Determination 425208

Cash settlement amount for fire-damaged home

FirmFinancial Firm (Unknown - Insurer)
Decided2017-04-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$50,000
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The applicant's fire-damaged home was cash settled on the higher of two repair quotations, and she disputed that demolition and rebuild was required. AFCA accepted the FSP's obligation was limited to the fire-damaged parts but awarded $50,000 for contingencies and price changes, a reimbursement of her engineer's report, and $3,000 for non-financial loss.

The policy covers only repair of damaged parts of the home to current building standards, but the cash settlement was made years after the quotation and shifted rebuild risk to the insured, justifying an additional payment.

Issues

Subjects and remedies

home or building damagepay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 425208 Determination Page 1 of 8 Case number: 425208 10 March 2017 1 Overview 1.1 Dispute This matter involves a claim by the applicant under her Home Insurance Policy, held with the financial service provider (FSP), following damage to the insured property as a result of a fire. The FSP has accepted the applicant’s claim but a dispute has arisen as to the resolution of the claim. 1.2 Issue and key findings Has the FSP met its obligations under the terms and conditions of the policy in respect to the claim? The FSP is required to pay the applicant an additional amount of $50,000 to allow for all contingencies and the risk assumed by the applicant given the cash settlement of the claim. The FSP has met its obligations under the policy in respect to Temporary accommodation and is not required to pay any further amount. The FSP is not required to pay the applicant’s legal costs but is required to reimburse the applicant the cost of obtaining the report from the engineer SM, upon provision by the applicant of an invoice or receipt. The FSP is required to pay the applicant non-financial loss compensation of $3,000. The substance of the dispute relates to the damage to the building following a fire. There is insufficient information for the Panel to reach a conclusion regarding the applicant’s claims for transport and storage of contents, contents disposed of contrary to advice and table and chair restoration. Should the applicant wish to proceed with claims in this regard, the applicant should lodge a separate dispute with the Service. 1.3 Determination This determination is partially in favour of the applicant. Upon acceptance of this determination by the applicant, the FSP is to pay the applicant the additional amount of $50,000 in respect of the risk and contingencies associated with cash settlement of the claim. Case No: 425208 Determination Page 2 of 8 The FSP is to pay the applicant the additional amount of $3,000 for non-financial loss compensation. The FSP is to refund the applicant’s costs of obtaining a report from the engineer SM, upon provision by the applicant of an invoice or receipt. Interest is not payable on any of these amounts. Case No: 425208 Determination Page 3 of 8 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material exchanged. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, prior determinations. Whilst all of the exchanged material has been reviewed by the Panel, only that material relevant to the final outcome will be referred to within this determination. 2.1 Has the FSP met its obligations under the terms and conditions of the policy in respect to the claim? Coverage of the policy The applicant’s Home Insurance Policy provides coverage for loss and damage as a result of the fire that occurred at the property on or about 6 January 2014. The exchanged material confirms that the fire was accidental and likely the result of a build-up of heat in a smart meter. The coverage provided by the policy is detailed within the Product Disclosure Statement (PDS). The PDS details: … … Case No: 425208 Determination Page 4 of 8 …’ Case No: 425208 Determination Page 5 of 8 It is accepted insurance law that the applicant carries the initial onus to establish the loss and damage suffered is covered by the terms and conditions of the policy. As detailed, the FSP accepted the applicant’s claim but a dispute has arisen as to the FSP’s obligations in respect to the claim under the terms and conditions of the policy. The applicant says that the exchanged material confirms that the home requires demolition and in those circumstances the FSP should pay for all costs associated with the demolition and construction of a similar size dwelling in the same style with the same facilities. The FSP says that the property had a number of pre-existing issues which were not the result of the insured event of fire. The FSP says that it is entitled to se ttle the applicant’s claim on the basis of quotations for repairs of the areas damaged in the fire. Each party has provided reports to support their respective positions. The FSP obtained several Scope of Works for the repairs to the damaged portion of the home and quotations for the repair works. The lowest quotation was in the amount of $142,827.42 (including GST) and the highest quotation was in the amount of $199,268.69 (including GST). The FSP elected to cash settle the applicant on the basis of the higher of these two quotations. Having reviewed all of the available material, the Panel does not accept the applicant’s position that as a result of the fire, the property requires demolition and rebuild. The Panel accepts that the property had a number of significant pre-existing problems which when combined with the damage caused in the fire, may lead to a conclusion that demolition and rebuild is required. However , the Panel does not accept the applicant’s position that the third Scope of Works prepared by MP (Builders and Engineers, engaged by the FSP) suggests that the fire damage to the home is such that demolition and rebuild is required. On the contrary, the Panel notes that MP detailed the pre-existing problems associated with the property including that the residence needs to be completely restumped. MP says ‘ it would be very difficult to construct the new work reinstating the fire damage and join this construction with walls and floors which out of square and out of level ’ (sic). In addition, MP noted that many external timber members to verandah and external cladding are rotted and are in generally poor condition and many areas exist where untreated timbers have been used too close to the ground and are thus non- compliant. MP also noted there are strong possible issues with the surrounding ground levels being at a higher level than ground levels below the sub-frame of the property causing a water collection point below the building leading to excessive mould and moisture problems. Further, there would be strong possible compliance issues with electrical and plumbing work and existing compliance issues with floor coverings to Case No: 425208 Determination Page 6 of 8 wet areas. The rear skillion verandah adjoining the property is a non-compliant structure and with possibly many other hidden building defects which would cause excessive variations to meet current building compliance. Whilst the Panel notes that MP suggests it would be more economical to replace the existing building structure, he makes the following points:  In normal circumstances, this building would certainly have been repaired and reinstated to its pre-existing condition, however due to its poor state of maintenance it is forcing the building to be completely rebuilt in order to maintain current building compliance and statutory warranties  Thus it will be at the discretion of the insurer whether the extra cost in demolishing and rebuilding the structure new in its entirety would be borne by either themselves or the insured. The Panel is satisfied that the position taken by MP is at least in part supported by the structural and geo-technical engineer SM, engaged by the applicant. Within a report dated 21 April 2016, SM says: ‘The footings of the house were found to be bluestone strip footings and a mix of concrete and timber stumps. Most of the footings appeared to be from the original house construction in the 1890’s. A difference in floor level was found to be in excess of 60mm, however it is unclear whether the house was originally built with uneven floors or if differential settlement of the footings had occurred. The walls did show signs of cracking or leaning that would be indicative of differential settlement. It is unclear how much the footings were affected by the fire and the large quantity of water used to extinguish the fire. The original house was built in an era when sub-floor ventilation was not part of the design, this can create sub-floor ventilation issues. The house may well have had no need for footings repairs before the fire, however the level of differential deflection across the floor measured during our site visit, and the lack of sub-floor ventilation, makes re- building on the existing footings impractical.’ The Panel is satisfied that the coverage provided by the policy, detailed within the PDS, is clear and unambiguous in that the FSP is not required to meet the costs for undamaged parts of the home and the FSP is only required to meet the costs to meet current building regulations to repair or rebuild the part of the home that was damaged. The quotation provided by the applicant details the cost to demolish and rebuild all of the home, including those areas which were not damaged in the fire event. The Panel is satisfied that the Scope of Works quotation on which the FSP based its payment to the applicant of $199,268.69, represents the cost to repair that part of the home which was damaged in the fire. Having reviewed all of the exchanged material, the Panel is satisfied that the FSP was entitled to rely upon this Scope of Works and quotation to meet its obligations under the terms and conditions of the policy, in respect of the claim. While the Panel does not dispute that the home requires demolition and rebuild, the FSP’s obligation only extends to those parts of the home damaged within the fire. Case No: 425208 Determination Page 7 of 8 Noting the Panel’s acceptance that the property requires demolition and a rebuild but the FSP’s obligation only extends to the areas damaged in the fire and not the pre - existing problems, the Panel is satisfied that in accordance with the policy coverage detailed within the PDS and above, the FSP was entitled to resolve the claim by a cash settlement payment to the applicant. That said, the Panel is aware of the fact that by cash settlement of the claim, the applicant has assumed the risks associated with the rebuilding or repair of the home. The risks include consideration of contingencies, additional potential permit and heritage overlay issues, together with building code requirements. Noting also that the quotation relied upon by the FSP for cash settlement payment was prepared in August 2014, but the payment of the amount was not made to the applicants until December 2015, the Panel is satisfied that it is fair in all the circumstances that the FSP pay the applicant the additional amount of $50,000 to represent the risks, contingencies and price changes between the date of the quotation and the payment to the applicant. Upon acceptance of the determination by the applicant and payment of the amount of $50,000, the FSP’s obligations in respect to the substantial is sue in the claim have been completed. Temporary accommodation Noting that the policy provides for the payment of temporary accommodation for a 12 month period from the date of the loss, on the basis of the exchanged material the Panel is satisfied that the FSP has met its obligations under the policy and in respect of the claim and dispute with regard to temporary accommodation. The FSP is not required to make any further payment in this regard. Legal costs and costs of reports While the Terms of Reference of the Service do provide for the payment of costs, the Panel is not satisfied that it is appropriate that legal costs be paid in this matter. However, the report obtained by the applicant from the engineer SM has assisted the Panel in resolution of this dispute and the FSP should reimburse the applicant the cost of that report, upon provision by the applicant of an appropriate invoice or receipt. Non-financial loss compensation The terms of reference of the Service provide: 9.3 Other compensation a) … b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to re solve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; or Case No: 425208 Determination Page 8 of 8 (ii) in the case of a Dispute pertaining to an individual’s privacy rights – injury has occurred to the Applicant’s feelings or humiliation has b een suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. ... While the Panel does not generally accept the arguments presented by the applicant in respect to the FSP’s behaviour and the applicant’s allegations concerning delay, the Panel is satisfied that treatment of the applicant in respect to the question of temporary accommodation is completely unsatisfactory and no doubt contributed to a good deal of disquiet on the part of the applicant. The Panel is satisfied that given the experience of the applicant in this regard, it is appropriate that the FSP pay the applicant the amount of $3,000 representing non- financial loss compensation. Contents While the substance of the dispute relates to the damage to the insured building, the applicant has made a claim for transport and storage of contents, contents disposed of contrary to advice and table and chair restoration over charged and incomplete. The exchanged material is insufficient for the Panel to reach a conclusion regarding these questions. While the Panel could have obtained further information which would have led to a further exchange between the parties, the Panel is satisfied it is appropriate to bring the question of the substantive issue to a conclusion by way of this determination. Should the applicant wish to make a claim in respect to the contents then the applicant can lodge a further dispute with the Service. Allegations by the applicant The applicant has made a number of allegations against the FSP and the organisations with whom it has obtained information to support its position. The allegations extend to the fabrication of reports and other material. Having reviewed all of the exchanged material, the Panel is not satisfied that the applicant has provided evidence sufficient to reach a conclusion that the FSP has fabricated reports and other material, or that the FSP has failed to act with the utmost good faith, or that the FSP has acted with a lack of transparency.