Cyclone roof damage to rental home: whether the home is a total loss and the amount of cash settlement
Text of the determination
Determination
Case No: 420315 Determination Page 1 of 8
Case number: 420315 27 July 2016
1 Overview
1.1 Dispute
The Applicant lodged a claim on his landlord policy for storm/cyclone damage to his
tenanted rental home on or about 20 February 2015. The home was a custom
modular-built home which is about 30-40 years old. The roof was severely damaged.
The Financial Services Provider (FSP) accepted the claim and offered a cash
settlement for damage of $105,793 which included $2,000 for curtains less the policy
excess of $500. The offer was based on its builder’s estimate of the cost to repair
and replace the storm damaged parts of the home. However given the custom nature
of the construction and the levels of corrosion to the steel frame of the home (which
pre-dated the storm), the FSP was not satisfied it could safely repair the roof.
The Applicant’s view that the home should not be repaired is supported by some
experts. As such, the Applicant is of the view the FSP should indemnify him for the
cost to demolish and replace the home, which he estimates at $270,000. The
Applicant says that in the alternative, the FSP should at least take its unique design
into consideration in its settlement offer. He further says the FSP withheld reports
from him during the handling of the matter and unnecessarily delayed the claim.
1.2 Issues and key findings
Is the home repairable or a total loss?
The available evidence suggests the insured home should not be repaired due to a
combination of the storm damage and the underlying s tructural issues. The FSP is
only liable for the damage attributable to the storm.
What is a fair amount to settle the claim?
While the offer of settlement is reasonable, a margin should be allowed in
consideration of the unique nature of the structure and the difficulty in repairing such
a home. The existing quote arguably does not cover all eventualities as it is an
estimate only, based solely on the Scope of Works documentation. It is fair in all the
circumstances that the FSP increase its offer by an additional 15% ($15,643.95) to
cater for any contingencies.
1.3 Determination
This Determination is partly in favour of the Applicant.
Case No: 420315 Determination Page 2 of 8
Should the Applicant accept this Determination, then within seven days of
acceptance of this Determination, the FSP is to pay:
the additional sum of $15,643.95
interest on this amount at the statutory rate from 8 December 2015 until the
date of settlement
Pursuant to the Terms of Reference, the FSP is also to pay the costs incurred by the
Applicant in engaging the engineer, TC. These costs are to be paid within seven
days of production of proof of the costs by the Applicant to the FSP.
The FSP is otherwise not obliged to pay any further amount to the Applicant for the
claim.
Case No: 420315 Determination Page 3 of 8
2 Reasons for determination
2.1 Is the home repairable or a total loss?
Parties agree about many issues
It is not in dispute that:
the Applicant’s rental home was a modular construction, built by a company that
no longer trades
the original construction of the home was approximately 30-40 years ago
as a result of heavy winds and rain from Cyclone Marcia, the home suffered
severe roof damage
it was unlivable after the incident and the tenant left the property
due to the damage caused in this event, the Applicant is entitled to indemnity
under the policy
the structure of the roof was unique to the original builder and included custom -
built trusses that cannot be readily sourced
due to the proximity of the home to sea water, it had suffered extensive
corrosion in its steel frame
the FSP’s chosen engineer, ‘ST’, determi ned the home should be demolished
and not repaired
a second engineer, ‘SE’, considered the roof damage repairable and its quantity
surveyor submitted a quote for $104,293
The FSP also allowed $2,000 for curtains (which amount is not in dispute)
a third en gineer ‘TC’ was unsure if a repair would be possible.
Home was severely damaged in the insured event
The FSP accepts it is liable for the damage caused by the storm to the home but
denies it has an obligation to replace the building altogether.
In conside ring the damage, ST accepted generally that the roof ‘can be
repaired/replaced’ but said that the ‘integrity of the building was significantly
compromised by corrosion prior to the occurrence of the weather event’.
ST attributed this corrosion to the environmental conditions (with the home being
about 200m from the coastline) and the ‘inappropriate use of steel framing’ in the
building’s construction. The framing was not adequately protected from the elements.
There is no suggestion that this corrosion was in any way caused or influenced by
the storm. However the corrosion is problematic in considering the repair of the
damage, as is the custom nature of the building.
Given the evident problems, ST formed the view that the home should be demolished
and not repaired.
This need arose due to the corrosion affecting the structural integrity of the building,
which meant it would be difficult (if not impossible) to safely repair the home.
Case No: 420315 Determination Page 4 of 8
The Applicant’s expert, TC, noted that the roof was damaged as a result of t he forces
of the storm, although it was ‘difficult to provide structural recommendations’ for the
home, given its custom design.
TC ventured there would need to be a ‘monetary loading’ associated with attending
to any repairs, due to the ‘non -standard con struction’ of the building.
Policy provides the FSP is not obliged to repair undamaged property
The FSP’s policy makes it clear that cover does not extend to damage caused due to
‘rust, corrosion, gradual deterioration, depreciation or wear and tear’.
Further to this, the policy stipulates:
‘When damage or loss occurs to your buildings we will pay the cost of rebuilding your
buildings or repairing the damaged portions to the same condition as when they were
new…’
In attending to this, the FSP will:
‘… try to match any material used to repair the buildings with the original materials. If
we cannot, we will use the nearest equivalent available to the original materials. We will
not pay any costs for replacing undamaged property.’
The policy creates an onus on the FSP to source the original materials where
possible but allows it to source the ‘nearest equivalent’ where this is not possible.
It is accepted that original materials will not be available for the Applicant’s home and
if the home was to be repaired, any repairs would be reliant upon obtaining some
‘nearest equivalent’ or custom designing and engineering of some materials.
Home probably not repairable
In consideration of the available evidence, the Panel accepts that the insured home,
which the Applicant says has deteriorated further in recent months, is likely not
repairable.
Given the apparent problems with the corrosion of the steel framing, and the opinion
of ST in particular, it would appear the best course of action would be for the home to
be de molished. TC’s opinion leant in this direction also.
This alone does not make the FSP liable for its replacement.
The FSP’s onus under the policy is only for the damage caused as a result of the
insured event. ST made it clear that this was essentially limited to the roof damage,
which theoretically could have been repaired but for the condition of the steel frame
and the overall impact on the integrity of the structure.
As the frame damage is not event related, the FSP has no obligation to cover the
Applicant for this damage.
The quotes prepared for the repair of the home are of value as an estimate of the
repair cost of the claim-related damage, which is representative of the FSP liability.
Case No: 420315 Determination Page 5 of 8
The Panel is satisfied that the FSP is liable only for the storm damage and not for the
underlying corrosion issue which would appear to make repair of the roof an
unreasonable proposition.
The Applicant is adamant that the corrosion did not have an effect on the roof or the
damage caused in the storm. The Panel agrees with this (as does the FSP). This is
not the concern with the claim – the issue is whether the storm damage to the roof
and other areas can be safely repaired, given the bespoke nature of the original
construction and the underlying issues caused through exposure to salt air over time.
The available evidence suggests that the repairs to the home should not be
undertaken. Further, the Panel considers it unlikely that if SE (or any another
repairer) did attend to the work, a warranty for such work could be provided.
In such circumstances, a cash settlement for the estimated value of the storm
damage is appropriate. It will then be at the Applicant’s discretion as to what he will
do with the home. Should he demolish the building, the Panel accepts the FSP is not
liable for these costs.
The Panel accepts this is not an ideal outcome for the Applicant but the policy terms
mean the FSP is not responsible for the underlying corrosion problem.
The responsibility for the upkeep of the home rests with the Applicant. Whilst he likely
did not know of this problem, it does not mean the FSP is responsible for it. In all
likelihood, the original construction was inappropriate for the location.
The Panel is satisfied the FSP’s liability is only to the extent of the damage ca used in
the storm event.
2.2 What is a fair amount to settle the claim?
Two quotes prepared for consideration
Engineer SE provided a general scope of works to attend to the repairs necessitated
by the storm damage, and a subsequent quote for this work. After revision, this quote
was $104,293.
A second quote was later prepared by ‘PB’ based on the same scope of works from
SE. PB said the necessary repairs could be undertaken for $78,382.81.
Noting the large disparity in the quotes and in fairness to the Applica nt’s situation, the
FSP preferred the larger SE quote and used this as a basis for its proposed
settlement. However, the Panel notes the FSP made its offer in July 2015, then in
August 2015, based on the scope of works from SE. It was not until some many
m onths later that the further quote from PB was obtained. The FSP’s position was
comprehensively set out in its letter to the Applicant dated 8 December 2015. In that
letter, the FSP did not rely on or refer to the quote from PB. On this basis, the Panel
is satisfied it is entirely appropriate to consider this matter based on the FSP’s earlier
conclusions.
Case No: 420315 Determination Page 6 of 8
Scope of the repairs may be imprecise and offer should be increased
Given the unique construction of the building and the difficulty for the FSP in
potentially obtaining appropriate replacement parts, any prepared scope of works is
likely to be somewhat speculative, particularly given the FSP’s quantity surveyor
based its estimate solely on documents provided.
The Applicant refers to a comment from his engineer, TC, who noted there would be
a ‘loading’ associated with sourcing relevant replacement parts or to custom -design
such parts, as necessary.
SE appears to have attempted to cater for this in its revised quote, which increased
the overall settlement amount by about $10,000.
It is difficult to ascertain an exact figure, given both the unique construction of the
home and the repairs are unlikely to be ever completed.
In consideration of what is fair in all the circumstances, the Panel considers the FSP
should include a margin on its repair costs to allow for potential costs that have not
been identified and considered or further custom work that would likely be needed
and has not been catered for. The Panel has also taken into account the costing is
not in fact a quote but an estimate based on a scope of works and not a site visit. If
the Applicant was to rebuild, a cash settlement includes no warranty and leaves all
the risk with the Applicant. The builder SE noted that its estimate (as would often be
the case) may vary by a margin of +/- 15%. Given the unique nature of this property,
and other factors set out herein, the Panel considers it is fair in all the circumstances
that a margin of 15% should be allowed. To this end, the FSP should increase its
settlement amount by 15% ($15,643.95).
FSP also to pay costs incurred by the Applicant in engaging TC
The Service’s Terms of Reference allow that FOS may decide the FSP is to
contribute to the professional costs incurred by the Applicant in the course of the
dispute. Unless exceptional circumstances apply, FOS will not require the FSP to
contribute more than $3,000 to these costs.
FOS decides whether the FSP should make such a contribution by considering what
is fair in the circumstances. FOS makes this decision taking into account the
complexity of the dispute and whether the Applicant incurred costs because they
genuinely required expert assistance.
The material establishes the insured property was unique and advice was required in
relation to whether the insured property could be rebuilt, and at what cost, in view of
its non-standard construction. In these circumstances, the Panel considers it is fair
the FSP pays the costs incurred by the Applicant in the engagement of the engineer,
TC subject to the production by the Applicant of documents evidencing the costs
incurred.
Timeliness and compensation
The Applicant considers the FSP unnecessarily delayed the claim and withheld
material from him. He further considers that it did not meet relevant service standards
Case No: 420315 Determination Page 7 of 8
in dealing with him.
The FSP denies it withheld reports and says all relevant material was made
available.
The Panel accepts there were delays with the claim, although given the nature of the
event which caused the damage (cyclone) and the volume of c laims, the availability
of skilled resources would have been stretched.
Whilst the Applicant has been undoubtedly inconvenienced by this, the unusual
circumstances meant that this would always have been a difficult claim to assess and
quantify.
It is normal in the context of any claim for an insured person to experience a degree
of inconvenience. The Panel certainly accepts that was the case here. The claim
might not have been handled strictly in line with the FSP’s normal service levels,
however the unique circumstances did make it difficult for all involved.
Noting the Panel has offered an additional amount in the overall context of the claim,
it is satisfied the Applicant has been duly compensated.
The Applicant has also stated that reports were withheld from him. A review of the
material indicates that a report was communicated late to him. However there is no
indication of an intent to avoid the FSP’s obligations or mislead the Applicant.
Tenant left the home
The Applicant’s policy provided cover for r ent default but not loss of rent. Rent default
applies when a tenant leaves before the end of a tenancy (without notice), stops
paying rent or is legally evicted.
It is not specified as to when or why the tenant left, although almost certainly the
home could not be lived in after the storm damage occurred. A number of conditions
are placed on this cover and no details of the rental tenancy agreement have been
provided.
Rental default is set up to account for losses incurred due to a tenant failing to make
payments or leaving without notice. The more appropriate cover for the Applicant’s
circumstances was ‘Loss of Rent’, which caters for the situation where a loss occurs
and the tenant is forced to vacate. As the Applicant did not have this cover (which
was optional under the policy), no award of this type can be made.
Case No: 420315 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach to this dispute
General information
As advised to the parties, FOS has considered it appropriate to expedite the dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference. This
is because of the nature and complexity of the matter. This dispute has not been the
subject of a FOS Recommendation and has proceeded directly to Determination.
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been read and co nsidered. The parties have raised
numerous issues in their submissions to the Service. For the purpose of this
Determination, commentary is restricted to only those issues considered relevant to
the outcome.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions. This decision has been made by a Panel consisting of an
Ombudsman, a representative with extensive experience in insurance c laims and a
representative with extensive experience in consumer claims.
Onus of proof
It is an accepted principle of general insurance law an insured bears the onus to
establish on the balance of probabilities they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities an
exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP’s letter dated 8 December
2015 and Notice of Dispute dated 10 December 2015. Both the policy document, the
letter and the Notice have been exchanged with the Applicant.
3.3 Relevant material considered and relied on
Parties’ submissions and all attachments to submissions
Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.