Home / Financial Firm (Unknown - Insurer) / Determination 419036
Determination 419036
claim_denial
Summary
A homeowner claimed under contents insurance for water damage to an undercover patio roof after heavy rain. The insurer denied the claim as caused by gradual deterioration and design or workmanship defects, and AFCA agreed the exclusions applied.
The policy excludes gradual deterioration and inherent design or workmanship defects, and the applicant did not establish a storm-caused prima facie claim.
Issues
- Claim denial primary · not upheld“I accept that the FSP is entitled to deny the claim as the cause of damage was excluded under the terms of the policy.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 419036 Determination Page 1 of 6
Case number: 419036 30 June 2016
1 Overview
1.1 Dispute
The applicant lodged a claim on 7 September 2015 on his Home Contents policy for
water damage sustained during heavy rain on 15 July 2015.
The FSP accepted the property was water damaged but declined the claim for
damage to the undercover patio. The FSP considered the damage was caused by
design defect of the roof and gradual deterioration which is excluded under the terms
of the policy.
The applicant maintains that the patio roof was built according to regulations and that
the damage is a direct result of the rainfall event.
A recommendation was issued by FOS on 18 February 2016. The recommendation
was in favour of the FSP and rejected by the applicant.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The applicant ‟s policy is an insured events policy that provides cover for specified
insured events subject to exclusions.
While there is no dispute the property suffered damage following a storm on 15 July
2015, on balance, the damage resulted from the gradual deterioration of the silicone
sealant and the faulty workmanship or faulty design of the patio roof.
In the circumstances the FSP is entitled to rely upon the exclusions contained within
the policy to refuse payment of the claim.
1.3 Determination
The determination is in favour of the FSP.
The FSP is entitled to deny the Applicant ‟s claim.
Case No: 419036 Determination Page 2 of 6
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of clarifying the issues arising from the material exchanged.
No further information has been provided by either party following the
recommendation. In rejecting the recommendation the applicant was given the
opportunity of providing additional information but has not done so.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principals, terms of the policy, good industry practice includi ng codes of practice and
prior determinations where applicable.
2.1 Is the FSP entitled to deny the claim?
Applicant has not established a prima facie claim under the terms of the policy
The applicant must establish, on the balance of probabilities, the loss or damage was
caused by one of the events insured under the policy. This is known as a prima facie
claim.
The applicant ‟s policy is an insured events policy that provides cover for damaged
caused by a number of insured events including storm, rain water and flood.
The onus is therefore on the applicant to establish on the balance of probabilities that
the damage sustained to the property was caused as a result of storm, rain water or
flood.
Circumstances
The applicant says he noticed water leaking through the light panels and ceiling joints
following heavy rainfall. The applicant lodged a claim for damage around 2 months
after the event. At that time, rust had formed around the ceiling joints and panels.
The applicant says the building was certified to be completely sound at the time of
purchase approximately 6 years ago and the roof had not leaked prior to the event.
There is no evidence to dispute that the roof had not leaked prior to the July 2015
event.
The FSP had the property inspected by an assessor. The applicant was present
during the inspection. The assessor confirmed the property had been maintained in
good condition but from an inspection of the damage that the damage was caused by
a defect issue relating to the pitch of the patio roof being virtually flat.
The assessor considered the resulting damage was caused by water pooling on the
roof sheets during heavy rains before penetrating underneath the hip capping
flashings and/or sheet lap joins being absorbed by the insulation inside the panels
and leaking through the ceiling sheets, joins and light fittings.
Physical inspection revealed the roof had a pitch of 0.2 degrees, well below the
manufacturer ‟ s recommendations which state this type of insulated roof panel should
Case No: 419036 Determination Page 3 of 6
not be installed on roofs with a pitch of less than 3 degrees. The assessor also noted
that inspection of the underside of the insulated roof/ceiling panels revealed evidence
of extensive rust/corrosion which was clearly not the result of a single defined event
as claimed. The assessor considered the problem had developed or worsened over
an extended period of time as a result of repeated and ongoing exposure to moisture.
The applicant disputed these findings and the FSP went back to the assessor
seeking clarification. In an email dated 12 November 2015 the parties the assessor
advised:
1. „T he existing roof ab ove the affected area where the ingress occurred is 0.2 degrees‟.
He was aware of one insulated roof panel on the market that was recommended for
use on roofs with a pitch of less than 1 degree and that was rated to a minimum of
0.72 degrees, well below the identified pitch roof on the applicant ‟s property.
2. The nature of the staining indicates water pooling on the roof sheets was an ongoing
issue. Whilst accepting that the roof may never have leaked previously in spite of the
identified defects, the likely explanation is that the sealant previously applied to the
hip cavity was providing a seal and prevented ingress. As this seal has deteriorated
the water ingress has occurred.
3. The pitch reading of the hip capping is exactly the same as the roof sheeting as they
are fixed together. The reading obtained of the pitch confirmed the actual pitch of the
roof sheeting at the point where the ingress occurred.
4. The sealant was mouldy which confirmed the ongoing exposure to moisture and
dampness. ‟
In the absence of any evidence to the contrary, I accept that the damage most likely
arose due to a design defect in the pitch of the roof and the deteriorated sealant
applied to the hip joint.
The policy is clear. Damage caused by way of gradual deterioration, inherent defects,
structural faults, faulty workmanship or faulty design is excluded from cover.
In the absence of any evidence from the applicant to dispute the findings of the
assessor, I accept that the FSP is entitled to deny the claim as the cause of damage
was excluded under the terms of the policy.
Case No: 419036 Determination Page 4 of 6
3 Supporting information
3.1 Policy terms
“Insured Event – You are covered for loss or
damage to your home or contents (a s
applicable) caused by
Exclusions to Insured Events (see also ‘What
is not covered under your policy’, pages 38 -
40 – You are not covered for
Storm, rainwater and flood …
Caus ed by gradual deterioration from
rainwater;
…
“ Exclusions
The following general exclusions apply to all covers under your policy.
You are not covered for any loss or damage caused by or loss caused by or resulting from, or
the costs incurred from or of:
…
Gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or
deterioration from exposure to light;
Inherent defects, structural faults, faulty workmanship or faulty design;”
3.2 Expert reports
Record Key points
Asse ssor (A)
Report
9 September 2015
The metal insulated ceiling panels have been water damaged
(joints rusted/deteriorated).
Water leaks through the light fittings during heavy rain
Damage has been caused by a defect issue relating to the
pitch of the patio roof
The roof lies flat and is unable to drain water from the sheets
to the guttering
Water pools on the roof, penetrates through the sheet lap
joints or the deteriorated sealant; and is absorbed into the
insulation and leaks through the ceiling
Roof has a pitch of 0.2 degrees – below the manufacturer‟s
recommendation
Believed this is a defect relating to poor design
Evidence of extensive rust to the joints of the sheets whic h
has developed over a period of time
Asse ssor (A)
Addendum Report
12 November 2015
As far as they are aware the only product that is
recommended for use on roofs with a pitch of less than 1
degree is Kingspan which has a minimum pitch of 0.72
Case No: 419036 Determination Page 5 of 6
degrees. Still higher than the meas ured 0.2 degrees
The likely explanation as to why the roof had not leaked
before this event is because the sealant previously applied to
the hip capping was providing a watertight seal and this
prevented ingress. However as the sealant started to
deteriorate, it was not pr oviding a watertight seal.
Another possible suggestion is that the area of the roof
sheeting has gradually sagged slightly over time due to
age/ wear and tear or was never previously exposes to the
volume of rain.
The inspection confirmed no storm created opening or
related damage to the roof sheeting that has contributed to
the ingress that occurred indicating the defect is the roof
being under pitched in conjunction with torrential rain.
The rust and corrosion indicates the ingress that has
occurred is not a one off event and is an ongoing issue.
Mouldy sealant confirms ongoing exposure to
moisture/dampness
The pitch of the roof sheeting directly above the affected area
where the ingress occurred is 0.2 degrees.
Regardless of where the ingress occurre d, the manufacturer
stipulates a minimum pitch of 1 degree must be maintained
across the entire surface of the roof, not just at its highest
point.
The evidence of staining to the roof sheeting adjac ent to the
guttering confirms that water ponding/ pooling on the roof is
an ongoing issue which likely occurs only during heavy rain
periods.
Asse ssor (B)
Report
11 January 2016
Inspection of the patio roof revealed no storm related
openings or related damage.
Concluded that the roof panels were manufactured by
Bondor and are called “Solarspan.”
Checked the pitch of the roof using a Magnetic Polycast
Protractor and found the side „C‟ panels were installed at the
minimum pitch of 2 degrees although checks on the sheets
and the area around the hip beam where th e leaks occurred
returned a pitch calculations below 1 degree.
The water ingress between the insulated patio panels is
unrelated to any one off storm event and appears to be a
direct result of an installation defect at the time of
construction.
The patio has large areas which have been inadequately
supported (hip beam) causing the panels to be positioned
below rec ommended pitch.
The cause of corrosion is a direct result of the patio having
been installed at less than the manufacturers required 2
degree pi tch which has caused water to pool on the surface
of the sheets during heavy rain periods instead of draining
away.
Confirm that the minimum pitch stipulated for this type of
Case No: 419036 Determination Page 6 of 6
panel is 2 degrees.
Asse ssor (WG)
Report
14 January 2016
Inspected the Applicant ‟s roof
Found the materials used on this patio are the same as
would be used today
There is no need for a supporting post to be used on the hip
beam and all beam sizes currently meet engineering
standards.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.