Home / Financial Firm (Unknown - Insurer) / Determination 418598

Determination 418598

Extent of fire and water damage repair cover for a home after an adjoining fire

FirmFinancial Firm (Unknown - Insurer)
Decided2016-08-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$52,355
Non-financial loss$3,000
Amount claimed$125,500
SourceAFCA PDF

Summary

An individual's home insurance claim for fire and water damage from an adjoining property was disputed over the scope and cost of repairs. AFCA set an indicative repair cost of $111,298.48 and ordered an additional $55,355.42 (including $3,000 delay compensation and a $5,000 risk margin), plus the cost of an engineering report.

Where the builder quotes were inconsistent and too much time had passed for fresh quotes, the Panel struck an indicative rebuild cost between the averages of the insurer's and applicant's quotes.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 418598 Determination Page 1 of 6 Case number: 418598 18 July 2016 1 Overview 1.1 Dispute This matter involves a claim by the applicant under her Home Insurance Policy, held with the financial service provider (FSP), following damage to the home as a result of a fire at the adjoining premises. The FSP has accepted the applicant’s claim but a dispute has continued as to the extent of the loss and damage which is to be covered under the terms and conditions of the policy. 1.2 Issue and key findings What is the extent of the coverage to be provided by the FSP under the terms and conditions of the policy? The FSP is to pay the applicant the additional amount of $55,355.42 to finalise its obligations under the terms and conditions of the policy and the dispute. 1.3 Determination This determination is in favour of the applicant. The FSP is to pay the applicant the additional sum of $55,355.42 to finalise its obligations under the terms of the policy and the dispute. The FSP is not required to pay interest on this amount. The FSP is to pay the applicant the reasonable cost of obtaining the report from SDC, on proof of payment being provided by the applicant. Case No: 418598 Determination Page 2 of 6 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material exchanged. This determination follows consideration of all of the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, prior determinations. 2.1 What is the extent of the coverage to be provided by the FSP under the terms and conditions of the policy? Coverage of the policy The appl icant’s Home Insurance Policy is a defined events policy which provides coverage for specified insured events which are detailed within the Product Disclosure Statement (PDS). The PDS details: ‘Events you are covered for The following insured events apply to both building and contents cover under the Residential and Investment Home Packages subject to the exclusions set out on pages 18 to 20 and any additional exclusions set out below. … Fire and explosion You are covered for loss or damage as a result of fire or explosion. We will also pay up to $100 to repair or replace the item that exploded if the item would have been covered under your type of cover (building or contents). …’ The coverage provided by the policy is subject to exclusions which are also detailed within the PDS. The PDS details: ‘The policy doesn’t cover everything General exclusions – apply to the overall policy Unless included in additional cover, we will not cover loss, damage or legal liability caused by: …  wear and tear and lack of maintenance, including rust, corrosion, deterioration, except in the case of escape of liquid (refer page 21), or legal liability claims;  gradual loss or damage of any kind;  structural defects and faulty workmanship in the construction of the building or lack of maintenance to the building and/or contents; …  actions of trees, plants or their roots; Case No: 418598 Determination Page 3 of 6 …  erosion or earth movement including shrinkage;  subsidence and landslide, unless it happens immediately following an earthquake or explosion; …’ It is accepted insurance law that the applicant carries the onus to establish a claim under the terms and conditions of the policy. Once the applicant has established a claim under the terms and conditions of the policy, the onus transfers to the FSP to establish the basis on which it otherwise seeks to deny the claim. As stated, the FSP has accepted the applicant’s claim but a dispute has arisen as to the coverage provided by the policy. The Panel notes that the FSP asserts some of the observed house damage is attributable to normal house maintenance and upkeep and inherent factors. It also maintains that problems on site, including long term wear and tear, aging, deterioration and differential foundation movement were caused by issues such as poor site drainage, tree roots in drains, significant climatic weather variances and the like, which have contributed to the house’s appearance and deterioration. It is accepted insurance law that the FSP carries the onus to establish these various allegations as the basis on which it s eeks to deny aspects of the applicant’s claim. Preliminary matters As already stated, the FSP has accepted the applicant’s claim. The Panel notes that in addition to making an offer of settlement, the FSP has made a number of concessions and the offers made by the FSP extend to at least part of the repairs claimed by the applicant. In particular, the Panel notes that the FSP has conceded that there have been unsatisfactory delays, as evidenced by the fact that the applicant originally lodged her claim in 2010 but the FSP did not make an offer of settlement until June 2014. The FSP has conceded this is an unacceptable delay and pursuant to clause 9.3 of the Service’s Terms of Reference, has offered the maximum award of compensation of $3,000. The Panel is satisfied that this is an appropriate offer, given the delay that occurred and the fact that it is the maximum that can be awarded under the Terms of Reference of the Service. The amount of $3,000 compensation is in addition to the other aspects of the claim. The Panel also notes that the FSP has included within its offers an amount of $5,000 which it says is in respect to any potential risk that the applicant may experience when the applicant begins the re-construction of her property. The FSP says that the $5,000 is for risk margin. The Panel is also satisfied that this is an appropriate allowance and is in addition to any amounts specifically for repairs. Case No: 418598 Determination Page 4 of 6 Circumstances of the loss, claim and dispute The exchanged evidence confirms that there was a fire at the property adjacent to the applicant’s home in November 2010 which caused extensive damage to the adjacent property and the shared party wall between the adjacent property and the applicant’s home. The fire involved full fire engine attendance together with significant quantities of water in or about the area to douse the flames. The damage to the adjacent property was so significant that the adjacent property was demolished in December 2011, which left the party wall of the applicant’s home exposed. The ap plicant’s claim relates to the damage to her home as a result of the fire at the adjacent property and the demolition of the adjacent property. A number of experts have attended on site and provided reports in support of the respective submissions made by the parties. On 21/5/2014 the FSP paid the applicant the amount of $63,943.06. This payment appears to be in relation to the quotation from the FSP’s builder, JLI, in the amount of $63,943.06 and dated 26 November 2013. This quote was based on the FSP’s en gineering expert’s (the Expert) Scope of Rectification Works dated 15 July 2013 (the SOW). Subsequently, the FSP made a further offer of $83,000, which appears to be based upon the original allowance of $63,943.06, $3,000 compensation referred to above, the $5,000 risk margin referred to above and an additional amount of $11,056.94 based upon the FSP’s assessor’s review of the JLI quote. The FSP says that the offer is made up of $75,000 being a rounding off of the JLI repairs quote, $5,000 for the risk margin and $3,000 for compensation. The FSP has also provided a supplementary report from the Expert to the effect that he regards the offer of $83,000 as more than fair and reasonable to cover the costs of all necessary insurance related repairs. The applicant has provided a quotation from EBG in the amount of $125,500 for the repairs but the Panel notes that the quotation does not include a costs break down on an item by item basis. The Panel also notes that the FSP originally sought 3 quotes from builders, all based on the SOW. These quotes came in as follows:  JLI: $63,943.06  M: $64,509.50  U: $162,838.06 The Panel is concerned at the great discrepancy between the U quote and those provided by M and JLI, given that all 3 worked from the same SOW. This issue will be returned to later in the determination. Case No: 418598 Determination Page 5 of 6 Of significance to the dispute, is the question of the impact of the water at the insured property as a result of the fire which occurred at the adjacent property. On the basis of the exchanged information, the Panel is satisfied that the amount of water required by the respective attending fire services was significant. In this regard, the Panel notes the conclusions of the applicant’s engineer (SDC) to the effect that the excessive volumes of water used during the fire event would have seeped into the soils supporting the internal wall footings of the applicant’s home. SDC was of the view that this would have reduced the bearing capacity of the founding soil supporting the internal wall footings, resulting in settlement, as well as causing heave due to the swelling of clays in other locations supporting the walls. Further, this combination of events would further contribute to the cracking of the internal walls. In addition, SDC noted that the party wall was further affected by its prolonged exposure to the weather after the demolition of the neighbouring building due to the ponding of water at the party wall footings. In response, the FSP’s Expert was of the view that the water used during the extinguishing of the fire at the adjoining property could not have caused the ground movements at the applicant’s home, as any effects upon the founding soils from the firefighting water, would have been relatively short-lived and would have quickly dissipated. However, the Panel observes that SDC also asserts that the evidence suggests the exposure of the adjoining wall and its foundations to the weather and elements after the demolition of the adjoining property’s party wall, have been significant factors, as well as other inherent site issues, in the problems that have arisen in respect of the applicant’s house. The Panel has given consideration to all of the information exchanged and has been greatly assisted by a number of helpful photographs and reports. The Panel is of the view that the report from SDC and subsequent information is more persuasive because of the emphasis given to the lengthy exposure of the party wall as a result of the demolition of the adjoining property. The Panel notes that the adjoining property was demolished in December 2011 and this means that the party wall and surrounding areas have been exposed to the elements for several years. The report from SDC is thorough, logical and its conclusions are compelling. Unfortunately, SDC has not provided a quotation in respect to repairs and the quotation from EBG is not costed on an item by item basis. Nevertheless, the Panel, as mentioned earlier, is concerned at the spread of quotes, originally obtained by the FSP. Under normal circumstances, the Panel would direct the FSP and the applicant to each obtain a fresh builder’s itemised quote using the SOW. However, too much time, as admitted by the FSP itself, has elapsed for this to occur, in terms of now doing what is fair in all the circumstances. Case No: 418598 Determination Page 6 of 6 Therefore, the Panel, as required by the courts, will do the best it can with the material before it; accordingly, the average of the FSP’s 3 quotes comes in at $97,096.97, while the applicant’s comes in at $125,500. Under these circumstances it seems reasonable to strike an indicative re-build quote of the average between those figures, namely $111,298.48. In summary, the Panel, having given consideration to all of the information exchanged and doing what it is fair in the circumstances, is satisfied that it is appropriate that in order to resolve its obligations of coverage under the terms of the policy, the FSP should pay to the applicant the total amount for repairs of $111,298.48. In addition to the $111,298.48, the Panel is also satisfied that it is appropriate the FSP pays the amount of $3,000 for compensation and $5,000 for risk margin (both detailed above). Thus the total amount to be paid by the FSP to finalise its obligations under the policy, the claim and the dispute is $119,298.48. Noting that the FSP has already paid the applicant in the amount of $63,943.06, the FSP is now required to pay the applicant the additional amount of $55,355.42 to resolve its obligations under the policy, the claim and the dispute. The FSP is not required to pay interest on this amount. In addition, the FSP is to pay to the applicant the reasonable costs incurred of obtaining the report from SDC. The applicant is to provide proof of payment.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.