Business loans alleged to be irresponsible lending; sale proceeds retained; financial difficulty handling
Text of the determination
Determination
Case No: 421689 Determination Page 1 of 8
Case number: 421689 3 October 2016
1 Overview
1.1 Dispute
The Applicants include a company (the company) and a second company acting as
trustee (the trust). The Applicants are part of a group of companies that are property
developers and builders. I will refer to the company and trust together as the
Applicants. The financial services provider (the FSP) has provided loan facilities to
the Applicants and other companies in the group over the last eight years.
The Applicants say the FSP should not have provided loans to them as set out in
section 3.1 of the Recommendation attached.
The Case Manager provided the parties with a recommendation dated 21 April 2016
on the issues in dispute. The recommendation was in favour of the FSP.
The FSP accepted the Recommendation. The Applicants rejected the
Recommendation because they don‟t agree that they had sufficient capacity to
service the loans and that the FSP did not meet its obligations in relation to their
financial difficulty for the reasons set out in section 2.
A copy of the recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination . Further submissions provided after the recommendation have been
considered.
Was the FSP’s serviceability/viability approach correct?
The FSP‟s assessment approach was consistent with industry practice fo r the
Applicants specialised market of construction and development.
Should the FSP have approved loan 3 and loan 5 for the Applicants?
The FSP information provided shows that the Applicants had sufficient capacity to
service the loans on the rental received and on the proposed development project.
Case No: 421689 Determination Page 2 of 8
Did the FSP breach any obligation owed to the Applicants in relation to the 216
O Street development?
The Applicants have not established that the FSP breached any obligation owed to
them in relation to the 216 Street development. The FSP‟s relationship with the
Applicants was as its banker not its adviser.
Did the FSP meet its obligations in relation to the Applicants financial
difficulty?
The FSP has met its obligations to the Applicants as it has been and is willing to work
with the Applicants in relation to their asset realisation proposal.
1.3 Determination
This determination is in favour of the FSP.
I agree with the case manager‟s reasons for the recommendation and the
recommended outcome.
The FSP is not required to pay the Applicants compensation. The Applicants remain
liable for the loan balances.
If the Applicants accept this Determination within 30 days of its date, then within a
further 14 days of those acceptances:
provide details of their current financial position with a reasonable repayment
arrangement of the credit facilities
The FSP must consider the Applicants proposal but is not obligated to accept it if
the FSP does not consider it to be reasonable
If, after a further 14 days, the Applicants and the FSP are unable to agree upon a
reasonable repayment arrangement for the credit facilities, the FSP will be
entitled to take recovery action against the Applicants in accordance with the
terms and conditions of the business loan facilities once our file is closed.
Case No: 421689 Determination Page 3 of 8
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law. The terminology and references used
in the Recommendation have been adopted in this Determination.
2.2 Was the FSP’s serviceability calculation correct?
The Applicants dispute the FSP’s serviceability/viability calculation
The Applicants rejected the Recommendation on the basis that:
They do not agree that the April 2012 loan of $480,000 (loan 3) to purchase the
property at 216 O street was not irresponsible lending
The FSP did not follow industry practice in its calculation of serviceability by
failing to base its calculation on a “minimum of two years results”
The FSP failed to follow industry practice for “lending to developers which was
mainly based on the viability of the proposed funded project” in relation to the
July 2013 loan of $1.767 million (loan 5) for the construction and development
on 216 O street, because of the restricted access to the development. They say
the FSP‟s appointed valuer failed to identify the restricted access to the 216 O
street project development (the 216 G properties) that made it not viable as a
development project
The FSP failed in its due diligence of the proposed 216 G properties
development project and to identify the potential deficiencies
They do not agree that the FSP provided them with genuine financial hardship
assistance
The FSP‟s post recommendation response is that:
The group and staff had over 66 years of combined experience and expertise in
all facets of the building and development industry. In 2005, the group
expanded its business into the G area for the purpose of commencing the
development of its own multi-block land subdivisions having success in other
areas
Loan 5 was approved specifically for the 216 properties development project for
the construction of six townhouses and the loan would be repaid from the sale
proceeds of the six townhouses
The viability of development projects rests with the Applicants to complete their
due diligence or by the hiring of their own professional surveyors in relation to
the survey plans and the Land Titles Office. Its role was of financier, not
advisor. The completion of the valuation, dated 17 May 2013, was part of its
Case No: 421689 Determination Page 4 of 8
credit assessment process for its benefit to ensure that it had adequate security
for the proposed development. The report noted that access for the 216
properties was via the existing “driveway currently serving the 7 units at 214 O
Street”.
It has considered and is willing to work with the Applicants with a debt reduction
plan
The FSP’s approach was reasonable
I have sought the views of one of my other FOS Banking Specialist (the Banking
Specialist) on the initial s pecialist‟s review of the FSP‟s approval of the loans on the
basis of the viability of the funded projects and the projected sales and yields as
detailed in the Recommendation, and whether this this was consistent with industry
practice.
The Banking Specialist has provided the following opinion:
The Applicants ‟ view that standard industry practice is to adopt a minimum of
two financial year results and to use the average cash available of these years
is relevant to trading entities such as manufacturing
The above convention is not relevant to a specialised market, as in this case,
where the group activates are in construction and development. Typically the
financials reflect the expenses related to development over a number of
financial years with the profits recorded at the end/sale in the year of the
completed project
The FSP approach of viability of a project was the appropriate method to use
when making the decision to provide the Applicants with loan 5 which included
an interest allowance in the loan amount to specifically service the interest
expense during construction, which is consistent with industry practice for this
specialized market
The Banking Specialist agrees with the approach taken by the specialist in the
Recommendation as being consistent with industry practice for the construction and
development market.
As the Applicants have specifically identified loan 3 and loan 5 in their response, I
have asked the Banking Specialist to review these loans.
Loan 3 was not irresponsible lending
The Applicants say that the FSP knew that loan 3 approved in March 2012, was
specifically to purchase the residential investment property at 216 O street and that
the funds were to be used “for the removal/demolish of the house and to construct six
units”. Their intention was not to rent the existing property at 216 O Street and the
house was moved to the C location and was “never rented”.
The Recommendation stated that the FSP did not provide FOS with its serviceability
calculation for this “short form commercial submission”. However on the submission
comments it was noted that the Applicants ‟ purchase of 216 Street was a strategic,
Case No: 421689 Determination Page 5 of 8
as it is located next to their current development at 214 O Street, and they intended
to hold it as an investment and may be developed later (which it was with loan 5 in
June 2013).
On this basis, it was reasonable for the FSP to accept that the property was going to
be rented at an annual rental of $31,200 that would cover the annual interest
associated with the loan of $31,488 and the annual shortfall of $288 would be
absorbed by the group.
The Banking Specialist has said that even if the house had been relocated to the
group‟s C location , it was still appropriate for the house to be rented at its new
location. The FSP submission includes the comment that $150,000 of the loan
amount was to reimburse the Applicants for the cost of the relocation which had been
paid out of its working capital and that the relocated house was rented out.
The available information shows that the 216 property was “stock in trade” for the
group and the submission indicated the house was going to be rented. I agree with
the Recommendation that loan 3 was not irresponsible lending.
The Applicants could service loan 5
The FSP satisfied itself that the Applicants would be able to repay loan 5, as it was
presented with presales for four of the six townhouses, which at the indicative sale
price of $520,000 (including furniture packages) would clear the debt. In support, the
FSP was provided with the sale contract (dated 7 December 2012) for unit 13 of 214-
216 O Street showing a sale price of $520,000. Loan 5 was approved to assist with
the development and construction of the six townhouses on the property purchased
with loan 3. The funds were to cover the costs of construction only as the Applicants
already held the property.
The Applicants say that the FSP‟s approval condi ti on of “four arm‟s length presales”
was not met because one of the properties went to the director‟s son, one was a
pending sale and that “all presales were unconditional well before prop erty
completion”.
The FSP credit notes indicate that it was aware that one of the pre sales was to the
director‟s son and did not qualify for an arm‟s length sale . However it made the
commercial decision to approve the loan considering that it only needed the sale of
four of the six townhouses to be sold to pay out the loan and taking into account the
group ‟ s previous development projects. The FSP was not privy at the time of the loan
application to the knowledge that the pre sales would subsequently fall through due
to access issues, which I will discuss below.
The Banking Specialist notes that loan 5 included the interest capitalisation in the
loan amount which is consistent with generally accepted industry practice that the
cost of construction plus i nterest is funded pending the sale of the finished project.
Case No: 421689 Determination Page 6 of 8
On the basis of the available information including the Banking Specialist‟s view, the
FSP‟s decision to provide loan 5 for the specific purpos e of the construction of the
216 O Street development and its reliance on the repayment of loan 5 on the sale of
the constructed town houses was not irresponsible lending.
The FSP’s viability of the 216 O street development was limited to the
repayment of loan 5
The Banking Specialist has provided the view that while the viability of a project is
based on numerous factors, as is general accepted industry practice, the FSP‟s is
concerned with the project ‟ s ability to repay the loan either through sales or ongoing
rental income to service the loan. To assist the FSP in its assessment it may engage
the services of a Quantity Surveyor to assess whether the construction costs
provided are reasonable and /or to consider the request for drawdowns of a projects
against the costs incurred. The FSP would generally also request approval plans and
permits which would have been provided after the builder/council/land registry have
consider the construction specification/codes/town planning.
The FSP was the Applicants ‟ banker, not its adviser, and its responsibility was to
provide the Applicants with loan 5 which met their needs and objectives for the
construction of the six townhouses on 216 O Street. It satisfied itself that the
Applicants could afford the loan noting that the interest was capitalised in the loan
amount and that it would be repaid via the sale of the townhouses.
The responsibility for driveway access to 216 O Street was the Applicants
The Applicants say that they were not aware that there was no access to 216 O
street until they had completed the construction of the six townhouses and went to
register the titles. It was then that they “uncovered that there was no access”. They
say that the FSP as part of its process of obtaining a valuation from an independent
valuer should h ave ensured that their appointed valuer completed “an important part
of checking the title” and if he had done so would have been alerted to there was no
access to 216 O street.
The Applicants say the FSP was in receipt of the valuation report prior to its approval
of loan 5 and the report states “the proposed development will share common
driveways with the neighbouring development” (214 O Street). Further, the FSP was
aware that the development at 214 O Street had been completed and the six
townhouses sold.
The Recommendation detailed that the purpose of the valuation was for the FSP‟s
internal purposes which is confirmed in the valuation report which states that the
valuation was completed for the use of the FSP only for the purpose of “first
mortgage p urposes only” and “for no other purposes”. The FSP instructed the valuer
to assess the valuation on “as if complete” gross realisation from the sale of the six
townhouses and on “as is land value” excluding the construction to date which had
commenced in early 2013.
The valuer had been provided with the listed below documentation and/or information
to assist in the completion of the 13 May 2013 valuation report:
Town approval granted to the Applicants dated 24 August 2012 (with a currency
of four years) for “Multiple Unit Residential” (six townhouses)
Case No: 421689 Determination Page 7 of 8
Operational works and Building Works and Plumbing permits (with a currency of
two years) granted to the Applicants
The proposed development was for the “second stage” located “directly the
adjoining [214 O street] existing modern development completed in 2012” by
the same developer who is also the builder of the project
“The proposed development will share common fac ilities including driveways
with the neighboring development”
Section 4.3 headed “Road System/Access” says “…Vehicular access in the
proposed development will be easy and direct via an existing driveway currently
servicing the 7 units at [214 O Street]”
The valuer attached the title for 216 O street which confirmed that the
Applicants were the registered owner of the property and that the FSP held a
mortgage over the property
Annexure 4 of the site plans dated 25 February 2013, shows the existing stage
1 of units 1 to 7 (214 O street) and proposed stage 2, the construction of units 8
through to 12 at 216 O street
Annexure 5 of the building plans for units 8 to 12, dated 15 November 2012,
shows access would be through the common shared driveway
The valuation report does not say that there were problems with access, or that
access was not available or that it still pending approval (council/body corporate).
Rather it says access was required via 214 O Street.
The FSP has provided a copy of “The Request to R egister First Community
Statement” for 214 O Street that was approved by the Queensland Land Registry on
7 September 2012. The statement refers to stage 2 and includes in its plan the 216 O
Street development and that the body corporate established will be for both 214 O
Street and 216 O Street. The chairman of the body corporate was the director of the
group.
T he Banking Specialist‟s has provided his view on the available information and what
a prudent lender would have done in relation to the valuation report re driveway
access:
The valuation report does not imply that access to 216 O Street was an issue
for the FSP or that the FSP should have taken greater care and make further
enquiries
T he valuer‟s role in the development process is to confirm the accu racy of
costing and confirm that all statutory approvals are held. The valuer provides a
valuation estimate on “as is” and upon completion b asis, it does not consider
construction issues
The Quantity Surveyor‟s role is to confirm that the costing adopted i n the
valuation are realistic and asses the veracity of progress draw request and
ensure that all certificates obtained are valid
The Applicant had owned and developed 214 O street
The sale contract for unit 13 refers to the address as 214 - 216 O Street
The director was the chairman of the body corporate committee which applied
to both 214 O Street and 216 O Street. The body corporate covered units 1 to 7
which were located on 214 O street and units 8 to 13 which were located on
216 O Street
Case No: 421689 Determination Page 8 of 8
The Banking Specialist has confirmed that the FSP was not responsible for the due
diligence for the construction. The actual construction and the responsibility of
making sure that access was available rests with the Applicants and would have
been part of the council approval of the plans and permits.
The available information shows the FSP was presented with a project for the
development of 216 O street by experienced builders and developers who had
owned and developed 214 O Street and were now going to dev elop “stage 2” at 216
O Street with approved plans and permits.
2.3 Did the FSP breach any obligation owed to the Applicants in relation
to the 216 G properties?
The Applicants were responsible for the investment risk associated with the
216 G properties
I agree with the view in the Recommendation that the FSP‟s responsibility is to
assess the credit risk within its credit guidelines and industry standards which I have
discussed above in section 2.2. The investment risk associated with the 216 G
properties rested with the Applicants. The Applicants were responsible for ensuring
that there was access to the 216 G properties.
The Applicants ‟ say that the FSP‟s valuer should have checked the title for access,
however any “legalities” associated with the title rested with the Applicants and their
advisers.
2.4 Did the FSP meet its obligations to the Applicants ’ financial
difficulty?
The FSP considered the Applicants request for assistance
The Applicants says that the FSP‟s failed to provide assistance because it did not
accept the group ‟ s asset realisation plan with the projected cash flows that showed
the group would be able to make the interest payments, if it was allowed to retain
$200,000 of the PM sale proceeds.
The available information, detailed in section 2.4 and 3.4 of the Recommendation,
shows that the Applicants were in default on their loan facilities as at May 2015 and
did not submit the FSP‟s request ed asset realisation plan by its required dated of 27
November 2015. The Applicants say that an asset realisation plan (a copy has not
been provided to FOS) was submitted to the FSP in early 2016 to which the FSP
responded with a counter proposal on 16 March 2016.
I agree with the Recommendation that the FSP was entitled to retain the sale
proceeds from the PM security properties and it does not indicate that the FSP was
not willing to work with the Applicants.
On the basis of the available information the FSP has met its obligations to the
Applicants.
Recommendation
Case No: 421689 Recommendation Page 1 of 20
Case number: 421689 21 April 2016
3 Overview
3.1 Dispute
The Applicants include a company (the company) and another company acting as
trustee (the trust) and are part of the same group of companies that are property
developers and builders. I will refer to the company and trust together as the
Applicants. The financial services provider (the FSP) has provided loan facilities to
the Applicants and other companies in the group o ver the last eight years. This
dispute concerns the loans set out at section 3.1.
The Applicants say the FSP:
was aware that they had cash flow problems
was irresponsible by relying solely on the pre-sales of its G development and a
hotel site
was aware that the director (Mr G) was naïve and not commercially minded. Mr
G relied on the FSP to determine whether the G development would enable the
repayments of the FSP loans to be met
Misled the Applicants to believe that they would be able to retain $200,000 from
the PM property sales.
The dispute is about whether:
the FSP was irresponsible in providing the business loan facilities to the
Applicants as detailed in section 3.1 below
The FSP failed to identify deficiencies in the G development plan which caused
delays and difficulties with the loan repayments
The FSP misled the Applicants to believe that they could retain $200,000 of the
PM property sales in May 2015
The FSP gave genuine consideration to the Applicants‟ financial difficulty
3.2 Issues and key findings
Should the FSP approved the business loans to the Applicants?
The FSP‟s approval of the business loans to the Applicants was within the FSP‟s
lending policy and was consistent with industry practice for lending to developers
which is mainly based on the viability of the proposed funded projects. The
information provided by the FSP shows that the Applicants had sufficient capacity
based on the proposed development project to service the business loans.
Case No: 421689 Recommendation Page 2 of 20
Did the FSP breach a fiduciary duty to the Applicants to advise them about the
G development?
The available information shows that the relationship between the FSP and the
Applicants was a commercial one of banker and customer. It has not been
established that the FSP owed a fiduciary or an advisory obligation to the Applicants.
Did the FSP mislead the Applicants in May 2015?
The FSP did not mislead the Applicants to believe that they could retain a portion of
the PM property sale proceeds. The FSP was entitled under the security
documentation to retai n all the PM sales proceeds as a reduction in the Applicants‟
debt.
Did the FSP meet its obligations in relation to the Applicants financial
difficulty?
The FSP has met its obligations to the Applicants as it has been and is willing to
work with the Applicants in relation to their asset realisation proposal.
3.3 Recommendation
This recommendation is in favour of the FSP. The FSP is not required to pay
compensation to the Applicants.
The Applicants remain liable for the business loan balances.
If both the Applicants and the FSP accept this Recommendation, then the following
should occur:
The Applicants should, within 14 days of both parties accepting the
Recommendation, provide details of their current financial position with a
reasonable repayment arrangement of the credit facilities
The FSP must consider the Applicants proposal but is not obligated to accept it if
the FSP does not consider it to be reasonable
If, after a further 14 days, the Applicants and the FSP are unable to agree upon a
reasonable repayment arrangement for the credit facilities, the FSP will be
entitled to take recovery action against the Applicants in accordance with the
terms and conditions of the business loan facilities once our file is closed.
Case No: 421689 Recommendation Page 3 of 20
4 Reasons for recommendation
4.1 Did the FSP act as a responsible lender when it provided the
Applicants with the business loan?
The FSP has obligations to its customers when assessing loan applications
At law and under the Code of Banking Practice, the FSP must exercise the care and
skill of a diligent and prudent lender in assessing whether a customer has the ability
to repay a loan.
As part of the loan assessment process, a financial services provider should:
Request documentation to support the application
Make further enquiries where there are obvious inconsistencies in the
information
Ensure there is sufficient information and supporting documentation provided to
demonstrate capacity to service the loan.
FOS will consider whether or not it was appropriate for the FSP to lend the money to
the Applicant at the time of the loan application.
Our approach to irresponsible lending disputes
If an Applicant claims that a financial services provider has provided funds to them
but they did not have the capacity to repay the debt, we will consider whether it was
appropriate for the financial services provider to lend the money.
We will also take into account whether the loan funds were used mainly for personal
use or for business or investment purposes. This is relevant because the financi al
services provider is generally not liable to the borrower for the investment risk. The
financial services provider is only obliged to assess the credit risk. The investment
risk rests with the borrower.
The Applicants did not incur any loss in relation to loan 1 and loan 2
The FSP‟s approval of the Applicants‟ l oan 1 and loan 2 were for the refinance of
their existing debt with another lender.
The FSP contemporaneous documents show:
On 25 January 2012, the other lender‟s loans of $1,005,603 and $298,327.46
were paid out via loan 1 and loan 2 respectively
As at 25 January 2012 (settlement), the other lender‟s applicable annual
interest rate for loan 1 was 10.36% and 7.1% for loan 2
The other lender‟s annual interest rate as at settlement on 25 Jan uary 2012,
was based on the letter it sent to the Applicants advising them that the existing
margin of 1.1% below the commercial rate would change as at December 2011
to be 0.6% above the commercial rate (equates to 10.36%)
As at 25 January 2012 (settlement), the FSP applicable annual interest rate was
6.26% for loan 1 and for loan 2
Case No: 421689 Recommendation Page 4 of 20
Hence the Applicants loan 1 and loan 2 were at a lower annual interest rate with the
FSP then their previous lender.
FOS‟s approach, in these circumstances, is that i f an Applicant has obtained credit
and has used it to refinance other debts which were already owed, we generally
consider that they have not suffered a loss. This is because the liability to repay the
funds existed before the debt was refinanced by the FSP. In these circumstances,
even if it was inappropriate for the FSP to lend the money, the Applicant is generally
no worse off as a result of the FSP‟s actions.
On the basis of FOS‟s approach to refinance of existing debt, the Applicants were no
worse off as a result of the FSP‟s actions and did not incur any loss.
The Banking Specialist review of the FSP’s assessments for loans 3 to 6 and
the overdraft
I have sought the views of the FOS Banking Specialist (the Specialist), who has
extensive industry experience in the banking and financial services industry, and
regularly provides advice about what constitutes good industry practice in lending
decisions.
The Specialist has reviewed the FSP files and the information provided by the
Applicants and has made the following comments:
The Applicants are part of a group of companies who are property developers
and builders. The FSP‟s files show that there were at least eight entities in the
group
Mr G started as a carpenter joiner in 1971, became a licensed builder and over
time became a developer
It appears the group has split its banking between two lenders on the basis of
the “family residences” and surrounding properties in NSW and the
investment/development properties in QLD
Properties are in most instances the “stock in trade” for the group which can
have long holding periods. The financials can vary from year to year depending
on the activities undertaken within that particular year. Such as, whether during
that year the activity was purchasers, construction, sales or completion of
properties which were held to rent
As a general rule loans provided to this type of industry and the servicing
exercises which is conducted are based on historical performance and rental
income are academic and not a true representation of affordability. Historical
data has limited relevance for debt servicing but is useful in establishing the
business acumen, experience and the prior success of projects.
Analysis for lending to developers is mainly based on the viability of funded
projects and projected sales and yields. That is lending is project specific.
A lender would consider but is not limited to the following:
o The Applicants experience
o Pre-sales
o The Applicants have the means to service interest independently
o Feasibility, total costs and returns
Case No: 421689 Recommendation Page 5 of 20
o What is the proposed development and what is the strategy (sell / hold /
sell & keep)
o What equity the Applicants have in the transaction
o Whether the Applicant is utilizing a Quantity Surveyor
In this case, the Applicants have had a relationship with the FSP since January 2008
for the purchase, completion and then sale of properties. The FSP information shows
that at the peak, the group had total loan facilities of $4,757,000.
The FSP’s lending to the Applicants was not irresponsible
The specialist has reviewed the FSP credit assessment and decision to provide the
loan facilities as detailed in section 3.1 to the Applicants and has formed the view
that the FSP did not engage in irresponsible lending for the following reasons:
It is generally accepted industry practice that a lender‟ s primary basis for
supporting borrowing requests is based on how the loans would be repaid
The specific nature of this group‟s industry was that income was related to their
property development and investment activities
The FSP assessed that servicing capacity was sufficient to repay the debt from
activities. The FSP was comfortable to provide the Applicants with the
requested loans and allowed the Applicants sufficient time to develop and sell
properties and relied on rental income
It is accepted industry practice for a lender to consider/review for secured loan
facilities the security it holds for the loan facilities provided and an exit strategy
that takes into account the sale of its security properties, in the event of default.
In this case, the FSP did review the security it held and noted that it believed it
had sufficient security in the event that serviceability was compromised
The FSP was also aware that the group of entities had multiple properties which
were nearing completion or complete and subject to sale. It was also aware of
other properties held by the group which were subject of another lenders
security structure.
In this instance, the FSP held security over the development properties and
investment properties. It did not hold a charge over the family homes.
The group in their submission for the loan facilities presented their construction
cases well and the FSP considered Mr G‟s business acumen and history in
successful building projects when making their lending decisions.
The building projects themselves appear on the whole to have run to schedule.
The Applicants were well known to the FSP with a track record of successfully
building and selling properties.
The FSP‟s credit as sessments and serviceability calculations are detailed in section
3.2 below. This information shows that the FSP approval was mainly based on the
group‟s project development taking into account the purpose of the project, what its
strategy was, the projected costs and returns, its equity in the proposed
development, pre-sales and how it would service the interest costs. Mr G also
provided the FSP a signed Statement of Positon – Business which he certified the
details were true and correct and that the assets detailed in the statement were held
by the group and the liabilities details included all contingent liabilities, such as
guarantees and all known possible future liabilities.
Case No: 421689 Recommendation Page 6 of 20
In April 2012, the FSP did a “short form” assessment due to its recent approva l in
December 2011 of loan 1 and loan 2 (which do not form part of the irresponsible
lending claim). The February 2013, May 2013 and the June 2013 requests were
assessed on a project specific basis and the group‟s serviceability was based on the
average of the group financials for the year ended June 2011, June 2012 and on the
interims for the period ended March 2013, to determine serviceability which is
detailed in section 3.2 below.
On the basis of the available information including the specialist‟s o pinion, I agree
that the FSP did not engage in irresponsible lending when it provided the Applicants
with the loan facilities detailed in section 3.1 below.
I will review and comment on each of the FSP‟s credit assessment separately for the
various loans as detailed below.
The provision of loan 3 was not irresponsible
In April 2012, at the time of the loan 3 request, the group total loan facilities with the
FSP were $4,757,000. The purpose of loan 3 was to enable the Applicants to
purchase a property located (at O Street) next door to their current property
development (at O Street). The purchase was strategic due to the property being
located next door to their current development.
The FSP records state that the property was to be held as an investment a nd that it
could be developed later. The property was to be rented out for $31,200 per annum.
The FSP has not provided FOS with its debt servicing calculation for this request and
it appears that it conducted a “short form commercial” submission in view of its recent
completed December 2011 credit assessment. This accords with industry practice.
In the specialist‟s view this loan approval was not irresponsible lending for the
following reasons:
The interest rate of 6.56% per annum equates to interest charges of $31,488
per annual and to $38,688 when an interest buffer of 1.5% is added
The annual rental was $31,200
On this basis there was an annual short fall of $288 at the actual interest rate
and an annual shortfall of $7,488 with the interest rate buffer
Although there was an annual shortfall, in her view, the shortfall could easily be
absorbed across the group given that within a short time (less than 12 months),
the Applicants reduced their debt by at least $2 million from sale of the project
on the property next door.
The provision of the overdraft was not irresponsible
As at February 2013, the group total loan facilities were $2,502,000 and the overdraft
request was for $250,000. The purpose of the overdraft was to reimburse the
Applicants for funds used from their cash flow to purchase a property for $205,000
located at C, as well as, to cover the initial development costs of the property
purchased with the loan 3 above.
Case No: 421689 Recommendation Page 7 of 20
The FSP‟s credit memorandum notes that there was a shortfall for the group of
$747,178 based on the financials for the year ended June 2012, because “… the
costs of construction was included in the 2012 profit and loss statements, whereas
the sales [of the properties] didn‟t occur until September through to December
2012….”. This is a pertinent as confirms that the FSP‟s approach was consistent with
the industry practice for this industry.
The specialist has confirmed that the group financials for the year ended 2012 were
not reflective of the “true” servicing position and affordability due to the constructions
being shown in 2012, but the revenue from the sale of the properties not shown until
the following financial year.
The provision of loan 4 was not irresponsible
As at May 2013, the total group facilities were $2,652,000 and this request
represented an overall increase of $150,000 consisting of a reduction in the overdraft
of $150,000 (to a limit of $100,000) and loan 4 for $300,000.
The FSP‟s credit memorandum comments that 7 units were sold last year and that
loan 4 will reimburse the Applicants for the purchase of land and construction of a
home which the Applicants had funded through the group working capital. The notes
also state that the house is currently rented at $500 per week.
As discussed above, based on the financial year ended 2012, the group had a
shortfall due to the nature of the Applicants‟ industry. The Applicants did provide the
group‟s interim financial for March 2013 for the FSP‟s consideration. The FSP notes
show that the group‟s statement of financial position as at 10 May 2013 was a net
worth of $9.6 million consisting of assets of $14.5 million (which included 15
properties) less liabilities of $4.9 million.
The specialist has reviewed the FSP‟s debt servicing and notes that the FSP has
included an interest buffer of 1.5% per annum across all facilities. However, industry
practice is to include a 3% buffer which would add approximately $6,000 per annum
to the commitments, which in her view is not a significant amount for the group.
The provision of loan 5 was not irresponsible
As at June 2013, the total group facilities with the FSP were $4,419,000 and the loan
5 request was for $1,767,000. The purpose of loan 5 was to assist the Applicants
with the development and construction of six residential townhouses on the property
purchased subject of the April 2012 landing decision.
The specialist reviewed the FSP‟s credit memorandum and has provided the
following comments:
The background is very detailed and covers each of the entities within the group
including a family tree
The group‟s other lender debts were included in the serving c alculation
Case No: 421689 Recommendation Page 8 of 20
The loan 5 funds were to cover construction of the six townhouses only as the
Applicants already held the property on which the construction was to occur on
The sale price of each townhouse will be $520,000 (including furniture
packages) which equated to total sale proceeds of $3,120,000
The FSP Credit Manager reduced the term to 12 months. She considers that
reduction of the time frame was not onerous at the time as the Applicants had
previously completed the development next door in six months‟ time
The FSP Credit Manager also noted “….As the residential market in [G]
continues to move, both sales and rentals, the [FSP] will step up the
requirement for presales on an any and all speculative developments- including
[the Applicants]. Please precondition the [Applicants] now as to manage their
expectations…”
Approval was subject to four unconditional arm‟s length sales at price with 10%
deposit or bank guarantee and it required that the Applicants use a Quantity
Surveyor
Loan 5 was subject to all the usual terms and conditions which are considered
good industry practice for construction lending.
On this basis, the anticipated sale proceeds of $3,120,000 sufficiently covered the
purchase of the land at $480,000, the construction costs of $1,700,000 and holding
costs of say a further $200,000. Hence, the group required the sale of four of the six
townhouses in order to clear /repay loan 5. The Applicants had four presales
consisting of:
Two arms-length sales with deposits paid
One arms-length sale that was not unconditional
One sale to Mr G‟s son which was not arms -length
The FSP provided the Applicant with loan 5 for the specific purpose for the
construction of the units and repayment of the loan was reliant on the sale of the
units. I note that the FSP‟s condition of four arms -length transactions pre sales was
not met, and could potential be seen as a “red” flag. However, there were two
unconditional sales, one pending sale and one non arms - length sale to Mr G‟s son.
Even if only the two sales had eventuated the Applicants would have been in receipt
of approximately of $1 million to reduce the debt. I note that all the properties were
sold within two years.
The provision of loan 6 was not irresponsible
The approval of loan 6 in September 2014, did not involve any new lending, it was
the refinance of loan 5 for a period of 12 months and was paid out on 20 July 2015
and did not represent a loss to the Applicants.
Case No: 421689 Recommendation Page 9 of 20
4.2 Did the FSP breach any obligation owed to the Applicants in
relation to the G development project?
The relationship between the Applicants and FSP is contractual
The relationship between the Applicants and the FSP is a commercial one of banker
and customer, based in contract. The loan agreement sets out the rights a nd
obligations of both the FSP and the Applicant.
A financial services provider does not generally owe a fiduciary duty or advisory
obligations to the Applicants. There is no information to show that the FSP agreed to
act as an adviser to the Applicants or undertook to conduct a due diligence on their
behalf.
The FSP did not have an obligation to the Applicants in respect to the business risk
involved in the G development project. The FSP‟s obligation was to provide loan
facilities to the Applicants that met their needs and objectives and that they could
afford to service without substantial hardship, on the terms agreed in the loan
contracts.
The FSP was not responsible for the due diligence associated with the G
development
The G development consisted of two stages:
Stage One the construction of seven townhouses at O Street
Stage Two was the construction of six townhouses next door at O Street
The Applicants say that the FSP should have alerted them to “the fact there was no
right of access” in order f or them to complete Stage Two of the G development
without the a “community management statement for the First Stage”. That is, the
Second Stage of the G development was reliant on access to the properties using
the drive way access of the First Stage and amalgamation with the First Stage. The
Applicants say that they relied on the FSP to tell them that the G Development was
profitable as it was their first development in QLD and they had “no knowledge of the
QLD approval system for these kinds of developme nts”.
In particular, the Applicants say that the valuation the FSP obtained in May 2013
indicated that there was a “high degree of uncertainty” in the G development and that
there was an “oversupply of new units” in the G area. Hence, they say the FSP
should have been aware that the pre- sales were in „danger” and that the completed
Second Stage may be difficult to sell, “in circumstances where the market was likely
to drop”.
The FSP says that:
The completion of a valuation of security property is part of its credit
assessment process for its benefit to ensure that it has adequate security for
the loan facilities
The valuation report indicated that vehicular access would be easy and direct
via an existing driveway servicing Stage One units
the Applicants engaged their own professional surveyors in respect of the
survey plans and the Land titles Office had registered the Stage One plans with
full knowledge of the pending Stage Two
Case No: 421689 Recommendation Page 10 of 20
The registration of Stage Two was the Applicants‟ responsibility, as was the
responsibility to identify or comment on any potential problems associated with
the investment risk. Its role was of a financier
By September 2014, when it refinanced loan 5, it was aware of the issues in
relation to Stage Two, as were the Applicants. However, the Applicants
provided it with a reasonable plan of how they planned to solve the registration
problems and with documents to show how the Applicants would be able to
service the group cash flows from the rental income from the six units.
As the FSP was not the Applicants ‟ adviser but rather it was its banker, the
investment risk and any due diligence associated with the Second Stage of the G
development rested with the Applicants. If the Applicants had a need for advice on
the proposed development they should have sought independent advice. The FSP
satisfied itself that the group cash flows would not be impacted by any issues
associated with Stage Two because all of the six unties were rented and were
generating rental income.
In relation to the FSP‟s valuation obtained in May 2013, the valuation was for the
FSP‟s internal use in assessing security and credit risk and not part of a service in
providing advice to the Applicants.
Based on the available information provided both parties were aware of the possible
Stage Two issues but both entered into loan in September 2014. The FSP took into
account in its approval that the Applicants would be able to service the cash flows
arising by the interim rental of the six units at “above market estimates”.
There is no information to show the FSP breached any obligation to the Applicants in
relation to the G development.
4.3 Did the FSP mislead the Applicants that they could retain part of the
PM sale proceeds?
The FSP has obligations to its customers
The FSP has an obligation not to engage in conduct that is likely to be misleading.
That obligation applies regardless of intention.
Section 12DA of the ASIC Act states:
“A person must not, in trade or commerce, engage in conduct in relation to
financial services that is misleading or deceptive, or is likely to mislead or
deceive”.
FOS can investigate whether the FSP engaged in conduct that was likely to be
misleading. The test is objective, so the issue is whether the FSP‟s conduct was
likely to mislead or deceive a reasonable person.
Broadly, to succeed in a claim for misleading or deceptive conduct relating to a
financial product or service, the Applicants must show that:
Case No: 421689 Recommendation Page 11 of 20
the FSP made a statement or engaged in conduct that was likely to be false or
misleading (misrepresentation), and
the Applicants reasonably relied on the misrepresentation to their detriment.
The FSP was entitled to retain the sale proceeds under its securities
The parties have provided conflicting information as to what occurred in relation to
the sale proceeds from the PM properties and in section 3.4 below, I have
summarised the sequence of events based on the contemporaneous documents
provided by both parties. The information does not support that the FSP told the
Applicants that they could retain a portion of the PM sale proceeds, but rather, only
that the Applicants made a request and the FSP indicated it would give consideration
to their request. There is no information to show the Applicants were misled in this
regard.
The Applicants were in default of the terms and conditions of the loan facilities at this
time. The FSP exercised its rights under the security documentation to retain all the
net proceeds from the PM unit sales as a permanent debt reduction, which the
Applicants acknowledged.
4.4 Did the FSP meet its obligations in relation to the Applicants
financial difficulty?
A credit provider should genuinely consider a customer‟s request for assistance,
where the customer is in financial difficulty. A customer should also be willing to
work with their credit provider and propose a realistic repayment plan that will result
in the repayment of the debt within a reasonable timeframe.
On 28 May 2015, the FSP wrote to the Applicants offering forbearance
The Applicants say that the FSP did not take steps to assist them with their financial
difficulty despite their efforts to work with it to come to “a resolution prior to the FOS
compliant being lodged”. They refer to the FSP‟s letter of 28 May 2015, as not being
an “adequate measure taken to assist [them]”. The Applicants say they were willing
to accept the FSP‟s offer in the letter but on the basis “of some conditions and
formed a realisation strategy at that time”, but the FSP refused to entertain any
alternative strategy to assist them.
As at 28 May 2015, the loan facilities were in default and the FSP agreed to forbear
from taking any action in relation to the existing defaults until 30 June 2015, subject
to the conditions outlined in section 3.3 below.
Based on the details in section 3.3 below:
the Applicants had not submitted their asset realisation proposal to the FSP as
9 November 2015
On 30 November 2015, the Applicants‟ solicitors lodged dispute with FOS that
did not include their previously financial adviser
On 11 December 2015, the FSP wrote to the Applicants advising that it was
willing to work with them by allowing them time to realise the sale of the security
properties
Case No: 421689 Recommendation Page 12 of 20
Around early 2016, the Applicants‟ solicitors submitted to the FSP a proposal
(copy not provided to FOS)
On 16 March 2016, the FSP sent the Applicants a counter resolution proposal
On the basis of the available information the FSP has met its financial difficulty
obligations because it has been willing to work with the Applicants. I note the
Applicants did not submit their proposal to the FSP by the required due date of 27
November 2015 and that their dispute with FOS was lodged on 30 November 2015.
Case No: 421689 Recommendation Page 13 of 20
5 Supporting information
5.1 Summary of business loan facilities provided to the Applicants
The FSP provided the Applicants the following business loan facilities :
Date Original
amount
Loan purpose Subsequent changes to the
original loan
15.12. 11 $1 million
(loan 1)
Investment loan ending (xx96)
Refinance of existing debt
On 20 April 2012, the securities
for the loan were changed
On 12 April 2014, the loan
repayments were changed to
interest only repayments
15.12. 11 $300,000
(loan 2)
Investment loan ending (xx42)
Refinance of existing debt
On 12 February 2014, the loan
repayments were changed to
interest only repayments
19.04. 12 $480,000
(loan 3)
Investment loan ending (xx30)
To buy an existing home
06.03. 13 $250,000
(overdraft )
Business overdraft (xx29)
To provide working capital
On 6 June 2013, the overdraft
limit was reduced to $100,000
06.06. 13 $300,000
(loan 4)
Investment loan ending (xx05)
For other investment purposes
04.07. 13 $1,767,000
(loan 5)
Interest capitalised variable
commercial loan (ending xx73)
$109,000 of the facility limit to be
used for the payment of interest
accrued
Maximum term of one year
To assist with construction of six
townhous e of the G
development
Paid out by loan 6 on 16
October 2014
29.09. 14 $1,337,000
(loan 6)
Commercial rate loan facility
(ending xx11)
Maximum term of one year
Loan was drawn down on 16
October 2014 Assist with further
extension of Commercial Rate
Loan for 12 months
Paid out on 20 July 2015 from
the PM property sale proceeds
Case No: 421689 Recommendation Page 14 of 20
5.2 The FSP’s assessments
Summarised below are the FSP‟s commercial submissions:
Date Details
26.03. 12 The group recently was approved for residential property development in QLD
Loan 3 is for the opport unity to purchase residential investment property (at 216 O
street) next door to the property development
They may develop this site given the major costs associated with developing the site
have already been complet ed on the adjoining property
At this stage, the property will be rented out at an expensed annual rental of $31,200
with the interest charges on the loan of $31,488
The appr oving FSP Manager notes that this is a “development in waiting” and the
Applicants should be made aware that at this type of funding is now “considered to
be full”
No serviceability calculation was provided other than the rental income covers the
interest charges on the loan
22.02. 13 Request for an overall increase in the loan facilities by $250,000 to provide:
o New overdraft for fluctuating requirements
o Extend interest only period for loan xx9325 (not part of this dispute)
o G area has had significant growt h and heated market conditions since
late 2010. The last six months have seen a softening of the market and
values have reduced
o The security properties is considered “good security for lending”. A
lending margin of 70% to be used
Background:
o Entity has be en family run and operated since 1970s
o Mr G started as qualified carpenter join in 1971 and became an open
licensed builder in 1973
o The business specializes in residential houses, units an commercial
building contracts
o From 1979 to 1994, the business specialized in multiple project homes
producing 40 houses per annum until the group moved towards house
and land packages in NSW
o In 1998, the group developed and released its own multi - block and
subdivision
o In 2000, Mr G‟s son joined the group after compl eting a Bachelor of
Buildings and Construction Management
o In 2003, Mr G‟s daughter joined the group as the groups interior
designer
o In 2005, the group ex panded into QLD. Mr G and his son secure a
QLD Open Building License and proceeded to open an office in the G
area. The group has invested in a number of residential and sites in the
G area
o Since then the group has completed a number of townhouses, units,
duplex developments including house reloc ations and subdivisions
o The business and staff have 65 years o f combined extensive
experience in all facets of the building and development industry
The group has sold seven units and paid out the loan and are looking for future
Case No: 421689 Recommendation Page 15 of 20
development opportunities. The group is looking at O Street with the view of building
ano ther six units similar to the project just completed
The group purchased a vacant lot located in C with its own funds
The group has received council approval to build the six units and have moved the
house that was located on O street to the C vacant lot u sing their own funds
Mr G gas spent funds on council fees and other associated costs preparing for the
development on O Street. They have plans for six new units with four of the units
under contract at average sale price of $520,000
The Applicants will be approaching the FSP for further funds for the construction of
the six units
Applicants have a proven history with the FSP and have previous successful
development projects
Profit and Loss Analysi s : 30/6/12 30/6/11 30/6/10
(For the company only)
Cont ract building income 1,574 1,915 2,849
Other inc ome (inc rentals) 112 88 112
Less expenses 2,385 1,696 3,660
Net profit before tax (698) 307 (699)
Add backs
Depreciation 21 22 20
Interest 346 273 269
Leasing 0 0 15
Free construction work 0 0 1,050
Amended Net Profit (331) 602 656
Building work in 2012 was the construction of the G d evelopment. This has proven
successful with the seven units been completed in six months‟ time
The $2.3 million expenses are inflated in relation to income because a large portion
of the G development have been included. Whilst the income was not received until
after June 2012 with the majority of the unit sleds settling in Sept ember 2012 which
will be reflected in the year ended June 2013
The unit sales with an average sale price of $470,000 before GST means that total
gross income of $3,290,000 was recei ved after June 30, 2012.
The group losses mean there will a significant reduction on any tax liability
Mr G‟s signed statement of position for the group shows that the group has a surplus
of $9,369,672 (total assets of $14,529,648 with liabilities of $4,88 9,976)
21.05. 13 Request for loan 4 of $300,000 to complete the house located at C
Review commentary as above
Mr G is in negations for the sale of the land loc ated in Y Street. This land adjoins two
other lots owned by a business associate of Mr G‟s and t ogether they are planning to
sell the whole parcel with the three street front ages to an investor. Mr G expects
negotiations to be finalized this week and the sale to be completed around October
2013
Mr G showed the FSP manager confidential “correspondenc e ad documents from
the overseas prospective investor showing a sale price of $6 million” for the Y street
land and the development of the site. Accordingly the FSP expected that the groups
lending would be “significantly reduced” from the sale of Y street
Profit and loss statements for the year ended 2012 have been supplied but tax
returns have not been finalized. The directors individual tax returns have not been
Case No: 421689 Recommendation Page 16 of 20
finalized
Signed group statement of position by Mr G certifying that the details are “true and
correct” shows a surplus of $9,639,672
Profit and Loss Analysi s : 30/3/13 30/6/12 30/6/11
(For the company only)
Net profit before tax 2,464 (698) 307
Add backs
Depreciation 0 21 22
Interest 90 346 273
Leasing 43 70 0
Amended Net Profit 2,597 (261) 602
The FSP used living ex pens es for a couple of $27, 060. FOS specialist has advised
that this higher than the HEM living expenses plus 10% that FOS uses which were
$26,104 as at March 2013 and $26,260 as at June 2013
The FSP calculated a net surplus of $289,074 available when all the group income
was included less the group loan facilities including those with another lender and
the directors credit cards of $92,000
07.06. 13 Request was to assist with the for the construction of six townhouses at O Street
The group has a Development Approval for six multi dwelling townhouses and a
Building Permit dated 6 December 2012 has been granted wit h a currency of two
years
The proposed development will share common facilities including driveways with the
adjoining development at O Street whic h was completed in 2012
There are two unconditional contracts and two conditional contracts o f which one is
to a related party (Mr G‟s son). The sale price of the units was $520,000 including
furniture packages
The groups business plan included:
o to finalize the sale of the Y street project to an overseas investor
o consider the sale of the duplex at S street in the coming year
o sell the three units at PM
Total cost for the development was to be $2,285,590 with the Applicants equity being
$518,590
The loan is to be paid “via the sale of the end product”
Interest costs of $69,000 included as interest ca pitalization
G property income from leased properties provided showed total annual gross rental
income of $195,000 and net rent al income after expenses of $139,585.91
The loan was approved on a number of conditions, among which included:
o A quantity surveyo r, approved by the FSP, would be required to
confirm accuracy of costings and confirm that all necessary statutory
approvals are held
o Providing required documentation of the development application and
approval, building application and approval by the loc al
council/authority
o Copies of approved building plans, specifications ect as appropriate to
the development
The approval manager asked that the Applicants be pre conditioned that “ as the
residential mark ed in G continues to move, the FSP will step up the requirements for
presales on any and all speculative developments” . He al s o reduced the te r m of 12
months instead of the requested 18 months
Case No: 421689 Recommendation Page 17 of 20
5.3 Summary of correspondence between the FSP and the Applicants
I have summarised the details of the written correspondence provided by both parties
in relation to the sale of the PM units:
Date Details
28.05. 15 The FSP sends letter to Mr G stating:
Due to the existing defaults under the group facilities and securities, it is entitled to
take enforcement actio n
Refers to conversations wit h Mr G and confirms that it is, “subject to the
Reservations below, willing to forbear from taking any action in relation to existing
defaults until 4pm on 30 June 2015 subject to the following:”
o Cont racts of sale for the PM Units 1 to 3 must be presented to it by no
later than 30 June 2015. These contracts must be acceptable to the
FSP
o Any requests for the release of tis mortgage over the above properties
are required to be submitted to the FSP
o The FSP reserves its rights to retain full net settlement proceeds from
the sale of the PM units to payout secured facilities
It gives no undertakings and provides no assurance that it will agree to a restructure
of the group facilities or accept any amount less than full proceeds from the sale of
PM properties in permanent debt reduction
01.06. 15 Mr G emails the FSP and says:
Acknowledges the FSP letter dated 28 May 2015
He is inclined to accept the FSP offer to sell the PM properties subject to the
condition that he be able to retain the sum of $200,000. This will provide the
Applicants with cash flow for the next 12 months in which time they will be able to
finalise the sale of the Hotel in Queensland which will bring in a further $2 million
Refers to the asset realisation plan that he has submitted to the FSP which will
resolve the present crisis with the six month period
If the FSP takes the whole proceeds of the sale of the PM properties, it will prevent
the Applicants completing the rationalization and will “effectively destroy us ”
He needs to hear from the FSP “urgently and would appreciate a written res ponse
with 48 hours”
01.07. 15 The Applicants solicitor emails the FSP‟s solicitor to say:
It is acting on behalf of the trust re the sale of the PM properties
Settlement is scheduled for 17 July 2015
Will be in contact closer to the settlement date
06.07. 15 The FSP solicitors email the Applicants solicitors to say:
The FSP has instructed it that it is willing to hand over the “executed releases” in
exchange of receiving a ba nk cheque payable to the FSP for the “whole of the net
proceeds of the [PM] properties ”
17.07. 15 Mr G emails the FSP and says:
Thank you for the proposed schedule for disposition of the sale proceeds of sale of
the PM property owned by the trust
He notes that the FSP has security over “virtually all of my assets and as a result has
Case No: 421689 Recommendation Page 18 of 20
control of my financial affairs”. He says that it is “unreasonable and unfair that the
[FSP] uses this control to unfairly penalise me”
Refers to a discussion about 10 days ago, when the FSP told him what it propos ed
to do with the PM property sale proceeds and that he had objected saying there was
a reasonable alternative that would not penalize the FSP and allow the group to
“survive”. The FSP has not considered his proposed al ternative instead it has chosen
to use its “advantaged position” to seek the full sale proceeds which is “legally
defensible but morally bereft of any consideration for the welfare of the client”
His proposal is a fair and reasonable disposition of the sal e funds which will enable
him to trade out of his current difficulties without jeopardizing the FSP position and
security
He requests that the FSP urgently review his proposal and he provides in support of
his request the group cash flow projections
17.0 7. 15 The FSP emails Mr G to say:
It has on “numerous occasions and consistently advised him that the FSP”:
o Would retain the net settlement proceeds for the PM unit sales as it
“entitled to do under the relevant facility and security documents”
o Would use the net settlement proceeds for permanent debt reduction
o While taking into account his preferenc es, it would not allocate the net
settlement proceeds to the detriment of its overall security position
Refutes his assertions that it has acted improperly, unr easonably or unfairly in its
dealings with him
The decision to proc eed with the sale of the PM security property is entirely his and
asks that he notify it if he wishes to proceed with the settlement which he notes has
been postponed until 21 July 2015
5.4 Sequence of events in relation to the loan repayments
The documentation provided by both parties in relation to the sequence of events
relating to the loan repayments was as follows:
Date Details
06.06. 14 &
06.09. 14
The FSP sent the Applicants arrears letters
25.02. 15
06.03. 15
24.03. 15
30.03. 15
03,05 &19
of April
2015
The FSP sent the Applicants arrears letters
The letters also stated that “if you are experiencing financial hardship and need
assistance, please con tact our Hardship Assistance Team on [phone number and email
address] to find out how we can help”.
Case No: 421689 Recommendation Page 19 of 20
28.05. 15 The FSP sends letter as detailed above stating due to the existing defaults under its
facilities and securities, it is entitled to take enforc emen t action
01.06. 15 Mr G emails the FSP as detailed above stating he was inclined to accept the FSP offer
but requested that he be able to retain a portion of the sale proceeds. The FSP
declined this request, as outlined above.
01.07. 15 to
17.07. 15
For t he details of the events refer above
30.10. 15 The FSP‟s manager sent an email to Mr G and his appointed external advised setting
out the group loan facility balances and that arrears.
04.11. 15 The FSP‟s manager emails to Mr G to say:
Refers to the FSP email of 30 October 2015
Understands that Mr G with the assistance of an appoint ed external adviser (the
representative) a proposal for the FSP‟s consideration
The FSP requires the proposal to be submitted by no later than 27 November 2015
The proposal sh ould include the Applicants proposed course of action to address the
current arrears or steps to reduce the current level of debt
09.11. 15 The Applicants‟ representative emails the FSP‟s manager to say:
The Applicants were in the process of finalising their plan to both the debt and
address arrears
He will be in contact to discuss in “greater detail the steps that are currently being
undertaken to address the above issues”
The Applicants are close to finalizing the appointment of a G real estate agent
C onfirms that the proposal will be sent by the due date
30.11. 15 The Applicants‟ solicitor, as their representative, lodged the dispute with FOS
11.12. 15 The FSP emails the Applicants‟ solicitor to say:
it has been notified of the FSP dispute and confirms that the FSP‟s collection activity
has been placed on hold pending review of the matter
it understands that the Applicants are in the process of preparing a realisation
strategy for the various security properties in the G region for its consideration
the realisation strategy should include key dates and milestones, including (amongst
other things) the date the marketing campaigns are to commenc e and when it is
expected a cont ract of sale will be exec uted for each property
It conforms it is willing to work with Mr G to allow them time to release the security
properties subject to entering into a Deed of Forbearance which is acceptable to it
23.12. 15 An FSP Manager emails the Applicants‟ represent ative to say:
Refers to their earlier conversation
As FOS has notified that a dispute has been lodged by the Applicants and he, the
representative , is not listed as a representative, the manager cannot discuss the
matter further with him
16.02. 16 The Applicants‟ representative responds to the FSP manager‟s abo ve email copying in
the Applicants solicitor to say:
He is in discussions with a commercial real estate agent regarding the Hot el site
Case No: 421689 Recommendation Page 20 of 20
G real estate are finalising the Applicants‟ Realisation Strategy by weeks end (19
February 2016)