Text of the determination
Determination
Case No: 417445 Determination Page 1 of 8
Case number: 417445 10 June 2016
1 Overview
1.1 Dispute
The applicant lodged a claim under his home and contents policy with the financial
services provider (FSP) after his property was damaged when his wife accidentally
reversed her car through the garage wall into the main part of the house.
The applicant has disputed the amount of the cash settlement offered by the FSP for
damage to the plumbing in his en suite bathroom identified following the accident. He
also says the FSP‟s restoration contractor damaged his Persian rug.
The applicant is also dissatisfied with the manner in which the FSP has handled his
claim and seeks compensation for stress and inconvenience suffered as a result.
1.2 Issues and key findings
Is the cash settlement for the bathroom fair and reasonable?
The cash settlement is fair and reasonable because:
the scope of works includes all of the repairs required to repair the damaged
plumbing and rectify the surrounding area; and
the policy limits the allowance for replacing undamaged, non-matching tiles.
Is the FSP required to pay the applicant for damage to the rug?
The FSP is not required the pay the applicant any additional amount in respect of the
rug as the available information does not establish that the actions of its contractors
caused any additional damage to the rug.
Is the applicant entitled to compensation for non-financial loss?
The circumstances of the claim are not such as to justify the award of compensation.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to increase the cash settlement of $4,455.24 previously
offered for the damage to the en suite bathroom. The FSP is not required to pay the
applicant any additional amounts.
Case No: 417445 Determination Page 2 of 8
2 Reasons for determination
2.1 Is the cash settlement for the bathroom fair and reasonable?
Dispute concerns extent of repairs required
The impact damage to the applicant‟s property occurred in October 2014, when the
applicant‟s wife accidentally reversed through the wall between the garage and the
laundry. The FSP accepted the claim and cash settled the applicant for the cost of
repainting the affected area.
Several months later, the bath in the en suite bathroom above the laundry began
leaking. Reports provided by the plumbers (AS and AK) engaged by the parties
confirm the leak occurred as a result of damage to the breech piece for the bath,
which was broken at the spout.
The FSP accepted that the leaking breech may have been caused by the impact of
the vehicle in October 2014 and offered to cash settle the applicant for $4,455.24,
being the estimated cost of the repairs. The app licant had previously advised that he
preferred to have his own builder carry out any works required at the property.
The FSP‟s cash settlement offer of $4,455.24 was based on a quotation and
approved scope of works provided by its builder (CS). The scope of works included
provision for the repair of the breach piece (which required the removal of the
surrounding wall tiles and lining), as well as the rectification of the surrounding area.
The applicant says the approved scope of works does not include all of the repairs
required to repair the damaged breach and restore the bathroom to its pre -existing
condition. In particular, he says that:
the existing waterproofing in the bathroom needs to be replaced in its entirety
(which necessarily requires the removal and replacement of the wall and floor
tiles and many of the bathroom fittings); and
if the FSP is unable to match the tiles damaged in the course of the repairs to
the existing, undamaged tiles, then it is required to pay for the cost of replacing
all of the tiles in the bathroom.
The applicant has provided two quotations from his own builders (AB and PB), which
estimate the cost of the necessary repairs at $19,250 and $31,350 respectively.
FSP’s approved scope of works is appropriate
The reports and photographs provided by the various contractors indicate that the
damaged breech piece is located behind two rows of wall tiles between the top of the
bath and the bathroom window.
The FSP‟s approved scope of works provides for the removal of approximately s ix
wall tiles and a one square metre section of the wall lining in the immediate area of
the damaged breech piece, to enable the necessary repairs to occur.
Case No: 417445 Determination Page 3 of 8
In order to rectify the area damaged in the course of the repairs, the scope of works
provides for the replacement of the displaced wall lining, the application of a
waterproof membrane and the installation of replacement tiles.
The FSP‟s builder (CS) has confirmed that in his view, the proposed scope of works
complies with all applicable building standards.
However, the applicant says the proposed scope of repairs is inadequate and does
not comply with applicable building requirements. He has provided a report from his
builder (AB) which refers to the Australian Standard for waterproofing and states that
the partial repair of existing damaged waterproofing is not an appropriate long term
solution.
The report provided by AB does not refer to the any specific provisions of the
Australian Standard and therefore it is not clear exactly why he considers the
proposed works are inadequate. However, it appears that AB‟s view is based on his
concern that the removal and replacement of the wall tiles will cause further damage
to the existing water proofing.
As noted above, only a limited number of wall tiles in a localised area need to be
removed in order to allow the breech piece to be repaired.
In these circumstances, I am satisfied that any resulting damage to the waterproofing
in the relevant area can be adequately addressed by reapplying the waterproof
membrane. I do not consider it is necessary to strip out and re-waterproof the entire
bathroom.
The quotations provided by the applicant‟s builder also include the replacement of
various bathroom fittings such as the toilet and shower. However, in the absence of
any requirement to re-waterproof the entire bathroom, there is no need for any of
these items to be replaced.
For the reasons outlined above, I am satisfied that the approved scope of works for
the repairs obtained by the FSP is appropriate to provide for the repair of the
damaged breech piece.
Cash settlement amount is fair and reasonable
Under the terms of the applicant‟s policy, the FSP may cash settle his claim for the
amount which reflects the cost (to the FSP) of undertaking the necessary repairs.
The FSP‟s cash settlement offer of $4,455.24 for the bathroom repairs is based on
CS‟s quotation of $3,705.24 for the necessary repairs, plus an additional amount of
$750 to allow for the fact that the replacement tiles are unable to be matched to the
existing tiles.
The applicant says that the amount of $750 is not sufficient to enable him to retile the
whole bathroom to match the replacement tiles installed as part of the repairs. He
says the FSP is required to reimburse him for the cost of doing so because the policy
requires it to restore his home to its condition prior to the insured event.
The applicant‟s policy contains detailed provisions setting out the FSP‟s obligations
when it settles a claim for damage to the applicant‟s home. While the pol icy requires
Case No: 417445 Determination Page 4 of 8
the FSP to repair the home to its pre-existing condition, this obligation is subject to
the specific conditions set out in the policy.
The policy clearly and unambiguously states that, where wall tiles are unable to be
matched, the FSP will pay up to $750 extra to provide for the replacement of
undamaged tiles.
In these circumstances, the FSP is entitled to apply the terms of the policy to limit is
liability for the replacement of undamaged tiles to the amount of $750.
For the reasons outlined above, I am satisfied that the cash settlement amount
offered by the FSP for the repair of the breech piece is fair and reasonable.
2.2 Is the FSP required to pay for the damage to the rug?
FSP cash settled applicant for damage to rug caused by insured event
When the FSP‟s assessor attended the applicant‟s property to assess the damage
caused by the accident, she noted water damage to two rugs in the lounge room
including a hand knotted Persian silk rug.
It is unclear how the damage observed by the assessor was related to the current
claim, given the location of the rug and the nature of the insured event.
The applicant‟s restoration contractor has subsequently advised that the only
damage he observed to the rug was a light coating of gyprock dust (which would
appear to be consistent with the insured event).
During the claim process, the applicant confirmed that he considered the rug to have
been damaged as a result of the accident and advised that it had an estimated value
of $35,000.
The cash settlement paid by the FSP for damage to the applicant‟s contents items
included an amount of $1,000 which reflected the policy limit for woven rugs (where
such items had not been insured as specified contents items under the policy).
Available information does not estab lish damage was caused by FSP’s repairer
The applicant says that the FSP‟s restoration contractor irreparably damaged the
Persian rug when he attempted to clean it during his initial attendance at the property
on 15 October 2014.
The restoration contractor has confirmed that the restoration of the rug was outside
his scope of works he was instructed to carry out. However, he says he attempted to
clean the rug at the applicant‟s request.
The restoration contractor has advised that, while at the applicant‟s p remises, he
vacuumed the rug using a warm mild sour rinse solution typically used in such
processes.
The applicant has provided a report from his Persian rug specialist stating that the
rug is permanent damaged due to the coloured dyes having bled in some areas,
most likely as a result if inappropriate steam cleaning.
Case No: 417445 Determination Page 5 of 8
The FSP‟s restoration contractor confirms that the rug exhibits loss of colour and
bleeding, especially in areas where pink dye has been used. However, he says that
this damage was apparent before the cleaning process.
The parties have provided a number of photographs of the rug at various times.
Having carefully reviewed these photographs, I am not satisfied that the actions
taken by the FSP‟s restoration contractor have caused further damage to the rug.
In particular, I have had regard to the photographs of the rug taken by the FSP‟s
assessor several days before the restoration contractor attempted to clean the rug.
These photographs clearly show areas of faded colours and bleeding dye, reflecting
the issues identified by the applicant‟s rug specialist.
The FSP‟s claim notes indicate that the applicant did not advise the FSP that the
restoration contractor had damaged the rug until approximately two months after the
damage occurred. It is perhaps surprising that the applicant did not raise this issue
earlier, given the high value of the item.
Based on the available information, I am not satisfied that the actions of the FSP‟s
restoration contractor caused any further damage to the rug. Accordingly, the FSP is
not required to pay the applicant any additional amount in this respect.
2.3 Is the applicant entitled to compensation?
FOS may award compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
The fact that the applicant‟s policy excludes cover for consequential losses does not
preclude the award of compensation where such losses have occurred as a result of
the manner in which the FSP has handled his claim, rather than as a result of the
insured event itself.
However, FOS adopts a conservative approach to the award of compensation for
non-financial loss. FOS expects applicants to be moderately robust and bear the
usual stress and inconvenience associated with an insurance claim.
Applicant says FSP managed claim poorly
It is clear that it has taken an extended period of time to resolve the applicant‟s claim.
The applicant is dissatisfied with the level of service provided by the FSP and its
contractors during the course of the claim.
Among other things, the applicant says that the FSP and its contractors have delayed
the progress of his claim and he has been required to deal with multiple
representatives from the FSP who are difficult to contact and unresponsive.
The applicant says the delays in resolving his claim have meant he and his family
have been unable to use the en suite bathroom for a significant period of time.
Case No: 417445 Determination Page 6 of 8
The applicant also says that the FSP failed to arrange an electrical assessment of
the property when the water leak in the bathroom was identified. He says this
exposed him and his family to the risk of electric shocks.
FSP managed claim for initial impact damage reasonably overall
Having carefully reviewed the claim history, I am satisfied that the FSP managed the
applicant‟s claim for the impact dam age reasonably overall.
The damage to the applicant‟s property was relatively extensive and required
assessment by several contractors (including a structural engineer) and the
preparation of a relatively extensive scope of works for building repairs.
There was also damage to a number of contents items about which additional
information was required in order to determine an appropriate settlement amount.
By December 2014, the FSP had completed the initial claim process and cash settled
the applicant for damage to his building and contents. Given the nature of the claim,
this time period is not unreasonable.
Applicant has not established FSSP failed to adequately assess damage
In late January 2015, the applicant notified the FSP that there were noises comi ng
from the pipes which appeared to indicate a “water hammer” issue at the property.
The applicant confirmed that he would provide a report from his plumber. It appears
that at this stage, no leak was apparent.
The report from the applicant‟s plumber was n ot received until late March 2015.
Several days later, the applicant notified the FSP that there had been a major water
leak and his plumber would provide a report and photographs. The FSP
subsequently arranged for its builder (CS) to attend the property a nd inspect the
damage.
It appears that neither the applicant‟s builder (AB) nor the FSP‟s builder (CS)
considered it was necessary to undertake an electrical make safe of the property,
despite water from the bath leaking into the light fitting of the laundry below. It may
be that the builders considered the risk could be effectively mitigated by not using the
bath until the necessary repairs had been carried out.
The applicant says that the FSP‟s contractors failed to properly carry out their
investigations into the impact damage because they failed to identify the damage to
the breech pipe.
However, it is not clear that the damage to the breech pipe would have been
apparent following the initial impact. It is not uncommon for damage from events of
this nature to only become apparent over time.
The FSP‟s claim notes indicate that it was not entirely satisfied that the damage to
the breech pipe identified in March 2015 was in fact related to the accident in
October 2014. Nevertheless, the FSP agreed to cover the damage.
Case No: 417445 Determination Page 7 of 8
For the reasons outlined above, I am not satisfied that the available information
establishes that the FSP‟s contractors failed to adequately assess the damage to the
applicant‟s property.
Circumstances of claim do not justify award of compensation
After the applicant reported the water leak in March 2015, the FSP acted reasonably
promptly to assess the damage and determine an appropriate cash settlement
amount.
The settlement of the claim for damage to the bath breech has been delayed for a
number of months. However, this much of this delay has been due to the applicant
disputing the proposed settlement amount.
For the reasons outlined above, I consider the settlement amount proposed by the
FSP was fair and reasonable. Accordingly, I do not consider that the FSP should be
required to compensate the applicant for the delay in repairing his bathroom.
Nor do I consider that the FSP was solely responsible for the delays in arranging
further inspections for the purpose of determining whether it was liable for any
additional damage to the rug. At least some of these delays were due to the applicant
being overseas for a period of approximately six weeks.
Having carefully reviewed the FSP‟s management of the claim, I do not consider the
circumstances are such as to justify the award of compensation for non-financial
loss.
Case No: 417445 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach to this determination
This Determination follows the review of a recommendation issued on behalf of the
Financial Ombudsman Service (FOS) on 25 February 2016 . The recommendation
was rejected by the applicant.
This case has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Settlement of
claims
If we agree to pay a claim for loss, theft or damage to the building, we will
decide if we will:
repair damage to the building …
pay you what it would cost us to repair or rebuild the building …
If we repair (or pay you what it would cost to repair), we will at our option do
so on a „new for old‟ basis or repair to a similar condition to what the building
was in before the loss or damage occurred …
Repair of
undamaged parts
Repairing or rebuilding undamaged parts
We will only repair or rebuild the parts that are damaged in the incident
covered by your policy. You cannot claim to replace undamaged parts of the
building to creat e a uniform appearance …
When we will repair or rebuild undamaged parts
If we canno t match the mat erials with the undamaged parts, we will pay extra
to create a uniform appearance when:
wall tiles are damage d
we will pay up to $750 extra for eac h incident to replac e undamaged wall
tiles in the same room, stairs, hallway or passageway, so they match or
complement new tiles used for re pairs.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.