Text of the determination
Determination
Case No: 417574 Determination Page 1 of 9
Case number: 417574 22 September 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP) for cracking and movement damage to his property following
a storm in February 2010.
The applicant considers the damage was caused by the effects of rainwater run-off
discharging onto his property during the storm, as a result of faulty downpipes and
guttering at his neighbour‟s property.
The FSP denied the applicant‟s claim on the basis that the damage was not caused
by the storm in February 2010 (or by any other event insured against under the
policy). The FSP says the damage was caused by long-term drainage issues
affecting the property, together with the manner in which the property was
constructed.
1.2 Issues and key findings
Is the FSP liable for the damage to the applicant’s home ?
The available information establishes that the saturation of the foundation soils at the
applicant‟s property (which resulted in the claimed damage) was caused by a range
of moisture-related issues.
Such issues included long-term drainage issues (which are not subject to cover
under the policy) as well as the effects of rainwater run-off during the storm in
February 2010 (which is subject to cover under the policy).
Having regard to the extent of the damage and the likely contributing factors, it is fair
in all the circumstances that the FSP contribute $10,000 towards the costs of
repairing the damage.
Is the applicant entitled to compensation?
The circumstances do not justify the award of compensation.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is to pay the applicant the amount of $10,000 in full and final settlement of
his claim, plus interest as set out in section 2.1 below.
Case No: 417574 Determination Page 2 of 9
2 Reasons for determination
2.1 Is the FSP liable for the damage to the applicant’s home ?
Policy provides cover for insured events subject to exclusions
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant‟s policy provides cover for damage caused by the events listed in the
policy, including the insured event of „ storm , rainwater or wind‟ .
Applicant has established a prima facie claim
The applicant considers the damage to his property was caused by the high volume
of rainwater run-off which saturated the foundation soils near the southern boundary
of the property during a severe storm in February 2010.
The reports prepared by the various contractors appointed by the parties confirm that
there is cracking and movement damage to the applicant‟s property.
Both the FSP‟s engineer (JM) and the applicant‟s engineer (JA) have advised that
the damage has occurred due to the rotation and settlement of the southern wall of
the property, which is adjacent to the garage.
The FSP does not dispute that the area where the applicant‟s property i s located was
affected by a storm in mid-February 2010. Media reports confirm that the storm
resulted in high levels of rainfall and flash flooding.
In these circumstances, I am satisfied that the applicant has established a prima
facie claim under the policy.
Accordingly, the FSP bears the onus of establishing that, on the balance of
probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny
the applicant‟s claim.
FSP says damage was caused by excluded factors
The FSP says it is not liable for the claimed damage because the damage was not
caused by the one-off effects of the storm in February 2010.
The FSP says the damage was caused by:
the gradual effects of regular rainwater run-off due to ongoing drainage issues
at the property;
faulty workmanship or design in the construction of the garage area
(specifically, the use of inadequate footings), which is excluded from cover
under the policy; and
Case No: 417574 Determination Page 3 of 9
other excluded factors such as corrosion, gradual deterioration and earth
movement.
The FSP will only be entitled to deny liability for the claimed damage if it can show
that the proximate cause of the damage (that is, the real, effective or dominant
cause) was one or more of the excluded factors outlined above.
As noted above, during the course of this dispute, the parties have appointed
numerous contractors to determine the cause of the damage.
I have carefully reviewed the reports prepared by the various contractors (together
with the other information provided) in order to determine the proximate cause of the
damage.
Parties disagree about source of moisture affecting foundation soils
The applicant and the FSP agree that the cracking and movement damage to the
property occurred due to the effects of water saturating the foundation soils adjacent
to the southern wall.
However, the parties disagree as to the source of the water.
As outlined above, the applicant says the saturation of the soil was due to high
volumes of rainwater run-off during the storm in February 2010, which discharged
onto his property because of h is neighbour‟s inadequate drainage system .
In contrast, the FSP considers the saturation of the foundation soils was caused by
acute, long-term drainage issues which had affected the property since it was first
constructed (approximately two years before the storm).
Passage of time has complicated matter
The various consultants engaged by the parties have identified a number of potential
moisture issues which may have affected the property and contributed to the
saturation of the foundation soils.
However , any consideration of the issues raised in the consultants‟ reports is
complicated by the length of time which has passed since the damage occurred, as
well as the intervening changes to the surrounding environment.
In particular, there was a period of over three years between the date the FSP initially
denied the claim (in August 2010) and the date the applicant obtained additional
expert reports for the purpose of disputi ng the FSP‟s denial.
In the interim, a number of changes had been made to the drainage provisions
affecting the applicant‟s property. In particular, both the applicant‟s neighbour and the
local council had carried out works to improve the drainage arrangements.
Property was subject to some long-term drainage issues
The engineer (JM) appointed by the FSP to determine the cause of the damage
inspected the applicant‟s property in April 2010.
Case No: 417574 Determination Page 4 of 9
In his report, JM concluded that the saturation of the foundatio n soils at the property
had occurred due to the following long-term drainage issues affecting the property:
rainwater run-off and sub-surface seepage from a large council reserve located
on higher ground approximately 100 metres to the rear of the property, which
JM noted formed a large catchment area and had little to no provision for
surface and sub-surface drainage;
inadequate provision for drainage of rainwater run-off from the road at the front
of the property, allowing water to pond on the road and saturate the surrounding
soil through cracks in the pavement; and
poor surface drainage in the rear yards of the applicant‟s property and
neighbouring properties, due to use of loose pebbles rather than impervious
paving.
Having carefully reviewed the available information, I accept that the property was
subject to ongoing drainage issues. However, I am not satisfied that these issues
were as significant as indicated by the FSP‟s engineer (JM).
In relation to the council reserve, soil tests carried o ut by the applicant‟s geotechnical
engineer (SG) indicated that the nature of the soil was not conducive to water flows.
SG noted that, while it would be possible for water to travel laterally by way of soil
suction, the reserve was far enough away from t he applicant‟s policy for this to be of
no relevance. The FSP‟s consultants (including JM) did not carry out their own soil
tests.
In relation to the provision for drainage from the road at the front of the property,
photographs taken by JM in April 2010 support his observations about water ponding
in the road. The nature and extent of the ponding suggests it is more likely to reflect
long- term drainage issues than a surface puddle (as suggested by the applicant‟s
loss adjuster (RS)).
Further, it appears that the drainage issues affecting the road were recognised by the
local council, which undertook works to improve the street drainage provisions in or
around September 2010.
However, it is not clear to what extent the drainage issues with the road would have
affected the applicant‟s property. In his initial report, the FSP‟s engineer (JM) notes
only that “it is possible” that water seeping through the pavement may have
contributed to the moisture issues.
The photographs of the applicant and his neighbour‟s r ear yards provided confirm the
yards were covered in loose pebbles, which would allow rainwater to penetrate the
surrounding soils. Accordingly, this is likely to have contributed to the saturation of
the foundation soils.
Additionally, the soil report pre pared by the applicant‟s geotechnical engineer (SG) in
October 2014 described the site as having poor surface and sub-surface drainage.
This report was prepared several years after the issues with the neighbour‟s drainage
system had been fixed and the roadside drainage problems had been addressed. By
the time SG prepared his report, a stormwater blockage caused by the council works
had also been identified and repaired (in February 2014).
Case No: 417574 Determination Page 5 of 9
Accordingly , SG‟s report suggests there were some long-term drainage issues at the
property.
Property was affected by rainwater run-off during storm in February 2010
The applicant says that, regardless of any pre-existing moisture issues at the
property, the proximate cause of the cracking and movement damage was the
sudden and direct influx of significant volumes of rainwater run-off during the storm in
February 2010.
Several of the consultants appointed to determine the cause of damage to the
applicant‟s property acknowledged the potential impact of stormwater run-off due to
the deteriorated drainage system at the neighbouring property.
Both the FSP‟s builder (PP) and its second engineer (MC) appear to have considered
this stormwater discharging onto the property to have been a significant contributing
factor to the damage.
The FSP‟s builder (PP) attended the applicant‟s property shortly after the claim was
lodged. PP confirmed that the downpipe at the neighbour‟s property was not
connected, causing a large amount of water to be discharged into the surrounding
soil.
PP also confirmed that the neighbour‟s gutters were corroded and unable to cope
with the significant volume of rainwater run-off from the roof, which had exacerbated
the dampness of the soil next to the south wall of the applicant‟s property.
The FSP ‟s second engineer (MC) was appointed after the applicant sought a review
of the FSP‟s claim denial,
MC confirmed that the ground immediately adjacent to the southern wall of the
applicant‟s property had been saturated by water flowing off his neighbour‟s roof
which had eroded the surrounding soil, thereby reducing the foundation support for
the garage wall. MC noted this was likely to have been an ongoing issues.
The FSP appears to have discounted the views expressed its builder (PP) and
engineer (MC) and instead sought to rely solely on the findings of its original
engineer (JM).
JM acknowledged that the deteriorated state of the neighbour‟s downpipe and
guttering would have resulted in rainwater run-off discharging onto the ground
between the two properties.
However, JM considered that water discharging from the neighbour‟s property was
unlikely to have significantly contributed to the moisture affecting the foundation soils
at the applicant‟s property, given the ground sloped away from the applicant‟s
propert y (and towards his neighbour‟s property) in this area.
While I accept that the slope of the ground would have reduced the effects of water
discharging from the neighbouring property, I am not satisfied that it was appropriate
for the FSP to entirely dismiss the findings of its own consultants (including MC, an
engineer) in this regard.
Case No: 417574 Determination Page 6 of 9
Moisture issues were caused by a range of factors
For the reasons outlined above, I consider that the saturation of the foundation soils
which triggered the claimed damage was caused by a range of moisture-related
factors affecting the applicant‟s property.
Such factors include rainwater run-off from the storm in February 2010 (which is an
insured event under the policy), as well as long-term drainage issues affecting the
property (which are not subject to cover).
The applicant has sought to rely on section 46 of the Insurance Contracts Act 1984
(Cth) (the Act), which prevents the FSP from relying on policy exclusions in certain
specified circumstances.
However, section 46 does not apply in the present case, as the operation of the
particular exclusions on which the FSP seeks to rely does not depend on the
condition of the property at the time when the applicant incepted the policy.
Damage was not caused by faulty design or construction
The FSP says that the damage to the property due to the settlement and rotation of
the garage wall has occurred because the garage slab was constructed using
inadequate footings, given the soil conditions at the site.
However, having carefully reviewed the available information, I am not satisfied that
the FSP has established that:
the footings were necessarily inadequate; and
even if the footings were inadequate, the defect is a proximate cause of the
loss.
The FSP‟s engineer (JM) advised that the wrong kind of footings had been used,
given the garage was built over deep fill material.
However, JM also noted that the existing footings would have been appropriate, had
the bearing capacity of the soil been adequate (which it was not, due to its saturated
condition).
The applicant‟s own engineer (JA) noted that, in hindsight, the footings should have
been designed to allow for abnormal moisture conditions at the site.
B oth JM and JA‟s comments were made in circumstances where it had become
apparent that the foundation soils were saturated, due to a range of moisture issues
affecting the site.
However, it is not clear that such issues were existing or apparent at the time of
construction.
In his reports, the FSP‟s engineer (JM) referred to a so il report obtained by the
original builder prior to construction which did not indicate significant problems with
the site.
While JM has suggested the results of these tests were mistaken, I am not satisfied
there is sufficient information to support this conclusion.
Case No: 417574 Determination Page 7 of 9
FSP is liable for part of repair costs
For the reasons outlined above, I consider that the saturation of the foundation soils
at the applicant‟s property was caused by a range of factors, including the effects of
rainwater run-off during the storm in February 2010.
The FSP says that, to the extent that any of the damage was caused in this manner,
it should be excluded from cover due to the general policy exclusions for damage
caused by corrosion, gradual deterioration and/or earth movement.
In the present case, the general exclusion for earth movement does not apply. While
earth movement was the mechanism, by which the damage occurred, it was not the
proximate cause of the loss.
As outlined above, the discharge of rainwater run- off onto the applicant‟s property
during the storm was due to the corrosion and deterioration of his neighbour‟s
downpipe and guttering.
However, I am not satisfied that the general exclusion for corrosion and gradual
deterioration applies to deny cover, when considered in the context of the policy as a
whole.
While the FSP is not liable for maintenance issues at the applicant‟s own prope rty, it
is not fair in the circumstances to exclude cover for damage which has occurred as
the result of a severe storm, due to such issues affecting a neighbouring property.
It is not clear when these issues arose or whether the applicant would have been
aware of them prior to the storm in February 2010.
FSP is required to cash settle applicant for $10,000
For the reasons outlined above, I am satisfied that rainwater run-off during the storm
in February 2010 (together with other moisture issues) contributed to the damage at
the applicant‟s property.
Given the time which has passed and the nature of the intervening events, it is
difficult to determine with any certainty the relative contribution of the various issues
affecting the applicant‟s property.
Further, it is unclear to what extent the claimed damage was due to the effects of
rainwater run-off from the storm in February 2010, as opposed to prior rainfall events.
The applicant seeks cover for approximately $30,000, representing the quoted costs
of repairing the claimed damage to the property (as well as certain other items),
together with fees paid to his consultants during the claim process.
Having regard to all of the factors outlined above, I consider it is fair in all the
circumstances that the F SP be required to cash settle the applicant‟s claim for
$10,000.
The FSP is to pay interest on this amount calculated in accordance with section 57 of
the Act, for the period from 14 July 2014 until the payment date.
Case No: 417574 Determination Page 8 of 9
2.2 Is the applicant entitled to compensation?
Applicant is dissatisfied with FSP’s claim handling
Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation
(capped at $3,000) for non-financial loss where an applicant has suffered an unusual
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with their expectation of enjoyment or peace of mind.
The applicant is dissatisfied with the manner in which the FSP has managed his
claim.
Among other things, he says that the FSP‟s engineer (JM) improperly entered into an
arrangement to provide him with advice about the underpinning works required to his
property.
The FSP says the applicant approached JM directly.
JM‟ s advice to the applicant about underpinning works (together with
recommendations to improve the site drainage) was provided in February 2011,
almost six months after the FSP had denied the applicant‟ s claim and approximately
three years before he sought to challenge the denial.
In these circumstances, I am not satisfied the FSP is re sponsible for JM‟s actions .
However, the FSP should have given careful consideration to JM‟s further
involvement, after the applicant disputed the claim denial.
It was natural that the FSP would seek JM‟s additional input during the internal
dispute resolution (IDR) process, given he had inspected the property shortly after
the damage occurred.
However, the FSP should have required JM to disclose that he had provided services
to the applicant in the interim and should have been aware of the potential for an
actual or perceived conflict of interest in these circumstances.
Nevertheless, I do not consider that the circumstances are such as to justify the
award of compensation for non-financial loss.
Case No: 417574 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
dispute. Accordingly, this dispute has not been the subject of a FOS recommendation
and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
During this dispute, the applicant has been assisted by his father. For the purposes
of this determination, submissions made by the applicant‟s father have been treated
as if they had been made by the applicant himself.
3.2 Terms of policy
Subject Terms
Defined event –
storm
Storm, rainwater or wind
We will cover your buildings or contents from loss or damage as a result of
storm, rainwater or wind …
We will not cover … water entering your buildings
t hrough an opening made for any building, renovation or repair work
b eca use of a structural defect, faulty design or faulty workmanship when
your buildings were constructed
General exclusions Exclusions to your cover
Any cover we provide is subject to the following exclusions …
We will NOT cover any loss or damage as a result of, or caused by:
s ettling, shrinkage or any movement of earth
e rosion, rust, corrosion, gradual deterioration, depreciation, wear or tear …
roots from trees, plants, shrubs or grass …
a defect in an item, structural defects, or faulty workmanship or desi gn
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.