Text of the determination
Determination
Case No: 423738 Determination Page 1 of 9
Case number: 423738 2 December 2016
1 Overview
1.1 Dispute
The applicant lodged a claim for malicious damage to two dog wash units (the units)
under a business insurance policy with the FSP. The FSP assessed the claim and
determined only some of the damage was caused maliciously. It offered the applicant
$5,000 (less $200 excess) in settlement of the malicious damage claim.
The applicant was not satisfied with the offer made and requested the damage also
be considered under the equipment breakdown section of the policy. The FSP
agreed some of the damage was covered under equipment breakdown and offered
the applicant an additional $2,769 in settlement of his claim. At IDR, a further $733
was paid bringing the total settlement amount paid (with some adjustments) to
$8,302.
The applicant is not satisfied with the settlement amount paid by the FSP. It says it
cannot repair the units due to needing a replacement component (a PLC) which is
now obsolete (rendering the units inoperable). The applicant seeks compensation,
and the units are repaired, or the units are replaced at a combined cost of $39,160.
1.2 Issues and key findings
Are the FSP’s offers to settle the claims reasonable?
The FSP’s offer to settle the claim for the damage to unit 1 is reasonable as the
material provided establishes the damage to unit 1, caused by insured events, can
be repaired. The material provided does not establish parts to repair the insured
damage are unavailable. Further, the material provided establishes some damage to
unit 1 is caused by wear and tear which is excluded from cover.
The FSP ’s offer to settle the claim for the damage to unit 2 is not reasonable as the
material provided establishes the damage to unit 2, caused by insured events,
cannot be repaired. Although some of the damage to unit 2 is caused by wear and
tear which is exclu ded from cover, the FSP’s policy requires the FSP to repair the
damage or replace the damage. As the material provided establishes an essential
component (the PLC) required to repair the insured damage is unavailable, it is fair in
all the circumstances the FSP replace Unit 2.
The FSP has already paid settlement amounts for the damage to unit 2. Therefore
the FSP is required to pay the difference between the replacement cost of unit 2 and
the costs already paid for damage to unit 2.
Case No: 423738 Determination Page 2 of 9
Is the applicant entitled to compensation?
In circumstances where one unit could have been repaired by the applicant and used
in the operation of dog washing business, and in circumstances where the applicant
has not particularised the loss or provided material substantiating the claims, the
material provided does not establish all of the loss claimed has been caused by the
FSP’s conduct.
However, although the units were comprehensively assessed in February 2015, the
material provided by the FSP is silent about the timing of availability of part and is not
persuasive of the contention the PLC unit was available at the time of the FSP’s
offer. In these circumstances, it is fair in the FSP pay the applicant some
compensation for the claimed consequential loss.
1.3 Determination
This determination is mainly in favour of the applicant.
Should the applicant accept this determination, then within seven days of
acceptance, the FSP is to make the following payments
$13,707 being the balance payable to replace unit 2
$1,500 compensation
Otherwise, the FSP is not required to take any further action in relation to the claims
or the dispute.
Case No: 423738 Determination Page 3 of 9
2 Reasons for determination
2.1 Are the FSP’s offers to settle the claims reasonable?
FSP accepted the units were damaged
The applicant must establish on the balance of probabilities that it has suffered a loss
caused by an event to which the policy responds. In the circumstances of this
dispute, the applicant must establish the units were damaged by malicious acts or
there was a breakdown (as defined in the policy) of the insured equipment.
This is known as a prima facie claim.
FSP must establish policy exclusions
Once established, the onus shifts to the FSP to prove on the balance of probabilities
that an exclusion applies if it seeks to deny or limit its liability for the loss. In the
circumstances of this dispute, the FSP must establish the loss or damage was
caused by lack of maintenance, inherent defects or wear and tear.
It is not in dispute that the applicant’s units sustained damage. The FSP has
accepted some of the costs of repairing the units under two sections of the policy.
The dispute is whether the FSP has correctly determined its liability for the claimed
damage. The FSP says it has fulfilled its obligations as it has sent settlement
cheques to the applicant for the cost of repairing the insured damage on each unit.
The FSP submits it is not required to replace the two units as a result of the damage
caused by the two insured events as only some of the components on each unit have
been damaged as a result of an event insured under the policy. It says the other
damage claimed is as a result of wear and tear which is excluded from cover.
The FSP has considered the report provided by the applicant from the manufacturer
of the units, B. The FSP s ays B’s report describes the damage on each component
but either speculates as to the cause of damage or does not specifically state the
claimed damage is related to equipment breakdown or malicious damage.
Further, the FSP says it is entitled to cash settle the claims under the policy. It says it
is entitled to rely on the policy terms and its expert reports in making its settlement
offers. It contends it calculated the settlement amounts offered based on the expert
advice of its experts and the manufacturer of the units (W).
The applicant has rejected the offers made by the FSP. It is willing to have the units
repaired by the FSP, but contends the units cannot be repaired as all spare parts are
not available and the PLC component was never available. The applicant also
contends new parts would only work on the units with serious modifications and the
repairs would be without warranty.
Parties have provided expert reports
The applicant relies on material obtained from B. The applicant says the FSP placed
greater emphasis on a technical report produced by W which “lacked in credibility
Case No: 423738 Determination Page 4 of 9
knowledge and experience.” The applicant submits B is the only one qualified to
assess and repair the units and B’s recommendation should be accepted.
B inspected the units on 22 September 2014. B also provided a breakdown of costs
for current systems built and supplied by it in the amount of $39,160 (including GST).
A summary of B’s report is as follows:
Damage Cause of damage
Door locks Locks on both machines tampered with
Coin validators Coin validators “show signs of damage”. Does not identify cause.
Note validators Validators on bot h machines show signs of water damage
Air blower (dryer) External hos e on both units had broken clips caused by overstressed use
Pushbuttons Malfunctioning “likely been subject to shock.”
Dosing pumps Not dosing chemicals as required. Does not identify cause
B concluded:
“Both dog wash machines have been the subject of vandalism and have therefore
rendered them into an inoperable state. Critical components of the machine have been
damaged and are beyond economical repair. Both machines are MK1 versions built in
2007. Some components are no longer available as spare parts from the
manufacturer.”
The FSP relied on reports from an engineer P who said vandalism was not a cause
of all the claimed defects identified in B’s report. P considered most of damage was
wear and tear. He accepted there was malicious damage to the locks and coin reject
tray only.
The FSP also engaged H (a chartered loss adjuster and engineer) who inspected,
tested and photographed the units with W in February 2015. W manufactures the
units by procuring major parts from B.
W provided a summary of the damage to both units in an email dated 23 February
2015. W also provided an estimate of the cost of repairs to items W considered were
either maliciously damaged or had broken down.
H said W concluded the units were repairable at an economically viable cost with
some failures due to wear and tear, some to breakdown and some to malicious
damage.
A summary of W’s report follows:
Damage to M1 Cause of damage
Foot valve, tube
for pump, MEI,
Wear and tear
Case No: 423738 Determination Page 5 of 9
pulse box to suit
MEI note reader,
and dryer motor
1 bracket for QL,
5 door locks
Malicious damage
Venturi valve Breakdown
Damage to M2 Cause of damage
Foot valve, tube
for pump, MEI,
pulse box to suit
MEI note reader
Wear and tear
1 bracket for QL,
5 door locks
Malicious damage
Venturi valve Breakdown
6 buttons Breakdown causing possible damage to PLC
1 PLC Breakdown, possible short on buttons
After the inspection, H reported to the FSP (which report included the material from
W) and made certain recommendations regarding the malicious damage and
equipment breakdown claims for both units.
Taking into account the previous payment of $4,800 for malicious damage, H
recommended a further amount of $2,769 be paid to the applicant.
Relevantly in respect to unit 2, H reported:
“…. the exact repair costs will not be known until the machine is further tested during
repairs to establish if its PLC need replacement, but in a worst case scenario, the
insured will be entitled to about $3,473.for separate failures of the venturi valve and
control button/PLC, as calculated …”
FSP’s reports more persuasive as they are more comprehensive and specific
I have considered the business insurance schedule and the FSP’s policy. The
applicant is covered for malicious acts and for equipment breakdown.
However, the policy does not cover loss or damage caused by or arising out of
gradual deterioration, existing defects, and lack of maintenance and wear and tear.
I have carefully considered the material provided by the parties. Although the
applicant says B’s evidence is to be preferred, having considered the detailed report
from the FSP’s assessor H and the material provided by W, I am satisfied both W
and H have the expertise to comment on the issues in dispute. This is because W
now manufactures the units by buying parts from B and H is an engineer and has
thoroughly inspected and tested the units with W.
Case No: 423738 Determination Page 6 of 9
Moreover, although I accept B has inspected the units contemporaneously with the
breakdown of the units, B’s report is lacking in sufficient detail to establish all the
claimed damage is caused by the insured events.
Although B says the units are not in an operational state and have substantial
damage caused by vandalism, a close examination of B’s report do es not establish
this contention. Rather, B either does not state the cause of damage or the observed
damage is wear and tear damage which is excluded from cover.
The inspection and testing by the FSP’s adjuster and W is more persuasive.
Relevantly, W has provided a comprehensive summary of the damage to both units,
the cause of damage and an estimate of the cost of repairs.
Unit 1 is repairable
W says the units are repairable. Having considered the material from W, I accept unit
1 is repairable. I am not satisfied the parts required to repair unit 1 (that is, those
parts which are covered under the policy) are no longer available. The material
provided by the applicant is insufficiently specific on this point.
Unit 2 is not repairable as an essential component is unavailable
As for unit 2, I accept it is repairable, providing the parts listed by W in his estimate
are available. The applicant says parts, including the PLC, are not available. In this
regard, I accept the applicant is supported by B in his earlier report. Specifically, in
relation to the PLC, B’s email dated 27 July 2016 says:
“As discussed, for the past couple years B have had difficulty obtaining various direct
spare parts for the Dogwash MK1 machines you currently have onsite, in particular the
controller (PLC). This is largely due to the components either having end of life or
being unavailable from our suppliers.”
In response, the FSP says when the claim was assessed, the parts were readily
available. The FSP agrees parts are no longer available and the applicant will now
have to replace the unit. However, it says this situation is due to the applicant’s delay
and not the FSP’s actions.
The claim was assessed in February 2015. The material provided about that
assessment by the FSP’s adjus ter and W is silent about the availability of parts.
In the circumstances, and on information provided, I accept unit 2 cannot be repaired
as an essential part namely the controller (PLC) could not be provided to W by B.
Balance payable by the FSP in relation to unit 2 is $13,707.
The FSP’s policy schedule shows has applicant has “repair and replace” cover with
the FSP if there is equipment breakdown. In the event of a claim, the FSP will pay
the lesser of the cost, at the time of the breakdown, to repair the damaged property
or replace the damaged property with similar property of like kind, capacity, size,
quality and function.
As the material establishes the unit cannot be repaired, then it is fair in all the
circumstances the unit be replaced even in the presence of uninsured damage.
Case No: 423738 Determination Page 7 of 9
At the time of the breakdown, B provided a quote to replace, deliver and install both
units in the sum of $39,160.
The FSP can elect to replace the unit or cash settle the applicant.
In all the circumstances of this claim, as settlement cheques have been already
dispatched to the applicant, and in order to bring early resolution to this long running
dispute, I am satisfied it is fair in all the circumstances the FSP cash settle the
applicant by paying $19,580 to replace unit 2 less amounts already paid to the
applicant in respect of the claims for damage to unit 2.
The amount of $8,302 has been paid by the FSP to the applicant for equipment
breakdown damage and malicious damage to both units as set out in the chronology
attached to the FSP’s IDR letter 19 October 2015.
Having considered the material provided by W, and the policy terms regarding
excess payable, I am satisfied the amounts offered for unit 2 are reasonable , save for
the issue of the unavailability of the PLC. I accept the amount of $5,873 has already
been paid to the applicant in relation to unit 2.
In those circumstances, I am satisfied the balance owing by the FSP to the applicant
in relation to the claim regarding unit 2 is $13,707.
As for unit 1, on the material provided, I am satisfied the amounts offered ($2,429) by
the FSP are fair in all the circumstances and in accordance with the policy terms.
In relation to a cash settlement, I have considered the policy terms and conditions. I
am satisfied the terms are clear and unambiguous. At the FSP’s option, it is entitled
to replace items or cash settle the claims.
2.2 Is the applicant entitled to compensation?
Compensation payable in some circumstances
The applicant claims it had to pay insurance on units while they were stored and it
lost the business and fit out because the FSP did not act responsively and limit its
losses. The applicant later submitted the units were stored in a facility owned by it so
there was no extra storage charge. However it continues to claim it paid rent, rates,
outgoings etc. while the units were broken down.
The applicant has not particularised the loss or provided material substantiating
these claims.
The FSP acknowledges there were delays in reaching a final outcome, but says
compensation is not warranted because some of the delays were due to the
applicant failing to provide substantiating material and/or allowing access. It contends
when it originally assessed the claim and made an offer the PLC unit was available.
Policy terms do not prevent compensation for losses caused by FSP’s conduct
The FSP’s policy does not insure the applicant for loss of use or consequential loss.
The policy schedule shows the applicant is not insured for a reduction in gross profit
or gross rental arising from equipment breakdown.
Case No: 423738 Determination Page 8 of 9
However, FOS can award compensation (with a $3,300 cap) for consequential loss.
FOS will not provide compensation for consequential loss in a dispute arising from a
claim on an insurance policy which expressly excludes liability for such loss.
Whilst I acknowledge the policy exclusion in the FSP ’s policy, I am not satisfied the
policy term prevents an award of compensation under the Terms of Reference for
consequential losses caused as a result of the FSP’s conduct.
Fair in all the circumstances the FSP pay the applicant $1,500
The material provided establishes when the claim was made in October 2014, the
units had already been examined and reported on by B, who inspected the machines
in September 2014. Although B’s report is not specific as to which components are
unavailable, B indicates in the report some components are no longer available as
spare parts from the manufacturer. In these circumstances, I am satisfied adequate
substantiating material was provided at the time of the claim.
As stated earlier in this determination, it is not accepted B established both units
were the subject of vandalism and both units were rendered inoperable by insured
events. However, from the material provided and for the reasons stated, I am
satisfied one unit should have been replaced by the FSP.
As set out earlier, although I am satisfied the units were comprehensively assessed
in February 2015, I consider the material provided by the FSP and the FSP’s
assessment is silent about the timing of availability of parts. The information provided
is not persuasive of the contention the PLC unit was available at the time of the
FSP’s offers.
In circumstances where one unit could have been repaired by the applicant and used
in the operation of dog washing business, and when the applicant has not
particularised the loss or provided material substantiating the loss, I am not satisfied
all of the loss claimed has been caused by the FSP’s conduct. However, as the
information provided is not persuasive of the contention the PLC unit was available at
the time of the FSP’s offer, and so one unit could have been replaced earlier, I am
satisfied it is fair in all the circumstances the FSP pay the applicant $1,500
compensation for losses claimed.
Case No: 423738 Determination Page 9 of 9
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The applicant is a company. Any references to the applicant include references to the
company and to the company’s representative.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts and schedule
The relevant policy extracts and schedule are referred to and attached to the FSP’s
Notice of Response dated 5 April 2016. Both the policy document, schedule and the
Notice have been exchanged with the applicant.
3.3 Other relevant material considered and relied on
Parties’ submissions including all attachments: emails, invoices, estimates,
photographs and reports
Correspondence between the parties