Home / Financial Firm (Unknown - Insurer) / Determination 423970
Determination 423970
claim_denial
Summary
The applicant claimed under his strata building policy for sunroom floor excavation and retiling costs incurred to access a blocked pipe, after the FSP paid $1,000 towards that work. AFCA found the policy limit had been applied correctly, rejected further payment and rejected non-financial loss compensation.
The policy caps cover for repairing or replacing fixed pipes at $1,000 and the access works fall within that limit, and the claim handling was not shown to warrant compensation.
Issues
- Claim denial primary · not upheld
“the FSP is not obliged to make any further payment to the Applicant in this regard as set out in the PDS.”
- Poor claim handling secondary · not upheld
“the FSP's management of the claim process was reasonably in line with the policy in General Insurance Code of Practice.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 423970 Determination Page 1 of 4
Case number: 423970 13 May 2016
1 Overview
1.1 Dispute
The Applicant held cover for accidental damage to his home (insured building) under
a strata building insurance policy (the policy) held with the Financial Services
Provider (FSP).
The FSP was contacted on or about 6 October 2015 regarding water damage to the
insured property which resulted in lodgement of two claims under the policy. The
FSP has accepted one of the two claims with respect to water damage in the laundry
from a concealed leak located in the plumbing between the laundry and kitchen wall.
However, the Applicant has only received partial cover for costs associated with the
second claim relating to a collapsed/blocked drainpipe located under the sunroom
floor. The Applicant remains dissatisfied with the FSP decision under the second
claim as well as the FSP’s overall management of his claim.
1.2 Issues and key findings
Has the FSP fulfilled its obligations to the Applicant under the policy?
The available evidence establishes on the balance of probabilities that the FSP in
partially covering the Applicant’s loss regarding the blocked pipe claim has fulf illed its
obligations under the policy. The declined costs associated with the excavation of the
sunroom floor, repair the blocked pipe and re-tiling of the sunroom floor are not
covered under the policy as per the Product Disclosure Statement (PDS).
Is the Applicant entitled to compensation for non-financial loss?
The available evidence establishes the FSP’s decision to partially decline the claim is
in line with the policy. Further, the FSP’s management of the claim process was
reasonably in line with the policy in General Insurance Code of Practice (the Code). I
am not satisfied the available evidence establishes an entitlement to compensation
for non-financial loss under the FOS Terms of Reference (TOR).
1.3 Determination
This Determination is substantially in favour of the FSP. The FSP is not required to
make any further payment(s) to the Applicant with respect to the locating and
repairing of the blocked pipe under the sunroom floor in line with the policy.
Case No: 423970 Determination Page 2 of 4
2 Reasons for Determination
This dispute has been the subject of a written preliminary view provided to the parties
by the Service on 14 April 2016. I note the preliminary view did not resolve the
dispute. In providing this Determination focus will be limited to the outstanding issues
in dispute between the parties relating to the claim for damage in the sunroom as
well as the FSP’s overall management of the claim.
2.1 Has the FSP fulfilled its obligations under the policy?
The policy specifically excludes cover for the loss subject of this dispute
I have considered all of the available information and am satisfied it establishes on
the balance of probabilities that:
the Applicant held a valid building insurance policy with the FSP at the time of
loss subject of the claim
the policy provides cover for accidental damage to the insured property during
the period of insurance 19 November 2014 to 19 November 2015
on 6 October 2015 the FSP was contacted regarding water damage to the
insured property
during the course of the investigations into the cause for the water damage it
was identified there were two concerns i.e. water leaking from the plumbing in
between the kitchen and laundry walls as well as a blocked pipe beneath the
sunroom floor
the FSP has accepted the loss arising from and cost to repair damage caused
by the leaking pipe discovered in the kitchen/laundry area. Therefore, this does
not form part of the dispute before me for consideration
the Applicant is seeking cover for the costs incurred in authorizing excavation of
the sunroom floor, cost to repair the blocked pipe and the re-tile/re-laying of the
sunroom floor
the Applicant has also raised concerns regarding the FSP’s overall
management of his claim and the associated stress and anxiety he experienced
over the course of the claim
the FSP has covered costs submitted by the Applicant in the amount of $406
(less the policy excess) associated with identifying and locating the blocked
pipe as per tax invoice from ‘DP’ dated 6 October 2015
the FSP has also issued payment of $1,000 to the Applicant under the claim in
line with the maximum policy limit provided for repairing or replacing damaged
pipes
there is an absence of any compelling evidence which would establish on the
balance of probabilities there had occurred any water damage to the sunroom
flooring from the blocked pipe
the available evidence establishes on balance the need to excavate the
sunroom floor and associated damage/repairs including the need to retile the
floor was needed in order to access and repair the blocked pipe below.
Case No: 423970 Determination Page 3 of 4
The loss claimed does not fall within the scope of the policy
Having considered all of the available evidence I am satisfied the policy provides
cover for the reasonable costs incurred to identify and locate the source of water
leak. With respect to the Applic ant’s claim this cost is reflected in the invoice
submitted by DP as well as ‘C’ appointed by the FSP and which have been settled
under the claim.
Accordingly, I am satisfied the FSP has fulfilled its obligations under the policy in this
respect. The additional costs incurred by the Applicant, once the source of the water
leak (blocked pipe) was identified, reasonably fall under the policy section relating to
the repairing and/or replacing of the blocked pipe.
As referred to above the excavation of the sunroom floor, cost to repair/replace the
blocked pipe and subsequent requirement to retile and/or resurface the sunroom
floor arose from the works required to gain access to and repair the pipe. The policy
does extend cover for the reasonable costs of repairing or replacing damaged or
defective parts of any fixed apparatus, fixed appliances, fixed pipes or other systems
to a maximum limit of $1,000.
It is not in dispute the FSP has arranged payment of $1,000 under the claim towards
the cost incurred by the Applicant with respect to these works. I acknowledge this
payment does not cover the full extent of costs incurred in this regard . However, I am
satisfied the FSP in arranging this payment has fulfilled its obligations to the full
extent as prescribed in the PDS. The remainder of the costs associated with
accessing and repair of the blocked pipe fall outside the monetary limit set by the
policy.
Accordingly, I am satisfied the FSP is not obliged to make any further payment to the
Applicant in this regard as set out in the PDS.
I acknowledge the Applicant’s view he should be covered and/or there should at least
be a greater contribution from the FSP towards his loss. However, consideration of
the extent of cover and any entitlements the Applicant has under the policy are
strictly dictated by the terms of the policy. There is an absence of substantiating
evidence which would support the view there had occurred any water damage to the
sunroom floor as a result of the blocked pipe.
Therefore, any damage to the flooring, as discussed above relates to the works
required to access and repair the blocked pipe and indemnity under the policy will be
limited to the policy limits (which the FSP has accepted and settled under the claim).
2.2 Is the Applicant entitled to compensation for non-financial loss?
The FSP is not required to pay compensation for non-financial loss
The Applicant has expressed dissatisfaction with the FSP’s overall management of
his claim and maintains this has resulted in him having experienced stress and
anxiety over the course of the claim and this dispute.
The TOR allow for an award of compensation for non-financial loss up to a maximum
award of $3,000. Such an award is subject to consideration as to whether there has
Case No: 423970 Determination Page 4 of 4
occurred an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant’s expectation of enjoyment or
peace of mind.
I acknowledge the Applicant, considering the views held with respect to his
entitlements and the FSP’s obliga tions under the policy, will have experienced a
degree of stress and anxiety. However, in saying that in order to consider whether it
would be reasonable to require the FSP to arrange payment of compensation I must
be satisfied that the FSP’s conduct under the claim warrants such payment.
As discussed above I am not satisfied the FSP has failed in its responsibility to
assess and settle the Applicant’s claim under the policy. The evidence does not
support the occurrence of an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Applicant’s expectation of
enjoyment or peace of mind to an extent whereby it would be reasonable to require
the FSP to financially compensate the Applicant.
Accordingly, I determine the FSP is not required to arrange payment to the Applicant
by way of compensation for non-financial loss under the claim.
3 Supporting information
3.1 TOR 9.3
9.3 Other compensation
...
b) Subject to paragraph 9.3c) and paragraph 9.7, FOS may decide that the
Financial Services Provider Compensate the Applicant for non-financial
loss but only where:
(i) An unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with the Applicant’s
expectation of enjoyment or peace of mind has occurred; or
(ii) In the case of a Dispute pertaining to an individual’s privacy rights
– injury has occurred to the Applicant’s feelings or humiliation has
been suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be
$3,000 per claim made in the Dispute. …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.