Home / Financial Firm (Unknown - Insurer) / Determination 421907

Determination 421907

Cash settlement amount for fire damage repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2017-01-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$21,973
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

After a house fire, the FSP cash settled the building repair claim for $167,730.46 plus temporary accommodation, and paid contents. AFCA found the cash settlement was reasonable in method but should be increased by $21,973.05, and awarded $1,500 for claim handling failures, rejecting the further contents and accommodation claims.

The FSP could cash settle reasonably under its policy discretion, but the settlement had to be sufficient to repair fire damage, and pre-existing earth movement was excluded.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 421907 Determination Page 1 of 11 Case number: 421907 27 January 2017 1 Overview 1.1 Dispute The applicant lodged a claim under his home insurance policy with the financial services provider (FSP) following a fire in November 2014. The FSP accepted the applicant’s claim and sought to arrange for the repair of the damage. However, after various issues arose, the FSP decided to cash settle the applicant’s claim rather than undertake the necessary repairs. The FSP cash settled the applicant for $167,730.46 based on the estimated cost of the repairs, plus an additional $7,700 for the costs of temporary accommodation during the repair process. The FSP also paid the applicant $43,100 for damage to his contents items. The applicant says the amount paid by the FSP is not sufficient to carry out the necessary repairs to the property. He considers the FSP should be required to undertake the repairs or fund the cost for his builders to do so. The applicant also seeks additional payment for damage to contents, as well as compensation for further losses suffered due to the FSP’s delay in finalising his claim. 1.2 Issues and key findings Is the FSP entitled to cash settle the claim for the cost of repairs? The FSP acted reasonably in deciding to cash settle the claim, given the need for the property to re-stumped before the repairs could be commenced. The FSP is not liable for re-stumping as the movement damage at the property was not caused by the fire in November 2014 but by long-term earth movement (which is excluded from cover under the policy). The available information establishes that the applicant’s property can be effectively repaired and does not need to be demolished and rebuilt. Accordingly, the FSP was entitled to determine the cash settlement amount based on the estimated cost of repairs. Is the cash settlement amount fair and reasonable? The cash settlement amount should be increased by $21,973.05 to reflect additional items previously approved by the FSP, together with an allowance for hidden damage and/or unforeseen variations in the scope of works. Case No: 421907 Determination Page 2 of 11 The applicant is not entitled to any further payment in respect of temporary accommodation or contents damage. Is the applicant entitled to compensation? The applicant is entitled to compensation of $1,500 for non-financial loss due to the manner in which the FSP handled his claim. 1.3 Determination This determination is partly in favour of the applicant. The FSP is to pay the applicant the amount of $21,973.05 in full and final settlement of his claim. The FSP is to pay the applicant an additional amount of $1,500 as compensation for non-financial loss. Case No: 421907 Determination Page 3 of 11 2 Reasons for determination 2.1 Is the FSP entitled to cash settle the claim for the cost of repairs ? Policy outlines how claims will be settled Under the terms of the policy, the FSP may settle a claim for damage to the applicant’s property caused by an insured event by:  repairing the damage or rebuilding the property; or  paying the applicant the cost (to the FSP) of doing so. It is clear from the terms of the policy that the FSP has the discretion to decide which settlement method to adopt. However, FOS expects an insurer to act reasonably in exercising its discretion, having regard to the circumstances of the claim. Available information establishes property can be effectively repaired Following lodgement of the claim, the FSP appointed an engineer (PB) to assess the damage to the property caused by the fire and identify any potential issues associated with the repairs. In his report dated 12 December 2015, PB concluded that the property should be demolished and rebuilt (rather than repaired). PB reached this conclusion on the basis that:  a repair would be more expensive, time consuming and difficult to achieve than a demolition and rebuild, given the significant nature of the damage caused by the fire; and  a repair strategy would be likely to have ongoing health and amenity issues (particularly with respect to odour). PB noted that, while he had been unable to inspect the structural framework of the house closely, it was likely that there were many areas which had been severely damaged by the fire. PB also noted the risk that, given its age and manner of construction, the property may contain asbestos or other hazardous materials, which would complicate the repair process. The FSP subsequently engaged a hygienist (GC) who, after conducting a thorough assessment, advised that there was relatively little asbestos or other hazardous building materials present. In light of GC’s findings, the FSP reviewed its preliminary view (based on PB’s report) that the property needed to be demolished. Accordingly, the FSP engaged a second engineer (FM) to carry out a more detailed inspection. FM reported that the structural damage was localised to the south east corner of the house, being the area where the fire had started. FM confirmed that there was no structural damage to the timber wall and roof framing throughout the remainder of the house. Case No: 421907 Determination Page 4 of 11 The FSP’s building consult ant (SG) subsequently prepared a scope of works for the necessary repairs and the FSP obtained quotations from two builders to carry out the repairs. Neither SG nor the FSP’s builders indicated that the property could not be effectively repaired. Having carefully reviewed the available information, the Panel is satisfied that the applicant’s property can be effectively repaired and does not need to be demolished and rebuilt. While PB concluded that a demolition and rebuild was required, his view was based on a limited inspection of the property only and the assumption that any repair strategy would be complicated by the presence of asbestos. In circumstances where the subsequent investigations carried out by GC and FM provided additional and more accurate information, the Panel considers it was reasonable for the FSP to depart from PB’s recommendation that the property should be demolished. Further, the fact that the FSP’s builders were willing to undertake (and guarantee) the repairs provides further support for the fact that they could be effectively completed. Property had pre-existing damage due to earth movement During the assessment process, the applicant raised concerns that part of the property had subsided due to the effects of explosions which occurred during the fire. Following his inspection of the property, the FSP’s engineer (FM) reported that, while there was evidence of differential foundation movement in the concrete stumps at the property, this damage pre-existed the fire in November 2014 . FM considered that the differential settlement (downwards movement) evident at the property had occurred over an extended period of time due to naturally occurring changes in the moisture content of the highly reactive clay foundation soils. In his report, FM advised that:  the general fall of approximately 60 millimetres towards the south east corner of the building (as identified by floor level surveys) was consistent with commonly observed patterns of foundation movement;  the downwards movement of the stumps in this area was likely to have been caused by the drying effect of trees in the vicinity (which would cause the surrounding soils to shrink), together with the relatively shallow depth at which the concrete stumps were founded; and  a verticality check of the internal and external walls of the house did not identify any significant movement or misalignment, such as would be expected in the event of damage caused by an explosion. The Panel is satisfied that, as an engineer, FM is suitably qualified to determine the cause of the differential foundation movement at the applicant’s property. FM’s report provides a logical explanation of how the damage occurred which is consistent with the observed facts. The applicant has not provided any information (such as a report from an equivalently qualified expert) which refutes FM’s findings. Case No: 421907 Determination Page 5 of 11 In the absence of any such information, the Panel is satisfied that the differential foundation movement at the applicant’s property was not caused by the fire in November 2014. The policy excludes cover for damage caused by naturally occurring earth movement. Accordingly, the FSP is not liable for repairing this damage. FSP acted reasonably in deciding to cash settle claim The FSP’s building consultant (SG) confirmed that, due to the differential foundation movement, the applicant’s property needed to be restumped in its entire ty. The FSP’s builder (PP) advised that it would be unable to guarantee the repair of the fire - related damage until the restumping works had been completed. The applicant had previously expressed a strong preference to have the FSP to carry out the repairs (rather than accept a cash settlement) as he had limited time available to supervise the repair process, due to work and family commitments. When the FSP discovered that the property needed to be restumped, it advised the applicant that it remained willing to complete the repairs, provided he undertook the restumping first. However, when the applicant did not accept the FSP’s offer, the FSP cash settled him for the estimated cost of the repairs, based on a quotation provided by PP for the repairs set out in SG’s scope of works. Given the pre-existing movement damage to the property, the panel is satisfied that the FSP acted reasonably in deciding to cash settle the claim. However, in determining the amount of the cash settlement, the FSP was required to ensure that this amount was sufficient to repair the damage to the applicant’s property caused by the fire in November 2014. 2.2 Is the cash settlement fair and reasonable? FSP’s scope of works is generally appropriate As outlined above, the cash settlement amount was based on the scope of works prepared by the FSP’s building consultant (SG). The FSP’s builder quoted the cost of undertaking these works as $167,730.46. Having reviewed the available information, the panel is satisfied that SG’s scope of works generally provides an accurate assessment of the damage to the property caused by the fire in November 2014 and a detailed breakdown of the works required to repair that damage. The repairs included in SG’s scope of works are generally consistent with the claim- related damage to the property as identified in the various reports provided, and the photographs taken, by the various contractors who inspected the property. After the applicant queried several aspects of the scope of works, the FSP arra nged for its assessor to meet the applicant on site to review the scope of works. Following this meeting, the FSP agreed to include several additional items. Case No: 421907 Determination Page 6 of 11 The applicant says the revised scope of works is still inadequate to restore the property to its condition before the fire. He has provided copies of quotations from three builders, who quoted the cost of the necessary repairs as $262,628 (BB), $291,500 (PW) and $326,000 (BS). The quotations provided by the applicant’s builders do not clearly identif y the extent to which the builders consider additional repairs are required, over and above the scope of works prepared by the FSP’s building consultant (SG). The applicant has not provided any other independent information which confirms that there is additional fire damage which has been omitted from the FSP’s scope of works. In these circumstances, the panel is not satisfied that the applicant has shown that the FSP’s scope of works is inadequate. In relation to some of the more significant issues raised by the applicant, the panel notes as follows:  while the FSP’s engineer (FM) initially advised that the timber floorboards in all rooms should be replaced, this was solely to ensure that the floorboards in all rooms matched following the replacement of the fire-damaged floorboards in the living room. However, under the terms of the policy, the FSP is not obliged to replace floorboards in different rooms for matching purposes. The available information does not establish that the FSP’s proposed approach o f sanding and refinishing the boards in the other rooms will not address the cosmetic damage suffered during the fire;  the FSP’s builder has confirmed that the proposed replacement of the existing, multi-layer lathe and plaster ceilings with new ceiling linings (as reflected in the scope of works) complies with industry standards; and  while the applicant has provided a quotation from his contractor (BW) for the restoration of the fire- damaged kitchen and bathroom tiles, the FSP’s scope of works provides for the complete replacement of the tiles (meaning that the restoration of the existing tiles is not required). Cash settlement amount should be increased by $21,973.05 The fact that the applicant’s builders have quoted significantly higher amounts for the repairs than the FSP’s builder (PP) does not of itself establish that PP’s quotation is inadequate. The quotations provided by the applicant are not itemised and therefore it is not possible to determine in which areas the differences arise. For example, while the applicant has raised concerns about the qualities of the fixtures and fittings reflected in PP’s quotation, the quotations he has provided do not itemise these amounts (or confirm the quality of the existing items). However, having carefully reviewed the information provided, the panel considers the cash settlement amount should be increased to reflect the following:  the amount of $5,200 for professional fees which the FSP had previously approved (in accordance with the additional benefits provided in the policy), but which does not appear to have been included in the cash settlement amount; Case No: 421907 Determination Page 7 of 11  additional items which were approved by the FSP’s assessor but do not appear to have been included in PP’s revised quotation (eg replacement of surround sound cabling); and  a buffer to provide for any additional damage which may become apparent during the course of the repairs (given this is not uncommon in fire damage claims and the FSP would have been liable for any resulting increase in costs, had it carried out the repairs as initially proposed). On this basis, the panel considers it is fair in all the circumstances that the cash settlement increased by an additional amount of $21,973.05 to allow for the issues identified above. This amount represents a 10% increase in the amount of $167,730.46 quoted by the FSP’s builder, plus the additional $5,200 for professional fees. The FSP is not required to increase the cash settlement amount to include an allowance for project management (in addition to the site supervision fees included in PP’s quotation), as the FSP would not have been liable for this amount had it arranged the repairs. Nor is the FSP required to increase the cash settlement to include an amount in lieu of the lifetime guarantee which applies where the FSP’s contractors undertake the repairs. The policy clearly states that the lifetime guarantee does not apply to repairs which are authorised by the applicant (as in the case of a cash settlement). In determining the increased cash settlement amount, the panel has taken into account the passage of time. Accordingly, the FSP is not required to pay interest on the increased amount. FSP is not liable for additional damage to property The applicant says his property has suffered further damage due to the delay in the FSP finalising his claim. The applicant says damage has been caused by intruders vandalising the property, as well as ongoing exposure to weather. The claim records and the photographs provided by the parties confirm that the FSP arranged for the erection of temporary fencing at the property and the boarding up of doors and windows. The FSP arranged for the boards to be refitted on several occasions, after the applicant advised that intruders had entered the property. The applicant has provided photographs of damage to the brickwork at the front of the property, which he says was caused by vandals in the period since the fire. He has not provided details of any other additional damage caused. The panel considers that the FSP took reasonable steps in the circumstances to secure the property from intruders. In the case of an obviously vacant and fire- damaged property, it is not possible to prevent unauthorised entry completely. On this basis, the panel considers the FSP is not liable for the additional damage to the property claimed by the applicant. However, the applicant is entitled to lodge a separate claim for the damage to the brickwork under the insured event of ‘malicious acts and vandalism’. Case No: 421907 Determination Page 8 of 11 The applicant has not provided any independent i nformation confirming that there is additional damage to the property caused by ongoing exposure to the weather (which would not be adequately addressed by the repairs set out in SG’s scope of works). The available information indicates that the direct damage to the roof was limited to the area where the evaporative cooler was previously located. To the extent that any additional damage has been caused, the panel considers this is adequately addressed by the buffer included in the increased cash settlement amount. Applicant is not entitled to any further payment for temporary accommodation The policy provides for the payment of reasonable costs for temporary accommodation where the applicant’s home becomes uninhabitable due to an insured event. The policy limits the payment of benefits to the period of 52 weeks following the event. The FSP paid the applicant temporary accommodation benefits for the full 52 week period following the fire. The cash settlement paid by the FSP in January 2016 included an allowance for an additional 14 weeks’ worth of benefits. This amount was determined based on the estimated repair period of 10 weeks, plus an additional 4 weeks’ worth of benefits in recognition of the delays experienced during the claim process. The panel considers the amount paid by the FSP is reasonable in the circumstances. Based on the available information, the amount for temporary accommodation paid to the applicant would have been sufficient to enable him to complete the repairs to the property, had the applicant accepted the FSP’s settlement offer when it was initially made in November 2014. Applicant is not entitled to any further payment for contents damage The FSP cash settled the applicant for $43,100 for damage to his contents caused by the fire. This amount reflects the full contents sum insured ($45,800), less the emergency payment made shortly after the fire ($2,500) and the applicable policy excess ($200). The applicant seeks payment of an additional amount for contents damage, on the basis that the FSP’s assessor (CS) told him that his contents were insured for a total of $50,000. The FSP has provided a copy of an email from CS, in which he expressly denies having provided this advice. In the absence of any independent information confirming the discussions between the applicant and CS, the panel is not satisfied that, on the balance of probabilities, CS advised the applicant that his contents were insured for $50,000. Even if CS had done so, the applicant would not be entitled to any additional payment for his contents items because his policy schedule clearly specifies the contents sum insured as $45,800. In these circumstances, it was not reasonable for the applicant to rely on any advice provided by CS as to the amount of the sum insured. Further, there is no information Case No: 421907 Determination Page 9 of 11 to suggest that the applicant acted to his detriment as a result of relying on any such advice. For the reasons outlined above, the applicant is not entitled to any additional payment for damage to his contents items. 2.3 Is the applicant entitled to compensation? FOS may award compensation for non-financial loss Under the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The fact that the applicant’s policy excludes cover for consequential losses does not preclude the award of compensation where such losses have occurred as a result of the way in which the FSP has handled their claim, rather than as a result of the insured event itself. However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Applicant is entitled to compensation The applicant is dissatisfied with the manner in which the FSP has managed his claim. Among other things, the applicant says:  the FSP has unreasonably delayed the settlement of his claim;  the FSP’s assessor coerced the second engineer (FM) into recommending the repair of the property (rather than a demolition and rebuild); and  he and his family were made to feel like criminals during the FSP’s investigation of the fire. While it has clearly taken an extended period of time to resolve t he applicant’s claim, the panel considers that the FSP was not solely responsible for the delays experienced. While the FSP ultimately accepted the claim, it was reasonable for it to carry out investigations before doing so, given the circumstances in which the claim arose (a house fire started with the use of accelerant). It is standard practice for such investigations to include interviews with the insured person and family members, as well as the review of personal information such as financial records. The FSP completed its investigations approximately two months after the fire, which represents a reasonable timeframe in the circumstances. It is also not uncommon for claims involving significant fire damage to require multiple inspections and revisions in order to finalise an approved scope of works for the repairs, which may take a number of months to resolve. Case No: 421907 Determination Page 10 of 11 Nevertheless, the panel considers that, in the present case, the FSP could have managed the claim better. In particular, the panel considers the FSP should have arranged for a comprehensive inspection of a property by a structural engineer at the outset, rather than initially relying on the limited inspection and qualified report provided by PB. In circumstances where PB initially recommended a demolition and rebuild, it is not surprising that the FSP’s subsequent decision to repair the property would raise concerns on the part of the applicant which complicated the subsequent resolution of the claim. Further, the panel considers that the approach taken by the FSP of assessing the causes and implications of the movement observed at the property resulted in additional delays. The concerns identified by the applicant in relation to coercion raise issues of serious misconduct. The panel considers it inappropriate to make a finding on such matters without a substantial weight of evidence confirming the events alleged by the applicant occurred in the manner claimed. In the absence of independent evidence confirming the matters alleged by the applicant, the panel is not satisfied that misconduct on the part of the FSP or its contractors has been established. Having regard to the factors outlined above, the panel considers an award of compensation for non-financial loss in the amount of $1,500 is fair in all the circumstances. Case No: 421907 Determination Page 11 of 11 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this case based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.