Determination 422257
Liability to rectify disputed flooring damage after insurer-authorised repairs
Summary
Homeowners disputed whether the insurer must rectify black stains on timber flooring and gaps in lounge flooring after repairs by its contractors. AFCA held the insurer liable for both, except one split floorboard attributed to defective timber.
On the balance of probabilities the insurer's contractors caused the stains during fridge delivery and the gaps through excessive sanding.
Issues
- Repairs or contractors primary · upheld“The FSP is liable to rectify the disputed damage except for the split floorboard in the lounge.”
- Third-party or outsourcing failure secondary · upheld“The available evidence establishes the black stain marks were caused by the FSP's contractors when replacing the fridge.”
Subjects and remedies
home or building damagerepair or rectify
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 422257 Determination Page 1 of 3
Case number: 422257 10 June 2016
1 Overview
1.1 Dispute
The applicants lodged a claim for water damage on 8 January 2010 which was
accepted by their insurer, the Financial Services Provider (FSP). Repairs were
authorised by the FSP.
Issues with the repairs were identified. This required rectification works that were
agreed and undertaken by the FSP. Quality repair issues were again identified that
have given rise to a second set of rectification works.
However, these works have yet to begin as the parties dispute whether the following
issues should be included (disputed damage):
large black marks on the timber flooring adjacent to the kitchen
cracks and holes in the flooring of the lounge room
1.2 Issues and key findings
Is the FSP liable for the disputed damage?
The FSP is liable for the disputed damage because:
the available evidence establishes the black stain marks were caused by the
FSP’s contractors when replacing the fridge,
both parties accept the cracks and holes in the flooring could have been caused
by excessive sanding, and
there is no dispute the FSP’s contractors had sanded the flooring two and three
times during the repair and rectification process.
The FSP is not liable for a split floorboard in the lounge area that was reviewed by an
engineer and attributed to defective timber.
1.3 Determination
This determination is in favour of the applicants.
The FSP is liable to rectify the disputed damage except for the split floorboard in the
lounge.
Case No: 422257 Determination Page 2 of 3
2 Reasons for determination
2.1 Is the FSP liable for the disputed damage?
Black marks were noticeable after contractors replaced a fridge
The applicants say the black marks were likely caused by removalists engaged by
the FSP to replace the fridge. This is due to the following:
they noticed it shortly after the removalists left,
photographs taken a few months before show these stains did not exist, and
there was a similar black stain on the box that the fridge was stored in.
The applicants notified the FSP of this incident in an email dated 19 June 2015 that
included photographs of the stain in question.
The FSP has attached numerous expert reports to support its position. However, the
only expert who reviewed and commented on the black stain was LT.
LT’s opinion is set out in a file note within the FSP’s system dated 6 August 2015 that
says the following of relevance:
“Clos e up of marks show no damage to actual floor coating. Floos are still smooth. This
indicates to me that marks are not caused from above.
…
In my opinion, find it hard to believe that marks are from delivery of fridge. As mentioned earlier,
the marks are not affecting the coating or appear to be on top surface but are in timber.
…
Explained to OI that possibly engineer is required due to amount of movement to house.
Engineer can also provide comment hopefully about moisture in house and if black marks are
related to this.” [sic]
Having viewed the photographs, it is not apparent that the black stain is in the timber
and not on the surface. Instead, the photographs indicate they could be on the
surface.
Evidence consistent with the applicant’s position
Whilst LT finds it hard to believe the black stains were caused by the delivery of the
fridge, no other plausible explanation has been forthcoming about their existence.
The FSP has attempted to argue that it could be an issue with the timber. There is
nothing to support this. It is also inconsistent with the fact the issue has been isolated
to the areas adjacent to the kitchen and only manifested at the time the fridge was
delivered.
The applicants have provided photographs of the underside of the affected timber.
No stains are evident. Therefore, it is unlikely the black stains would have been
caused by anything happening underneath, such as a previous flooding incident.
Further, the applicants maintain the damage was evident contemporaneous to the
fridge being delivered. They have provided photographs of the area prior to the
delivery which show there was no staining. It is also consistent with the fact that
previous contractors who visited the property prior to this incident did not notice the
staining.
Case No: 422257 Determination Page 3 of 3
The applicants’ position is also consistent with the fact they notified the FSP shortly
after the delivery of the new fridge with photographs in support.
In addition, the staining is apparent and difficult to be missed. If it happened before
the delivery of the fridge, then it is likely this would have been immediately
noticeable.
The presence is also relatively consistent with the fact there was a black stain on the
box that the fridge was delivered with.
Accordingly, when I consider all of the available evidence as a whole, I am
persuaded by the applicants’ argument that the damage was likely caused by the
contractors engaged by the FSP.
Therefore, the FSP is liable for the costs of rectifying this staining.
Flooring damage likely caused by excessive sanding
The flooring damage appears to relate to gaps appearing in the floorboards within the
lounge. This was not initially apparent to the applicants as the gaps were underneath
a rug and lounge.
Both parties note this could have arisen from excessive sanding of the floorboards.
The applicants have noted the flooring in this area was sanded four times. Once by
them and three more times by the FSP. They have supported this argument by
referring to the scope of works set out in the initial repairs as well as the first and
second rectification repairs.
The FSP has not disputed its contractors sanded the area two to three times. Neither
is there a ny evidence to refute the applicants’ position that they only sanded the area
once and this would have been before the claim was lodged.
The FSP is relying upon an engineer’s report dated 10 September 2015 who
reviewed the area. However, this report only commented on one floorboard that was
split which he attributed to defective timber.
The engineer did not consider the gaps identified by the applicants. Therefore, his
evidence is limited to this one floorboard.
Given the available evidence, I accept the gaps now evident in the timber floorboards
were caused by the excessive sanding undertaken by the FSP’s contractors. The
FSP is liable to rectify these gaps.
This excludes the split floorboard reviewed by the engineer as he has attributed the
damage to defective timber and his opinion is not refuted by any of the evidence.