Home / Financial Firm (Unknown - Insurer) / Determination 423784

Determination 423784

Storm damage claim partly denied and handling delays

FirmFinancial Firm (Unknown - Insurer)
Decided2016-08-23
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The applicant's storm claim for a strata unit was accepted in part, but the FSP denied internal cracking and ceiling damage it said was not storm-related. AFCA ordered a scope of works for the accepted items, the decking reseal share, and $1,500 for delay and inconvenience.

The applicant bore the onus to prove the additional damage was storm-caused and the engineer's evidence attributed the cracking to foundation movement, but the FSP's delays in handling the claim warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 423784 Determination Page 1 of 9 Case number: 423784 18 August 2016 1 Overview 1.1 Dispute The Applicant owns a property insured under a Strata Insurance Policy with the FSP (the policy). On 21 April 2015, the property was damaged in a storm when a tree fell onto the Applicant ’s p roperty from next door. The damage included damage to the roof, some internal damage and damage caused by the tree striking outdoor items. The Applicant made a claim under the policy. The FSP accepted the claim. However, when the Applicant noticed further damage in the bathroom, the FSP denied this part of the Applicant ’s claim. In order to bring the dispute to conclusion, the FSP engaged an engineer to advise about the cause of damage but the dispute remains unresolved. 1.2 Issues and key findings Is the FSP entitled to deny the Applicant ’s claim for additional damage ? On the information provided, the Applicant has not established on the balance of probabilities all of the claimed additional damage was caused in the storm. The FSP is entitled to deny the Applicant ’s claim for the internal cracking damage to the lounge, dining room, bathroom and bedroom two and for the bubbling of the painted finish of the ceiling at the shower recess. As for the other items claimed, the FSP is obliged to cover the damage which has been accepted by the FSP’s assessor already and which has been identified in the FSP’s engineer’s report as damage caused as a result of the tree impact, namely, water penetration to bedroom two and damage to the external rear deck and surrounds. At its option, the FSP can repair the damage or pay the reasonable cost of repairs. If the FSP opts to pay the reasonable cost of repairs, the amount of the cash settlement is yet to be determined but is to be based on a scope of works to be prepared by the FSP’s engineer for all the accepted items set out in this Determination under the heading ‘FSP to arrange for engineer to prepare scope of works.’ Is the FSP obliged to pay the Applicant compensation? The FSP is obliged to pay the Applicant $1,500 compensation as the material establishes there has been an unusual degree of physical inconvenience and time Case No: 423784 Determination Page 2 of 9 taken to resolve the situation which would have interfered with the Applicant ’s expectation of enjoyment and peace of mind. 1.3 Determination This Determination is substantially in favour of the Applicant. If the Applicant accepts the Determination, then within seven days of acceptance the FSP is to:  pay the Applicant $1,500 compensation  arrange for its engineer to prepare a scope of works for all the accepted items set out in this Determination under the heading ‘ FSP to arrange for engineer to prepare scope of works ’  engage a hygienist to investigate the water penetration into bedroom two as set out in its engineer’s report and, depending on the outcome of the hygienist’s report, further items may be added to the engineer’s scope of works. Case No: 423784 Determination Page 3 of 9 2 Reasons for Determination 2.1 Is the FSP entitled to deny the Applicant ’s claim for additional damage? The Applicant must establish additional damage caused by storm The Applicant bears the onus to establish on the balance of probabilities she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Accordingly, she must establish accidental loss or damage which includes loss or damage from incidents shown in the policy. The policy provides cover for a number of incidents which includes loss or damage caused by storm. It is not in dispute storm damaged the property on 21 April 2015. The issue in dispute is the extent of the damage caused by the storm. FSP’s assessor accepted and costed certain damage The material provided establishes the FSP arranged for an assessor to attend the Applicant ’s property in May 2015. The assessor agreed the storm had caused damage both inside and outside the house. The assessor noted and photographed damage in the following areas  window/skirting/ceiling lounge room  behind the kitchen sink  internal privacy screen  shade sail cloth  clothesline  balcony handrails  7 broken ridge tiles The assessor assessed the cost of repairs in the amount of $7,568.07. FSP’s assessor did not accept additional damage caused by storm An assessor re-attended and photographed the property i n October 2015. This was because the Applicant contended there was further damage to the property which included a cracked tile at the bottom of the shower stall, flaking paint on the ceiling above the shower stall, and cracking damage in the ceiling in the bathroom and the laundry. The Applicant was also concerned about mould growing on the floor in the room below where the tree struck (bedroom two). As a result of the assessor’s opinion, the FSP contended the further damage claimed was not caused by the storm. But, in order to resolve issues, the FSP arranged for an engineer’s report. Engineer concluded some additional damage not caused by storm The engineer inspected and photographed the property in February 2016. In his report to the FSP he lists observations about damage to the property which includes:  cracking in the lounge room ceiling/cornice at the wall common to the bathroom Case No: 423784 Determination Page 4 of 9  swelling to the kitchen bench top between the sink and the wall  damage to the insect screen sliding door in kitchen  cracking damage in the bathroom  settlement of the floor around the wall common to the shower/ bath area  bubbling of the paint finish to the ceiling above the shower  cracking and water staining in bedroom two  damage in the rear deck and surrounds including to the shade cloth, timber balustrade, freestanding privacy screen, and clothesline The engineer inspected the roof and noted the capping tiles above bedroom two and roof tiles along the eastern side above the bathroom had been replaced. The engineer also inspected the roof ceiling void space. He noted minor water staining to the surface of the lounge room ceiling and bathroom ceiling. Finally, the engineer inspected the subfloor. Under the bathroom, he noted a pier along the western side had settled differentially compared to the other piers. He said the floor bearer was not being supported by the settled pier. As a result of his investigations, the engineer concluded the damage in the following areas were not as a result of the tree impact event:  the internal cracking damage to the lounge, dining room, bathroom and bedroom two. He said this was caused by foundation movement.  the kitchen bench top. He said this was caused by general moisture uptake.  the bubbling of the painted finish of the ceiling at the shower recess. Although he notes water had penetrated during the storm event, he said it was minimal, had not affected the integrity the ceiling, and the bubbling area was not below the area where water had penetrated. Engineer accepted water penetration into bedroom two and damage to external rear deck and surrounds caused by storm Otherwise, the engineer was satisfied the water penetration into bedroom two and the areas described in the report on the external rear deck and surrounds were damaged in the storm. Engineer recommended further assessment by hygienist The engineer also recommended the FSP arrange for assessment of the residual moisture mould in the wall lining below the eastern window and the carpet and underlay in bedroom two. No assessment is provided. Applicant has not established all claimed damage caused by storm The Applicant has provided no expert report. She says it took a week for the SES to remove the tree and install a tarp. She says the tarp blew off twice over the next few months before the tiles were replaced. Further, she contends if tiles were broken then water would have entered through the broken tiles. She has provided photographs of the bathroom ceiling which show water damage. She concedes she is not sure if the bathroom damage was caused by the storm but points out the cracks only appeared after the storm. Case No: 423784 Determination Page 5 of 9 The Applicant says if a pier has moved, it needs to be looked at. She says it is still under insurance and needs to be fixed. She also says the gutter guard needs repair and she can no longer shut the door in bedroom two. However, the Applicant must show the damage claimed was caused in the storm event. On the information provided, I am not satisfied all of the damage claimed was caused in the storm event. Although I accept the information provided establishes tiles were replaced above both bedroom two and the bathroom, and I accept there is minor water staining observed to the ceiling lining in the bathroom, on the information provided, I do not accept the internal cracking damage claimed or the bubbling of the painted finish of the ceiling at the shower recess was caused by the storm event. Rather, the information provided establishes on the balance of probabilities the cracking damage is caused by a subfloor pier which has settled. The information provided does not establish the settlement was caused by the storm event. Rather, the expert engineer’s opinion is the foundation movement is consistent with changes in the moisture condition of the soil from seasonal events. As for the bubbling of the painted finish of the ceiling at the shower recess, the engineer’s expert opinion is the water staining is minimal and has not affected the integrity of the ceiling. Further, I accept his observation that the bubbling finish is not below one of the areas of water penetration. FSP to arrange for engineer to prepare scope of works The FSP’s assessor noted and costed the following damage :  window/skirting/ceiling lounge room  behind the kitchen sink  internal privacy screen  shade sail cloth  clothesline  balcony handrails  7 broken ridge tiles The FSP’s engineer also accepts there is water penetration into bedroom two and damage as described in his report to the external rear deck and surrounds. It is assumed therefore, save for the broken tiles, the FSP has not repaired the damage noted by the assessor or cash settled the damage. Although the Applicant contends roof tiles need fixing correctly, on the information provided, I am not satisfied the FSP is required to undertake further work to the roof tiles. The engineer has not prepared a formal scope of works. The FSP is to forthwith arrange for the engineer to prepare a scope of works for the water penetration damage into bedroom two and for the damage the engineer describes i n his report to the external rear deck and surrounds and for the (non-cracking) damage described and noted by the assessor to the window/skirtings/ceiling in the lounge room and behind the kitchen sink. Case No: 423784 Determination Page 6 of 9 I note the difference in opinion between the engineer and the assessor about the water damage behind the kitchen sink but I consider it is fair in all the circumstances to accept the opinion of the assessor and include the damage he noted behind the kitchen sink bench in the scope of works to be prepared by the engineer. In addition, as recommended by its engineer, the FSP is to forthwith undertake the investigations by a hygienist in relation to the water penetration into bedroom two. Depending on the outcome of the hygienist report, these items may be inc luded in the engineer’s scope of works. The Applicant also claims the gutter guard needs repair and she can no longer shut the door of bedroom two. The FSP has not formally responded to these two items. The FSP is to obtain an opinion from the engineer and if it accepts these two items, it is to add these two items to the engineer’s scope of works. In addition, the applicant claims damage to a screen over part of the back fence. The assessor and the engineer refer to an internal privacy screen and a freestanding privacy screen. It is not clear whether the screen over part of the back fence is the same screen referred to by the FSP’s assessor and eng ineer. If it is a separate item, the FSP is to obtain an opinion from the engineer. If it accepts the screen over part of the back fence was damaged in the storm, it is to add this item to the engineer’s scope of works. The Applicant also claims:  potted p lants need replacing  the kitchen door needs fixing  the deck needs re - sealing The FSP has not formally responded to these items either. The FSP’s engineer noted the insect screen sliding door does not move freely and its screen is damaged. I assume the potted plants were on the deck. Due to the proximity of the door to the falling tree, in the absence of further information from the FSP, I accept the insect screen sliding door and potted plants on the deck were damaged in the storm. These items are to be in cluded in the engineer’s scope of works too. I note the engineer’s comments regarding the weathering of the painted surface of the timber decking boards. The engineer accepts the weathering of the painted surface of the timber decking boards may have been accelerated by the removal of the shade sail. He also says other areas were not protected by the shade sail and he considers damage in these areas to be normal wear and tear. In order to bring this protracted matter to conclusion, I am satisfied it is fair in all the circumstances that the FSP pay 50% of the cost to reseal the decking. In summary, at the FSP’s cost, the FSP’s engineer is to prepare and cost a scope of works. The scope of works is to address the damage to the insured building, as at the date of this Determination, arising from the storm event as accepted and set out in this Determination. The policy sets out how the FSP will settle a buildings claim. At its option, the FSP can repair or pay the reasonable costs of repairs. If the FSP opts to pay the reasonable cost of repairs, it remains necessary for the amount of the cash Case No: 423784 Determination Page 7 of 9 settlement to be determined, based on the scope of works to be prepared by the FSP’s engineer . FOS encourages the parties to this dispute to resolve any issues which might arise during that process. However, the parties can return to FOS if they are unable to resolve any issues arising from the scope of works and/or the costing of that work. 2.2 Is the Applicant entitled to compensation? Compensation is awarded in certain circumstances The Terms of Reference allows FOS to direct an FSP compensate an Applicant for non-financial loss where there is an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant ’s expectation of enjoyment or peace of mind. The maximum amount of compensation for non-financial loss is $3,000. The Applicant claims the FSP has not kept her well-informed. She complains about the length of time it took for the FSP to address her concerns and reassess the damage. She also complains about the length of time it took for the FSP to provide the engineer’s report. I assume from the engineer’s report the repairs accepted by the assessor have still not been undertaken. In the meantime, the Applicant submits she is sick, literally, of the moisture and mould and stress the storm has caused. The Applicant says not only has her health deteriorated since the commencement of this claim but the living conditions for her daughter in bedroom two are difficult. The FSP has not responded to these contentions. The material provided shows the Applicant made a claim on 21 April 2015. Although the FSP first responded to the claim in reasonable time, I am not satisfied the claim has been handled in a timely fashion since. Both the re-attendance by the assessor in October 2015 and the engagement of an engineer in February 2016 took too long. Further, despite the engineer’s opinion, the FSP does not appear to have engaged a hygienist to investigate the residual moisture mould referred to by the engineer in the wall lining and carpet of the second bedroom. $1,500 compensation is fair in all circumstances While I accept the material provided shows the FSP has been communicating with the Applicant and the assessor in April 2016, no information is provided by the FSP about the upshot of those discussions. On the information provided, I consider the FSP’s investigations of the various aspects of this claim appear to have taken insufficient account of the physical inconvenience and stress experienced by the Applicant. I consider the FSP should have taken more heed of the Applicant ’s circumstances particularly in relation to the observations of the engineer regarding bedroom two. Case No: 423784 Determination Page 8 of 9 The FSP could have acted more quickly to ease the Applicant ’s concerns and circumstances. In all the circumstances I consider it is fair the FSP pay $1,500 compensation to the Applicant as I am satisfied there has been an unusual degree of physical inconvenience and time taken to resolve the situation together with interference with the Applicant ’s expectation of enjoyment and peace of mind. Case No: 423784 Determination Page 9 of 9 3 Supporting information 3.1 FOS approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s Notice of Response dated 19 February 2016 and letter dated 19 April 2016. Both the policy document, the Notice and the letter have been exchanged with the Applicant. 3.3 Other relevant material considered and relied on  p arties’ submissions, emails and photographs  correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.