Cash settlement of water damage storm claim disputed: repair quantum, excluded items and claims handling
Text of the determination
Determination
Case No: 423241 Determination Page 1 of 11
Case number: 423241 23 August 2016
1 Overview
1.1 Dispute
The Applicants hold a home building and contents policy underwritten by the
Financial Services Provider (FSP) covering their home address.
On 1 May 2015 the insured property was damaged by water ingress during a storm
and a claim lodged under the policy. The FSP accepted the claim and arranged a
cash settlement in lieu of repairs. The Applicants maintain the cash settlement
amount is insufficient to reinstate the property and other items have been excluded
from the claim.
1.2 Issues and key findings
Has the FSP fulfilled its obligations pursuant to the terms of the policy?
The FSP has partly fulfilled its obligations. It is not obliged to pay $3,500 for the pool
solar heating and $1,000 for taxis and software.
However, the FSP is obliged to pay the Applicants:
a further $3,500 for unknown contingencies in the building works but is
otherwise entitled t o base its settlement on its builder' s quotation
$5,596.80 (less $1,500, if $1500 has been paid) for claimed plastering and
electrical works
$3,303.06 for three new ceilings
$3,245 to repair the pool table
$500 for pet accommodation
$2,100 for temporary accommodation (less $1,500, if $1,500 has been paid)
$275 for fitting charges on blinds (if not paid already)
$2,253 for balance of pack, storage and disposal of contents (if not paid
already)
Are the Applicants entitled to compensation?
The Applicants are not obliged to pay the policy excess of $750 and are entitled to
$750 further compensation for the manner in which the FSP managed the claim
because the FSP’s claims handling was sometimes untimely and would have
interfered with the Applicants’ peace of mind.
Case No: 423241 Determination Page 2 of 11
1.3 Determination
This Determination is mostly in favour of the Applicants .
If the Applicants accept this Determination, within 7 days of acceptance, the FSP is
to pay the Applicants:
a further $3,500 for unknown contingencies for building repairs
$5,596.80 (less $1,500 already paid) for plastering and electrical works
$3,303.06 for three new ceilings
$3,245 to repair the pool table
$500 for pet accommodation
$2,100 for temporary accommodation (less $1,500 already paid)
$275 for fitting charges on blinds (if not paid already)
$2,253 for balance of pack, storage and disposal of contents (if not paid
already)
$750 compensation
Save for the compensation, the FSP is also to pay statutory interest on the said
amounts from the date the Applicants paid the above amounts (if the amounts have
been paid) until date of settlement.
Otherwise, the FSP has adequately discharged its liability under the policy and need
take no further action in relation to the claim or the dispute.
Case No: 423241 Determination Page 3 of 11
2 Reasons for Determination
2.1 Has the FSP's offer fulfilled its obligations under the policy?
The onus rests with the Applicants to establish their loss
There is no dispute between the parties the Applicants suffered a loss from a risk
insured against or that the FSP accepted the claim.
However, a dispute has arisen between the parties as to the FSP’s offer of
settlement, which the Applicants maintain is insufficient to remedy the damage from
the claimed event.
As the party seeking the benefit under the policy terms, the onus rests with the
Applicants to establish they are entitled to the benefit which they are seeking.
As there are a number of issues remaining in dispute in the matter, for the sake of
clarity, each item will be addressed separately below. Some matters which have
recently resolved between the parties since this matter has been brought to FOS
have also been included in this Determination.
Balance claimed for building repairs: $11,498.78
The FSP has settled the claim for the building damage by way of cash settlement i n
lieu of conducting the repairs. The terms of the policy ultimately give the FSP the
right to determine which method of settlement it uses when settling a claim.
The FSP's offer of settlement of $26,575.23 was based on a quotation provided to it
by building firm "MT". The FSP had also earlier obtained a quote and scope of works
from another builder in the sum of $21,015.20. This builder was not prepared to
undertake the work because of maintenance repairs required.
The Applicants seek settlement of $38,065.01 based off a quotation provided by their
builder "SB". They say the balance outstanding is $11,498.78.
The parties are in agreement that generally speaking, the scope of works (SOW) for
both the MT and SB quotes are the same. Having reviewed same, except for some
minor differences, I would agree.
However, the Applicants state that items 9, 11 and 18 of MT's SOW are based on
incorrect room dimensions, and when adjusted to the correct measurements, this
shows MT underquoted by approximately 40%. The Applicants have then applied this
uplift across the entirety of the quote, which they say broadly brings the quoted
amount in line with SB's. In support of their position, the Applicants have prepared a
spreadsheet setting out the discrepancies.
The items specified by the Applicants are listed on MT's SOW as follows:
9. (Games room) Patch plaster walls and ceili ngs as required in preparation for painting.
Plasterer 28m2 x $40 = $ 1,120.00
11. (Games room) Apply two coats of wall low sheen, ceiling white, and gloss timberwork and
doors to match existing scheme as close as possible.
Painter 45m2 x $16 =$ 720.00
14. (Store room) Prepare and paint walls and ceilings as for entry/games room including stain
blocking paint as required. Painter 20 m² x $16 =$ 320.00
Case No: 423241 Determination Page 4 of 11
18. (Study) Paint walls, ceiling, timberwork and door to match existing as close as possible
including stain blocking paint as for ent ry / games room.
Painter 21m2 x $16 = $336.00
Review of the SB quote shows it does not include a detailed breakdown of the area
which the quote covers nor does it quote the room sizes. Therefore, it is insufficiently
detailed to conclude that it quotes on a greater area than that allowed for by MT.
The FSP accepts MT did not attend the property to prepare its quotation, but based
its measurements off an earlier repairer (AZ) who did, but did not want to complete
the work. AZ's SOW provides the following measurements:
- (rumpus ) remove and replace ceiling 28m2 incl 55mm cove
- (bedroom/study)remove and replace ceiling 12m2 incl 90mm cove
- (bedroom/study) prep and paint ceiling, walls and trims 45m2
- (office) prep and paint ceiling, wall to front and window surround total 21 m2
Review of the other quotations and measurements reported by the FSP's assessor
are also insufficiently detailed to enable a direct comparison between SOWs to
ensure they are quoting on the same area for repairs. Accordingly, I consider the
most reliable information provided is the room dimensions quoted by AZ.
Comparison between AZ's SOW and MT's show the measurements for the
games/rumpus room appear to be the same. Further, MT quotes under item 18 the
study at 21m2 and the AZ quote shows the same square metres quoted for the office.
There is another room in the house referred to by MT as study/bedroom 3 but this is
not referred to by the Applicants in their submissions about MT’s measurements. In
any event, the allowances made by MT for this area are very similar to the
measurements taken by AZ.
Although work was done in the downstairs storage area, it was to remove, replace
and paint doors, so no measurements were provided for this area by AZ. However,
having reviewed the liability quote from MT and compared it with the measurements
in the scope of works provided by AZ, I am not satisfied on the material provided the
Applicants have established MT has under quoted as he has taken into account
incorrect measurements.
In these circumstances, on the information provided, save for replacement of ceilings
and further electrical and plastering works (which items are dealt with next in this
Determination), I am satisfied the FSP has demonstrated it could repair the damage
for the price quoted by MT. I am satisfied MT's quotation and SOW accurately reflect
the works required at the property particularly in view of the other earlier quote
obtained by the FSP for the cost of repairs.
Provision of more expensive quotes is not a basis on which to conclude the price
quoted by MT is not actionable. I am also not persuaded the Applicants have
sufficiently demonstrated the MT quote as a whole is underquoted by about 40% or
the method of simply applying the uplift of 40% to the entire quote is reasonable.
However, in consideration of what is fair in all the circumstances, I determine the
FSP should make an allowance on the cash settlement of the repair costs to allow for
potential costs which were not identified. I have taken into acco unt MT’s costing is an
estimate based on the scope of works and not a site visit.
Case No: 423241 Determination Page 5 of 11
Although I accept the FSP acted fairly in offering the Applicants the option for the
FSP to authorise repairs in circumstances where the FSP would provide a lifetime
guarantee, the cash settlement includes no lifetime guarantee and left all the risk with
the Applicants. Further the quotes relied on by the parties are no longer current.
In those circumstances, on the information provided, I consider it is fair in all the
circumstances to allow a further allowance of $3,500 to take into account unknown
contingencies.
On the information provided, I am satisfied settlement based on the amount quoted
by MT plus a further allowance of $3,500 adequately discharges the FSP's liabi lity
under the policy.
Electrician and plasterer $5,596.80
The A pplicants’ final spreadsheet indicates in October 2015 the amount of $5,596.80
was incurred to find and repair faults and make safe. The Applicants comment work
was to be completed as the FSP would not approve plaster works. The spreadsheet
has a further comment: “water damage to ceiling and power.”
The Applicants then provided a further quote and scope of works from SB dated 17
February 2016 to repair the downstairs games room ceiling. SB’s scope of works
describes work to repair and replace water damaged electrical wiring, replace the
water damaged plasterboard ceiling and paint in the sum of $5,596.80.
The Applicants’ recent spreadsheet also notes an amount incurred on 22 December
2015 to locate and repair faults. The Applicants comment work was required in
relation to plasterwork and completion of electricals as there was no power in most of
the downstairs area, entryway and driveway. The amount claimed is $4,336.20. The
FSP says it paid this amount on 29 January 2016.
Recent correspondence from the Applicants clarify their position. They say the
amount claimed is in relation to work in the games room as three quarters of the
ceiling needed to be pulled down so the electrician could find the water damaged
electrical system. They say the quotes supplied prior to repair only allowed for the
patch and repair of the ceiling not the replacement of the ceilings.
The FSP says this appears to be a double up in costs. It says the FSP has paid the
electrician P’s invoice for $4,336.20 for electrical work. It says it has unsuccessfully
tried to contact P to clarify. It notes the invoice from P states power was restored to
the games room. It also submits plastering and painting work is included in the MT
quote. The FSP was willing to accept $1,500 for electrical work as stated in the
February 2016 quote from SB.
The Applicants say there is no double up in costs as a timeline shows the FSP
attended the site on separate occasions after the builders quoted and three ceilings
were removed. It also says the initial work was in relation to fault diagnosis and repair
and was work done before the ceilings had to be replaced. They say further
attendances were required to reconnect and re-fit lights in the listed rooms when the
ceilings had to be replaced.
Case No: 423241 Determination Page 6 of 11
Three new ceilings $3,963.67
In June 2016, the Applicants claim works were carried out to three new ceilings as
FSP’s contractor removed the ceilings. In two downstairs rooms, (office and a spare
bedroom) the removal of the ceilings was due to asbestos. In the upstairs office, they
claim the removal of the ceiling was due to mould. The Applicants note this work was
charged as a variation by SB. They claim $3,963.67.
In support, the Applicants provided photographs of the ceilings under repair and a
variation cost sheet. The sheet sets out the supervision, tradesmen, labouring and
material costs to prepare and plaster ceilings. On my calculations, the amounts
highlighted in the sheet total $3,303.06. The Applicants also provided details of bank
transfers to SB which show various amounts paid to SB including two highlighted
amounts: one for $13,750 and the other for $38,065.01 (both paid earlier this year).
The FSP says it is not clear whether the documents submitted by the Applicants are
from SB and without a valid quote or invoice, it cannot accept this cost.
I have considered the material provided. I accept the photographs provided show
work done to the ceilings. I accept SB has been paid the amounts claimed.
On review of the timeline, I note on or about 27 November 2015, AZ attended the site
with the FSP’s hygienist. I note asbestos was removed not long thereafter. AZ’s
scope of works refers to the removal and replacement of ceilings in the rooms in
question save for the downstairs office. In the downstairs office, AZ’s scope allowed
to prepare and paint the ceiling only.
The asbestos clearance certificate was provided 2 December 2015. AZ quoted to
repair on 2 December 2015 as well. MT quoted to repair on 11 December 2015
based on AZ’s scope. However, save for the lounge and bathroom, (which rooms are
not relevant to this part of the claim), MT has only quoted to prepare and paint and
patch plaster ceilings in all the other rooms.
I accept SB had to revise its quote, after it was necessary to remove ceilings.
However, although AZ’s scope of work allowed for the removal of the ceilings, save
for two rooms which are not the subject of this part of the Applicants’ claim, MT’s
liability quote did not allow for removal of the ceilings.
In these circumstances, I am satisfied the further amount of $1,500 allowed by the
FSP is insufficient. On the information provided, the FSP is to pay to the Applicants
$5,596.80 and $3,303.06 less $1,500 (if paid already).
Pool table repairs $3,245
The Applicants acknowledge the FSP has paid $17,615.97 for damaged contents. In
addition, the Applicants claim the sum of $3,245 for damage they claim was done to
a pool table when the FSP’s contractor removed asbestos .
In a recent telephone conversation with FOS’s Case Manager, the Applicants
advised the pool table was damaged because items were placed on the felt as
evidenced by the photograph. They submit the felt has to remain flat, so putting items
on it created divots and unevenness, meaning balls will roll and not stay in place.
Case No: 423241 Determination Page 7 of 11
They also claim the legs of the table were scratched by moving the contents items
around it.
The Applicants provided a quote in the amount of $3,245 for repairs. The Applicants
have also provided a photograph which they say clearly sets out their position.
The FSP says the Applicants have not provided evidence the damage occurred as a
result of the FSP ’s tradesmen. While the FSP acknowledges the photograph shows
items stacked on the table, it contends no evidence produced to date shows the pool
table was damaged. The FSP says it is open to consider a report which establishes
the cause and extent of damage.
The quote is dated 3 March 2016. The work required is described as “re -cloth and
repair damaged pool table.” The photograph provided shows a large number of items
stored on the table.
The quote establishes to my satisfaction the pool table is damaged. The photograph
establishes a large number of items were stored on the table.
Having considered the Applicants’ recent explanation as to how the pool table was
damage, I am satisfied on the balance of probabilities the pool table was damaged in
circumstances described by the Applicants and I am satisfied the FSP is liable for the
cost to repair the pool table.
Pet accommodation $700
Upon provision of a quotation, the FSP says it will pay pet accommodation for the
A pplicants’ dog.
The Applicants claim $700. They say the dog kennel has provided an estimate of $70
per day with a minimum of 10 days.
The FSP has not responded to this detail. The Applicants have not provided a
quotation for the FSP to consider. I have reviewed pet accommodation on the
Internet. I note the various rates charged and consider the amount claimed at the
high end.
In the interests of bringing this protracted matter to an end, I consider it is fair in all
circumstances the FSP pay to the Applicants $500 for pe t accommodation.
Further temporary accommodation $4,200
The Applicants claim one more week temporary accommodation was required in
January/February 2016. They say this was required while floors were being repaired.
They claim $4,200 which they have calculated from the previous value paid by the
FSP for 2.5 weeks accommodation. Further, they submit they should be entitled to
accommodation comparative to their home.
The FSP reviewed the recent spreadsheet from the Applicants. The FSP accepts one
week’s accommodation is fair but considers $4,200 is excessive and is based on
peak season rates. The FSP is willing to pay to the Applicants $1,500 for one more
week temporary accommodation. The FSP calculates its offer at $250 per night for a
2 bedroom apartment.
Case No: 423241 Determination Page 8 of 11
In recent correspondence the Applicants referred to an accommodation website
which placed accommodation rates at between $240 and $360 per night. Their
revised claim is $2,100.
The FSP’s policy provides when a n insured event causes damage to the extent the
insured cannot live in their home, the FSP will pay its insured’s reasonable temporary
accommodation costs for the time it will take to repair or rebuild the home to a
liveable condition. The most the FSP will pay for is up to 4 weeks in short term
accommodation agreed to by the FSP (e.g. standard rates for a hotel, motel or
serviced apartment), then if necessary up to another 48 weeks in residential
accommodation of a similar standard to the home.
I note the size of and photographs of the Applicants’ home. Having considered the
material provided, I consider the amount offered by the FSP would not accommodate
the Applicants in accommodation similar to the standard of their home.
I am satisfied it is fair in all the circumstances the FSP pay to the Applicants $2,100
for temporary accommodation.
Fitting charges on blinds $250
The Applicants claim the FSP approved blinds in all affected rooms. The FSP has
paid to the Applicants $8,619. The Applicants claim the settlement value is $8,894
which includes the fitting charge. They claim the shortfall of $250.
The Applicants provided 4 invoices from the blind company.
Upon review of the most recent spreadsheet from the Applicants and a review of the
invoices, the FSP agrees to pay to the Applicants the fitting costs of $275.
Contents pack and storage $9,000 and disposal of damaged contents $2,500
(balance claimed $2,253)
The FSP offered the sum of $6,127 for the packing, removal and storage of contents
items whilst the repairs are completed. This was based on a quotation submitted by
its contactor "KB". The FSP has also paid $220 for a skip bin. The Applicants
disputed this is sufficient, and seek $9,000 in settlement of this aspect of the claim.
The Applicants were invited to present an alternative quotation for review, or other
supporting evidence to show the amount offered by the FSP was insufficient.
The Applicants were also seeking the sum of $2,500 in settlement of disposal of
damaged content items. The FSP does not dispute the unsalvageable content items
require disposal, however it has asked the Applicants pro vide a quotation supporting
the claimed amount, as it believes the amount claimed is excessive.
Recently, the Applicants provided a quote from S dated 3 March 2016 in the sum of
$8,600. The quote is for sorting furniture and belongings between items going to
storage and items going to the tip. The quote includes the price of storing the items
for eight weeks and the return trip with all belongings and furniture from storage.
Case No: 423241 Determination Page 9 of 11
The FSP has not provided its own quote for the removal of content items, nor has
either party provided a list of what content items are still to be disposed of in order to
ascertain what is required.
In the recent spreadsheet, the Applicants note the quotation received from S totalled
$8,600.04 for both pack out and disposal. Taking into account the amounts of $6,127
and $220 paid by the FSP, the Applicants claim a balance of $2,253.
In the interests of bringing this longstanding matter to a conclusion, and as the FSP
does not dispute the unsalvageable content items require disposal, I am satisfied it is
fair in all the circumstances the FSP pay the Applicants $2,253 to finalise this aspect
of the claim and in particular to dispose of the damaged content items.
Further, after review of recent information from the Applicants, the FSP has agreed to
pay the Applicants $2,253 to settle this aspect of the claim.
Pool solar heating $3,500
The Applicants claim $3,500 for repairs to the pool solar heating. MT inspected the
roof area where the heating is located and considered this was one of the sources of
water entry to the house. The solar heating covers up the tile lap and causes debris
to be caught under the heating unit. The build -up of debris has caused rainwater to
overflow into the roof cavity. MT considered the solar heating was not ins talled in
accordance with building standards and the rectification of same would be a
maintenance issue.
The Applicants were invited to present evidence supporting their position this item
should form part of the claimed repairs, however did not do so.
As the available evidence on the file shows this is a long term maintenance issue as
opposed to damage caused by the storm or any other insured event, I am satisfied
the FSP was entitled to decline this aspect of the Applicants' claim.
In any event, in the final spreadsheet provided to FOS, the Applicants noted they
accept the FSP’s decline on this item.
Taxi/Uber/Laptop and software $1,000
The Applicants seek $1,000 for damaged laptops and software. However, no
evidence or explanation has been presented to s uggest this was as a result of the
claimed event. Accordingly, on the information provided, the FSP is entitled to
exclude this from the claim.
In any event, in the final spreadsheet provided to FOS, the Applicants noted they
accept the FSP’s decline on t his item.
Case No: 423241 Determination Page 10 of 11
2.2 Are the Applicants entitled to compensation for the manner in which
the FSP managed the claim?
Compensation payable in certain circumstances
The Applicants claim $5,000 for time spent and earnings lost following up the FSP
and seeking avenues of recovery from the FSP. They have itemised the amount of
time spent dealing with the claim.
FOS’s Terms of Reference enable FOS to compensate an Applicant for non-financial
loss but this award is capped at $3,000.
Compensation for non-financial loss is limited. FOS may decide an FSP should
compensate an Applicant for such loss only where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference
with the Applicant’s expectation of enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss and
expects an Applicant to be moderately robust a nd bear the usual degree of
inconvenience when managing an insurance claim. Costs incurred or time spent in
managing the claim are not compensable by FOS.
FOS does not have the power to grant entitlements not provided for under the terms
of the insurance contact. The FOS Terms of Reference also specifically excludes
from the powers of FOS, the ability to award punitive, exemplary or aggravated
damages.
Fair in all the circumstances a further $750 is paid
Having considered the timeframes, I consider not all of the delays of bringing this
matter to a conclusion can be attributed solely to the FSP. The Applicants have, at
times, been the source of delays, albeit because of family issues, the requirement to
complete maintenance repairs and the necessity of obtaining quotes and repair
estimates for a number of items.
However, as the party responsible for progressing the claim, it is the FSP's obligation
to ensure the claim is completed in a timely and proactive manner. In this case, I am
satisfied the FSP’s cla ims handling was sometimes untimely and would have
interfered with the Applicants’ peace of mind.
In particular, I note the original settlement offer has been accepted by the FSP as
inadequate and the funds to complete the works not released to the Applicants until
March 2016. Further, the FSP did not arrange for asbestos removal and remediation
until November, some many months after the loss had occurred.
The FSP has previously agreed to award the Applicants the sum of $750 in
compensation for the claims handling experienced, essentially offsetting the policy
excess payable. I consider this amount as insufficient. I am satisfied it is fair in all the
circumstances compensation in the sum of $1,500 is warranted.
Therefore, a further amount of $750 compensation is to be paid.
Case No: 423241 Determination Page 11 of 11
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues co nsidered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant po licy extracts are referred to in the FSP’s Notice of Response dated 5
January 2016. Both the policy document and the Notice have been exchanged with
the Applicants.
3.3 Other relevant material considered and relied on
Parties’ submissions and all attachments to submissions including photographs,
invoices, reports and spreadsheets
Correspondence between the parties