Home / Financial Firm (Unknown - Insurer) / Determination 424238

Determination 424238

Cash settlement amount and handling of burst pipe home claim

FirmFinancial Firm (Unknown - Insurer)
Decided2017-03-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$35,980
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

A burst pipe home claim settled by cash was disputed on method, amount and handling. AFCA accepted cash settlement was reasonable but increased the amounts payable by $35,979.82 with interest, and awarded $1,000 for non-financial loss.

An insurer may cash settle where repair is untenable, but the cash amount must reasonably reflect the cost of repairs including omitted items and likely variations.

Issues

Subjects and remedies

pay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 424238 Determination Page 1 of 13 Case number: 424238 9 February 2017 1 Overview 1.1 Dispute The applicant lodged a claim under his home insurance policy with the financial services provider (FSP) for damage to his home caused by a burst water pipe in March 2015. The FSP accepted the claim and authorised repairs to the property. However, after various issues arose, the FSP decided to cash settle the applicant’s claim rather than undertake the necessary repairs. The FSP cash settled the applicant for $95,316.88 based on the estimated cost of the outstanding building repairs, plus an additional $20,475 for the costs of temporary accommodation during the repair process. The FSP also cash settled the applicant for damage to various contents items and storage of undamaged contents during the repairs. The applicant says the amount paid by the FSP is not sufficient to repair all the damage to his home and contents caused by the burst pipe. He says the FSP should not be entitled to cash settle the claim but should be required to arrange the repairs itself. The applicant is also dissatisfied with the way in which his claim has been handled. 1.2 Issues and key findings Is the FSP entitled to cash settle the claim for the cost of repairs? The FSP acted reasonably in deciding to cash settle the claim, given the information provided by its restoration specialist about the ongoing presence of pre-existing mould at the property and the nature of the renovations to the property undertaken by the applicant during the claim process. Is the cash settlement amount fair and reasonable? The cash settlement amount for the building repairs should be increased by an amount of $25,046.53 to reflect items omitted from the scope of works, together with an allowance for reasonable variations during the repair process. The cash settlement amount for the applicant’s contents items should be increased by an amount of $10,933.29 to reflect items previously accepted by the FSP, together with an allowance for additional damage to certain other contents items. Case No: 424238 Determination Page 2 of 13 The applicant is not entitled to any further payment in respect of temporary accommodation. Is the applicant entitled to compensation? The applicant is entitled to compensation of $1,000 for non-financial loss due to the manner in which the FSP handled his claim. 1.3 Determination This determination is partly in favour of the applicant. The FSP is to pay the applicant the following amounts in full and final settlement of his claim:  the amount of $25,046.53, as an increase in the cash settlement amount for building repairs, plus interest on this amount at the rate determined in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) the “Act”) from 24 December 2015 until the payment date;  the amount of $10,933.29, plus interest at the rate of 3% for the period from 7 December 2015 until the payment date; and  the amount of $1,000 as compensation for non-financial loss. Case No: 424238 Determination Page 3 of 13 2 Reasons for determination 2.1 Is the FSP entitled to cash settle the claim? Insurer is generally bound by election to repair Under the terms of the policy, the FSP may settle a claim for damage to the applicant’s home or contents caused by an insured event by:  repairing the damage or replacing the damaged item; or  paying the applicant the cost (to the FSP) of doing so. The policy states that, in determining the cost of repair or replacement, the FSP is entitled to take into account any trade discounts provided by its suppliers. It is clear from the terms of the policy that the FSP has the discretion to decide which settlement method to adopt. However, FOS expects an insurer to act reasonably in exercising its discretion, having regard to the circumstances of the claim. The FSP initially elected to repair the damage to the applicant’s prope rty caused by the burst water pipe in March 2015. The damage was relatively extensive, as the incident had occurred while the applicant was overseas and a significant volume of water had flowed through the property. Accordingly, the FSP arranged for its restoration specialist (FE) to carry out mould remediation works at the property. These works involved stripping out the plasterboard wall linings in a number of areas and removing the kitchen and bathroom cabinets, so that mould could be removed and an antimicrobial solution applied. The FSP also arranged for its contractors to prepare a scope of works and provide quotations for the building repairs required to restore the property to its condition prior to the water leak. Once an insurer makes an election to repair the insured property (rather than to cash settle the policyholder for the cost of the repairs), it is generally obliged to complete the repairs in accordance with the terms of the policy. However, particular circumstances may arise which make the conduct of repairs by an insurer untenable. In such cases, it is reasonable for the insurer to seek to settle the claim by way of a cash settlement, provided that the cash settlement amount is sufficient to allow the policyholder to engage a builder directly to complete the necessary repairs. FSP cash settled claim due to pre-existing mould and post-claim renovations During the process of carrying out the initial mould remediation works at the property, the FSP’s restoration specialist (FE) repor ted that there was pre-existing mould on the eaves above and below the first floor balcony. Case No: 424238 Determination Page 4 of 13 Laboratory testing of samples taken from the eaves revealed “very high” levels of mould, including species known to be hazardous to health. The levels of mould recorded outside the property significantly exceeded those recorded inside the property. FE considered that, due to the pre-existing mould in the outside areas, the building would be continually re-contaminated every time the doors and windows were opened. FE also identified extensive pre-existing black mould inside the wall cavities, - in particular, in the wall adjacent to the disused shower recess in the ground floor bathroom. He considered the mould in this area had most likely been caused by a series of water leaks over an extended period of time. A pre-existing hole cut in the plasterboard wall adjacent to the downstairs shower indicated that repairs to this area had previously been commenced but had not been completed. FE advised that, due to the presence of pre-existing mould at the property, it would not be possible to provide a clearance certificate for the claim-related mould remediation. Accordingly, the FSP advised the applicant that he would need to remediate the pre- existing mould at the property before its builder would be able to commence the claim-related repairs. In August 2015, the applicant advised the FSP that he had completed the remediation of the pre- existing mould. On 12 August 2015, the FSP’ s assessor (NW) attended the property and viewed the eaves linings above and below the front balcony. He reported that these areas had been repaired and therefore the building repairs could commence. However, the claim was subsequently reviewed by the FSP’s assessing team leader who was concer ned that the applicant’s failure to provide a clearance certificate for the mould remediation meant that the FSP would not be able to guarantee the claim- related repairs. Accordingly, the FSP sought to cash settle the claim. When the applicant rejected the FSP’s attempt to cash settle, the claim was reviewed by the FSP’s internal dispute resolution (IRD) department, who required the FSP to have FE re-attend and provide an expert opinion as to whether there was still pre- existing mould at the property. In November 2015, FE inspected the property and advised that the mould-affected eaves in the balcony area had been painted, but there was mould apparent on the rear and side eaves and the façade timber. FE also considered that there was likely to be untreated mould in the roof space, roof cavity and eaves. During FE’s inspection, he noted that the property was undergoing renovations, including the replacement of an internal brick staircase between the upper and lower levels, with a new external staircase providing direct access to the upper level. These works were also noted by the FSP’s builder (JL) when he attended to provide an updated quotation for the claim-related building repairs. Case No: 424238 Determination Page 5 of 13 The FSP says it is entitled to cash settle the claim (rather than complete the outstanding repairs) due to the continued presence of pre-existing mould at the property and the renovations carried out by the applicant since the claim was lodged. FSP acted reasonably in deciding to cash settling claim Having carefully reviewed the claim history, I am satisfied that it is appropriate for the FSP to cash settle the applicant for the cost of completing the outstanding repairs. As outlined above, the FSP’s mould restoration specia list advised in November 2015 that the property remained affected by pre-existing mould, even after the applicant had completed mould remediation works. I am satisfied that, as a mould remediation specialist, FE is suitably placed to provide an assessment of mould at the property. The photographs includ ed in FE’s report of November 2015 show the external areas at the property where mould was identified. The applicant disputes FE’s findings and says that the photographs reflect dirt and staining (of the eaves) and weathering (of the timber façade). The applicant notes that FE did not conduct any further testing at the property in November 2015 and did not inspect the interior of the roof cavity. He relies on the earlier report by the FSP’s as sessor (NW) as confirming that remediation of the pre- existing mould issues had been successfully completed. While NW concluded that the pre-existing mould issues had been successfully addressed, his report was relatively brief. Further, as a claims assessor, I consider he is unlikely to have same level of specialist knowledge and experience in this area as FE. In circumstances where the applicant was obliged to address the pre-existing mould at the property, it was his responsibility to provide appropriate information evidencing the effectiveness of the works completed. During the course of this dispute, the applicant was asked to provide a clearance certificate and any other information confirming the works carried out (for example, a report from the contractor who completed the repairs). The applicant has not done so. In the absence of any information from an equivalent specialist which refutes the findings in FE’s report, I am satisfied that the property remained affected by pre - existing mould issues in November 2015. In addition, I consider that the renovations carried out by the applicant during the claim process represents an additional reason why the cash settlement of the claim was appropriate. While the applicant says the renovations were minor, the photographs provided by the parties indicate that the internal staircase was located in the vicinity of the areas affected by the water leak. Where the FSP arranges for the repair of claim-related damage, it is liable for any subsequent issues arising out of the repairs. Case No: 424238 Determination Page 6 of 13 Accordingly, it is not reasonable to require the FSP to undertake repairs in circumstances where renovations carried out by the applicant since the claim was lodged may make it unclear as to which party should be liable for any subsequent building issues which may arise in the future. For the reasons outlined above, I am satisfied that the FSP acted reasonably in seeking to cash settle the claim. However, in determining the amount of the cash settlement, the FSP was required to ensure that this amount reflected the reasonable cost of repairing the damage to the applicant’s property caused by the burst water pipe in March 2015. 2.2 Is the cash settlement fair and reasonable? FSP obtained updated scope of works and quotation After the IDR process was completed in October 2015, the FSP arranged for its builder (JL) to re-attend the property and confirm whether the scope of works and quotation he had previously provided remained appropriate. JL provided an updated scope of works and quotation dated 30 November 2015, which estimated the cost of completing the claim-related works as $95,316.88 (including GST and a builder’s margin of 20%). This amount was included in the cash settlement paid to the applicant over two payments in October and December 2015. Applicant says scope of works does not address all claim-related damage The applicant says the scope of works prepared by JL does not address all of the damage to the property caused by the water leak in March 2015. Among other matters, the applicant says the scope of works does not adequately provide for:  the repair of cracking and movement damage which he says has occurred due to subsidence of the concrete slab caused by the escape of liquid from the leaking pipe;  certain items which the applicant claimed as contents but the FSP considered should properly be included in the scope of works for the building repairs (namely, wall units, a sliding door pelmet box, a screen door and a gas furnace);  chipping and denting damage to the bath tub, bathroom mirror and kitchen sink, which the applicant says was caused by the FSP’s contractors in the course of carrying out the mould remediation works; and  sundry other items, such as the pantry door and shelving and plasterboard linings for three of the four walls surrounding the downstairs toilet. FSP is not liable for cracking and movement damage Having reviewed the available information, I am satis fied that JL’s scope of works generally provides an accurate assessment of the damage to the property caused by Case No: 424238 Determination Page 7 of 13 the water leak in March 2015, as well as a detailed breakdown of the works required to repair that damage. The repairs included in JL’s scope of works are generally consistent with the claim - related damage to the property as identified in the various reports provided, and photographs taken, by the various contractors who inspected the property. As outlined above, the applicant seeks cover for cracking damage to the floor tiles in the front downstairs area and movement damage to an external window sill outside the lounge room. The applicant says the flow of water from the upstairs kitchen sink eroded the soil underneath the concrete slab, causing it to subside. The FSP’s builder (JL) inspected the damage to the tiles and the window sill and advised that this damage had not been caused by the leaking pipe. JL considered the nature of the cracking damage to the tiles was more consistent with the damage having been caused by the impact of a heavy item, rather than by subsidence of the slab underneath. The photograph of the damage provided with JL’s report supp orts this conclusion. JL advised that the damage to mortar in the window sill had been caused by gradual deterioration over time, together with movement of the brick strip footing as a result of naturally occurring changes in the moisture content of the surrounding soils. The applicant disagrees with JL’s findings. He says he has been advised by several builders that the damage to the tiles and window sill was caused by the escape of water from the leaking pipe in March 2015. However, the applicant has not provided any independent information (for example, written reports from his builders) confirming this. In the absence of any independent information refuting JL’s conclusions as to the cause of damage, I am not satisfied that the cracking and movement damage was caused by the escape of water in March 2015. Accordingly, the FSP is not liable for repairing this aspect of the damage. FSP is liable for some (but not all) of the additional items claimed The FSP has previously accepted that the wall units, sliding door pelmet box, screen door and gas furnace suffered water damage in March 2015. The FSP assessed the value of these items at $10,749. However, the FSP reserved its final decision as to whether additional amounts were payable in respect of these items, pending confirmation from the applicant as to where in the house each of the items was located (so that it could confirm whether or not they had already been included in the building scope of works). During the dispute process, the applicant has provided information (including photographs) confirming the location of these items. Having carefully reviewed this information, I am satisfied that the scope of works does not include the items and therefore they have not been allowed for in the cas h settlement amount paid to date. Case No: 424238 Determination Page 8 of 13 I consider it is also appropriate to make a partial allowance for some of the damage which the applicant says was caused by the FSP’s contractors during the mould remediation works. The chipping and denting damage occurre d in areas where the FSP’s contractors were carrying out mould remediation, which included the stripping of adjacent cabinets and plasterboard wall linings. While not conclusive, the nature of the damage is such that it could readily have been caused by tools used to remove surrounding building materials. Further, the applicant first notified the FSP of the damage in May 2015, shortly after the mould remediation works had been completed. In relation to the remaining items which the applicant says were omitted from the scope of works, the FSP has not provided any specific response (or sought further confirmation from its contractors). In these circumstances, I consider it appropriate that some allowance for these items should be made. Cash settlement amount does not make sufficient allowance for variations In the covering notes to his scope of works, JL referred to several specific aspects of the building repairs that had not been included in the scope of works but might result in additional costs. Such items included:  the ply board in the living room which due to its age may need to be replaced instead of re-fixed;  levelling of the water-affected concrete floor, if required prior to laying of the new tiles;  additional safety measures if asbestos was loca ted at the property (which the FSP’s restoration specialist had previously indicated was likely); and  any additional electrical upgrades required. The applicant has also noted the possibility that additional damage may become apparent during the course of the repairs. Given the nature of the potential variations identified, it is possible they may result in significant additional costs. Following payment of the cash settlement, the FSP advised the applicant that he was welcome to submit reports from his builders identifying additional works required, once the repair process had commenced. However, I am not satisfied that, in practice, the process suggested by the FSP represents a fair outcome. In the circumstances, it is not reasonable to require the app licant and his builder to engage in ongoing negotiations with the FSP and its contractors regarding the scope of works. It is more appropriate that the cash settlement amount be increased to provide a reasonable buffer to allow for likely variations to the scope of works. Case No: 424238 Determination Page 9 of 13 Cash settlement amount for building repairs should be increased by $25,046.53 For the reasons outlined above, I consider the cash settlement amount should be increased to reflect the following:  the replacement of the wall units, sliding door pelmet box, screen door and gas furnace, as well as the additional minor items the applicant says were omitted from the scope of works;  a partial allowance for the additional damage to the fixtures and fittings which the applicant says was caused by th e FSP’s contractors; and  a buffer to provide for necessary variations and/or the repair of additional damage which may become apparent during the course of the repairs. On this basis, I consider it is fair in all the circumstances that the cash settlement increased by an additional amount of $25,046.53 to allow for the issues identified above. This amount represents a 15% increase in the amount of $95,316.88 quoted by the FSP’s builder, plus an additional amount of $10,749 for the items accepted by the FSP but excluded from the building scope of works. The FSP is required to pay interest on this amount at the rate determined in accordance with section 57 of the Act from 24 December 2015 until the payment date. Applicant is not entitled to any further payment for temporary accommodation The policy provides for the payment of reasonable costs for temporary accommodation where the applicant’s home becomes uninhabitable due to an insured event. The FSP arranged temporary accommodation for the applicant for the period from 31 March 2015 until 9 January 2016 (being two weeks after the IDR process was completed). The FSP also paid costs of approximately $500 for meals while the applicant was living in temporary accommodation, which was outside the scope of cover under the policy. The cash settlement amount paid by the FSP in October 2015 included an allowance of $20,475 (at short term rates) for an additional 15 weeks’ worth of temporary accommodation costs. This amount was determined based on the estimated repai r period of 13 weeks provided by the FSP’s builder, plus an additional 2 weeks’ worth of benefits. The applicant says he has incurred additional costs for temporary accommodation as he has been unable to return to the property because the FSP did not complete the building repairs. However, I am satisfied that the amount paid by the FSP was reasonable in the circumstances. For the reasons outlined above, I consider the FSP was entitled to cash settle the claim. Given the amount of the cash settlement paid in October 2015, the applicant should have been able to undertake such repairs as were required to make his home habitable within the period allowed for temporary accommodation. Case No: 424238 Determination Page 10 of 13 Cash settlement for contents items should be increased by $10,933.29 The FSP has paid the applicant the amount of $30,205.73 for contents items which were damaged by the escape of water in March 2015 and assessed as non- restorable. The FSP also paid the applicant a total of $7,651.49 for the cost of replacing damaged carpets. Shortly after the cash settlement was paid, the FSP approved a further payment of $5,136.89 for damage to additional contents items. However, this amount was not paid due to a misunderstanding between the parties about whether the applicant’s rejection of a cash settlement applied to his contents claim as well as his building claim. An additional payment of $3,667.40 for the removal and storage of undamaged contents items during the repair process remains outstanding for the same reason. The FSP has also accepted liability for the costs of replacing a sewing machine cover and reframing the applicant’s damaged academic certificates, subject to the applicant providing a quotation for these items. The applicant has subsequently provided quotations totalling $1,129. The applicant seeks cover for certain additional contents items which he says were damaged by the water leak on March 2015. The FSP denied cover for these items primarily on the basis that the damage was pre-existing. In circumstances where the damage to the items (eg rusting to the trolleys) was consistent with the insured event, I do not consider it was reasonable for the FSP to deny liability for these items. The applicant also seeks cover for items which he says were lost or damaged by the FSP’s contractors during the assessment and restoration process (for example, dents to furniture and damage to paint caused by masking tape). However, there is limited information to confirm the extent of any such loss or damage. For the reasons outlined above, I consider it is fair in all the circumstances that the cash settlement amount paid for damage to contents is increased by an additional amount of $10,933.29. This amount represents the outstanding amounts owed to the applicant plus a further $1,000 to allow for the additional issues outlined above. While the FSP reasonably inferred from the applicant’s correspondence that he did not want any further settlement amounts to be paid, the FSP has nevertheless had the use of funds during the relevant period. In these circumstances, I consider the FSP should be required to pay interest at the rate of 3% on the outstanding settlement amount for contents items, for the period from 7 December 2015 until the payment date. 2.3 Is the applicant entitled to compensation? FOS may award compensation for non-financial loss Under the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of Case No: 424238 Determination Page 11 of 13 physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The fact that the applicant’s policy excludes cover for consequential losses of any kind does not preclude the award of compensation where such losses have occurred as a result of the way in which the FSP has handled their claim, rather than as a result of the insured event itself. However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Applicant is entitled to compensation for non-financial loss The applicant is dissatisfied with the manner in which the FSP has managed his claim. Among other things, the applicant says the FSP has unreasonably delayed the settlement of his claim and the FSP’s contractors have shown bias and have provided flawed reports. While it has clearly taken an extended period of time to resolve the applicant’s claim, the FSP was not solely responsible for the delays experienced. To the extent that there was delays in commencing the necessary works, such delays were largely due to the nature of the damage – in particular, the need for extensive drying and mould remediation works to be carried out before a scope of works and quotations for the building repairs could be obtained. Nevertheless, I consider that the FSP could have managed the claim better. In particular, the FSP should have arranged for a reinspection of the property by its mould remediation specialist once the applicant advised that the mould remediation works had been completed. In the circumstances, it was not appropriate for the FSP to initially have the reinspection completed by its assessor and then seek to rely on the results of tests carried out in April 2015 to establish the ongoing presence of mould, given the relevant samples were taken before the applicant had carried out remediation works. I also acknowledge that the short-term nature of the temporary accommodatio n arrangements made by the FSP has contributed to the stress and inconvenience suffered by the applicant during the claim process. The FS P’s claim records suggest that it was reasonably evident from an early stage in the claim process that the assessment and settlement of the claim would be a protracted process, due to the nature and extent of the damage. In these circumstances, it would have been preferable for longer-term arrangements to have been made sooner. The concerns identified by the applicant in relation to bias raise issues of serious misconduct. It is not appropriate to make a finding on such matters without a substantial weight of evidence confirming the events alleged by the applicant occurred in the manner claimed. Case No: 424238 Determination Page 12 of 13 In the absence of independent evidence confirming the matters alleged by the applicant, I am not satisfied that misconduct on the part of the FSP or its contractors has been established. Having regard to the factors outlined above, the panel considers an award of compensation for non-financial loss in the amount of $1,000 is fair in all the circumstances. Case No: 424238 Determination Page 13 of 13 3 Supporting information 3.1 FOS approach to this dispute FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Preliminary View and has proceeded directly to Determination. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.