Text of the determination
Determination
Case No: 418103 Determination Page 1 of 9
Case number: 418103 23 September 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) after her home was damaged by a severe storm in June
2007.
The FSP accepted the claim and arranged for the repair of internal damage to both
the main building and a granny flat at the rear of the property. However, the FSP did
not undertake any repairs to the sub-floor.
In April 2015, the applicant advised the FSP that her property had suffered further
cracking and movement damage. The applicant says this damage was caused by the
storm in June 2007 (and/or the FSP‟s failure to repair the sub -floor following the
storm).
1.2 Issues and key findings
Is the FSP liable for the claimed damage?
The applicant has established a prima facie claim for the disputed damage, based on
the assessment provided by the FSP‟s contractor shortly after the June 2007 storm .
Subsequent information obtained by the FSP establishes that the bulk of the damage
to the brick piers occurred as the result of gradual deterioration over an extended
period of time. Damage caused in this manner is excluded from cover under the
policy.
However, additional damage to the brick piers (and associated cracking and
movement damage) occurred as a result of effects of stormwater run-off during the
storm in June 2007. This damage is subject to cover under the policy.
How should this dispute be resolved?
Having regard to the extent of the damage and the likely contributing factors, the FSP
is required to contribute to the estimated repair costs. The FSP is also required to
compensate the applicant for non-financial loss suffered due to its failure to properly
assess her claim.
1.3 Determination
This determination is partly in favour of the applicant.
Case No: 418103 Determination Page 2 of 9
The FSP is to pay the applicant the amount of $5,500 in full and final settlement of
her claim, plus interest calculated as set out in section 2.2 below. The FSP is to pay
the applicant an additional amount of $1,000 as compensation for non-financial loss.
Case No: 418103 Determination Page 3 of 9
2 Reasons for determination
2.1 Is the FSP liable for the claimed damage?
Policy provides cover for insured events subject to exclusions
The applicant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant‟s policy provides cover for damage caused by the events listed in the
policy (including the insured event of „storm‟), subject to the conditions and
exclusions set out in the policy.
The insured event of storm includes cover for damage caused by a sudden,
excessive run-off of water as the direct result of a storm.
Dispute concerns storm damage to sub-floor area
The FSP does not dispute that the applicant‟s property was affected by a severe
storm in June 2007. Media reports confirm that the storm resulted in heavy rainfall
and flash flooding.
As noted above, the FSP accepted the applicant‟s claim and arranged for the repair
of internal damage to her home and a granny flat at the rear of the property. These
repairs were completed in late 2007.
However, the applicant says the FSP failed to properly assess the effects of
stormwater run-off on the sub-floor area of her property, following the storm.
The applicant says a number of the brick pier footings in the sub-floor area sustained
water damage during the storm and need to be replaced. She says the damage to
the brick piers has also caused additional cracking to the interior walls of the house,
as well as sinking of the floor in the master bedroom.
FSP failed to appoint an engineer to inspect the sub-floor area
After the applicant lodged her claim in June 2007, the FSP appointed a building
consultant (PI) to attend the property and inspect the damage.
In his report dated 28 July 2007, PI confirmed that:
the granny flat at the rear of the property had been completely inundated by
stormwater run-off, resulting in internal water damage to the building and
contents;
there was “settlement cracking” of the internal wall plaster in various rooms of
the main house; and
Case No: 418103 Determination Page 4 of 9
the brick and concrete stumps under the main house had “obviously mo ved”
since repacking was previously carried out, possibly as a result of the flash
flooding.
PI prepared a scope of works for the repair of the internal damage to the main house
and granny flat, which included the repair of cracking damage to various rooms, as
well as the refitting of several doors (presumably to address issues arising from
building movement).
The scope of works prepared by PI specifically excluded any allowance for repairs to
the “sub floor brick areas”. PI noted that an inspection by a structural engineer would
be required to confirm the nature and extent of the damage.
The FSP appointed a builder (DW) to complete the repairs set out in PI‟s scope of
works. However, it appears that the FSP failed to action PI‟s recommendation to
appoint an engineer to confirm whether there was any storm-related damage to the
sub-floor area.
Applicant has established a prima facie claim for damage to sub-floor
The recent reports obtained by the parties (including the photographs contained
therein) confirm that a number of the brick piers under the original section of the main
house are damaged and need to be replaced.
The original claim records indicate that the brick piers in the sub-floor area were
affected by rainwater run-off during the storm in June 2007. In this regard, I note that:
the inundation of the granny flat confirms that the property was subject to high
volumes of rainwater run-off during the storm;
the FSP‟s building consultant (PI) observed movement of the brick piers and
considered the damage justified the appointment of an engineer to determine
whether it was storm-related; and
the nature of the internal damage to the main house repaired by the FSP is
consistent with having been caused by differential movement of the brick piers
due to saturation of the surrounding soils.
On this basis, I am satisfied that the applicant has established a prima facie claim for
storm-related damage to the brick piers of the main house.
Accordingly, the FSP bears the onus of establishing that, on the balance of
probabilities, it is entitled to rely on a policy exclusion to deny the applicant‟s claim.
FSP says damage was caused by ongoing moisture issues
The FSP says it is entitled to deny the applicant‟s claim based on the general
exclusions under the policy for damage caused by:
wear and tear, corrosion and deterioration; and/or
the applicant‟s failure to maintain her property in good repair and condition.
The FSP says the water damage to the brick piers (and associated movement
damage) was not caused by the one-off effects of the storm in June 2007 but
occurred over an extended period of time due to ongoing moisture issues at the
property.
Case No: 418103 Determination Page 5 of 9
In support of its position, the FSP relies on the findings of its engineer (SB), who
inspected the property after the applicant notified the FSP of additional damage in
April 2015.
Passage of time has complicated matter
By the time the FSP‟s engineer (SB) inspected the property in April 2015, almost
eight years had passed since the storm in June 2007.
The passage of time necessarily makes it more difficult to identify the cause of the
observed damage to the brick piers (and, in particular, the extent to which the storm
in June 2007 contributed to the damage).
These difficulties are exacerbated by the absence of any photographs showing the
condition of the brick piers when PI inspected the property following the storm.
The FSP notes that the applicant did not dispute the repairs carried out at the time of
the storm or at any time during the intervening eight year period.
Further, the FSP says the applicant did not raise concerns about additional,
unrepaired damage until shortly after another severe storm event affecting the region
in late April 2015 (by which time she had changed her cover to another insurer).
The applica nt says she accepted the FSP‟s assessment of her claim at the time of
the storm in June 2007. She says she did not become aware that the additional
damage may have been caused by the storm until after speaking with a family
member who is an architect, many years later.
While there has been a delay in the applicant disputing the storm-related damage to
the sub-floor area, the need to revisit this issue many years later is primarily due to
the FSPs failure to appoint an engineer to assess the damage at the time.
Had the FSP done so, it is likely the issue could have been resolved relatively
promptly by reference to contemporaneous photographs and reports .
Damage to piers was primarily caused by long-term deterioration
As outlined above, the applicant is seeki ng cover under the policy for damage to the
brick pier footings at her property. She has provided a quotation from her re-stumper
(AA) which states that 40 of the piers need to be replaced.
The applicant is also seeking cover for the cost of repairing additional cracking and
movement damage following the storm, which she believes has occurred as a result
of the damage to the brick piers.
The FSP‟s e ngineer (SB) has advised that, based on his inspection of the property in
March 2016, approximately 24 of the piers under the original section of the house
require replacement.
However, the FSP says it is not liable for the replacement of the piers because the
damage has occurred as result of gradual deterioration over an extended period of
time.
Case No: 418103 Determination Page 6 of 9
In his report, SB noted that the piers under the original section of the house have
been constructed using a range of different materials (clay bricks, masonry and
concrete), which suggests that they have been gradually replaced over time. There is
also evidence of packing in between the piers and the bearers in some areas.
SB advised that the damaged piers are in poor condition and show evidence of
gradual deterioration due to ongoing exposure to moisture over an extended period
of time. Among other matters, there are signs of moisture-related discoloration,
efflorescence, fretting and corrosion.
SB concluded that the nature of the damage to the brick piers was such that it was
likely to have occurred over a prolonged period, rather than as the result of a one-off
event. In particular, SB noted that the fretting and mortar deterioration observed
generally only occurs as a result of exposure to high levels of moisture over an
extended period of time.
SB identified several issues which could contribute to high moisture levels in the sub-
floor area on an ongoing basis, including the fact that the surrounding ground level
was higher, together with restricted ventilation in the sub-floor area.
While SB‟s comments were made based on his inspection in March 2016, I am
satisfied that key factors such as the site topography would not have been
significantly different at the time of the storm in June 2007.
SB‟s report includes a number of close -up, colour photographs of the damaged brick
piers under the original section of the house.
Having carefully reviewed these photographs (together with the findings in SB‟s
report), I am satisfied that the damage to the brick piers which necessitated their
replacement occurred primarily as a result of gradual deterioration over an extended
period of time.
In my view, the nature and extent of the damage is not consistent with it having been
caused solely as a result of the one-off effects of the storm in June 2007.
Further, the presence of various types of piers (and packing) suggests that there
have been ongoing issues requiring the replacement of the piers at various times
over the approximately 50 year life of the house.
Additional damage was caused by storm in June 2007
While I consider that the damage to the piers was primarily caused by long-term
deterioration, I am also satisfied that the storm in June 2007 would have caused
additional damage.
The available information establishes that the applicant‟s property was subject to
flash flooding, which resulted in the inundation of the g ranny flat. Further, the FSP‟s
builder observed damage to the brick piers, which he considered should be assessed
by an engineer to determine to what extent this damage was storm -related.
In relation to the additional movement damage reported by the applic ant, the FSP‟s
engineer (SB) confirmed that the piers in the relevant area appeared to have moved
(as noted by PI during his inspection in 2007).
Case No: 418103 Determination Page 7 of 9
However, SB advised that it was not possible to determine whether this movement
had been caused by the June 2007 storm (rather than by ongoing seasonal moisture
variations), due to the length of time which has passed.
In these circumstances, I am not satisfied that the FSP has established that this
aspect of the damage was caused by factors which are excluded under the policy.
The applicant has also raised concerns about several minor cracks to the internal
walls of the property, which have opened up again after being repaired by the FSP‟s
repairers at the time of the storm.
It is possible that these cracks re-occurred due to moisture issues affecting the
property in recent years (including the severe storms in April 2015), rather than the
June 2007 storm.
However, SB also noted that it was possible the cracks had opened due to the
original repairs having been carried out before allowing sufficient time for the
foundation soils to dry out. In these circumstances, the FSP would be responsible for
the additional cracking damage.
2.2 How should this dispute be resolved?
FSP is liable for part of repair costs
For the reasons outlined above, I am satisfied that the bulk of the damage to the
brick piers occurred as a result of gradual deterioration over an extended period of
time. The FSP is not liable for this part of the damage.
However, I consider that additional damage to the brick piers occurred as a result of
the June 2007 storm.
Further, the FSP has not established that the additional cracking and movement
damage was caused by factors which are excluded under the policy (in
circumstances where the applicant has established a prima facie claim).
The applicant has provided a quotation for $11,000 from her re-stumper (AA) for the
replacement of 40 brick piers.
This quotation includes the costs of re-levelling the property following the restumping
(which should resolve the issues with the floors) but does not include any allowance
for repairing consequential internal damage to the property as a result of these
works. Nor does it include the cost of repairing the (relatively minor) cracking
damage.
Having regard to the various factors outlined above, I consider it is fair in all the
circumstances that the FSP be required to cash settle the applicant‟s claim for
$5,500.
The FSP is required to pay interest on this amount at the rate calculated in
accordance with section 57 of the Insurance Contracts Act 1984 (Cth), for the period
from 1 December 2015 until the payment date.
Case No: 418103 Determination Page 8 of 9
The starting date of 1 December 2015 represents the date by which the FSP should
have resolved the claim, following receipt of SB‟s initial report (assuming that report
had been comprehensive).
Applicant is entitled to compensation for non-financial loss
Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation
(capped at $3,000) for non-financial loss where an applicant has suffered an unusual
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with their expectation of enjoyment or peace of mind.
For the reasons outlined above, I consider the FSP failed to thoroughly assess the
applicant‟s claim by omitting to appoint an engineer to inspect the sub -floor area, as
recommended by its building consultant (PI).
Further, the FSP initially failed to undertake a proper assessment when the applicant
notified it of her additional concerns in April 2015.
As noted above, the FSP appointed an engineer (SB) to inspect the sub-floor,
However, when SB‟s attended the property in November 2011, he carried out a brief
inspection of the brick piers under the extension at the rear of the house and did not
inspect the piers under the original section (which is where the claimed damage had
occurred).
It was only when the applicant raised concerns abo ut the nature and extent of SB‟s
inspection that the FSP instructed him to re-attend the property in March 2016 to
undertake a close inspection of the damaged piers.
I am satisfied that the FSP‟s failure to arrange for a proper engineering inspection (on
t wo separate occasions) has delayed the resolution of the applicant‟s claim and
caused her additional stress and inconvenience.
In these circumstances, I consider that an award of compensation for non-financial
loss in the amount of $1,000 is appropriate.
Case No: 418103 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
dispute. Accordingly, this dispute has not been the subject of a FOS recommendation
and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.