Home / Financial Firm (Unknown - Credit) / Determination 425058

Determination 425058

Delay in arranging overdraft facility

FirmFinancial Firm (Unknown - Credit)
Decided2017-04-04
ProductCredit · Business lending
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed$183,554
SourceAFCA PDF

Summary

A farming applicant and his company complained that a three-month overdraft delay caused lost crop profits and that loan interest was overcharged. AFCA upheld part of the delay, ordered $500 non-financial loss compensation, and rejected the consequential loss and interest complaints.

The FSP was responsible only for the initial delay, and the company had not shown that delay caused quantifiable financial loss.

Issues

Subjects and remedies

small businesspay non financial loss

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Case No: 425058 Determination Page 1 of 6 Case number: 425058 3 March 2017 1 Overview 1.1 Dispute This dispute is about facilities the Financial Services Provider (FSP) provided to four borrowers. Two of the four borrowers, the Applicant and the Company, lodged this dispute in which they claim that:  in 2014, the FSP took three months to arrange an overdraft, which meant the Company was unable to sow its crop at the expected time, and  between February and June 2015, the FSP overcharged interest on a loan (the loan). In resolution to the dispute, the Applicant and Company claim compensation related to the delay in provision of the overdraft. The senior case analyst provided the parties with a recommendation dated 8 December 2016 on the issues in dispute. The recommendation was in favour of the FSP. A copy of the recommendation is attached to this determination. The Applicant (on behalf of himself and the Company) rejected the recommendation, further submitting:  the FSP delayed arranging the overdraft and was aware of the incorrectly registered trust before May 2014  although loss cannot be quantified, it is undoubtedly considerable  the FSP acted in a threatening manner and  the FSP did not follow through with various offers to provide products. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. Do the Applicant’s further submissions change the outcome? The submissions made after rejecting the recommendation do not change the outcome for the reasons set out in section 2.2. They do not show any financial loss was suffered as a result of the FSP‟s contribution to delay in relation to the overdraft facility. Case No: 425058 Determination Page 2 of 6 The variable interest rate has been applied correctly to the loan and it has not been established that the FSP threatened the Applicants or made any other error. 1.3 Determination This determination is substantially in favour of the FSP. I agree with the senior case analyst ‟s reasons for the recommendation and the recommended outcome. If the Applicants accept this determination, the FSP should pay the Applicant $500 compensation for the non-financial loss he suffered. No compensation is payable to the Company. Case No: 425058 Determination Page 3 of 6 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the senior case analyst ‟s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 2.2 Do the Applicant’s further submissions change the outcome ? The FSP identified the trust issue on 29 April 2014 The recommendation found that the FSP was responsible for some delay in providing the overdraft but that the Applicants also contributed to the delay because the relevant trust was incorrectly registered. The recommendation concluded that:  the Company had signed the overdraft application on 22 May 2014  the FSP unreasonably waited until 18 June 2014 (i.e. 27 days later) to co-sign the application  the FSP consequently unreasonably delayed until 25 June 2014 identifying that the trust was incorrectly registered (the “trust issue”) .  the FSP asked the Company to resolve the trust issue on 26 June 2014  the Company did not do so until 5 August 2014 (i.e. 40 days later), and  the delay in setting up the overdraft was therefore held to be in part the FSP‟s responsibility and in larger part the Applicant‟s responsi bility. The Applicant has now drawn FOS‟s attention to correspondence showing that the FSP became aware of the trust issue as early as 29 April 2014, i.e. 58 days before its 26 June 2014 request that the Company resolve the issue. The trust issue did not impact on the financial arrangements at that time On 29 April 2014, when the FSP became aware of the trust issue, it considered whether that impacted on its financial relationship as of that date. The FSP‟s internal emails dated 30 April 2014, show that it concluded the trust issue did not impact on its relationship with the Company at that time: Credit Analyst‟s email, 9:22 AM: “ We have two options: 1) Given that no Letter of Offer will be issued and the [existing] debt will most likely be paid out in full soon, We can proceed as is […] Case No: 425058 Determination Page 4 of 6 2) We can put the remaining debt in the name of the Company only ” Manager‟s email, 10:52 AM: “can we proceed on the basis of option 1.” The Company did not apply for the overdraft until 22 May 2014 It is only after the Company asked for the existing debt to be extended (in the form of an overdraft application) that the trust issue became a matter the Company needed to address. Given the overdraft was applied for on 22 May 2014, the delay in assessing the application commenced after that time. Even if the FSP had raised the trust issue within a reasonable period on or after 22 May 2014, given the Company took 40 days to resolve the issue, the FSP‟s contribution to the delay is not significantly increased from that set out in the recommendation. The delay by the FSP in informing the Company the trust issue needed to be resolved was addressed in the recommendation. The case analyst awarded non- financial loss compensation of $500 to be paid to the Applicants in respective of stress and inconvenience caused. The Company is a business and cannot suffer stress or inconvenience; it is therefore not entitled to compensation on the same basis. Despite the information set out above, I consider that $500 compensation for non- financial loss is appropriate in the circumstances. The Company has not shown the delay caused any consequential loss The recommendation found the Company had not provided sufficient information to support its claim that it suffered a consequential loss relating to the unreasonable delay caused by the FSP. In response, Mr S (a party engaged by the Applicant to communicate on his behalf with FOS) wrote: “… there can be no doubt that the loss between crops sown at the optimum time or at a later date is considerable. [ … The Applicant] has provided rainfall records which show that had the crop been sown in May a reasonable return would have been received. What further proof would be required or indeed be possible?” The claim therefore rests on the possibility of having sown a crop in May 2014. However the Company did not apply for the overdraft until 22 May 2014. Allowing a reasonable period for consideration of the application, resolution of the trust issue, and providing the Company with access to the new facility, it is highly unlikely that sowing would have commenced in May of that year. As indicated above, the larger portion of the delay in opening the account is attributable to the Company by the time it took to deal with the trust issue, and a smaller delay is attributable to the FSP. In any case, no figures have been provided to FOS that would allow it to compare the rainfall records to any information about the intended sowing of crops, such as acreage, cost of seed, and cost of sowing. This means that the Company has not been able to demonstrate loss in consequence of the FSP‟s contribution to the delay. Case No: 425058 Determination Page 5 of 6 The FSP did not threaten the Applicant Mr S refers to the FSP‟s letter of 24 January 2014, the relevant section s of which have been included at section 3.1. Mr S wrote: “…the demand of a response within 14 days… is a little heavy handed even if it is in within legal requirements. To demand that action and then threaten Farm Debt Mediation is not in the spirit of the FDM legislation… As a result of this letter the B ank received some $826,000.00 by May of the same year.” I note that the letter advises the borrowers that they have not provided necessary information and grants a further period for the borrowers to do so, seeking a “proposal for the repayment”. No elemen t of the letter appears to be a threat, particularly the statement of the FSP‟s rights to engage mediation to resolve a debt dispute. It is unreasonable to expect that a person reading the letter would have assumed foreclosure to be imminent. The letter requests the borrowers provide information to allow the FSP to assess the borrowers‟ request, or to refinance the debt by the end of February 2014 , or otherwise to enter into a mediation process . This request cannot be said to have compelled the Company to sell its land and provide a lump sum of $826,000.00 in May 2014. The 2012 and 2013 letters do not make any promises to the Company The Applicant has referred to documentation provided to him and to the Company in 2012 and 2013. He says that the letters pro vide promises of a seasonal overdraft and offers of help. The letters referred to are generic letters issued to customers of the previous financial services provider of the Applicants, to announce that its assets had been acquired by the FSP. The letters included a brochure outlining the sorts of products the FSP can provide. The documents are not offers of these products or guarantees that the products will be provided to its customers. The FSP correctly applied interest to the loan Based on the available information, for the reasons set out in the recommendation the FSP correctly applied the variable interest rate to the loan, inclusive of both the 62 base point reduction and the subsequent 12 base point reduction. Other matters do not relate to the provision of financial services The Applicant has requested the FSP explain how much it paid the previous financial services provider to purchase the loan book in so far as it made up of the Company‟s facilities. This is unrelated to the financial services provided to him or the Company by the FSP. These matters were fully addressed in the recommendation and are therefore not considered in this determination. Case No: 425058 Determination Page 6 of 6 3 Supporting information 3.1 Relevant paragraphs from the F SP’s letter dated 24 January 2014 “Dear [Borrowers], Please be advised that you have not provided [the FSP] with the information required to complete the review [of your facilities] and assess your request, consequently, the review remains incomplete and request for increase has been declined. Your facilities have expired and are now due and payable… [The FSP] now requests that within 14 days (expiring 11 th February 2014) you provide the writer with your proposal for the repayment of your facilities for further consideration. Alternatively, [the FSP] will allow you 30 days (expiring .28 th February 2014) to obtain approval for refinance from another financial institution, with terms acceptable to [the FSP]. If you fail or are unable to comply with this request by the due dates, [the FSP] reserves its rights to initiate Farm Debt Mediation.” Recommendation Case No: 425058 Recommendation Page 1 of 6 Case number: 425058 8 December 2016 4 Overview 4.1 Dispute This dispute is about facilities the FSP provided to four borrowers. Two of the four borrowers, the Applicant and the Company, lodged this dispute and say:  in 2014, the FSP took three months to arrange an overdraft, which meant the Company was unable to sow its crop at the expected time, and  between February and June 2015, the FSP overcharged interest on a loan (the loan). The Company and the Applicant raised other issues which do not form part of this Recommendation; those issues are outlined at section 3.2. The Applicant claims compensation related to the delay in provision of the overdraft. 4.2 Issues and key findings Did the FSP delay providing the overdraft and cause loss? The Company was unable to quantify the loss it is said to have suffered due to the delay in providing an overdraft. The information does not show the FSP was entirely responsible for the claimed delay. As such, no compensation is payable to the Company. Did the FSP apply the correct interest rate to the loan? The variable interest rate has been applied correctly to the loan, inclusive of both the 62 base point reduction and the subsequent 12 base point reduction. The correct interest rate has been applied to the loan. Should the FSP compensate the Applicant? Based on the information provided, it is more likely than not the FSP only caused the initial delay in assessing the overdraft application. The initial delay is only a portion of the three month delay claimed by the Applicant, the FSP should compensate the Applicant relating to that portion of delay. 4.3 Recommendation This recommendation is substantially in favour of the FSP. The FSP should pay the Applicant $500 compensation for the non-financial loss he suffered. Case No: 425058 Recommendation Page 2 of 6 5 Reasons for recommendation 5.1 Did the FSP delay providing the overdraft and cause loss? The FSP initially delayed assessing the request for the overdraft The Applicant has claimed the overdraft application was submitted on 19 May 2014, but due to the FSP‟s delay, it was not provided u ntil three months later on 18 August 2014. The signed application form was signed by the borrowers on 22 May 2014, but not counter-signed by the checking officer until 19 business days later on 18 June 2014. FOS asked the FSP the reason for this delay; the FSP responded: “Ideally, [we] would like to have lending decisions made within 20 business days. Given the chequered credit history with this file, which was managed by the [specific FSP] Unit and included the condition to reduce debt through land sale which had only settled in early May [2014], this may have impacted on the turnaround time for a Relationship Manager to review and submit an application for additional credit.” This delay of 19 business days before the document was reviewed was an unreasonable one on the part of the FSP. The FSP should pay the Applicant $500 non-financial loss compensation for the stress and inconvenience associated with the unreasonable delay. Further delays were caused by the Company One reason for a continuing delay on the lending decision was that the FSP identified the Company was set up as trustee for a trust which was incorrectly registered. The FSP says it communicated this issue to the Applicant on 26 June 2014 and did not receive the corrected information until 40 days later on 5 August 2014. The FSP says its solicitor reviewed the corrected information on 8 August 2014, and the revised letter of offer was issued on 11 August 2014. The Applicant‟s representative says “I am assured by [the Applicant] that [his] solicitor/accountant only took a day to rectify the omissions”. When we assess disputes, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to contemporaneous documentary information. Neither the FSP nor the Applicant have provided information to prove their respective positions. However the FSP‟s contemporaneous “activity log” which is set out at 3.1 of this recommendation shows after the checking officer counter-signed the application on 18 June 2014, issues with the Trust were identified on 25 June 2014. The issues were not resolved until 5 August 2014, when the Company‟s accountant changed the Trust name. The Company has not provided sufficient information to support its claim The Company claimed that due to the delay in the provision of an overdraft, it was unable to realise profits. It provided two different estimations of the lost profits:  $13,000.00 (in correspondence dated 6 April 2016)  $183,554.00 (in correspondence dated 5 September 2016). Case No: 425058 Recommendation Page 3 of 6 FOS asked the Company to provide evidence of these consequential loss claims. The information provided was primarily composed of handwritten rainfall records. The rainfall records were intended to show that if crops had been sown, growth would have followed and profits would have been realised. The information provided does not allow loss to be calculated The general argument that sown crops would have realised a return on investment is accepted. However, the information is not specific enough to allow any actual calculation of loss to be established. This is particularly so given that, as set out above, only part of the delay can be attributed to the FSP. There is no information to support the Applicant‟s recollection that the Company‟s accountan t rectified the omissions within a day. In these circumstances, the FSP should not pay any compensation to the Company in relation to the claim of consequential loss. 5.2 Did the FSP apply the correct interest rate to the loan? The Applicant changed his claim in relation to the interest rate and charges The Applicant claimed incorrect interest was charged on the loan between February and June 2015. The Applicant did not provide any further information about this claim, including whether he believed any error had been made, except to say that he felt the amount was too high. Under the FOS Terms of Reference we are not able to consider disputes about the level of a fee, premium charge or interest rate . However in the course of consideration of this matter, the FSP agreed to an interest reduction, the implementation of which gave rise to further interest rate disputes. The FSP agreed in May 2016 to reduce the interest rate to 6.15% On 17 May 2016, during the course of the dispute, the FSP stated: “we have agreed to provide [the Applicant] a revised rate of 6.15% which is a 62bp [i.e. base point] reduction from his current rate”. No date was given as to when this reduction would be made. The Applicant noted, by letter dated 9 August 2016, the reduction had not been made as of 1 June 2016. The FSP applied the reduced interest rate, effective as of 1 June 2016 The FSP confirmed on 23 August 2016 that it would put the interest reduction of 62bp in place and backdate it appropriately. The following day it confirmed the reduction was in place and had been backdated effective to 1 June 2016; and that it would be reduced on 1 September 2016 by a further 12bp (i.e. from 6.15% to 6.03%). The Applicant was notified of this reduction and in response, on 20 September 2016 he provided to FOS a copy of his 1 September 2016 loan statement showing the Annual percentage rate of 6.030% circled, and placed a tick next to it. On this basis, it is accepted he was, at that time, satisfied this matter had been appropriately addressed. The Applicant asked FOS whether the calculation of the interest adjustment was correct, however FOS does not act as an audit service. Case No: 425058 Recommendation Page 4 of 6 The interest rate was not fixed by the transfer of ownership On 23 September 2016, the Applicant raised a new concern that in the transfer of his facility from the original credit provider to the current FSP, he was informed “current loan obligations will remain”. The Applicant says this means the interest rate must not be varied from the rate it was at the time of the transfer (which he says was 6.15%). He says the subsequent interest rate was, he states, “in breach of the agreement”. This argument fails, as the “loan obligations” referred to are the terms and conditions of the product, which allow the FSP to vary the interest rate. 5.3 Should the FSP compensate the Applicant? The Company cannot make a claim for non-financial loss When a company lodges a dispute with FOS, it is the legal entity that makes a claim for financial loss. Therefore the claim must be made by the legal representatives of the company: that is, the directors of the company. However, the directors of a company cannot make a claim for personal loss because the entity lodging the dispute is the company. So, we cannot consider a claim by directors of a company for inconvenience, distress or anxiety caused by the FSP‟s conduct with respect to the C ompany‟s accounts. The FSP should pay the Applicant non-financial loss compensation In this dispute, the Applicant was one of four borrowers the overdraft and loan were provided to. Non-financial loss includes claims for stress or inconvenience caused by an error of the FSP. The maximum amount we can award for non-financial loss is $3,000 for each claim. We will only award compensation for non-financial loss if there has been an unusual degree or extent of inconvenience. When assessing whether the circumstances are of an unusual nature we will review:  the degree or extent of physical inconvenience suffered  the general time taken to resolve the dispute  the extent to which the FSP‟s actions interfered with the Applicant‟s expectation of enjoyment or peace of mind. The Applicant is an elderly gentlemen working on a farm in a relatively remote area. The initial delay by the FSP in assessing the application for the overdraft would have caused him stress and inconvenience. However of the three month delay, the FSP only caused the initial delay of one month. In these circumstances, the FSP should pay to Applicant $500 non-financial loss. Case No: 425058 Recommendation Page 5 of 6 6 Supporting information 6.1 The FSP’s contemporaneous “activity log” Date Note 25 June 2014 Deficiencies: 1. Trust name [Trust Name A] or [Trust Name B]. 2. ABN noted is noting entity as [Trust Name A] and not [Trust Name B]? 3. ABN for partnership? 4. ABN [ Trust Name B] in own right? 5. Account ops seasonal? 6. Account ops T/loan? 7. Bus[iness] purpose declaration [requires] execution. 4 July 2014 Deficiencies still outstanding: 1. Trust Deed amendment required to [Trust Name A]. 2. Bus Purp Dec still requires execution. 10 July 2014 [the] deficiencies dated 4/7/14 are still [required] to be ad dressed. 23 July 2014 Deficiencies still outstanding: 1. Amendment to trust deed still required. 5 August 2014 After being advised that there would be a Trust Deed amendment signed and provided to amend the Trust to „[Trust Name A]‟, the [accountant] has had the Trust name recorded against the ABN changed to „[ Trust Name B]‟. I will have the joint borrowing entity name changed […] and get re - approved. 6.2 Key documents referred to I have reviewed all information provided by the FSP and the Applicant parties. Documents which were particularly relevant to forming my view included:  Applicant‟s letter dated 6 April 2016  FSP‟s email dated 17 May 2016  Activity log six months preceding the opening of the overdraft.pdf (provided by FSP by email 27 May 2016)  LAF 190614.pdf (i.e. the signed application form) (provided by FSP by email 27 May 2016)  Applicant‟s letter dated 9 August 2016  FSP‟s email dated 23 August 2016  FSP‟s email dated 24 August 2016  Applicant‟s letter dated 5 September 2016  Applicant‟s letter dated 20 S eptember 2016  Applicant‟s representative‟s email dated 23 September 2016  FSP‟s letter dated 1 November 2016  Applicant‟s letter dated 3 November 2016  Applicant‟s representative‟s letter dated 4 November 2016 Case No: 425058 Recommendation Page 6 of 6 6.3 Matters not considered in the recommendation The loan repayment date The Company originally said that it was inappropriate for the FSP to expect the annual repayments to be made in February of each year. During the course of investigation, the FSP agreed to change the instalment to October of each year. It is understood that this issue has been resolved to the satisfaction of the parties. The Applicant says the loan interest rate is too high FOS is not able to consider disputes about the level of interest rate charged. We can only consider a dispute about an interest rate if it is not being charged in accordance with the terms and conditions, or if it has in any way been misrepresented. The FSP purchased the loan from another financial service provider FOS can only review a dispute between an Applicant and their FSP which concerns a direct financial service that the FSP has provided to them. In this case, the Applicant and the Company are seeking information about arrangements between the FSP and the original credit provider. The information sought has no bearing on the Company‟s liability under the loan contract. FOS is unable to obtain information about the commercial arrangement between the FSP and the original credit provider.