Denial of cracking damage claim relying on subsidence, settlement and tree root exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2016-10-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for cracking damage to his home, attributing it to a neighbour's leaking pipe, while the FSP denied the claim under the tree root and settlement exclusions. AFCA found the damage was caused by settlement from tree roots and the leak timing did not meet the policy's cover conditions, so the FSP is not liable.

Damage caused by settlement and tree roots is excluded, and subsidence is covered only if it occurs within 72 hours of a covered event such as a leaking pipe, which was not established.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 423346 Determination Page 1 of 7 Case number: 423346 6 October 2016 1 Overview 1.1 Dispute In June 2014, the applicant lodged a claim under his home insurance policy with the financial services provider (FSP) for cracking damage to his home. The applicant considers the damage was caused by the effects of water escaping from a leaking pipe at his neighbour‟s property . The FSP denied the claim on the basis that the damage was not caused by water from the leaking pipe but by factors which are excluded from cover under the policy (namely, subsidence and the effects of tree roots). The FSP also says that, even if the leaking pipe did contribute to the cracking damage, the damage did not occur within 72 hours of the leak, as is required for cover to be available under the policy. 1.2 Issue and key findings Is the FSP liable for the cracking damage? The applicant‟s policy provides cover for accidental damage to his property, subject to exclusions for damage caused by tree roots and/or settlement. The available information establishes that the cracking damage was caused by settlement of the foundation soils at the applicant‟s property, due to the drying effect of roots from the large pine tree located in his neighbour‟s fron t yard. There is insufficient information to establish that the growth of the tree roots (and the resulting drying effects) occurred due to the escape of water from a leaking pipe in circumstances which are subject to cover under the policy. Accordingly, the FSP is entitled to rely on the exclusions for damage caused by tree roots and/or settlement to deny the applicant‟s claim. 1.3 Determination This determination is in favour of the FSP. The FSP is not liable for the damage to the applicant‟s property . Case No: 423346 Determination Page 2 of 7 2 Reasons for determination 2.1 Is the FSP liable for the damage to the property? Policy provides cover for accidental damage subject to exclusions The applicant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the applicant is able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicant ‟ s policy provides cover for accidental loss or damage to his property, subject to the conditions and exclusions set out in the policy. The courts have defined “accidental” in this context to mean “unintended and unexpected”. However, the policy clearly states that there are some forms of accidental damage which will only be covered in specific circumstances (and will not otherwise be covered). This includes damage caused by landslide or subsidence, which will only be covered where the damage occurs within 72 hours after a direct result of certain specified events (including the escape of liquid from a fixed pipe). The policy also contains general exclusions for damage caused by:  landslide or subsidence (except in the circumstances described above)  settling, shrinkage or any movement of earth; and/or  roots from trees, plants, shrubs or grass. Damage caused in this manner is not covered under any circumstances. Parties disagree as to cause of damage The reports prepared by the engineers appointed by the parties (MP and TC) confirm that there is significant cracking damage to the south- east corner of the applicant‟s house. Based on reports provided by its engineer (MP), the FSP says that the cracking damage was caused by earth movement due to naturally occurring changes in the moisture content of the foundation soils. MP considered that the roots of a large pine tree located on the front lawn of the applicant‟s neighbour‟s property to the eastern side had drawn moisture from the foundation soil, causing the soil to dry out and resulting in downwards movement. Accordingly, the FSP says it is entitled to deny the applicant‟s claim based on the general exclusions for damage caused by earth movement and/or tree roots. The applicant‟s engineer (TC) agreed with MP that the cracking damage was caused by the drying effects of the neighbour‟s pine tree on the foundation soils. Case No: 423346 Determination Page 3 of 7 However, TC considered that the root system of the pine tree had been attracted towards the affected corner of the applicant‟s property by a leaking water pipe in the vicinity. Accordingly, the applicant says the underlying cause of the damage was the leaking pipe (and not earth movement or tree roots). Damage was not caused by subsidence As outlined above, the policy wording draws a distinction between damage caused by „subsidence‟ and damage caused by „ settlement ‟ . While damage caused by subsidence is covered in certain circumstances (including where it occurs within 72 hours of a leaking pipe), damage caused by settlement is excluded from cover in all cases. The expressions „subsidence‟ and „settlement‟ are sometimes used interchangeably to refer to the downwards movement of foundation soils (and/or the structures above). However, „subsidence‟ is more commonly used to refer to a relatively sudden and pronounced sinking o f the land in a particular area, while „ settlement ‟ is used to describe a more gradual downwards movement over time. The panel considers this interpretation is consistent with the wording of the applicant‟s policy, in which „subsidence‟ is paired with „landslide‟ and covered only where such damage occurs within 72 hours of the triggering event (including a leaking pipe). In the present case, the engineers‟ reports indicate that the cracking damage to the applicant‟s house occurred over a period of time as a result of the ongoing effects of the tree roots drying out the soil. This mechanism is more appropriately characterised as „settlement‟ rather than „subsidence‟. Accordingly, the specific policy provisions dealing with damage caused by subsidence do not apply. FSP’s liability depends on proximate cause of damage In order to determine whether the FSP is liable for the c racking damage, it is necessary to identify the proximate cause of the damage. The proximate cause is the dominant, efficient or operative cause of the damage. However, it is not required to be the sole cause or the last in time. The identification of the proximate cause is a question of fact that depends on the circumstances of each particular case. If the proximate cause of the growth of tree roots which resulted in the subsequent drying out of the soil was a leaking pipe covered under the policy, then the FSP will be liable for the cracking damage. However, if the proximate cause was the natural growth of the tree roots and/or the settlement of the soil as a result of naturally occurring moisture variations, then the FSP will be entitled to rely on the relevant exclusions to deny the applicant‟s claim. Case No: 423346 Determination Page 4 of 7 No causal link established between water leaks and cracking damage The applicant says he first noticed the cracking damage in March 2013 but assumed it had been caused by seasonal variations in the moisture content of the surrounding soils. When the damage worsened over the following twelve months, he lodged a claim with the FSP. The information provided to the panel indicates that there have been a number of leaks from pipes at the applicant and his neighb our‟s property , over a period of several years. After the applicant lodged his claim, the FSP appointed a plumber (AL) who attended the property on several occasions between June and September 2014. AL identified several leaks in the sewer and stormwater drains at the applicant‟s property . In his report dated 9 September 2014, AL confirmed that, since his initial attendance, there had also been a burst water pipe at the property to the east, causing flooding of the neighbour‟ s cellar adjacent to the property boundary. This section of the pipe was subsequently replaced in its entirety. The effect of water on highly reactive clay soils (such as those found at the applicant‟s property) typically results in heave (upwards movement) of the surrounding soils. However, the engineers ‟ reports confirm that the cracking damage to the applicant‟s property was caused by settlement (downwards movement) of the surrounding soils due to a reduction in moisture content. Accordingly, the damage is not consistent with having been caused by the escape of water from any of the leaking pipes identified during 2014. The damage could not have been caused by changed moisture conditions following the repairs, as it was already apparent in March 2013. The applicant‟s engineer ( TC) has confirmed that the applicant advised him that there had been an earlier burst pipe at his neighbour‟s property in May 2010. The applicant says the plumber who fixed this leak considered it likely that there were further leaks and recommended that the pipe be replaced. However, no further repairs were undertaken and the pipe was not replaced until 2014. It is possible that the changed moisture conditions following the repair of the pipe in 2010 contributed to the growth of tree roots and the subsequent drying out of the soil in the south- east corner of the applicant‟s house (although any ongoing leaks would be expected to mitigate these effects). However, even if the panel were to accept that the leaking pipe in 2010 contributed to the cracking damage, this event occurred before the applicant incepted cover with the FSP in February 2013. Accordingly, the FSP would not be liable for the damage on this basis. Case No: 423346 Determination Page 5 of 7 FSP is not liable for cracking damage For the reasons outlined above, the panel is not satisfied that the proximate cause of the cracking damage was the escape of water from a leaking pipe during the policy period. The damage was caused by the roots of the neighbour‟s tree drawing moisture from the foundation soils on the applicant‟s property. However, there is insufficient information to establish that the growth of the tree roots (and the resulting drying effects) occurred due to the escape of water from a leaking pipe. The pine tree in the front yard of the applicant‟s neighbour‟s property (which has since been removed) was approximately 15 meters high and located between 12 and 13 metres from the affected corner of the applicant‟s house. While the tree roots may not ha ve been present in the soil adjacent to the applicants‟ house, the tree‟s zone of influence (ie drying effect) was capable of extending that far. As outlined above, the timing of the two major leaks identified is not consistent with the damage having occurred in a manner which is subject to cover under the policy. Further, MP has identified other moisture sources which may have contributed to the growth of the root system (such as stormwater run-off and/or watering patterns). In these circumstances, the panel is satisfied that the FSP is entitled to rely on the exclusions for damage caused by settlement and/or tree roots, in order to deny the applicant‟s claim. Policy provides limited cover for legal costs The applicant‟s policy provides cover for legal c osts and expenses incurred in relation to legal proceedings brought by the policyholder. However, cover is limited to claims notified by the policyholder to the FSP during the relevant policy period and is subject to the FSP providing its prior written consent to the costs and expenses incurred. The most the FSP will pay during any period of insurance is $5,000. During the course of this dispute, the FSP confirmed that it would be willing to consider a claim by the applicant for legal costs incurred in taking action against his neighbour for the damage to his property, subject to the terms of the policy. As far as the panel is aware, the applicant has not lodged a claim for legal costs to date. Accordingly, any further consideration of this matter is outside the scope of this determination. Case No: 423346 Determination Page 6 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation or preliminary view. Due to the nature of the dispute, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. During the course of this dispute, the applicant has been represented by his insurance broker. For the purposes of this determination, submissions made by the applicant‟s insurance broker have been treated as if they had been made by the applicant himself. 3.2 Terms of policy Subject Terms Accidental damage cover We will cover your buildings or contents for any accident al loss or accidental damage. There is some loss or damage we will cover only under specific conditions. This is accidental loss or damage caused by: Landslide or subsidence Landslide or subsidence. Cover only applies when the landslide or subsidence occurs within 72 hours after a direct result of one of the following  storm, tsunami, rainwater, hail, snow or wind  explosion  earthquake  liquid t hat escapes from a fixed pipe or something attached to a pipe, fixed gutter, fixed tank apparatus or a drain. General exclusions What we will not pay for We will not cover your buildings and your contents for any accidental loss or accidental damage caused by:  landslide or subsidence except as described above  settling, shrinkage or any movement of earth  roots from trees, plants, shrubs or grass Case No: 423346 Determination Page 7 of 7

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.