Home insurance claims for earthquake, water leakage and storm damage declined
Summary
The applicants claimed under their home insurance policy for earthquake, water leakage and storm damage, and the FSP denied the claims. AFCA found most of the damage was not covered but ordered the FSP to pay $50,000 to finalise the claims.
The applicants bore the onus to prove covered loss; damage from uncontrolled fill and the excluded water escape was not covered, but the failed stormwater system within the property was a covered contributor warranting a holistic payment.
Issues
- Claim denial primary · upheld
“The panel accepts that the policy will respond to some of the damage detailed by FE, RB and C.”
- Claim amount dispute secondary · unclear
“The panel cannot accept the costings provided by RB ... the panel proposes to do what is fair in all the circumstances and apply a holistic solution.”
- Product terms interpretation secondary · not upheld
“the panel is satisfied that the FSP is entitled to deny this aspect of the applicants' claim”
Subjects and remedies
pay claim
Text of the determination
Determination
Case No: 424098 Determination Page 1 of 9
Case number: 424098 24 February 2017
1 Overview
1.1 Dispute
This matter involves claims by the applicants under their Home Insurance Policy,
held with the financial services provider (FSP), following damage to the applicants’
home.
The FSP has submitted the applicants’ claim s should be dismissed on the basis that:
They fall outside the monetary and time limits prescribed by the Terms of
Reference of the Service; and/or
the damage is subject to exclusions contained within the policy.
1.2 Issues and key findings
What is the extent of the FSP’s obligation to the applicants under the terms
and conditions of the policy?
The FSP is to pay the applicants the amount of $50,000 to finalise its obligations in
respect of all claims and this dispute.
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP is to pay the applicants the amount of $50,000 to finalise its obligations in
respect of all claims and this dispute.
Interest is not payable on this amount.
Case No: 424098 Determination Page 2 of 9
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principals, terms of the policy, good industry practice and where applicable, prior
determinations.
An extensive amount of material has been exchanged in respect to this complex
dispute. Whilst all of the material exchanged has been reviewed, only that material
relevant to the final outcome will be referred to within this Determination.
Issues regarding the Terms of Reference of the Service have been raised.
The panel’s determination is made with regard to the Terms of Reference of the
Service and in particular:
…
…
…
…
Case No: 424098 Determination Page 3 of 9
…
…
Type of Claim Amount per claim
…
4 Other $309,000
2.1 What is the extent of the FSP’s obligation to the applicants under
the terms and conditions of the policy?
An issue has arisen as to the relevant policy provisions.
Having reviewed the exchanged material, the panel is satisfied that the Product
Disclosure Statement (PDS), prepared on 16 May 2004, contains the provisions
relevant to the applicants’ claims.
Coverage of the policy
The applicants’ Home Insurance Policy is a defined events insurance policy.
This means that not all loss and damage is automatically covered, but rather only
loss and damage as a result of a defined event detailed within the policy
documentation.
The coverage provided by the policy is detailed within the PDS.
The PDS details:
Case No: 424098 Determination Page 4 of 9
…
…
…
The coverage provided by the policy is subject to exclusions which are detailed within
the PDS.
Case No: 424098 Determination Page 5 of 9
The PDS details:
…
…
…
In addition, the PDS details obligations which may affect the claim.
The PDS details:
…
…
It is accepted insurance law that the applicants carry the initial onus to establish that
the loss and damage claimed is covered by the terms and conditions of the policy.
The FSP’s obligation to show the basis on which it otherwise seeks to deny a claim,
including the application of an exclusion, only arises once the applicants have
established that the loss and damage is covered by the terms and conditions of the
policy.
The claims made by the applicants
The exchanged material confirms that the applicants have lodged three claims with
the FSP in respect to damage at the home.
Case No: 424098 Determination Page 6 of 9
The first claim was lodged on 19 March 2009 in respect to damage claimed to have
been caused by an earthquake on 18 March 2009.
This first claim was denied by the FSP on 14 April 2009 on the basis that the
magnitude of the earthquake was insufficient to have caused the damage claimed.
On 16 January 2012 the applicants lodged a second claim in respect to internal
damage to the property caused by a hailstorm on 25 December 2011.
The FSP recorded the applicants’ claim that water had entered the property during
the storm causing cracks to appear in the ceiling and hallway and damage to the
ceiling and wall in the lounge room.
The FSP says that on 27 July 2012 the FSP offered to pay and the applicants agreed
to accept an amount in settlement of the whole damage claim and that amount was
paid to the applicants on 30 July 2012 (although the applicants say that they did not
agree with the scope of work).
Finally, the exchanged material confirms that on 22 March 2012 the applicants
lodged a claim in respect to damage to the property caused by leaking pipes, which
had caused the property to sink.
The FSP denied this claim on 7 March 2013 and a final decision letter was sent to
the applicants on 31 December 2013, also denying that claim.
The applicants referred the dispute to the Service on 21 December 2015, making
specific reference to earthquake, water leaking from pipes and cisterns and storm.
Numerous reports have been obtained by both parties in support of their respective
positions.
The panel does not propose to summarise or detail those reports, although all of the
material exchanged has been reviewed by the panel.
Earthquake
Having reviewed all of the exchanged material the panel is not satisfied that the
applicants have met their onus to establish that damage arose at the insured
property as a result of the earthquake.
Further, given the denial of the claim in April 2009 and the referral of this matter to
the Service in December 2015, in light of the Terms of Reference of the Service, the
panel is satisfied that consideration of this issue is beyond the jurisdiction of the
Service.
The panel is also not satisfied that exceptional circumstances apply such that would
mean the panel should consider that aspect of the claim and dispute.
The result is that the FSP is entitled to deny the applicants’ claim in respect to
damage as a result of an earthquake.
Water leaking from the neighbouring property
Whilst the exchanged material confirms that there has been a leak or a number of
leaks of water from a neighbouring property, the panel accepts that it is difficult to
Case No: 424098 Determination Page 7 of 9
ascertain the amount of water or the precise period during which the water has
escaped, or the extent to which that escape may have caused any damage.
Further, noting the specific exclusion within the policy coverage for water leaking or
escaping, in respect to a stormwater pipe off the site, the panel is satisfied that the
FSP is entitled to deny thi s aspect of the applicants’ claim.
The failure of the stormwater system within the applicants’ property
On the basis of the exchanged material, the panel is, however, satisfied that the
failure of the stormwater system within the applicants’ own property h as contributed
to some of the foundation movement problems throughout the rear/north-eastern
corner region of the property and the garage.
On the basis of the exchanged material the panel also accepts that the failure and
the resultant damage has most likely been occurring over a long period of time.
In particular, the panel notes the photographs taken at the property by the assessor
engaged by the FSP in March 2009.
These photographs can be compared to photographs taken by the engineer (C),
engaged by the FSP, who attended onsite in October 2013.
Comparison of the photographs shows cracking of the external walls to be virtually
identical in size and extent.
The panel’s conclusion is that there was substantial damage at the applicants’ home
well prior to the insured events and second and third claims made by the applicants
and referred to above.
Further, the panel has had regard to the findings of the geotechnical engineers (FE)
following their investigation onsite in November 2013.
FE noted that the footings of the house and the garage are founded on uncontrolled
fill material.
Further, FE was of the view that whilst the various drainage and plumbing faults have
affected the house and contributed to the development of the damage, the defective
stormwater drains and runoff from the neighbouring property may have had even
more effect than the problems with the drains and sewers at the property, although
FE was unable to accurately determine to what extent.
FE was of the view that the damage to the house was caused by a combination of
factors including:
the inadequate performance of the fill foundation material
the lack of strength and rigidity of the existing footings, particularly for the
garage
the effect from the various plumbing and drainage problems affecting the house
The report from FE is particularly significant given the applicants’ onus to establish
the loss is caused by an event covered by the terms and conditions of the policy. The
effect of the property being constructed over uncontrolled fill material is clearly not an
event covered by the terms and conditions of policy.
Case No: 424098 Determination Page 8 of 9
Further, the lack of strength and rigidity of the existing footings, particularly for the
garage, is likely excluded as a result of the general exclusions detailed within the
policy and above.
The panel notes that the statements from FE are largely supported by the FSP’s
engineer C.
The Panel is of the view that the material presented by FE and C is thorough and
logical and their conclusions are compelling.
Whilst an alternate view is put by the engineer engaged by the applicants (RB), the
panel prefers the views expressed by FE and C.
This is particularly so given that the presented photographic and geotechnical
evidence regarding the footings of the home, demonstrates them as being on
uncontrolled fill material.
Notwithstanding the above conclusions, the panel accepts that the policy will respond
to some of the damage detailed by FE, RB and C.
The difficulty for the panel is that the evidence concerning the cost of repairs is
limited.
RB provided a costing in July 2014, which he updated in a report of August 2015.
The costings provided by RB are clearly based on all of the work required at the
property. The majority of those costings appear to be associated with fixing the
problems related to the foundations being on the uncontrolled fill material.
As such and for reasons stated above, the panel cannot accept the costings provided
by RB.
The panel accepts, in these circumstances, that it is not possible to apply a scientific
or exact approach to the assessment of that aspect of the damage related to the
failures of the stormwater system at the property.
As a result, the panel proposes to do what is fair in all the circumstances and apply a
holistic solution.
The panel notes that the applicants have also made a claim in regards to temporary
accommodation and the cost of expert reports and legal fees.
The exchanged material only includes legal fees which predated the lodgement of
the dispute to the Service. The panel is of the view that it is not appropriate that legal
fees in those circumstances are payable.
On the other hand, the expert’s reports provided by the applicants (including RB)
have assisted the panel in its consideration of this dispute and noting the Terms of
Reference in regard to professional costs, as detailed above, the panel is satisfied
that some allowance should be made for the cost of those reports.
Finally, given the panel accepts that the failings of the stormwater system at the
applicants’ home have contr ibuted to the loss and damage at the home, an
allowance should be made for some temporary accommodation expenses for the
period during which these repairs are completed.
Case No: 424098 Determination Page 9 of 9
Having considered all of these matters, the panel is satisfied that it is fair in all the
circumstances that upon acceptance of the Determination by the applicants, the FSP
pay the applicants the sum of $50,000.
Payment of this sum by the FSP to the applicants, upon acceptance by the
applicants of this Determination, would finalise the FS P’s obligations under all of the
claims and the dispute for all claimed losses up to the date of this determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.