Determination 419036

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2016-06-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner claimed under contents insurance for water damage to an undercover patio roof after heavy rain. The insurer denied the claim as caused by gradual deterioration and design or workmanship defects, and AFCA agreed the exclusions applied.

The policy excludes gradual deterioration and inherent design or workmanship defects, and the applicant did not establish a storm-caused prima facie claim.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 419036 Determination Page 1 of 6 Case number: 419036 30 June 2016 1 Overview 1.1 Dispute The applicant lodged a claim on 7 September 2015 on his Home Contents policy for water damage sustained during heavy rain on 15 July 2015. The FSP accepted the property was water damaged but declined the claim for damage to the undercover patio. The FSP considered the damage was caused by design defect of the roof and gradual deterioration which is excluded under the terms of the policy. The applicant maintains that the patio roof was built according to regulations and that the damage is a direct result of the rainfall event. A recommendation was issued by FOS on 18 February 2016. The recommendation was in favour of the FSP and rejected by the applicant. 1.2 Issues and key findings Is the FSP entitled to deny the claim? The applicant ‟s policy is an insured events policy that provides cover for specified insured events subject to exclusions. While there is no dispute the property suffered damage following a storm on 15 July 2015, on balance, the damage resulted from the gradual deterioration of the silicone sealant and the faulty workmanship or faulty design of the patio roof. In the circumstances the FSP is entitled to rely upon the exclusions contained within the policy to refuse payment of the claim. 1.3 Determination The determination is in favour of the FSP. The FSP is entitled to deny the Applicant ‟s claim. Case No: 419036 Determination Page 2 of 6 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of clarifying the issues arising from the material exchanged. No further information has been provided by either party following the recommendation. In rejecting the recommendation the applicant was given the opportunity of providing additional information but has not done so. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principals, terms of the policy, good industry practice includi ng codes of practice and prior determinations where applicable. 2.1 Is the FSP entitled to deny the claim? Applicant has not established a prima facie claim under the terms of the policy The applicant must establish, on the balance of probabilities, the loss or damage was caused by one of the events insured under the policy. This is known as a prima facie claim. The applicant ‟s policy is an insured events policy that provides cover for damaged caused by a number of insured events including storm, rain water and flood. The onus is therefore on the applicant to establish on the balance of probabilities that the damage sustained to the property was caused as a result of storm, rain water or flood. Circumstances The applicant says he noticed water leaking through the light panels and ceiling joints following heavy rainfall. The applicant lodged a claim for damage around 2 months after the event. At that time, rust had formed around the ceiling joints and panels. The applicant says the building was certified to be completely sound at the time of purchase approximately 6 years ago and the roof had not leaked prior to the event. There is no evidence to dispute that the roof had not leaked prior to the July 2015 event. The FSP had the property inspected by an assessor. The applicant was present during the inspection. The assessor confirmed the property had been maintained in good condition but from an inspection of the damage that the damage was caused by a defect issue relating to the pitch of the patio roof being virtually flat. The assessor considered the resulting damage was caused by water pooling on the roof sheets during heavy rains before penetrating underneath the hip capping flashings and/or sheet lap joins being absorbed by the insulation inside the panels and leaking through the ceiling sheets, joins and light fittings. Physical inspection revealed the roof had a pitch of 0.2 degrees, well below the manufacturer ‟ s recommendations which state this type of insulated roof panel should Case No: 419036 Determination Page 3 of 6 not be installed on roofs with a pitch of less than 3 degrees. The assessor also noted that inspection of the underside of the insulated roof/ceiling panels revealed evidence of extensive rust/corrosion which was clearly not the result of a single defined event as claimed. The assessor considered the problem had developed or worsened over an extended period of time as a result of repeated and ongoing exposure to moisture. The applicant disputed these findings and the FSP went back to the assessor seeking clarification. In an email dated 12 November 2015 the parties the assessor advised: 1. „T he existing roof ab ove the affected area where the ingress occurred is 0.2 degrees‟. He was aware of one insulated roof panel on the market that was recommended for use on roofs with a pitch of less than 1 degree and that was rated to a minimum of 0.72 degrees, well below the identified pitch roof on the applicant ‟s property. 2. The nature of the staining indicates water pooling on the roof sheets was an ongoing issue. Whilst accepting that the roof may never have leaked previously in spite of the identified defects, the likely explanation is that the sealant previously applied to the hip cavity was providing a seal and prevented ingress. As this seal has deteriorated the water ingress has occurred. 3. The pitch reading of the hip capping is exactly the same as the roof sheeting as they are fixed together. The reading obtained of the pitch confirmed the actual pitch of the roof sheeting at the point where the ingress occurred. 4. The sealant was mouldy which confirmed the ongoing exposure to moisture and dampness. ‟ In the absence of any evidence to the contrary, I accept that the damage most likely arose due to a design defect in the pitch of the roof and the deteriorated sealant applied to the hip joint. The policy is clear. Damage caused by way of gradual deterioration, inherent defects, structural faults, faulty workmanship or faulty design is excluded from cover. In the absence of any evidence from the applicant to dispute the findings of the assessor, I accept that the FSP is entitled to deny the claim as the cause of damage was excluded under the terms of the policy. Case No: 419036 Determination Page 4 of 6 3 Supporting information 3.1 Policy terms “Insured Event – You are covered for loss or damage to your home or contents (a s applicable) caused by Exclusions to Insured Events (see also ‘What is not covered under your policy’, pages 38 - 40 – You are not covered for Storm, rainwater and flood …  Caus ed by gradual deterioration from rainwater; … “ Exclusions The following general exclusions apply to all covers under your policy. You are not covered for any loss or damage caused by or loss caused by or resulting from, or the costs incurred from or of: …  Gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light;  Inherent defects, structural faults, faulty workmanship or faulty design;” 3.2 Expert reports Record Key points Asse ssor (A) Report 9 September 2015  The metal insulated ceiling panels have been water damaged (joints rusted/deteriorated).  Water leaks through the light fittings during heavy rain  Damage has been caused by a defect issue relating to the pitch of the patio roof  The roof lies flat and is unable to drain water from the sheets to the guttering  Water pools on the roof, penetrates through the sheet lap joints or the deteriorated sealant; and is absorbed into the insulation and leaks through the ceiling  Roof has a pitch of 0.2 degrees – below the manufacturer‟s recommendation  Believed this is a defect relating to poor design  Evidence of extensive rust to the joints of the sheets whic h has developed over a period of time Asse ssor (A) Addendum Report 12 November 2015  As far as they are aware the only product that is recommended for use on roofs with a pitch of less than 1 degree is Kingspan which has a minimum pitch of 0.72 Case No: 419036 Determination Page 5 of 6 degrees. Still higher than the meas ured 0.2 degrees  The likely explanation as to why the roof had not leaked before this event is because the sealant previously applied to the hip capping was providing a watertight seal and this prevented ingress. However as the sealant started to deteriorate, it was not pr oviding a watertight seal.  Another possible suggestion is that the area of the roof sheeting has gradually sagged slightly over time due to age/ wear and tear or was never previously exposes to the volume of rain.  The inspection confirmed no storm created opening or related damage to the roof sheeting that has contributed to the ingress that occurred indicating the defect is the roof being under pitched in conjunction with torrential rain.  The rust and corrosion indicates the ingress that has occurred is not a one off event and is an ongoing issue.  Mouldy sealant confirms ongoing exposure to moisture/dampness  The pitch of the roof sheeting directly above the affected area where the ingress occurred is 0.2 degrees.  Regardless of where the ingress occurre d, the manufacturer stipulates a minimum pitch of 1 degree must be maintained across the entire surface of the roof, not just at its highest point.  The evidence of staining to the roof sheeting adjac ent to the guttering confirms that water ponding/ pooling on the roof is an ongoing issue which likely occurs only during heavy rain periods. Asse ssor (B) Report 11 January 2016  Inspection of the patio roof revealed no storm related openings or related damage.  Concluded that the roof panels were manufactured by Bondor and are called “Solarspan.”  Checked the pitch of the roof using a Magnetic Polycast Protractor and found the side „C‟ panels were installed at the minimum pitch of 2 degrees although checks on the sheets and the area around the hip beam where th e leaks occurred returned a pitch calculations below 1 degree.  The water ingress between the insulated patio panels is unrelated to any one off storm event and appears to be a direct result of an installation defect at the time of construction.  The patio has large areas which have been inadequately supported (hip beam) causing the panels to be positioned below rec ommended pitch.  The cause of corrosion is a direct result of the patio having been installed at less than the manufacturers required 2 degree pi tch which has caused water to pool on the surface of the sheets during heavy rain periods instead of draining away.  Confirm that the minimum pitch stipulated for this type of Case No: 419036 Determination Page 6 of 6 panel is 2 degrees. Asse ssor (WG) Report 14 January 2016  Inspected the Applicant ‟s roof  Found the materials used on this patio are the same as would be used today  There is no need for a supporting post to be used on the hip beam and all beam sizes currently meet engineering standards.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.