Text of the determination
Determination
Case No: 419700 Determination Page 1 of 8
Case number: 419700 25 August 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP) for damage to his home following severe storms in April
2015.
The FSP initially denied liability for the damage on the basis that it was not caused by
water entering through a storm-created opening. After the applicant disputed the
denial, the FSP accepted liability for internal water damage to the ceilings and walls.
However, the FSP says it is not liable for buckling and cracking damage to the floor
tiles in the dining room, on the basis that this damage was not caused by the storm in
April 2015, but by the manner in which the tiles were laid.
The applicant disputes the FSP‟s denial of liability for the damage to the dining room
tiles, as well as its decision to cash settle him for the cost of repairing the internal
water damage. He is also dissatisfied with the manner in whic h the FSP managed his
claim.
1.2 Issues and key findings
Is the FSP liable for the claimed damage?
The available information establishes that the damage to the dining room floor tiles
was not caused by the storm in April 2015. Accordingly, the FSP is not responsible
for this aspect of the damage.
Is the applicant entitled to compensation?
While the FSP generally managed the claim reasonably overall, it unnecessarily
delayed cash settling the applicant for the cost of repairing the internal water damage
(for which it accepted liability in August 2015).
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP is required to pay the applicant the amount of $2,500 in full and final
settlement of his claim. The FSP is to pay the applicant an additional amount of $500
as compensation for non-financial loss.
Case No: 419700 Determination Page 2 of 8
2 Reasons for determination
2.1 Is the FSP liable for the claimed damage?
FSP is entitled to rely on terms of policy as set out in PDS
In considering its liability for the applicant‟s claim, the FSP has relied on the terms of
the policy, as set out in a Product Disclosure Statement (PDS) dated 18 February
2013.
The applicant denies having received a copy of the PDS. He says the FSP has never
provided him with an updated PDS since he first incepted the policy more than
twenty years ago.
The FSP has provided a statutory declaration from the employee (GI) responsible for
managing the despatch of policy documentation to the FSP‟s customers.
In his statutory declaration, GI outlines the FSP‟s processes for the provision of
policy documentation and provides copies of systems records relating to the
despatch of policy renewal documentation to the applicant in September 2013.
Based on the information provided by the FSP, I am satisfied that, on the balance of
probabilities, the FSP sent a copy of the PDS to the applicant‟s recorded address in
September 2013.
On this basis, the FSP is entitled to rely on the terms of the policy (as set out in the
PDS) for the purpose of determining its liability for the appli cant‟s claim.
Policy provides cover for storm damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The appl icant‟s policy provides cover for damage to his property caused by the
insured events listed in the policy (including the insured event of „Storm‟), subject to
the conditions and exclusions set out in the policy.
However, the insured event of „Storm‟ only provides cover for damage caused by
water entering the property during the storm if the water entered a fully enclosed part
of the property through an opening created by the storm.
The FSP does not dispute that the applicant‟s property was affected by wat er entry
during the severe storms in April 2015. On this basis, I am satisfied that the applicant
has established a prima facie claim for storm damage under the policy.
Case No: 419700 Determination Page 3 of 8
FSP has accepted liability for internal water damage
The applicant‟s property suffered water damage to the kitchen and lounge room
ceilings and the laundry wall after rainwater entered the property during the storm.
The FSP‟s building consultant (SC) reported that water had entered through the lead
flashing covering the juncture between the lower storey gable roof and the upper
storey wall. This corresponds with the areas in which the damage occurred.
While acknowledging the severity of the wind-driven rain experienced during the
storms in April 2015, S considered that water had entered the property due to the
width of the lead flashing being insufficient.
The applicant‟s engineer (AR) considered that water entry had occurred due to the
gutters and downpipes at the property being unable to cope with the significant
volume of rain experienced during the storm.
The FSP initially denied the applicant‟s claim for internal water damage on the basis
that rainwater had not entered the property through a storm-created opening.
However, the FSP subsequently agreed to accept liability for this aspect o f the
damage.
I consider the FSP‟s decision to accept liability was appropriate, g iven the severity of
the April 2015 storm, the lack of any significant defect with the applicant‟s roof and
the absence of any evidence of prior water damage.
However, the FSP says it is not liable for the damage to the dining room floor tiles, on
the basis that this damage was not caused by the storm in April 2015.
FSP is not liable for damage to floor tiles
The reports provided by the various consultants who have inspected the property
confirm that a section of the floor tiles (approximately six square metres wide) near
the entrance to the dining room had buckled and lifted, resulting in cracking damage
to surrounding tiles.
The damage to the floor tiles did not occur immediately after the storms.
When the applicant lodged his claim in April 2015, he advised the FSP of damage to
the lounge room ceiling only. The applicant called the FSP approximately four weeks
later to advise that the dining floor tiles had “popped out of place”.
The consultants appointed by the parties to determine the cause of damage to the
floor tiles have provided differing opinions.
The applicant‟s e ngineer (AR) says the damage to the dining room floor tiles was
caused by excessive water entry during the storms. AR reported that wind driven rain
entered the house, finding its way into the cavity walls and floor tile bed, causing
damage to the tiles.
The building consultant (SC) appointed by the FSP concluded that the damage to the
floor tiles was not caused by the storms in April 2015, but by the inability of the tiles
to withstand the natural expansion and contraction of the building, due to the manner
in which they had been laid.
Case No: 419700 Determination Page 4 of 8
In his report, SC noted that:
there was no evidence of water staining to the walls or ceiling in the area
surrounding the damaged tiles, and the applicant had been unable to identify
any point of water entry;
in addition to tiles which had lifted, a number of other tiles showed evidence of
displacement;
the floor tiles had been wet laid ( that is, affixed directly to the damp cement bed
using cement powder to bond the tile s, rather than adhesive ) ; and
the tiles had been laid ov er the entire area of the ground floor rooms, with no
intermediate movement joints installed . The tiles had been directly abutted to
the timber skirting boards with hard grout , with no provision for perimet er
movement joint s .
Having carefully reviewed the reports provided, I am satisfied that, on the balance of
probabilities, the damage to the floor tiles was not caused by water entry during the
storms in April 2015, but occurred due to the manner in which the tiles were laid.
The report provided by the FSP‟s building consultant (SC) provides a detailed and
logical explanation of how the damage occurred, supported by photographic
evidence establishing how the tiles were installed.
In contrast, the applicant‟s engineer (AR) has provided only a general description of
the mechanism by which he considers the damage occurred . The photographs
contained in AR‟s report do not establish that significant volumes of water affected
the dining room area during the storms.
On this basis, I am satisfied that the damage to the dining room floor tiles was not
caused by the storms in April 2015 or by any other event insured against under the
policy.
Accordingly, the FSP is not liable for this aspect of the damage.
2.2 How should this dispute be settled?
FSP is entitled to cash settle claim
Under the applicant‟s policy, the FSP may settle a claim by repairing the damage to
his home as new or paying him the amount the FSP determines to be the reasonable
cost of the repairs. The policy allows the FSP to take into account discounts provided
by suppliers in determining this amount.
It is clear from the terms of the policy that the FSP has the discretion to decide which
settlement method to adopt.
Accordingly, the FSP is entitled to cash settle the applicant‟s claim.
Claim should be cash settled for $2,500
For the reasons outlined above, the FSP is liable for the cost of repairing the water
damage to the lounge room and kitchen ceilings and the laundry wall.
Case No: 419700 Determination Page 5 of 8
The FSP has obtained an estimated costing from its builder (AJ) for these repairs,
based on a scope of works prepared by the FSP‟s building consultant (SC). AJ
estimated the cost of repairing the damage as $1,951.81.
I am satisfied that SC‟s scope of works is appropriate, having regard to the extent of
the damage, as shown in the various photographs provided by the parties.
The FSP has provided limited information regarding the estimated costing provided
by AJ. For example, it is unclear whether or not the quoted amount includes GST.
Further, this amount is an estimate only (and not a quotation), as it was never
intended that AH would carry out the works.
The applicant has provided several quotations from his own builders for amounts
exceeding $30,000.
However, these quotations are not itemised and include the removal and
replacement of all of the floor tiles (over an area of up to 22 square metres), for which
the FSP is not liable. Accordingly, the quotations provided by the applicant
significantly overestimate the cost of the claim-related repairs.
Having regard to the factors outlined above, I consider it is fair in all the
circumstances that the FSP pay the applicant the amount of $2,500, in settlement of
his claim for internal water damage to the ceilings and walls.
Given the applicant‟s quotations have been obtained re latively recently, it appears
that he has not undertaken the repairs to date. Accordingly, the FSP is not required
to pay interest on the cash settlement amount.
2.3 Is the applicant entitled to compensation?
FOS may award compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual stress and inconvenience associated with an insurance claim.
The applicant is dissatisfied with the manner in which the FSP handled his claim. In
particular, he says the FSP unreasonably delayed settlement of the claim and
allowed its roofing contractor to inspect his property without his consent.
FSP unnecessarily delayed settlement of claim-related damage
Having reviewed the claim history, I consider that, while the FSP managed the claim
reasonably overall, there are some aspects of the claim which could have been
handled better.
While there was a delay of approximately five weeks between the date the applicant
lodged his claim and the date of the FSP‟s initial assessment, this was not
Case No: 419700 Determination Page 6 of 8
unreasonable in the circumstances, given the volume of claims triggered by the
severe storms in April 2015.
There was a further delay after the applicant disputed the FSP‟s denial of his claim,
before the FSP appointed its building consultant (SC) to review the initial findings
regarding the cause of the claimed damage.
However, the FSP‟s claim notes reflect that during this time it was awaiting the
provision of an updated report from the applicant‟s engineer (AR).
Nevertheless, I consider the FSP unreasonably delayed cash settling the applicant
for the cost of repairing the internal water damage for which it had first accepted
liability in August 2015. The FSP did not obtain an estimate for the cost of repairing
this damage until March 2016.
In the circumstances, I consider the applicant is entitled to compensation of $500 for
non-financial loss.
Applicant has not established mis conduct by FSP’s contractor
There is no independent information to confirm the applicant‟s assertions regarding
the FSP‟s roofing contractor (AB) having attended the property without his consent.
It appears AB was engaged by the FSP‟s assessor (AJ) to repo rt on the condition of
the roof. In his report, AB states that he inspected the property at 10:00am on 10
June 2015, in the presence of the applicant.
The applicant says he was not present when the inspection occurred. Accordingly, it
is possible that AB i ncorrectly recorded the inspection details (or met with another
member of the applicant‟s family).
Given the limited information available, I am not satisfied that the facts establish
misconduct on the part of the FSP or AB, such as would justify the award of
compensation.
Case No: 419700 Determination Page 7 of 8
3 Supporting information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
dispute. Accordingly, this dispute has not been the subject of a FOS recommendation
and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Scope of cover We will provide cover for the following Insured Events if they occur during the
Period of Insurance and are not subject to a:
General Exclusion (please refer to pages [xx] to [xx] ) ;
specific exclusion described under the Insured Event.
Insured event –
Storm
What is covered
Your building and/or contents are covered for loss or damage caused by
storm.
What is not covered
Your building and/or contents are not covere d under this Insured Event for: …
loss or damage caus ed by wind, rain, hail or snow which ent ered an
ordinarily fully enclosed part of your building through an opening not
created by the storm. This includes but is not limited to:
- an open window or door;
- a ny opening made for the purpose of any renovation, repair or
maintenance work …
General exclusions Under this policy, there is no cover provided for any loss, damage or liability
caused directly or indirectly by or in any way connected with:
defects, structural or design faults, faulty workmanship or faulty design; …
wear and tear and lack of maint enance …
Settlement of
claims
Building claims
If we agree to pay your claim, we will decide whet her to:
Case No: 419700 Determination Page 8 of 8
Subject Terms
repair or rebuild the lost or damaged part of your b uilding; … or …
pay you the amount we det ermine to be the reasonable cost of repairing or
rebuilding the lost or damaged part of your building up to the sum insured
stated on your Certificate of Insurance …
If discount arrangements we have in place with su ppliers result in us
replacing or repairing any part of your building for less than the sum insured
or its retail value, we will not refund any premium or pay the difference.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.