Text of the determination
Determination
Case No: 422897 Determination Page 1 of 10
Case number: 422897 30 December 2016
1 Overview
1.1 Dispute
The applicant brings this dispute on behalf of the strata plan, of which she is a
member. The strata plan holds a residential strata insurance policy with the FSP. A
claim was lodged in December 2013 for damage to Unit 1 on the strata plan (the
applicant‟s unit) , after water inundated the property.
The FSP accepted the claim and appointed a builder, US, to carry out repairs. US
quoted at $50,545. The applicant, who seeks $129,324 for the repairs, does not
accept the $46,900 settlement cheque sent by the FSP. The applicant also seeks
packing and storage costs, further temporary accommodation costs and legal costs.
1.2 Issues and key findings
Is the FSP’s cash settlement for the works fair and reasonable?
The FSP should cash settle the claim for repairs in the amount of $54,043.92. An
additional amount of $4,000 is to be paid for painting repairs. The FSP is not entitled
to deduct any amount for GST.
If it has not already done so, the FSP must refund the second excess of $100.
Is the FSP liable for additional costs?
The FSP is liable for packing and storage costs for a period of eight weeks only.
The FSP must pay additional temporary accommodation costs in the amount of
$6,899.87. The applicant is not entitled to reimbursement of her legal costs.
1.3 Determination
This determination is substantially in favour of the applicant. The FSP must pay the
strata plan:
$64,943.79 in accordance with the terms and conditions of the policy
packing and storage costs for a period of eight weeks in accordance with this
determination
pay interest on the $64,943.79 in accordance with the Insurance Contracts Act
from 17 August 2015 (being the date the FSP purported to settle the dispute) to
the date payment is made.
Case No: 422897 Determination Page 2 of 10
2 Reasons for determination
2.1 Is the FSP’s cash settlement for the works fair and reasonable?
The applicant’s unit suffered water damage
The applicant noticed water in her unit in November 2013. At the time, the origin of
the water was unknown. It has since been established that the cause was due to
failure to properly waterproof the planter boxes in the units above her own. This was
the subject of a previous claim in 2010. The applicant also provided a photo of an
exposed internal pipe, which the applicant says was leaking and also caused water
damage.
The FSP obtained three quotes
The policy provides for the FSP to pay the reasonable and necessary cost of
rebuilding or repairing the damaged portions to the same condition as when they
were new. The FSP can choose what course to take and nominate the repairer.
The FSP obtained three quotes from different builders. However, each builder made
their own assessment of works required, rather than quoting from an agreed scope of
works.
The three quotes were as follows:
PI initially quoted $67,929.40. This was revised down to $43,263.00 on the FSP‟s
instructions to only include works required unde r the policy.
JL quoted $54,043.92
US quoted $50,545.00.
The two PI quotes are difficult to compare. While the first refers to “additional works”
these include replacing water damaged architraves to the verandah doors in the
bedrooms. It has not been explained why this water damage is not part of the claim. I
note that JL‟s quote refers to two sets of architraves in each bedroom requiring
replacement.
Also in “additional items” are a rotted window sill and render repairs to a third wall in
the gymnasium.
PI‟s full quote, less carpet replacement is $61,800. JL‟s without carpet is $54,000.
US‟s quote appears to cover the majority of the same works as noted in PI‟s full
quote (less carpets at $8,100 and repairs to shutters). It does not specify the
floorboards to be used, other than that they will be a similar hardwood, such as
spotted gum. The quote states:
„C ontract price to increase to allow for additional works as per section on scope of
works “Additional Scope Items – as per [FSP] advice 15.10.14”.‟
However, FOS has not been provided with the advice of 15 October 2014.
Case No: 422897 Determination Page 3 of 10
The applicant obtained three quotes
The applicant also obtained three quotes as follows:
OC - $110,530
CP - $140,800
OP - $211,200.
In an email dated 23 August 2015, the applicant‟s pr oject director noted that the
scope of works used to obtain these three quotes followed the detailed instructions of
the applicant. However, the director was not convinced that the insurers would
approve some items, such as kitchen bench alterations as well as laundry works. The
director estimated these represented approximately $15,000 of the quote by OC,
bringing it down to approximately $95,000.
The director considered that all works were necessary due either to the water
penetration, humidity, or negligence and indiscriminate use of the premises by the
builders. However, it is not clear which builders are being referred to. It could not be
the FSP‟s builders as they did not conduct any works.
Only OC‟s quote was produced to FOS. It was dated 1 September 2015 (after the
project director‟s email) and was for $130,300. This quote referred to hardwood
flooring at $125 sqm (as opposed to an allowance by US of $75 sq/m). It also
included replacing a number of items with new items and installing them. No
reference was made to kitchen bench alterations or laundry works.
OC completed the works
The applicant recently advised the works were completed by OC for $134,027.15,
This included all additional variations and PC items. The applicant paid $129,324.01
and is disputing the balance as she is unsatisfied with some of the works.
JL’s quote is re asonable
I have difficulty in accepting OC‟s quote dated 1 September 2015 given it has very
little detail and differs from the quote referred to in the project director‟s email by
$20,000. This is despite the fact it includes fewer items. It is also clearly based on
improving the unit rather than restoring it. The invoices provided by OC of the
completed works do not provide sufficient detail to alter this view.
This leaves me to consider the three quotes obtained by the FSP. In this regard I
have considere d the applicant‟s assertion that US stated they quote for fewer items
in order to obtain the work form the FSP and then seek approval for additional items
later. US denies this. However, it is to some extent consistent with the reference in
US‟s quote to f urther additional items.
Comparing the FSP‟s quotes, I am most satisfied with JL‟s quote as being an
accurate assessment of the required works. This is because:
it falls within the range of P I‟s two quotes and US‟s quotes
for the reasons expressed above, I have difficulty reconciling PI‟s two quotes
f or the reasons expressed above, US‟s quote appears to be incomplete , and
Case No: 422897 Determination Page 4 of 10
JL‟s quote appears to include all items identified by the other quotes.
The FSP must therefore pay the strata plan the sum of $54,043.92 in accordance
with the terms and conditions in the policy.
FSP to pay GST
I note in this regard, that the FSP‟s settlement on 17 August 2015 deducted GST.
The policy permits such a deduction where an insured would be entitled to an input
tax credit under relevant legislation, had the payment been applied to acquire the
goods or services.
The FSP says it believes the strata plan would be entitled to input tax credits and
hence GST is not payable.
The applicant says the strata plan is no longer registered for GST. The applicant
notes she had to pay GST for the work undertaken. The applicant has also produced
tax invoices in her name for the work that has already been completed and bank
statements to support the payments made. In these circumstances, the FSP should
pay the full $54,043.92, without deductions for GST.
A further amount is to be allocated for painting
JL‟s quote does not refer to painting or to repairs to shutters. US‟s quote stated it was
awaiting advice from the FSP regarding painting.
The F SP says it is not liable to pay either and relies on the definition of “Building” in
the policy which states buildings do not include:
…paint…where your building is located in NSW, and…
curtains, blinds, window coverings inside a Unit.
Repair or replacement of shutters is therefore not covered by the policy.
Email correspondence between the FSP‟s assessor, the content‟s assessor and the
applicant, suggests that the FSP agreed to cover painting that was necessary as a
result of the building rectification works.
The FSP says it is not liable for any painting required, as this would be a result of the
damage caused by the applicant‟s chosen builders.
However, I am satisfied that it was reasonably contemplated that there may be some
damage resulting from the necessary works that would mean painting was required,
and that the FSP had accepted liability for this. This is sensible given that skirting
boards and architraves had to be removed and replaced.
The applicant says the original tendered price for painting was $7,500 and she paid
an additional $1,000 as part of the variations to ensure a timely finish. However, for
the reasons stated above, I am not satisfied that such painting was required solely
due to the repairs as opposed to improvements. I consider it fair in all the
circumstances to allow $4,000 including GST for such painting works.
Case No: 422897 Determination Page 5 of 10
2.2 Is the FSP liable for other costs?
The FSP is liable for storage
The policy provides that where a unit is owner-occupied for residential purposes, the
FSP will pay the reasonable costs to remove, store and return undamaged contents.
The FSP declines to make any payment in respect of the storage of contents,
explaining it only insures the building. The FSP notes the applicant has a separate
contents insurer who arranged transportation and storage and should bear the costs
of this.
The applicant has provided photos that illustrate the level of moisture in the unit and I
accept that removal of the contents and their storage were necessary until all
rectification works were complete.
Whether the contents insurer must also accept liability is a matter as between the
FSP and the contents insurer. The applicant says packing costs were $3,180.70 and
storage costs were $500 per month for 2 x 10 cubic metre units from October to
January. The applicant says she has not yet received a bill for this, nor paid it.
On provision of evidence to the FSP of the costs of the removal storage and return of
undamaged contents to the applicant, the FSP must pay the applicant her out of
pocket expenses or outstanding liability in respect of these costs for a period of eight
weeks only (being the estimated repair time as opposed to the time it took to
complete all works).
In reaching this conclusion I have considered the FSP‟s submission that it was
prejudiced by the delay in rectifying the waterproofing defect and by the applicant‟s
refusal to permit US to commence repairs. As a consequence, the FSP believes that
it should be entitled to refuse storage costs and / or reduce its liability to nil.
I do not accept this submission. There is no evidence that the applicant contributed to
any delay in rectifying the waterproofing defect. This was an issue with the owners of
the other units. Further, the applicant says she was querying US‟s quote when she
received, without discussion, the settlement cheque from the FSP. The applicant
says she did not refuse US access and her project manager was willing to work with
US.
The FSP has not produced its claim notes to verify that the applicant was the cause
of delay to the completion of waterproofing works. The correspondence provided to
FOS suggests there was an issue with obtaining the other unit owner‟s consent to the
works. There is also no evidence that the applicant refused to accept
commencement of the works by US. I am satisfied the FSP should pay the
applicant‟s removal, storage and return costs on the terms described above. The
FSP is then free to seek contribution from the contents insurer if it wishes to do so.
The FSP paid temporary accommodation costs during the waterproofing
The policy provides for temporary accommodation costs where the unit suffers
damage and is unable to be occupied for its intended purpose. Where a unit is
owner-occupied, the FSP will pay the reasonable temporary accommodation cost the
Case No: 422897 Determination Page 6 of 10
applicant will necessarily incur. The FSP will pay for the period that is reasonably
necessary for repairs and rebuilding to be completed and access to the applicant‟s
unit is re-established.
The FSP submitted it had already paid the applicant $22,750.09 for temporary
accommodation when the strata undertook repairs to the damaged waterproof
membrane. These were complete on 6 August 2015. The applicant has not denied
this.
The FSP says the applicant was not entitled to this amount because this was
incurred when the strata were installing the necessary waterproofing – not when the
repairs were being carried out to the apartment under the policy.
However, from the photographs provided by the applicant and the fact that her
contents were removed, either because they were damaged or to prevent further
damage, I accept that the unit was unable to be occupied for its intended purpose.
This means the applicant was entitled to temporary accommodation costs during the
period of repairs to the waterproofing membrane on the units above, as well as
during, her own repairs.
The applicant is entitled to further temporary accommodation costs
The applicant seeks a further $28,460 for temporary accommodation from 27
September 2015 to 21 January 2016 and has provided receipts for this amount. This
is sixteen and a half weeks. I note though, that the applicant has not sought
temporary accommodation for this entire period.
The only builder to estimate a period of time for repair was US, who stated it would
be between 6-8 weeks. The applicant says this was extended give n the Christmas
holiday period.
The FSP has not disputed the type of accommodation used by the applicant, but I
note that in its settlement offer, it provided only 12% of the costs since 1 January
2015. The FSP stated:
“The settlement amount for temporary accommodation is based on it being required by
the Unit Owner approximately twelve percent of the time since 1 st January 2015. This
calculates to be approximately seven days required for the duration of the eight week
schedule of works. The rate of $300.00 per night has been used with contribution for
fifty percent. ”
The FSP‟s response suggests that the 12% was based on invoices for
accommodation in respect of the $22,750.09 payment that was made and based on
the applicant‟s use of the property given it says it was not her primary residence. The
FSP was to provide FODS with the calculations of its 12% but it has not done so.
The applicant has explained that she was subjected to a lengthy recorded interview.
FOS requested a copy of the interview transcript, but the FSP was reluctant to
provide it. The applicant says her husband‟s business means that he is constantly
travelling around New South Wales and Victoria and she often travels with him. Her
family is in Sydney.
Case No: 422897 Determination Page 7 of 10
On balance, I accept that the FSP is required to pay for further temporary
accommodation. However, I am not satisfied on the evidence before me that
payment for temporary accommodation until 22 January 2016 is warranted. If
additional works were performed, above that required by the policy, the FSP cannot
be held liable for temporary accommodation during this time.
Eight weeks from 27 September 2015 is until 22 November 2015, before the
Christmas period. During this time, the applicant had temporary accommodation (that
has not been paid for by the contents insurer) of $6,899.87. The FSP must pay the
strata plan this additional amount for temporary accommodation.
The applicant is not entitled to her legal fees
The applicant asks the FSP to reimburse her $5,000 for legal fees. She provided a
receipt for $4,573.80.
The policy does not provide for the payment of legal expenses in these
circumstances, however FOS can make an award for legal expenses under its Terms
of Reference where, for example, the dispute is sufficiently complex that it requires
legal assistance.
FOS is an external dispute resolution that is free to consumers. It is not intended that
applicant‟s require or should need legal assistance in bring ing their dispute. The facts
in this dispute are not sufficiently complex to warrant a reimbursement of legal
expenses. The FSP is therefore not required to pay the applicant her legal costs.
Case No: 422897 Determination Page 8 of 10
3 Supporting information
3.1 The FOS approach
I have determined this dispute based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
FOS decisions (but are not bound by these). I have taken into account all the
material submitted by the parties.
There has been a full exchange of all documents relied on to make this determination
and each party has had the opportunity to address any issues raised by the other.
This dispute was expedited to a determination. No recommendation was issued.
3.2 Chronology
Date Event
November 2013 Applicant says there was a deluge of water, due to unknown
cause. This effected the front, middle and master bedroom,
bathroom, lounge / dining and kitchen area.
23 December 2013 Claim lodged
12 April 2014
Assessor‟s report
Damage is to the bedrooms (master bedroom and thirds
bedroom) and main bathroom tiles are stained.
Also says water is penetrating into the bedrooms and the lounge
area.
Caus e is planter boxes from apartments above.
Damage was first notice d to uni t above in April 2010. In 2011 unit
2 planter box was waterproofed (excess applied then).
2 May 2014
FSP quote
Quote f r o m JL - $54,043.92
12 June 2014
Assessor‟s report
Extent of damage is:
Floorboards in the open plant lounge, kitchen and dining areas
Skirting boards in the master bedroom, 3 rd bedroom and lounge
Main bat hroom tiles are stained.
Time delay due to negotiations to get other unit holders
agreement to tests to determine cause of damage.
?
FSP quote
Quote f r o m US - $50,545
18 July 2014
FSP quote
Quote f r o m P I for $67,929.40, revised down to $43,263.
Case No: 422897 Determination Page 9 of 10
Date Event
17 August 2014
FSP quote
FSP says US authorised to carry out the works.
30 August 2014
Email
From FSP‟s assessor to applicant:
“I did not request [US] to re - attend and have not communicat ed
with them about this matter since I last dealt with them.
As I mentioned to you I am working with the two quot es I have
received form [JL and P].
I will forward your claim for accommodation and await the
insurer‟s instructions.”
1 September 2015
Applicant‟s quot e
Quote from OC - $130,300
10 September 2014
Assessor‟s report
Applicant advised that no reinstatement works could proceed until
the waterproofing issues are addressed and rectified.
Cont ents insurer wants contribution for removal and temporary
storage costs and drying costs.
Query whether this was during rectificat ion works rather than
repair works, or whether premises uninhabitable because of poor
ventilation and mould.
23 September 2014 Email from FSP‟s assessor to content‟s assessor:
“I have received a response from [FSP] about the painting work
and they have advised insofar as damage occurring as a result of
building reinstatement works are concerned, the painting to walls
etc will be covered.”
13 October 2014 Email from contents assessor to applicant:
I have been in contact with the [FSP‟s] assessor and he has
confirmed that [FSP] will cover the painting if as a result of the
building works required. In this case, I am satisfied that they are
responsible and will follow up with [FSP] also.
In the int erim I will also submit a report requesting payment to you
in lieu of the carpets.
6 August 2015 Repairs to planter boxes complete.
17 August 2015
Letter fro FSP to strata
management
Strata management received an email from [FSP] with a form for
release for $46,900. Settlement breakdown as follows:
$46,900 settlement payment, less $100 excess.
UBS quot e - $50,545.
Temporary accommodation $1050
Less GST - $4,595
Less policy excess - $100.
Temporary accommodation based on the temporary
accommodation being required approximately 12% of the time
since 1/1/15.
Case No: 422897 Determination Page 10 of 10
Date Event
23 August 2015
Email from applicant‟s
project director
Refers to a number of quotes obtained, including OC for
$110,530.
Statement of works as written will not be approved by insurers,
given it covers remedial works as desired by the applicant – such
as kitchen bench alternations and laundry works. This represents
approx. $15, 000 of the quot e provided by OC.
OC quote covers damage from water plus negligent and
indiscriminat e use of the premises by the builders. – eg/ bad
workmanship in rehanging doors, unprofessional carpent ry, etc
Believes US quote is haphazard and does not address a
comprehensive approach to the prevailing issues, owners claims
and the situation of the apartment in its current state.
13 October 2015
Letter from FSP to
strata management
Encloses cheque for $46,900, even though settlement not
accepted and deed of release not signed.
3.3 Only one excess applies
The FSP has ultimately agreed that only one excess should apply. The FSP agreed
to refund the second excess of $100 that was paid.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.