible for the costs associated with addressing the ongoing water entry issues.
In reaching this view, I have had regard to the fact that:
there is conflicting information about whether the initial design and construction
of the roof was inadequate;
there is little information to suggest that the roof suffered water entry issues
between 2007 and 2012, as would be expected had the initial design and
construction been inadequate;
ongoing issues have continued to occur in the same past of the roof repaired by
EN;
the FSP has acknowledged that at least some aspects of the repairs carried out
by EN were inadequate.
As outlined above, the FSP has accepted liability for the repair of water damage to
the lounge room ceiling. However, I consider that the FSP should also be liable for
the repair of water damage to the skirting in the ground floor games room.
The FSP‟s records reflect that the plumber appointed to inspect the damage in Apr il
2014 considered this damage had most likely been caused by water which had
entered through the roof and travelled downwards through the roof cavity.
The games room is located directly beneath the area of concern and there is no
indication that any alternative cause of damage was ever identified (for example, a
leaking pipe).
FSP is liable for replacement of some additional roof tiles
The applicant says the FSP builder (EN) failed to replace a number of tiles which
were damaged in the storm in January 2012, which has contributed to the ongoing
water issues. The applicant notes that further damage may have occurred as a result
of foot traffic by the FSP‟s builders.
As outlined above, the FSP has accepted liability for the replacement of
approximately 30 damaged roof tiles. However, the applicant says the number of
damaged roof tiles is considerably higher, particularly on the south eastern face
which was most exposed to the hail storm.
Case No: 425333 Determination Page 8 of 14
The applicant has provided a report and quotation from his builder (KN) which was
prepared in April 2015.
In his report, KN confirmed that a number of tiles on the southern faces of the roof
had suffered were cracking, broken and/or displaced or had suffered pitting damage.
KN considered the observed damage was consistent with having been caused by
storm and/or hail damage.
However, KN also noted that the tiles had suffered wear and tear and colour
deterioration, as would be expected for their age.
KN‟s quotation dated 24 April 2015 provided for the replacement of:
approximately 60 chipped and cracked roof tiles which he considered had
suffered storm damage; and
65% of all of the tiles on the south eastern face of the roof, which he considered
had suffered pitting and abrasion damage from hail stones.
The report prepared by the applicant‟s roofer (MW) in May 2016 confirmed there
were at least 60 dislodged, cracked or broken tiles, as well as pitting damage to
approximately 70% of the tiles in the affected area.
The applicant has provided a further quotation from another builder (GB) dated 25
February 2017 which provides for the replacement of approximately 70% of the tiles
due to hail damage. It is not clear from GB‟s quotation whether this figure applies to
the roof as a whole or certain sections only.
The applicant has also provided photographs of damaged roof tiles. However, these
photographs do not clearly establish the number of damaged roof tiles.
The FSP disputes the extent of the damage to the roof tiles. The FSP notes that a
report obtained by the applicant from the tile manufacturer (B) stated that his visual
inspection did not identify any broken or dislodged tiles, while the tiles generally
appeared to be weathering normally. Of the six sample tiles, only one was identified
has having surface pitting which could be the result of storm damage.
The FSP also relies on the report prepared by its roofer (SN) in September 2014,
which confirmed the presence of cracked and broken roof tiles, but states that the
pitting damage to the coating of the roof tiles appeared more likely to have been
caused by sun exposure than hail damage.
Given the conflicting reports provided, it is not possible to determine with certainty
the precise extent of the damage to the roof tiles.
However, based on the weight of the available informa tion, I consider it is fair in all
the circumstances that the FSP be required to indemnify the applicant for damage to
the roof tiles, over and above that provided for in its settlement offer.
In circumstances where the FSP accepts that the roof has been damaged by hail and
the applicant has provided a number of reports indicating that the damage is
relatively extensive (as regards the south eastern face), I am satisfied that the
applicant has established a prima facie claim for this aspect of the damage.
Case No: 425333 Determination Page 9 of 14
Having regard to the views expressed by the various contractors, I am not satisfied
that the FSP has established that, on the balance of probabilities, this damage was
caused by factors which are excluded from cover under the policy.
FSP is not liable for costs of replacing tiles to ensure uniform appearance
The quotations provided by the applicant‟s builders include the cost of replacing
undamaged tiles, in order to ensure a uniform appearance. This includes (but is not
limited to) the replacement of mismatched tiles which the applicant says were
installed by the FSP‟s builder (EN) in 2012 and 2013.
The reports provided by the various contractors confirm that the original tiles are no
longer available. While the applicant says the tile manufacturer is able to
manufacture a new batch of tiles to match the existing tiles, he acknowledges that
the cost of doing so would be considerable.
The applicant‟s policy clearly and unambiguously states that the FSP will not pay for
materials to match the undamaged parts of the applicant‟s property to create a
uniform appearance.
The applicant says the FSP should not be able to rely on this provision of the policy
as it is „well - hidden‟ in „the fine print‟. The applicant says he understood he had „full
cover‟ for storm damage, based on the summary of cover in the policy booklet, verbal
advice from the FSP‟s consultants and public information provide d by the FSP.
As outlined above, I am satisfied that the FSP provided the applicant with a copy of
the PDS setting out the terms of the policy. In these circumstances, it was the
applicant‟s responsibility to review the terms of cover and confirm that they were
appropriate for his needs.
Having carefully reviewed the photographs of the tiles which the applicant says were
replaced by EN as part of the prior repairs, I do not consider that the colour
difference between the original and replacement tiles is such as to (of itself) render
these repairs inadequate.
The applicant says that the replacement of the damaged tiles only will not satisfy the
FSP‟s obligati ons under the policy because these repairs will not restore the roof to
the condition it was in before the damage occurred.
However, the policy only provides cover for loss or damage caused by the insured
events listed in the policy, subject to the exclusions and conditions contained in the
policy (including the provisions setting out how claims will be settled).
The applicant says the use of the replacement tiles will result in a reduction in the
value of the property.
However, any loss in value of the property is more appropriately characterised as a
consequential financial loss than a direct financial loss. The policy expressly
excludes cover for losses of this nature.
For the reasons outlined above, the FSP is entitled to rely on the terms of the policy
such that it is not required to replace undamaged roof tiles for matching purposes
only.
Case No: 425333 Determination Page 10 of 14
2.3 How should this dispute be settled?
Dispute should be cash settled
For the reasons outlined above, I consider the FSP should be liable for repairs to the
roof, in addition to the scope of work on which its current settlement offer has been
based.
The available information indicates that at least some of the additional damage has
occurred as a result of the inadequate repairs carried out by the FSP‟s builder (EN)
following the first storm in January 2012.
In these circumstances, the FSP is liable for this damage under the lifetime
guarantee for previous repairs provided under the policy.
During the course of this dispute, the applicant has expressed concern about the
competency and credibility of the FSP and its contractors. Among other things, he
says the FSP and his contractors have deliberately provided fraudulent and
misleading information.
In these circumstances, it is unlikely that the applicant retains sufficient trust or
confidence in the FSP and its builders to enable the additional repairs to be carried
out successfully. Accordingly, it is appropriate that the dispute be resolved by way of
a cash settlement.
FSP should pay applicant $16,493.75 for repairs
In its most recent submissions, the FSP offered to cash settle the applicant for
$8,867, being the cost of repairing the damage for which it has acknowledged liability
(as estimated by its contractors).
For the reasons outlined above, I consider this amount should be increased to
provide for the repair of additional damage not included in the scope of works
approved by the FSP.
I am satisfied that the quotation provided by the applicant‟s builder (KN) in April 2015
generally reflects the extent of the damage for which the FSP should be liable (other
than the replacement of the mismatching non-original roof tiles). KN quoted a total
$13,195 for the relevant repairs.
As KN‟s quotation is approximately two years old, I accept that it underestimates the
reasonable cost of the repairs at current prices.
The applicant has provided a more recent quotation from another builder (GB).
However, GB‟s quotation is significantly less detailed than that provided by KN.
Among other things, GB indicates that an inspection of the current condition of the
damaged areas is still to be completed and refers to the areas to be repaired by
reference to a „determined %‟, rather than providing specific measurements.
The applicant has expressed concern that further damage has occurred to the
property as the result of ongoing water entry. However, other than GB‟s quotation
(which is not definitive on this point), he has not provided any independent
information to establish the extent of any such damage.
Case No: 425333 Determination Page 11 of 14
The quotation provided by GB in February 2017 is for a total of $65,000 (excluding
the cost of replacing mismatching tiles). This is almost five times the amount of KN‟s
quotation from two years earlier.
In these circumstances, I consider it is more appropriate that the amount of the cash
settlement be based on KN‟s quotation, increased by a reasonable buffer to reflect
the time which has passed and the possibility that additional damage has occurred.
Having carefully reviewed all of the available information, I consider it is fair in all the
circumstance that the FSP be required to pay the applicant the amount of $16,493.75
(being the amount of KN‟s quotation increased by 25%).
In determining the cash settlement amount, I have taken into account the passage of
time. Accordingly, the FSP is not required to pay interest on this amount.
FOS may award compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
The fact that the applicant ‟s policy excludes cover for consequential losses does not
preclude the award of compensation where such losses have occurred as a result of
the way in which the FSP has handled their claim, rather than as a result of the
insured event itself.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual stress and inconvenience associated with an insurance claim.
Applicant is entitled to compensation of $750 for non-financial loss
As outlined above, the applicant has accused the FSP and its contractors of
deliberately providing fraudulent and misleading information.
The concerns identified by the applicant raise issues of serious misconduct. I do not
consider it appropriate to make a finding on such matters without a substantial weight
of proof confirming the matters alleged.
Having carefully reviewed the available information, I am not satisfied that it
establishes deliberate misconduct (as asserted by the applicant) on the part of the
FSP or its contractors.
Having said that, I do consider the FSP could have handled the matter better.
In particular, the FSP appears to have given insufficient weight to the multiple reports
obtained by the applicant which indicates there was more extensive storm damage to
the roof and cast doubt on the findings by the FSP‟s contractors as to inadequate
construction.
Given the conflicting information contained in these reports, it may have been
appropriate for the FSP to consider appointing an independent expert to provide an
opinion on these issues.
Case No: 425333 Determination Page 12 of 14
I accept that the applicant has suffered additional stress and inconvenience as a
result of the extended time taken to resolve his claim, in circumstances where a
further inspect ion may have been effective to address the FSP‟s liability for at least
some of the disputed items of damage.
In the circumstances, I consider that an award of compensation for non-financial loss
in the amount of $750 is appropriate.
Case No: 425333 Determination Page 13 of 14
3 Supporting information
3.1 FOS approach to this dispute
This determination follows the review of a recommendation provided on behalf of
FOS on 6 July 2016. The recommendation was rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Cover for
insured
events
We cover your h ome or contents when certain things happen. These are known
as “listed events”. You can mak e a claim if a listed event takes place and causes
loss or damage to your home during the policy period .
Insured event
- storm
Storm
If loss or damage is caused by a storm …
Covered
violent wind, cyclone or tornado
rain, thunderstorm, hail or snow …
General
exclusions
These exclusions apply to all cover under your policy.
What we don’t cover
Loss, damage, injury or death arising from …
rust, corrosion, gradual deterioration, depreciation, wear or tear …
Maintaining and occupying your home
We don‟t cover loss, damage, injury or death arising from
faulty design or workmanship
previous damage that has not been repaired …
Settlement of
claims
Matching materials …
we only repair the damaged parts of your home. We don‟t pay for materials to
match the undamaged parts of your home to create a uniform appearance.
Lifetime
guarantee
We provide a „lifetime guarantee‟ when your home is repaired or rebuilt by one of
our pr eferred repairers or builders.
Case No: 425333 Determination Page 14 of 14
Subject Terms
This means:
we guarantee the workmanship of repairs that we authorized for the lifetime of
your home;
we will fix any defect caused by poor workmanship.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.