Text of the determination
Determination
Case No: 418940 Determination Page 1 of 10
Case number: 418940 25 August 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) for damage to her property following a cyclone in January
2013.
The applicant says that, during the cyclone, her property was flooded by water from a
nearby river, damaging the revetment wall, concrete path and fencing at the rear of
the property.
The FSP denied the applicant‟s cla im for damage to the revetment wall and the
concrete path on the basis that the damage was not caused by the cyclone, but by
gradual deterioration over an extended period of time. The FSP also relies on the
policy exclusion for storm damage to retaining walls.
The FSP disputes the FSP‟s denial of her claim. She also seeks compensation for
stress and inconvenience suffered as a result of the manner in which the FSP has
handled her claim, together with reimbursement of professional costs incurred during
the dispute process.
1.2 Issues and key findings
Is the FSP liable for the damage to the applicant’s property ?
The available information establishes that the applicant‟s revetment wall and
concrete path had suffered age-related deterioration prior to the cyclone i n January
2013. Damage caused in this manner is excluded from cover under the policy.
However, additional damage to the wall and path occurred as a result of the
excessive forces (and the overtopping by the river waters) experienced during the
cyclone in January 2013. This damage is subject to cover under the policy.
Having regard to the extent of the damage and the likely contributing factors, it is fair
in all the circumstances that the FSP contribute to 50% of the costs of replacing the
revetment wall and concrete path.
Is the applicant entitled to any other amounts?
The applicant is entitled to 50% of the costs incurred in obtaining engineers‟ reports,
as these reports have assisted in determining the cause of the claimed damage.
Case No: 418940 Determination Page 2 of 10
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is to pay the applicant the amount of $22,216.68 in settlement of her claim
(and partial reimbursement of professional costs), plus interest on this amount
calculated in accordance with sections 2.1 and 2.2 below.
Case No: 418940 Determination Page 3 of 10
2 Reasons for determination
2.1 Is the FSP liable for the damage to the applicant’s property ?
Policy provides cover for storm damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant‟s policy provides cover for loss or damage caused by the events listed
in the policy (including the insured event of „Storm and flood‟), subject to the
conditions and exclusions contained in the policy.
Applicant has established a prima facie claim
The applicant says the damage to the masonry revetment wall, concrete path and
fencing at the rear of her property occurred when the river which abuts the revetment
wall flooded during the cyclone.
The applicant says the floodwaters rose over the revetment wall and the concrete
path above it and reached part way up the grassed slope at the rear of the property.
She says the forces exerted on the wall during the storm caused it to buckle and
rotate, displacing the masonry blocks and allowing the soil behind the wall to escape.
The engineer (JH) appointed by the FSP to inspect the revetment wall following the
cyclone confirmed that the wall was bulging outwards in a number of places. There
was evidence of fractures to the blockwork, sections of which had displaced.
The applicant has provided photographs taken shortly after the cyclone which
support her position that the floodwaters overreached the revetment wall and
encroached on the grassed slope at the rear of the property.
During the claim process, the FSP confirmed it was willing to accept liability for the
damage to the fencing at the rear of the property caused by the cyclone in January
2013 (although the sizeable excess payable under the policy meant that it was not
feasible for the applicant to proceed with this aspect of the claim alone).
The insured event of „Storm and flood‟ p rovides cover for damage caused by flooding
from rivers, streets and canals.
In these circumstances, the Panel is satisfied that the applicant has established a
prima facie claim for storm damage to the revetment wall, concrete path and fencing
under the policy.
Accordingly, the FSP bears the onus of establishing that, on the balance of
probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny
the applicant‟s claim for damage to the revetment wall and concrete path.
Case No: 418940 Determination Page 4 of 10
FSP says claimed damage is excluded from cover
The FSP says it is not liable for the claimed damage to the revetment wall because
the policy contains a specific exclusion for storm damage to retaining walls.
The FSP also says the claimed damage was not caused by the cyclone in January
2013 but by gradual deterioration over an extended period of time. Damage caused
in this manner is excluded from cover under the policy.
FSP says revetment wall is a retaining wall
The insured event of „Storm and flood‟ excludes cov er for damage to retaining walls,
garden borders and free standing walls.
The expression “retaining wall” is defined for the purposes of the policy to mean:
“A wall, which is not part of the residential building, designed to hold back or prevent
the moveme nt of earth”.
The words used in the policy should be interpreted in accordance with their natural
and ordinary meaning, having regard to the context of the policy as a whole.
The rear of the applicant‟s property is bordered by the river. The lawn at the rear of
the property slopes downwards towards the river, ending in a concrete path just
above the water level which has been laid above a masonry block wall.
Both the applicant and the FSP (as well as their various consultants) have
consistently described the masonry wall abutting the river as a “revetment wall”.
The FSP says the revetment wall is a “retaining wall” (as defined in the policy).
However, the applicant says that a revetment wall is fundamentally different from a
retaining wall, and the policy does not operate to exclude cover for revetment walls.
FSP is not entitled to rely on exclusion for retaining walls
As outlined above, the policy definition of a retaining wall refers to the purpose of the
wall being to hold back or prevent the movement of earth.
In contrast, the Macquarie Australian dictionary (online edition) defines the primary
meaning of “revetment” to be:
“a facing of masonry or the like, especially for protecting an embankment”.
The applicant says this definition reflects the primary purpose of her revetment wall,
being to protect the embankment at the rear of her property from erosion due to the
tidal flows of the river.
The dictionary provides alternative meanings for “revetment”, including a “retaining
wall”, which appears as the third of the three meanings listed. However, in the
Panel‟s view, this does not necessarily mean that a “revetment wall” should be
treated as a “retaining wall” in all situations in which the term is used.
The applicant has provided copies of information produced by the local council which
clearly distinguishes between retaining walls and revetment walls (which are
common in the local area, due to the large number of waterfront properties).
Case No: 418940 Determination Page 5 of 10
The council‟s website describes a revetment wall as a protective covering on an
embankment of earth to maintain the slope or to protect it from erosion, by holding
back tidal waters and protecting the boundaries of property owners. In contrast, the
expression “retaining wall” is used solely in the context of a wall designed to hold
back significant quantities of soil.
It is clear from the detailed information provided on the council ‟s website that the
expression “revetment wall” has a specific and well defined meaning in the context of
a waterfront property such as that at the applicant‟s property.
In this context, although the method of construction may be similar, the primary
purp ose of the applicant‟s revetment wall (being to prevent erosion by tidal waters) is
qualitatively different from the usual purpose of a retaining wall (being to hold back
earth).
In the Panel‟s view, the policy definition of “retaining wall” does not obvi ously
incorporate the concept of a walled embankment abutting a river.
Further, the reference to a “retaining wall” appears in the exclusion alongside
references to garden borders and free standing walls, which are also of a
fundamentally different nature.
Where a policy provides cover for loss or damage to insured property and the insurer
seeks to exclude certain types of damage, it is incumbent on the insurer to ensure
that any exclusions are drafted in a clear and unambiguous manner, so that a
consumer reading the policy can readily understand the scope of cover provided.
In the present case, the Panel is not satisfied that the applicant could reasonably be
expected to have understood that the policy exclusion for retaining walls would apply
to her revetment wall.
In these circumstances, the Panel considers the FSP is unable to rely on the
exclusion to deny the applicant‟s claim for damage to the revetment wall.
Parties disagree about how damage occurred
The applicant and the FSP disagree as to how the claimed damage to the revetment
wall and concrete path occurred.
As outlined above, the applicant says the damage was caused by the effects of
hydrostatic and other forces exerted on the wall during the cyclone in January 2013.
However, the FSP says the bulk of the damage to the revetment wall pre -existed the
cyclone. The FSP says the wall had gradually disintegrated over time due to the
ongoing effects of overland run-off and river water tidal flows.
Both parties have provided reports from various consultants regarding the cause of
damage to the revetment wall and concrete path. The Panel has carefully reviewed
these reports for the purpose of determining the proximate cause of the damage (that
is, the real, effective or dominant cause).
Case No: 418940 Determination Page 6 of 10
Consultants have provided differing opinions
The FSP‟s engineer (JH) inspected the damaged revetment wall and concrete path in
May 2013. JH confirmed that:
the concrete base of the wall had rotated significantly and the base had in some
places separated from the wall itself;
the wall was bulging outwards horizontally, the blockwork had fractured and
sections had displaced leaving gaps in the riverside face of the wall (which in at
least one location, extended all the way through to the soil behind);
the concrete path had suffered movement damage, resulting in a vertical
dislocation between two adjoining sections of the path.
In his report, JH stated that he considered the damage to be of long-standing
duration, based on the water marks and slime observed in the damaged areas.
Accordingly, he concluded that the wall had been in a dilapidated state prior to the
cyclone in January 2013.
JH concluded that the damage was partly due to the regular rise and fall of the tides
over time.
However, JH also considered that the damage had been exacerbated by the lack of a
barrier between the edge of the grassed lawn and the concrete path and/or the lack
of drainage measures to prevent overland water run-off entering the soil behind the
revetment wall at this juncture.
JH explained that the water run-off created hydrostatic pressure behind the wall,
causing the wall to bulge, creating space behind it and thereby enabling the further
flow of water and erosion of the soil behind the wall and under the concrete path. JH
considered that this factor explained why the applicant‟s wall was more severely
damaged than the walls of either of the neighbouring properties.
The applicant‟s engineer (SR) inspected the property in August 2014, by which stage
the wall had suffered catastrophic collapse over a five metre section and general
failure over its remaining length.
While SR acknowledged that the wall had suffered a moderate degree of age-related
deterioration over its life, he considered that the damage had been exacerbated by
the effects of the river waters overtopping the wall during the cyclone in January
2013 (and precipitated by similar events during an earlier cyclone in February 2012).
The applicant has also provided a report from her geotechnical engineer (MG) who
reviewed the original design of the wall and carried out a global stability analysis to
determine the extent to which the wall would have been able to withstand the
hydrostatic, buoyancy, debris and erosion forces operating during the cyclone in
January 2013.
MG concluded that the hydrostatic forces alone would have imposed an excessive
lateral load on the wall sufficient to cause a horizontal deflection which was too large
for the wall to accommodate and as a result it would have failed instantaneously. MG
considered the greater impact on the applicant‟s wall (as opposed to those of
neighbouring properties) was due in part to the landscaping differences noted by the
FSP‟s engineer (JH).
Case No: 418940 Determination Page 7 of 10
Damage was caused by a range of factors
The Panel accepts that each of the engineers appointed by the parties is qualified to
provide an opinion as to the cause of the damage to the revetment wall and concrete
path at the applicant‟s property.
Having carefully reviewed the engineers‟ reports (and the various photographs of the
damage provided), the Panel considers that the damage to the revetment wall and
concrete path has occurred as a result of both:
the ongoing deterioration of the wall and surrounding areas over an extended
period of time, due to the effects of water flows in the ordinary course; and
the more extreme forces experienced during the cyclone in January 2013
(and/or February 2012).
As outlined above, the applicant‟s engineer (SR) acknowledged that the wall and
path had experienced a moderate degree of age-related deterioration prior to its
more recent catastrophic collapse.
The Panel also accepts that the nature of the landscaping at the rear of the property
would have made the wall more susceptible to the effects of rainwater run-off
experienced during usual rainfall events.
However, based on the available information, the Panel is satisfied that the excessive
forces experienced during cyclonic events (together with the overtopping of the
revetment wall) are likely to have caused additional damage.
The applicant notified the FSP shortly after the cyclone that “her whole water front”
had started to subside due to the storms and flooding, which suggests additional
damage was noticeable at this time.
Further, the nature of the observed damage to the wall (buckling and rotation of the
concrete base) is consistent with at least some of this damage having been caused
by the various forces operating on the wall during the cyclone .
FSP is liable for part of repair costs
For the reasons outlined above, the Panel considers that part of the claimed damage
was caused by gradual deterioration of the wall and concrete path over time.
Damage caused in this manner is excluded from cover under the policy.
However, the Panel considers that additional damage to the wall occurred as a result
of the cyclone in January 2013 (and/or by the earlier cyclone in February 2012, which
occurred during the preceding period of cover). This damage is subject to cover
under the policy.
The FSP says that the applicant should be solely liable for the worsening of the
damage which occurred following the cyclone in January 2013. However, the Panel
is satisfied that the cyclone was the proximate cause of the further damage, by way
of the factors identified above.
Given the circumstances of the present case, the Panel does not consider it is
reasonable to have expected the applicant to have acted to mitigate further damage,
at an earlier stage in the dispute process.
Case No: 418940 Determination Page 8 of 10
Having regard to the extent of the damage and the likely contributing factors, the
Panel consider that it is fair in all the circumstances that the FSP contribute to 50% of
the costs of replacing the revetment wall and concrete path.
The applicant has provided information establishing payments totalling $40,423.35
for the demolition and replacement of the revetment wall and concrete path, and an
additional $2,000 for the repair of the fencing damaged during the cyclone (for which
the FSP has previously accepted liability).
Accordingly, the FSP is required to settle the applicant‟s claim for $22,216.68, plus
interest at the rate calculated in accordance with section 57 of the Insurance Contract
Act 1984 (Cth), from 19 November 2014 (when the bulk of the expenses were
incurred) until the payment date.
2.2 Is the applicant entitled to any additional amounts?
Applicant is entitled to partial reimbursement of professional costs
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial
services provider to contribute to legal or other professional costs incurred by an
applicant in the course of their dispute.
However, unless exceptional circumstances apply, FOS will not require a financial
services provider to contribute more than $3,000 to such costs.
The applicant incurred costs totalling $3,971 in obtaining reports from her engineers
(SR and MG). While the Panel has found these reports to be of assistance, it has not
fully accepted that all of the claimed damage to the applicant‟s property was caused
by the cyclone in January 2013.
In these circumstances, the Panel considers that it is fair and reasonable for the FSP
to reimburse the applicant for $1,985.50 (being 50% of the cost of obtaining the
relevant reports), plus interest calculated on the same basis as for the repair costs.
The applicant also seeks reimbursement for the value of time spent by her son‟s
chartered accounting firm (costed at over $16,000) in assisting her to pursue her
dispute.
However, FOS does not generally award compensation for the notional value of lost
time (and other incidental expenses) incurred by an applicant and related parties in
pursuing their dispute.
Applicant is not entitled to compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, FOS takes a conservative approach to the award of compensation for non-
financial loss. FOS expects applicants to be moderately robust and bear the usual
stress and inconvenience associated with an insurance claim.
Case No: 418940 Determination Page 9 of 10
The Panel acknowledges that it has taken an extended period of time to resolve the
applicant‟s dispute. However, the Panel is not satisfied that the FSP is solely
responsible for the delays experienced during the dispute process.
The FSP acted reasonably in relying on the advice provided by its engineer (JH) in
determining the cause of the claimed damage. The applicant did not obtain her own
engineer‟s report until over a year after the claim had been denied, by which time the
IDR process had already been completed. It was a further fifteen months before the
applicant lodged her dispute with FOS.
For the reasons outlined above, the Pa nel has determined that the FSP is
responsible for 50% of the costs of replacing the revetment wall and path (and
related professional costs) plus interest reflecting the additional costs incurred as a
result of the delay in settling the claim.
In the circumstances, the Panel does not consider that an award of compensation for
non-financial loss is appropriate.
Case No: 418940 Determination Page 10 of 10
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the Panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
During this dispute, the applicant has been assisted by her son. For the purposes of
this determination, submissions made by the applicant‟s son have been treated as if
they had been made by the applicant herself.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.