Text of the determination
Determination
Case No: 422778 Determination Page 1 of 9
Case number: 422778 28 November 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP), after her home was damaged by a burst water pipe in June
2014. The FSP accepted the applicant’s claim and arranged for the repair of her
property.
The applicant is dissatisfied with the quality of the building repairs carried out by the
FSP’s contractors and says they caused further d amage to her property. The
applicant also says the FSP’s restoration company has lost and/or damaged some of
her contents items.
The applicant seeks cover for the costs of engaging her own builder to undertake
further works, together with reimbursement for various lost and damaged contents
items. She also seeks compensation for losses incurred as a result of the manner in
which the FSP has handled her claim.
1.2 Issues and key findings
Is the FSP liable for the cost of further building works?
The available info rmation establishes that the repairs carried out by the FSP’s builder
were inadequate to restore the property to its pre-loss condition and resulted in
further damage to the property. However, the FSP is not liable for all of the disputed
damage.
Is the FSP liable for loss or damage to contents items?
The FSP is liable for some (but not all) of the additional amount claimed by the
applicant for loss or damage to her contents caused by the FSP’s contractors.
Is the applicant entitled to compensation?
The applicant is entitled to reimbursement for the costs of her building consultant.
She is also entitled to compensation for non-financial loss, due to the manner in
which the FSP has managed her claim.
Case No: 422778 Determination Page 2 of 9
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is required to pay the applicant the following amounts in full and final
settlement of her claim:
$35,000 for additional building works at her property;
$20,000 for loss and damage to her contents items;
$1,500 as compensation for non-financial loss; and
costs incurred by the applicant in engaging her building consultant (as referred
to in section 2.3 below), to the extent not previously reimbursed.
The FSP is not required to pay interest on the above amounts.
Case No: 422778 Determination Page 3 of 9
2 Reasons for determination
2.1 Is the FSP liable for the cost of further building works?
Applicant is dissatisfied with quality of building repairs
The applicant’s property sustained extensive damage as a result of a burst water
pipe in June 2014.
The FSP appointed its builder (JL) to prepare a scope of works and undertake the
necessary repairs. As the property had been significantly affected by moisture, the
FSP arranged for its restoration company to undertake mould testing and
remediation so the building repairs could commence.
During the repair process, the applicant notified the FSP of her concerns regarding
the quality of the repairs, which resulted in the builder re-attending the property on a
number of occasions.
In or around September 2015, the FSP advised the applicant that the works had
been completed and her entitlement to temporary accommodation under the policy
had expired.
Accordingly, the applicant moved back into the property. However, she remained
dissatisfied with the quality of the works undertaken by the FSP’s builder and
engaged her own building consultant (JC) to inspect the works.
In his report dated 26 October 2015, JC identified a number of aspects of the repairs
which he considered had not been completed to an acceptable standard.
Among other matters, JC noted that the quality of the plaster, paint finishes and tiling
did not comply with applicable building standards and several of the specific items
included in the approved scope of works had not been properly completed.
JC also reported that there were “a vast number” of chips, scratches, gouges and
other marks to various parts of the property, which he considered had most likely
been caused by the FSP’s builder in the course of undertaking the repairs. JC stated
that many of these marks appeared recent and/or showed evidence of contractor
neglect.
The applicant has subsequently provided a detailed list (on a room by room basis) of
each item she says was inadequately repaired and/or sustained further damage due
to the actions of the FSP’s builder.
The applicant has also provided a desktop estimate prepared by JC (as well as
quotations for certain additional items) which estimates the costs of completing the
outstanding works at approximately $55,000.
FSP disputes extent of rectification repairs required
After the applicant lodged her dispute with FOS, the FSP appointed an external
building consultant (JB) to review JC’s report, inspect the property and provide his
opinion as to the quality of the repairs carried out.
Case No: 422778 Determination Page 4 of 9
In his report dated 9 February 2016, JB confirmed JC’s findings that certain aspects
of the works (including the plaster, paint and tiling finishes) had not been completed
to an acceptable standard.
However, JB concluded that not all of the additional items of damage identified by JB
had been caused by the FSP’s contractors. JB considered that some of the minor
marks and scratches were due to wear and tear, consistent with the age of the
property.
The FSP has acknowledged that it is liable for the further rectification works identified
in JC’s report and has advised that it is willing to cash settle th e applicant for the fair
and reasonable cost of undertaking the further works identified by its building
consultant (JC).
The FSP says it has been unable to obtain its own quotation for these works, as the
applicant has lost confidence in its contractors.
FSP is liable for any additional damage caused by its contractors
The FSP says it is not liable for any of the additional items identified by JB as having
been caused by its builders, as this damage was not directly related to the burst pipe
in June 2014.
The FSP says that, to the extent its contractors have caused additional damage to
the property during the course of the repairs, the applicant should seek recovery from
the contractors directly, under their builders’ liability insurance policy.
The panel does not accept the FSP’s position that it is not liable for any additional
damage to the applicant’s property caused by the FSP’s contractors.
Under the terms of the policy, the FSP was responsible for repairing the damage to
the applicant’s home caused b y the burst water pipe. In order to fulfil its obligations,
the FSP appointed its builders to carry out the necessary works.
In these circumstances, the builders are acting on behalf of the FSP. Accordingly, the
FSP is responsible for the actions of the b uilders during the course of the repairs,
including any further, incidental damage caused to the applicant’s property.
FSP is responsible for some (but not all) of disputed damage
As outlined above, the applicant has provided an extensive list of specific items of
damage for which she says the FSP’s builders are responsible.
The report prepared by the applicant’s building consultant (JC) addresses some of
these items in detail and includes photographs substantiating the applicant’s
concerns.
However, JC’s report does not address all of the individual items of damage claimed
by the applicant directly. Further, JC’s report proceeds on the premise that the FSP’s
builders should be held responsible for all of the observed issues with the property, in
the absence of evidence to the contrary.
Case No: 422778 Determination Page 5 of 9
Similarly, the report prepared by the FSP’s building consultant (JB) includes his view
as to whether the FSP’s builders were responsible for each of the disputed items of
damage, but does not specifically identify the cause of damage in each case.
The photographs included in JB’s report illustrate some of the damage for which the
FSP has accepted liability, but do not depict the items for which it has denied liability.
The FSP has simply stated that there is no evidence to s uggest this damage was
caused by its builders.
In relation to items which the applicant says were not completed in accordance with
the approved scope of works (for example, the flooring), the FSP says the applicant
agreed to a variation to the original scope during the course of the repairs. However,
the FSP has not provided information which evidences this consent.
In these circumstances, it is difficult to determine with absolute certainty which of the
disputed items of damage the FSP is responsible for (either as a consequence of the
poor quality of the original repairs or due to the further actions of its builders).
As outlined above, the FSP has acknowledged that the repairs are still deficient in a
number of respects, despite the applicant having raised concerns on a number of
occasions.
Further, having regard to the manner in which the repairs were carried out, the panel
is satisfied that, on the balance of probabilities, at least some of the additional
damage to the property has been caused by the ac tions of the FSP’s builders.
However, the panel does not consider the FSP is liable for all the disputed damage
claimed by the applicant. The nature and extent of some of these items of damage
are more consistent with having been caused by wear and tear, over the life of the
house.
FSP is required to pay applicant $35,000 for building repairs
As outlined above, the applicant has provided an estimate of approximately $55,000
from her building consultant (JC) for the cost of repairing the disputed items of
damage.
JC’s estimate is prepared on an itemised basis and generally appears fair and
reasonable. The FSP has not directly challenged the costs estimate provided by JC.
However, JC’s estimate includes a number of relatively substantial items for which
only a provisional sum allowance could be made – for example, the estimate includes
an allowance of up $9,000 for the replacement of cabinets and doors, in the event
they cannot be successfully repaired and realigned.
JC’s estimate also includes an amount of $2,000 for re-cleaning drapes and pelmets,
which is duplicated in the applicant’s claim for contents rectification (as outlined in
section 2.2 below).
Based on the available information and having regard to the factors outlined above,
the panel considers that it is fair in all the circumstances that the FSP be required to
pay the applicant the amount of $35,000 for the outstanding building works.
Case No: 422778 Determination Page 6 of 9
This amount includes the costs of the applicant engaging her own contractors to
provide clearance certificates, to the extent that such certificates have not been
provided by the FSP. It also includes the costs of temporary accommodation, to the
extent required while the additional works are carried out.
2.2 Is the FSP liable for loss or damage to contents items?
Applicant says FSP’s contractor lost and damaged contents items
The FSP arranged for the entire contents of the applicant’s property to be packed up
by its contractor (S) and stored off-site while the building repairs were undertaken.
The applicant says that, when S returned her contents items in September 2015, a
number of items were missing and various items of furniture had sustained
scratches, marks and other damage.
The applicant has indicated that some of her concerns were discussed and resolved
with S in October 2015. However, she has provided a detailed list of items which (as
at March 2016) she considered to be unresolved.
The applicant seeks payment of approximately $42,000 for loss and damage to these
items, based on an itemised list she has provided.
FSP has not adequately addressed applicant’s concerns about contents items
The applicant says that S completed a detailed inventory report at the time her
contents were removed from the property, which listed the items removed and
included photographs documenting their condition at the time.
The applicant says that the damage to her furniture which is the subject of the current
dispute was not apparent from the inventory report and therefore must have been
caused by the manner in which the furniture was removed and stored by S.
The FSP has provided limited submissions in response to the issues raised by the
applicant. In particular, the FSP has not addressed the concerns raised by the
applicant in relation to each of the items and has not provided a copy of the reports
prepared by S at the time the items were removed from the property.
It appears that the FSP’s contractors met with the applicant in Marc h 2016 to review
the claimed damage to the furniture. Following this meeting, the FSP indicated it was
willing to consider a settlement offer subject to the applicant providing an estimate of
the costs of replacing or repairing the lost and damaged items.
The FSP has not provided any information regarding the outcome of the meeting with
the applicant to inspect the furniture. Nor has the FSP provided a response to the
applicant’s cost estimate.
FSP is required to pay applicant $20,000 for contents items
Based on the information provided, the panel accepts that the applicant has suffered
additional loss or damage to her contents items, as a consequence of S’s actions .
Case No: 422778 Determination Page 7 of 9
For the reasons outlined above , as S is the FSP’s contractor, the FSP is responsible
for any such additional loss or damage.
However, the panel is not satisfied that the FSP is responsible for the full amount
claimed by the applicant.
In the absence of photographs of the damaged items, it is not possible to determine
the nature of the damage or the repairs required. However, based on the applicant’s
descriptions, it appears that much of the damage to the furniture consist of scratches,
marks and other surface damage.
In the panel’s view it is likely that some of this damage has been caused by wea r and
tear, rather than by the actions of the FSP’s contractor.
Further, the applicant’s cost estimate provides for the full replacement of certain of
the damaged items – for example, master bedroom furniture at a total cost of $6,500.
However, given the nature of the damage to these items, the panel considers that at
least some of the items are likely to be able to be repaired, without the need for full
replacement.
Based on the available information and having regard to the factors outlined above,
the panel considers that it is fair in all the circumstances that the FSP be required to
pay the applicant the amount of $20,000 for loss or damage to contents items.
To the extent that the FSP has settled the applicant for damage to any contents
items following its inspection in March 2016, it is entitled to reduce the cash
settlement by this amount.
2.3 Is the applicant entitled to compensation?
Applicant is entitled to reimbursement of professional costs
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial
services provider to contribute to professional costs incurred by an applicant in the
course of their dispute.
The applicant seeks reimbursement for professional costs incurred in engaging her
building consultant (JC) to report on the q uality of the building repairs and provide a
cost estimate as for the further works required.
The applicant has previously provided the FSP with invoices from JC for the
preparation of his initial report, which it appears has been reimbursed by the FSP.
However, it is unclear whether FSP has reimbursed the applicant for the additional
costs of $1,322.75 incurred for JC’s cost estimate.
To the extent that it has not done so already, the FSP is required to reimburse the
FSP for amounts paid to JC, based on the invoices provided.
Applicant is entitled to compensation for non-financial loss
Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation
for non-financial loss (capped at $3,000) where an applicant has suffered an unusual
Case No: 422778 Determination Page 8 of 9
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with their expectation of enjoyment or peace of mind.
The applicant has raised a number of concerns about the manner in which the FSP
has handled her claim.
Among other things, the applicant says the FSP and its contractors have:
unnecessarily delayed resolution of the claim;
consistently failed to address the various issues she raised during the course of
the claim; and
failed to communicate with her clearly and promptly during the claim process.
Having carefully reviewed the claim records, the panel considers the FSP could have
better managed the repair process, as it is clear the applicant raised concerns about
the quality of the works from a relatively early stage.
Despite acknowledging that the repairs have not been completed to an acceptable
standard, the FSP has provided limited information which assists in determining the
scope of its liability.
Further, the FSP has sought to distance itself from liability arising from the actions of
its contractors, which the panel considers is inappropriate in the circumstances.
The panel is satisfied that the applicant has suffered significant stress and
inconvenience as a result of the manner in which the FSP has handled he r claim.
In the circumstances, the panel considers the FSP should be required to pay the
applicant an amount of $1,500 as compensation for non-financial loss.
Case No: 422778 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous Financial Ombudsman Service (FOS) decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.