Water damage claim declined
Summary
The owner of a strata unit claimed water damage from two strata policies held by the body corporate; FSP1 declined because the damage was gradual and began before its cover. AFCA decided FSP1 was not liable and FSP2 must pay 50% of the repair cost plus 50% of any loss of rent.
Damage occurring progressively over the periods of cover was accidental loss within FSP2's policy, and FSP2 did not establish the reasonable-care exclusion, so liability was apportioned between the two periods of cover.
Subjects and remedies
pay claim
Text of the determination
Determination
Case No: 418706 & 442357 Determination Page 1 of 7
Case numbers: 418706 & 442357 21 December 2016
1 Overview
1.1 Dispute
The applicant is the owner of a unit which was part of a Residential Strata Property.
On 16 November 2014, she lodged a claim through her broker on the Residential
Strata Policy held by the body corporate for damage sustained to her unit.
The financial service provider (FSP1) insured the body corporate under a Residential
Strata package from 13 June 2013. The financial service provider (FSP2) insured the
body corporate from 30 June 2011 to 30 June 2013 under its Strata Insurance Policy.
There is no dispute the applicant‟s unit has sustained water damage affecting both
the kitchen and laundry. FSP1 formed the view following investigation of the claim
that most likely the damage had first occurred prior to it coming on risk on 30 June
2013.
The applicant lodged a claim with FSP2 on 20 July 2015 for the damage. FSP2
declined the claim on the ground that the applicant had not established a claim under
the terms of the policy and relies upon the exclusions contained within the policy.
1.2 Issues and key findings
What is the cause of the damage?
The Panel is satisfied having considered the various reports provided that the cause
of the damage to the applicant‟s unit was a combination of factors. The Panel
accepts the findings from the latest building report from SH tha t the cause of the
damage was most likely a combination of water escaping the dishwasher waste inlet,
water leaking from a washing machine tap and/or appliance water flowing internally
through the top of the cavity sliding door during extreme rain events a nd water
flowing from unit 6.
When did the damage occur?
The Panel is satisfied that the damage occurred progressively over time and most
likely during the period of cover under the policies held with FSP1 and with FSP2.
Does the applicant have a claim as against FSP1?
The Panel accepts that the policy provides cover for loss or damage occurring during
the period of cover (from 30 June 2013) caused by an Event. An “Event” is an
occurrence or accident resulting in sudden and unforeseen physical loss or
destruction.
Case No: 418706 & 442357 Determination Page 2 of 7
The Panel accepts that as the damage most likely occurred gradually and was not
sudden and unforeseen physical loss, it is not covered under the policy with FSP1.
Has the applicant established a claim against FSP2?
The Panel is satisfied that the applicant‟s property suffered damage during cover
provided by FSP2 from 30 June 2011. The Panel is satisfied that the damage was
accidental loss or damage within the terms of the policy and therefore covered under
the terms of the policy.
The Panel acknowledges that not all of the damage can be attributed to the period of
cover during which FSP2 was on risk and in the circumstances believe it is fair and
reasonable that FSP2 pay 50% of the cost to rectify the damage to the applicant‟s
property. Should the property become uninhabitable or access prevented during any
repair, the FSP should pay 50% loss of rent received during the repair period.
1.3 Determination
This determination is partially in favour of the applicant.
The Panel determines that it is fair in the circumstances that FSP2 pay 50% of the
assessed cost of repair of the applicant‟s property, plus 50% of the loss of rent if any
suffered during the repair period.
Otherwise FSP1 and FSP2 are entitled to refuse payment of the balance of the
applicant‟s claim.
Case No: 418706 & 442357 Determination Page 3 of 7
2 Reasons for determination
As the damage to the applicant‟s property occurred over the period that FSP1 and
FSP2 were on risk, it was considered appropriate that FSP2 be joined to this dispute
in accordance with paragraph 7.4 of the Terms of Refere nce.
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise in this dispute.
In view of the complexities involved in this dispute, it has been referred to a Panel for
determination.
The Panel has had the opportunity of reviewing all information exchanged and has
based this determination on what is fair in all the circumstances, having regard to the
relevant legal principles, terms of the policy, good industry practice including relevant
codes of practice and prior determinations where applicable.
2.1 Has the applicant established the cause of the damage?
The applicant has the onus to establish on the balance of probabilities a claim that
falls within the terms of cover. This is commonly known as a prima facie claim. Once
established, the onus then shifts to the FSP to establish on the balance of
probabilities the application of any particular exclusion.
Circumstances of the loss
According to the information exchanged, the applicant ‟s tenant who had resided at
the property for 15 years, first noticed water pooling on the tile floor of the laundry in
September 2014.
A claim was subsequently lodged by the applicant through her broker with FSP1 on
16 November 2014. In support of the claim, the applicant provided a report from a
plumber SBP who said he undertook testing of the area and in particular the sky light
above the laundry. He removed the bottom plate in the section of plaster board wall
which revealed the timber had rotted to the point of disintegration.
SBP considered that the damage was caused as a result of rainwater leaking in
through the sky light.
The FSP appointed CL, a loss adjustor to inspect the property. In the initial report, it
was noted that there was a common timber wall between the applicant‟s unit (unit 7)
and a neighbouring unit (unit 6). There was an issue with a leak in unit 6 and CL
noted that any leak/escape of water in unit 6 is likely to track beneath the common
timber wall and affect both units.
CL appointed SBC who considered it necessary for a leak detection test to be
conducted. The leak detection test did not reveal any evidence that the water supply
pipes or waste pipes were the source of any water leak. It did concede that water
could have leaked from a waste connection pipe that had not been properly sealed. A
plumber found evidence of a leak from a hose connected to the washing machine
and gaps between the tiled floor and skirting could have allowed water to escape into
the wall cavity over time.
Case No: 418706 & 442357 Determination Page 4 of 7
SBC considered that water had flowed into the wall cavity at the rear of the laundry
causing damage to the timber framing and it also tracked through the wall cavity
resulting in damage to the kitchen cabinets in both units 6 and 7.
According to CL, water usage in unit 6 from November 2012 until December 2014
was excessive. SBC dismissed the likelihood of damage being caused through the
leaking skylight.
A claim was brought against FSP2 on 20 July 2015. FSP2 appointed its own
assessor after the claim was rejected by FSP1.
According to the FSP2‟s assessor, the applicant‟s tenant A had reported noticing the
water on the tiled floor of the laundry and damage to the laundry and kitchen
cabinetry in September 2014 following severe rain. The Panel accepts that the
severe rain may not have occurred in September 2014 but likely occurred in August
2014.
FSP2‟s assessor confirmed that the damage to each unit was consistent with water
damage which he considered was possibly due to two events, one from storm and
one from a burst pipe which had been unidentified.
FSP2 appointed a building group JLB who provided a report on 15 April 2016. JLB
formed a view after reading all relevant reports that most likely the damage to the
dividing wall between units 6 and 7 as well as all damage to the kitchen cabinets,
walls and laundry were a long term effect of a water leak which logically could be
isolated to the braided lines to the kitchen sink connection of unit 6.
As the actual cause of the damage and timing of the damage could not be resolved,
it was agreed by all parties that a further engineering report be obtained.
That report has been provided by SH and is dated 23 September 2016. SH had the
opportunity of reviewing all reports provided and also attending the property, meeti ng
with the tenant at unit 7 and the representative for unit 6. The report is detailed and
noted the following:
„ Unit 7
Kitchen – duct tape over dish-washer waste intake
Laundry – water damage to timber frame
Laundry inspection hole where plumber made initial investigation
Unit 6
Laundry – water collecting on floor from leak in washing machine tap
Laundry – calcium staining on hot water hose to washing machine
Water dripping from cold water tap to dish washer
Roof inspection – maintenance issues or defects
Broken roof tiles have been siliconed together
Sarking installed under roof batons
Timber to gable dressing rotten
Unit 7
Water has escaped from the S trap where the dish-washer would have been
attached causing damage to the kitchen cupboards – this would have occurred
before September 2014
Case No: 418706 & 442357 Determination Page 5 of 7
Slow leak to the washing machine taps and/or combination and/or appliance
happening over an extended period causing wall framing to decay – this was
maintenance prior to September 2014
In extreme rain events, water escaping over the back of the eave gutter and
flowing internally through the top of the cavity sliding door.
The Panel has considered all of the various reports and is persuaded by the findings
reached by SH.
The Panel is satisfied that the water damage occurred over an extended period of
time due to a number of events including water escaping from the S trap where the
dish-washer had been attached, water escaping from the washing machine
attachments and storm water entering the property.
The Panel is satisfied that this caused the damage to the kitchen cupboards, skirtings
in the meal rooms, damage to the laundry and cavity wall as well as additional
damage to the floor tiles.
2.2 When did the damage occur?
The information provided in particular the information provided by SBG and SH
establishes that most likely the damage to the applicant‟s property occurred over time
and during the period of cover with FSP2 from 30 June 2011 until 30 June 2013 and
with FSP1 from 30 June 2013.
Insofar as the cause of the damage arising from the leaking dishwasher water inlet
under the sink is concerned, the Panel accepts that this damage would be gradual
and not sudden or from a single event. Insofar as the damage is attributed to leaking
washing machine taps or a combination from both unit 7 and unit 6, the Panel
accepts that this occurred over an extended period of time.
Insofar as there was damage to the cavity wall and additional damage to the tile
adhesion, the Panel accepts that this most likely occurred over time as a result of a
combination of the above events together with water escaping and flowing internally
into the area during heavy storms.
2.3 Has the applicant established a claim against FSP1?
The Panel is not satisfied that the applicant has established a claim against FSP1.
Although the Panel accepts the applicant may not have become aware of the
damage until September 2014, the Panel is persuaded based on the available
information that the damage commenced during the period of cover with FSP2 and
prior to the commencement of cover with FSP1 on 30 June 2013.
Under the policy with FSP1, cover is provided for physical loss or damage occurring
during the period of cover 30 June 2013 and onwards) caused by an Event and not
otherwise excluded.
An Event is described as an occurrence or accident occurring or resulting in a
sudden unforeseen physical loss or destruction of or damage to insured property.
Case No: 418706 & 442357 Determination Page 6 of 7
The Panel is satisfied that the damage developed over time and not as a result of an
event meaning an occurrence or accident that resulted in a sudden and unforeseen
physical loss or destruction of the property.
Based on the available information the Panel is not satisfied that the applicant has
established on the balance of probabilities a claim against FSP1.
2.4 Has the applicant established a claim against FSP2?
The Panel is satisfied that the applicant has established a claim for part of the
damage as against FSP2.
The Policy with FSP2 provides cover for accidental loss or damage to the building or
common contents which occurs during the period of insurance.
The policy defines, under the general definition section, an occurrence as meaning
an event, including continuous or repeated exposure to substantially the same
general conditions, which results in personal injury or property damage, neither
expected nor intended to happen.
Based on the available information, the Panel is satisfied that at least part of the
damage occurred as a result of the continuous leaking of water from the dish-washer
connection and from the washing machine connections. The Panel is also satisfied
that the damage was contributed to by water leaking through the cavity wall from the
adjoining unit. The Panel accepts that this is properly classified as accidental
damage as a result of repeated or continuous exposure of the same general
conditions within the terms of the policy.
FSP2 has not established exclusion applies
The onus is therefore on the FSP if it wishes to avoid liability to establish the
application of any relevant exclusion.
The FSP has suggested that the applicant failed to take reasonable care to maintain
the property.
The relevant test to determine whether the applicant failed to take reasonable care is
a subjective test. It is not an objective test. The FSP is required to establish on the
balance of probabilities that the applicant having recognised the issue with the
leaking pipes and taps either deliberately or recklessly failed to take any action to
prevent the damage occurring.
There is no evidence that the applicant recognised the risk associated with the water
leaking into the laundry and kitchen areas. There is no evidence that the applicant
was aware of this until at least September 2014 when the tenant reports noticing the
pooling of water. In fact, the actual cause of the damage was not identified until the
FSP‟s experts had inspected the property.
The Panel is not satisfied that the FSP has established the application of the
exclusion.
FSP2 liable for part of the damage
The Panel is satisfied that not all of the damage occurred during the period of cover
with FSP2.
Case No: 418706 & 442357 Determination Page 7 of 7
In this regard, the Panel is unable to determine precisely, from the information
exchanged the extent to which the damage can be attributed to the first period of
cover. The Panel accepts the water readings referred to by CL suggest the increased
moisture is likely to have developed in 2012 or earlier. The Panel also accepts that
additional damage due to storms may have occurred after FSP2 went off risk on
30 June 2013.
The Panel has considered the various options available and believes in the
circumstances, it will be fair if FSP2 met 50% of the applicant‟s claim for the cost to
repair the damage sustained to unit 7.
In the event that the applicant has not already repaired the property, then FSP2 is
entitled to obtain a quotation for the cost to complete the repairs and to settle the
applicant‟s claim on the basis of payment of 50% of what it would cost FSP2 to repair
the property.
The policy also provides for additional benefits in the event that temporary
accommodation is required or there is a loss of rent received as a result of the
damage. The Panel understands the applicants‟ property is rented.
Under the terms of the policy if the property is rendered uninhabitable or access is
prevented the FSP will meet the cost of any temporary accommodation or loss of rent
received during the period that the property cannot be accessed. Should the property
be rendered uninhabitable or inaccessible during the repair period the FSP should
pay 50% of the loss of rent which would otherwise have been received during the
repair process.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.