Determination 422257

Liability to rectify disputed flooring damage after insurer-authorised repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2016-06-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners disputed whether the insurer must rectify black stains on timber flooring and gaps in lounge flooring after repairs by its contractors. AFCA held the insurer liable for both, except one split floorboard attributed to defective timber.

On the balance of probabilities the insurer's contractors caused the stains during fridge delivery and the gaps through excessive sanding.

Issues

Subjects and remedies

home or building damagerepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 422257 Determination Page 1 of 3 Case number: 422257 10 June 2016 1 Overview 1.1 Dispute The applicants lodged a claim for water damage on 8 January 2010 which was accepted by their insurer, the Financial Services Provider (FSP). Repairs were authorised by the FSP. Issues with the repairs were identified. This required rectification works that were agreed and undertaken by the FSP. Quality repair issues were again identified that have given rise to a second set of rectification works. However, these works have yet to begin as the parties dispute whether the following issues should be included (disputed damage):  large black marks on the timber flooring adjacent to the kitchen  cracks and holes in the flooring of the lounge room 1.2 Issues and key findings Is the FSP liable for the disputed damage? The FSP is liable for the disputed damage because:  the available evidence establishes the black stain marks were caused by the FSP’s contractors when replacing the fridge,  both parties accept the cracks and holes in the flooring could have been caused by excessive sanding, and  there is no dispute the FSP’s contractors had sanded the flooring two and three times during the repair and rectification process. The FSP is not liable for a split floorboard in the lounge area that was reviewed by an engineer and attributed to defective timber. 1.3 Determination This determination is in favour of the applicants. The FSP is liable to rectify the disputed damage except for the split floorboard in the lounge. Case No: 422257 Determination Page 2 of 3 2 Reasons for determination 2.1 Is the FSP liable for the disputed damage? Black marks were noticeable after contractors replaced a fridge The applicants say the black marks were likely caused by removalists engaged by the FSP to replace the fridge. This is due to the following:  they noticed it shortly after the removalists left,  photographs taken a few months before show these stains did not exist, and  there was a similar black stain on the box that the fridge was stored in. The applicants notified the FSP of this incident in an email dated 19 June 2015 that included photographs of the stain in question. The FSP has attached numerous expert reports to support its position. However, the only expert who reviewed and commented on the black stain was LT. LT’s opinion is set out in a file note within the FSP’s system dated 6 August 2015 that says the following of relevance: “Clos e up of marks show no damage to actual floor coating. Floos are still smooth. This indicates to me that marks are not caused from above. … In my opinion, find it hard to believe that marks are from delivery of fridge. As mentioned earlier, the marks are not affecting the coating or appear to be on top surface but are in timber. … Explained to OI that possibly engineer is required due to amount of movement to house. Engineer can also provide comment hopefully about moisture in house and if black marks are related to this.” [sic] Having viewed the photographs, it is not apparent that the black stain is in the timber and not on the surface. Instead, the photographs indicate they could be on the surface. Evidence consistent with the applicant’s position Whilst LT finds it hard to believe the black stains were caused by the delivery of the fridge, no other plausible explanation has been forthcoming about their existence. The FSP has attempted to argue that it could be an issue with the timber. There is nothing to support this. It is also inconsistent with the fact the issue has been isolated to the areas adjacent to the kitchen and only manifested at the time the fridge was delivered. The applicants have provided photographs of the underside of the affected timber. No stains are evident. Therefore, it is unlikely the black stains would have been caused by anything happening underneath, such as a previous flooding incident. Further, the applicants maintain the damage was evident contemporaneous to the fridge being delivered. They have provided photographs of the area prior to the delivery which show there was no staining. It is also consistent with the fact that previous contractors who visited the property prior to this incident did not notice the staining. Case No: 422257 Determination Page 3 of 3 The applicants’ position is also consistent with the fact they notified the FSP shortly after the delivery of the new fridge with photographs in support. In addition, the staining is apparent and difficult to be missed. If it happened before the delivery of the fridge, then it is likely this would have been immediately noticeable. The presence is also relatively consistent with the fact there was a black stain on the box that the fridge was delivered with. Accordingly, when I consider all of the available evidence as a whole, I am persuaded by the applicants’ argument that the damage was likely caused by the contractors engaged by the FSP. Therefore, the FSP is liable for the costs of rectifying this staining. Flooring damage likely caused by excessive sanding The flooring damage appears to relate to gaps appearing in the floorboards within the lounge. This was not initially apparent to the applicants as the gaps were underneath a rug and lounge. Both parties note this could have arisen from excessive sanding of the floorboards. The applicants have noted the flooring in this area was sanded four times. Once by them and three more times by the FSP. They have supported this argument by referring to the scope of works set out in the initial repairs as well as the first and second rectification repairs. The FSP has not disputed its contractors sanded the area two to three times. Neither is there a ny evidence to refute the applicants’ position that they only sanded the area once and this would have been before the claim was lodged. The FSP is relying upon an engineer’s report dated 10 September 2015 who reviewed the area. However, this report only commented on one floorboard that was split which he attributed to defective timber. The engineer did not consider the gaps identified by the applicants. Therefore, his evidence is limited to this one floorboard. Given the available evidence, I accept the gaps now evident in the timber floorboards were caused by the excessive sanding undertaken by the FSP’s contractors. The FSP is liable to rectify these gaps. This excludes the split floorboard reviewed by the engineer as he has attributed the damage to defective timber and his opinion is not refuted by any of the evidence.