Determination 418855
Home building claim declined for collapsed living room ceiling
Summary
The applicant's claim for ceiling collapse damage was declined because the damage was not shown to be caused by an insured event. AFCA found the damage was most likely caused by insufficient fixings and framing, which is excluded.
The applicant did not establish an insured event, and the faulty workmanship and gradual deterioration exclusions apply.
Issues
- Claim denial primary · not upheld“I am not satisfied the evidence is sufficient to establish the damage sustained to the property was due to an insured event.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 418855 Determination Page 1 of 4
Case number: 418855 2 7 April 2016
1 Overview
1.1 Dispute
The applicant held a Home Building and Contents Policy with the financial service
provider (FSP) for the period 2 May 2015 to 2 May 2016.
On or about 17 June 2015, the applicant lodged a claim following the collapse of the
ceiling of his living/dining room. The applicant believed the damage was due to water
entering the ceiling over time.
The FSP declined the claim on the grounds that the applicant had not established the
damage was due to an insured event. The FSP considered the damage was as a
result of insufficient fixing and framing and excluded from cover as faulty
workmanship and design.
A recommendation was issued in this matter in favour of the FSP. The applicant has
disputed the recommendation. A copy of the recommendation is attached to this
determination.
1.2 Issues and Key findings
Has the applicant established a claim under the terms of the policy?
The applicant has not established a claim under the terms of the policy. On balance,
the damage to the ceiling of the dining/living room was not caused by an insured
event, but due to insufficient fixings and framing.
Is the FSP entitled to refuse payment of the claim?
The FSP is entitled to refuse payment of the claim as the applicant has not
established the damage occurred due to an insured event.
1.3 Determination
I accept the reasoning contained in the recommendation. This determination is in
favour of the FSP. The FSP is entitled to refus e payment of the applicant’s claim in
accordance with the terms and conditions of the policy.
Case No: 418855 Determination Page 2 of 4
2 Reasons for Determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
Whilst the applicant has been unable to supply an expert report in this matter, I have
had the opportunity of discussing the circumstances of the damage with the
applicant.
The applicant advised that the property was constructed in 2011 and that he had
been informed by his builder that the framing and fixing of the ceiling was in
accordance with relevant Australian standards.
In about June 2015, his wife first noticed a crack on the underside of a pelmet. He
had previously noticed a water stain on the wall but cannot recall exactly when this
was first noticed.
The applicant now believes the collapse of the ceiling is related to a severe weather
event in 2012 when the terrace on the property flooded. At that time he noticed water
dripping down the east facing wall in the dining room. He later built a canopy
covering the entire terrace and has not suffered any water inundation since.
The applicant disputes that there were inadequate fixing and framing. He notes that
all ceilings throughout the property have been constructed in the same manner.
There was no indication of sagging or possible collapse of any of the other ceilings.
The only room that had any area of damage was the living room where there was
water mark which he believes goes back to 2012.
The applicant has not made any claim against his builder under any applicable home
building compensation fund. No claim was lodged against his insurer at that time.
This determination follows consideration o f all of the information exchanged including
the comments provided by the applicant following rejection of the recommendation.
The determination is based on what is fair in all the circumstances, having regard to
the relevant legal principles, good industry practice, terms of the policy and prior
determinations where applicable.
2.1 The applicant has not established a claim under the terms of the
policy
The policy is an insured events policy that provides cover for specified listed events.
Whilst the policy offers optional accidental damage cover, the applicant had not
incepted accidental cover. In any event, cover under both the listed events provisions
of the policy and accidental damage provisions are subject to the general exclusions
which relate to loss or damage due to issues such as gradual deterioration,
depreciation, wear or tear, design or workmanship.
The applicant denies that there was any specific incident occurring in or around June
2015 that could have caused the ceiling to collapse. At best, the a pplicant’s view is
that the ceiling collapsed because of water inundation in 2012 weakening the
ceiling’s fittings. In this regard, I note the applicant is clear in stating that other than
Case No: 418855 Determination Page 3 of 4
the event in 2012, there were no other episodes of water entering i nto the ceiling
area.
The FSP arranged for the property to be assessed by BB, a building group. BB
identified that the ceiling had collapsed as a result of insufficient fixings and framing.
This has allowed the ceiling to collapse over a period of time to the rear of the
building. BB advised that they had sighted building defects to the ceiling with
insufficient fixings and framing and considered works were required to supply and
install additional fixings and framings to the ceiling metal framework. A Scope of
Works was attached to the report.
The FSP sought a supplementary report from BB after the applicant had provided
pictures showing a water mark on the wall in the pelmet recess and rusty steel
furrings. The applicant related this to the flash storm in 2012.
BB provided a response on 7 September 2015 and maintained its belief that the lack
of fixings or inadequate fixings was the likely cause. BB considered it was unlikely
that the ceiling would collapse three years after being water damaged.
I accept the opinion expressed by BB. Whilst it is possible that some water damage
occurred in 2012, in my view it is unlikely that that would have caused the collapse
some three years later. According to the information exchanged, there was no
evidence that the ceiling had been soaked in water and whilst there was a water
stain, it was limited in area.
The applicant confirmed that no claim was lodged in 2012 and there is nothing to
establish the extent of the damage at that time.
Based on the information exchanged, I am not satisfied the evidence is sufficient to
establish the damage sustained to the property was due to an insured event.
Even if I accept that there may have been a contribution as a result of the water
event in 2012, I accept the view of BB that most likely the proximate cause of the
ceiling collapsing was the inadequate fixings and that this be excluded under the
terms of the policy as faulty workmanship.
2.2 Is the FSP entitled to decline the claim?
As I am satisfied the applicant has not been able to establish an insured event
occurred, then I am satisfied the FSP is entitled to rely upon the terms and conditions
of the policy to refuse payment of the claim.
I agree with the case manager’s recommendation in this regard.
Case No: 418855 Determination Page 4 of 4
3 Supporting information
3.1 Relevant information considered and relied on
Product Disclosure Statement and Certificate of Insurance.
Claim lodgement notes.
B’s report dated 23 July 2015 and emails dated 7 and 8 September 2015.
Various emails between the Applicant and the FSP.
Parties’ submissions and images of the collapsed ceiling.
Recommendation
Case No: 418855 Recommendation Page 1 of 3
Case number: 418855 29 February 2016
1 Overview
1.1 Dispute
On 17 June 2015, the Applicant lodged a claim under his home building policy for the
collapse of the ceiling to the dining/lounge area, which occurred on 16 June 2015.
The Applicant says the collapse was due to previous water penetration resulting from
a major storm in May/June 2012, which weakened the plasterboard.
The FSP has denied the claim on the basis the damage was not caused by an
insured event but by excluded causes such as faulty design and workmanship,
gradual deterioration and wear and tear.
The Applicant disagrees with this outcome and considers the FSP’s evidence lacks
credibility. He wants his claim paid in full.
1.2 Issue and key findings
Can the FSP deny the Applicant’s claim?
The FSP can deny the Applicant’s claim because:
the Applicant has not established the damage was caused by an insured event
the available expert evidence indicates the damage was caused by gradual
deterioration and faulty workmanship, which are excluded from cover.
1.3 Recommendation
This Recommendation is in favour of the FSP.
The FSP is entitled to deny the claim and is not required to take any further action.
Case No: 418855 Recommendation Page 2 of 3
2 Reasons for Recommendation
2.1 Can the FSP deny the Applicant’s claim?
Applicant’s onus to establish damage was caused by insured event
On the balance of probabilities, the Applicant must show the claimed damage falls
within the scope of cover of an insured event under the policy.
The policy provides cover for insured events. As such, t he Applicant’s onus in this
instance is to show the damage falls within the scope of cover of one of the insured
events as listed in the Product Disclosure Statement (PDS).
If this is established, the FSP must then show the claim is not covered or is otherwise
excluded under the policy if it wishes to deny the claim.
Applicant has not established insured event caused claimed damage
The Applicant says a storm in May 2012 caused the terrace directly above the
damaged ceiling to flood temporarily. He says there were leaks along the window
heads in the living room. He carried out repairs so leaks never happened again but
he says the plasterboard must had been weakened by the storm event.
The Applicant has provided several photographs, which reportedly show rusty ceiling
channel railings and aged water marks on the wall along the ceiling line.
His images and the FSP’s show the collapsed ceiling, rusty railing and dry insulation
hanging down from the roof cavity. Regrettably, the images are not of high quality
and it is difficult to identify the water marks discussed by the parties.
The FSP’s builder (B) says it is unlikely a ceiling would collapse three years after
being potentially water damaged, especially where there have been no other leaks
since then. B says there needs to be a heavy load of water on a ceiling to completely
collapse it, with water stains and rusty fixings over time and water soaked insulation.
B also notes water damage to an area would only have caused localised staining,
sagging or mould but not the whole ceiling to collapse three years later.
B notes water marks could be linked to the leak happening three years earlier but it
does not appear to be the origin of the damage. For this to affect the whole ceiling,
the marks would have to be more extensive and spread out.
Despite the Financial O mbudsman Service’s request for further information, the
Applicant did not provide an expert report on the cause of damage.
Also, I am not satisfied there is sufficient evidence available to confirm there was a
storm in May 2012 in the area where the property is located that could have caused
this damage. Even if this event was identified, I accept, on balance, the likelihood of
this being the cause of damage three years later is remote, as per B’s explanations.
In the absence of evidence to the contrary, I accept on the balance of probabilities
the Applicant has not established the damage was caused by an insured event.
Case No: 418855 Recommendation Page 3 of 3
Exclusions for faulty workmanship and gradual deterioration apply
Even if I were to accept the damage falls within the scope of cover of the insured
event of “storm”, I note there is expert evidence to the contrary.
B’s report says the damage was caused by insufficient fixings and framing which has
allowed the ceiling to collapse over a period of time.
The Applicant provided an email from the builder of the property (H), in which H says
it expects B’s information to be supported with references (eg, Australian standards,
manufacturer’s data sheets) to show the fixing spacing is inadequate.
Based on this, the Applicant says B’s information lacks credibility as it fails to provide
these references to determine the inadequacy of the fixing and framing. He notes
several other rooms were built the same way and have not failed the same way.
B’s information may not be ideal but there is no other expert opinion to challenge it.
Further, other explanations B provided for causation were persuasive. As such, I
accept on balance that the FSP has established the policy exclusions for gradual
deterioration and faulty workmanship apply.
Even if stormwater was an accepted cause of damage, it could not have caused the
ceiling to collapse by itself. It would have had to be contributed by faulty
workmanship as B identified. In this case, the Wayne Tank principle would operate.
This principle indicates when there are two or more proximate causes of damage,
where one is covered (eg, storm) and the other one is specifically excluded (eg,
faulty workmanship), the FSP is not liable for the loss.
For these reasons, I am satisfied the FSP is not liable for the Applicant’s c laim.
3 Supporting information
3.1 Relevant material relied upon
Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974]
QB 57
Product Disclosure Statement dated 1 March 2011.
Certificate of Insurance for the period 2 May 2015 to 2 May 2016.
Claim lodgement notes.
B’s report dated 23 July 2015 and emails dated 7 and 8 September 2015.
Various emails between the Applicant and the FSP.
Parties’ submissions and images of the collapsed ceiling.