Home / Financial Firm (Unknown - Insurer) / Determination 422345

Determination 422345

Storm damage to swimming pool claim partly declined

FirmFinancial Firm (Unknown - Insurer)
Decided2016-09-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$25,505
Non-financial loss—
Amount claimed$51,010
SourceAFCA PDF

Summary

Homeowners claimed for storm damage to an in-ground pool, and the FSP relied on the policy exclusion for water running down pool sides. AFCA found the storm was the proximate cause, that the exclusion did not cover all the damage, and ordered the FSP to settle for 50% of the $51,010 repair quotes, or $25,505, without interest.

Where the proximate cause is an insured storm but the mechanism of damage is unclear, the insurer's exclusion must be applied to the damage it actually proves was excluded.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 422345 Determination Page 1 of 8 Case number: 422345 19 September 2016 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy with the financial services provider (FSP), for damage to their in-ground fibreglass swimming pool. When the applicants lodged their claim, they advised the damage had occurred during a severe storm on or around 23 April 2015. However, they now believe the damage was caused by water leaking from a cracked pipe which occurred prior to the storm. During the course of the claim process, another major storm occurred and the damage to the applicants‟ pool worsened, such that it now requires complete replacement. The FSP says it is not liable for the applicants‟ claim be cause the damage occurred as a result of water running down the sides of the swimming pool during a storm. The policy specifically excludes cover for damage caused in this manner. 1.2 Issues and key findings Is the FSP liable for the damage to the pool? The available information establishes that the proximate cause of damage to the applicants ‟ pool and surrounding areas was the excessive volumes of rainwater run- off resulting from the severe storm in April 2015. Under the terms of the policy, where damage to a swimming pool (and the surrounding material) is caused by a storm, the FSP‟s liability depends on the manner in which the damage occurred. In the present case, the precise mechanism by which the damage occurred is not clear (partly due to the delay in inspecting the property and the effects of the intervening storm). Accordingly, some of the claimed damage may have occurred in circumstances which are covered under the policy. Having regard to the extent of the damage and the likely contributing factors , it is fair in all the circumstances that the FSP contribute to 50% of the costs of repairing the damage. 1.3 Determination This determination is partly in favour of the applicants. Case No: 422345 Determination Page 2 of 8 The FSP is to pay the applicants the amount of $25,505 in full and final settlement of their claim. The FSP is not required to pay interest on this amount. Case No: 422345 Determination Page 3 of 8 2 Reasons for determination 2.1 Is the FSP liable for the damage to the pool? Policy provides cover for insured events subject to exclusions The applicants are required to show that, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the applicants are able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicants‟ p olicy provides cover for damage caused by the events listed in the policy, including the insured events of „storm‟ and „escape of liquid‟ (such as water leaking from a fixed pipe or a swimming pool). The insured event of „storm‟ specifically excludes damage to swimming pools caus ed by a storm, where the damage occurs due to water leaking down or against the sides or underneath the pool. The policy also contains general exclusions for damage caused by:  erosion, subsidence, landslide, collapse, shrinkage or any other earth movement (except where the damage occurs in certain limited circumstances, including within 72 hours and directly because of, a storm); and  water seeping or running down the sides or underneath swimming pools causing them to move, change shape, lift or leak through their hydrostatic valves. The reports prepared by the various contractors appointed by the parties (including the photographs contained therein) confirm that the east side of the applicants‟ swimming pool has significant tears and the pebblecrete paving adjacent to this area has collapsed. However, the FSP will only be liable for the claimed damage if the proximate cause of the damage (that is, the real, effective or dominant cause) was one of the events insured against under the policy. The panel has carefully reviewed the reports prepared by the various contractors (together with the other information provided), for the purpose of determining the proximate cause of the damage to the applicants‟ pool. Consultants have provided differing opinions When the applicants lodged their claim in May 2015, they stated that their pool had been damaged during a storm approximately two weeks earlier. The applicants noted that their pool specialist (LD) had attended and advised that the damage was due to the skimmer box having dropped, possibly due to the storm. The applicants subsequently provided a copy of a brief report from LD dated 5 May 2015, in which he advised that the pool skimmer box had dropped, thereby allowing Case No: 422345 Determination Page 4 of 8 water to escape to the side of the pool. As a res ult, the wall had collapsed inwards, breaking the return pipe work. LD noted that, while temporary measures could be taken (including raising the pool skimmer box and blocking the return pipe), major works would be required to prevent further damage. The FSP appointed an assessor (RC), who attended the property on 15 June 2015. RC observed visible bulging to the fibreglass pool shell and sinking pebblecrete alongside (although the paving in this area had not yet collapsed). Photographs taken by RC during his inspection indicate that the skimmer box had ripped away from the slab (which RC concluded had occurred as the pool had moved). RC commented that a large volume of water appeared to have come down the hill and undermined the pebblecrete paving by washing away the compacted earth surrounding the pool. In accordance with RC‟s recommendation, the FSP appointed an engineer to assess the damage and determine the integrity of the paving and surrounding ground. The FSP‟s engineer (MP) attended the proper ty on 13 July 2015. By this time, a further storm had occurred in late June, triggering a number of tears in the fibreglass shell of the pool and the further collapse of the surrounding area. MP observed that the skimmer box filter basket container had completely separated from its position in the paving and there was a crack in the container immediately above the suction outlet pipe. In his report, MP concluded that the damage to the pool had been caused by large volumes of water entering the cement-stabilised sand backfill material beside the pool, softening this material and causing it to slump and put pressure against the inside wall of the pool. MP considered that:  the slumping of the backfill material may have destabilised the skimmer basket container and adjacent pipework, cracking the pipework and causing further leakage from the pool; and  the second storm had caused further destabilisation of the affected backfill, worsening cracking of the shell and leading to major settlement of the surrounding paving. MP also noted that the drainage arrangements in the rear yard were not ideal and were likely to have been overloaded during periods of heavy rain. MP considered that erosion of the backfill material may have been occurring gradually over time, before being exacerbated by the excessive rainfall experienced during the storm in April 2015. The applicants subsequently engaged their own engineer (CS) who inspected the pool in October 2015. Case No: 422345 Determination Page 5 of 8 CS concluded that the damage had occurred due to the pool skimmer box and surrounding pipe system being overwhelmed by the substantial volumes of water which entered the pool during the storm in April 2015. CS noted that:  a small increase in the load on the skimmer box would have been sufficient to cause a crack in the return pipe work, which may have already been in a deteriorated state due to the age of the pool over 20 years old); and  water from the compromised skimmer box and pipe system would have flowed consistently over time to the side of the pool, causing the side wall to bulge and crack under the resulting pressure; and  as the bulging in this area increased, the backfill material would have subsided, causing the pebblecrete to collapse. Mechanism by which damage occurred is unclear Having carefully reviewed the reports provided by the various consultants, the panel notes that there are a number of common elements. For the most part, the consultants agree that:  the skimmer box has been compromised;  there is a crack in the return pipe work; and  water entered the pool and/or the surrounding backfill during the storm in April 2015, causing the pool wall to bulge and crack under pressure; and  the damage to the skimmer box, pipework and pool wall during the initial storm made it susceptible to further damage, due to the ongoing leakage of water as well as the effects of heavy rainfall during the second storm. However, the consultants disagree as to the exact mechanism by which the damage occurred, including how and when the skimmer box was affected and the return pipework cracked. The consultants also disagree on the extent to which the damage was caused by pre-existing factors which had occurred gradually over time, rather than solely due to the effects of the storm in April 2015. Damage was not solely caused by excluded factors There is no dispute that the applicants‟ property was affected by a severe storm in April 2015, which generated extreme levels of rainfall. Media reports confirm that areas in the vicinity of the applicants‟ property were declared natural disaster zones as a result of the storm. The applicants consider the crack in the return pipe occurred before the storm in April 2015. They say they first noticed the water level in the pool receding in mid-April. However, this is inconsistent with the applicants‟ statements at claim lodgement. Further, when the applicants wrote to the FSP in September 2015 (four months later), they again advised that they first noticed the water level dropping in “late April”. Having regard to the severity of the storm in April 2015, the time at which the initial bulge in the pool became apparent and the opinions provided by the various consultants, the panel is satisfied that the damage was triggered by the effects of the Case No: 422345 Determination Page 6 of 8 storm. Given the unusually high volumes of rainfall experienced during the storm, the panel does not consider that the drainage provisions in the rear yard was a key contributing factor. Further, the panel is not satisfied that all of the damage to the pool and the surrounding area necessarily occurred in circumstances which are excluded under the policy. As outlined above, the applicants‟ policy excludes cover for damage caused by a storm where the damage is due to water leaking down or against the sides or underneath the pool. However, the policy provides cover for storm-related damage which occurs due to landslide or subsidence within 72 hours of, and directly because of, a storm. While the FSP‟s engineer (MP) considered the damage had occurred due to rainwater run-off entering the backfill material, the applicants‟ engineer (CS) and their pool specialist (LD) identified damage to the pool skimmer box and/or return pipe. Further, the FSP‟s assessor suggested that some of the damage may have occurred as a result of large volumes of rainwater run-off flowing down the hill and directly affecting the compacted earth around the pool. The panel acknowledges that, as engineers, MP and CS are appropriately qualified to comment on the cause of the damage. However, neither MP nor CS inspected the pool until at least three months after the initial storm, by which time the damage had been significantly exacerbated by the leaking water from the pool and the second storm. This necessarily made it more difficult to identify the mechanism by which the damage had occurred. In contrast, both the applicant‟s pool specialist (LD) and the FSP‟s assessor (RC) examined the pool prior to the second storm. FSP is liable for part of repair costs For the reasons outlined above, the panel considers the proximate cause of the damage to the applicants‟ pool was the storm in April 2015. The panel accepts that some of the claimed damage is likely to have occurred in circumstances which are excluded under the policy. However, for the reasons outlined above, the panel is not satisfied that all of the damage necessarily occurred in this manner. Having regard to the extent of the damage and the likely contributing factors, the panel consider that it is fair in all the circumstances that the FSP contribute to 50% of the costs of replacing the pool and repairing the surrounding area. The applicants have provided quotations for $51,010 for the necessary repairs. Accordingly, the FSP is required to settle the applicants‟ claim for $25,505. The FSP is not required to pay interest on this amount, as there is no information to suggest the applicants have undertaken the relevant works. Case No: 422345 Determination Page 7 of 8 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Insured event - storm What we cover Loss or damage caused by a storm. What we do not cover  … loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement but we will cover loss or damage caused by a landslide or subsidence that occurs within 72 hours of, and directl y because of, a storm and not because of erosion over time, structural fault or design fault …  loss or damage to swimming pools or underground tanks caused by wat er leaking down the sides, against the sides or getting underneath them … Insured event – esc ape of liquid What we cover Loss or damage caused by liquid leaking, overflowing or bursting from any of the following: …  any drain, fixed pipes …drainage and sewerage systems …  swimming pools or spas … General exclusions You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: … Ground movement  erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement but we will cover landslide or subsidence damage that is specifically covered under the following insured Case No: 422345 Determination Page 8 of 8 Subject Terms events: - „Storm‟ … Seepage of water  water seeping or running … down the sides or underneath swimming pools or spas causing them to move, change shape, lift or leak throu gh their hydrostatic valves …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.