1 Overview
1.1 Dispute
This matter involves a claim by the applicant under his Home Building Insurance
Policy held with the Financial Service Provider (FSP), following damage to the rental
property as a result of a storm.
The FSP has accepted the applicant’s claim but a dispute has arisen as to the extent
of the loss and the coverage to be provided by the policy.
In regard to the aspect of the claim which is in dispute, the FSP says that the
applicant has not established the extent of his loss claimed, the applicant has not
complied with his obligations under the terms and conditions of the policy and the
FSP has been prejudiced in its investigation of the applicant’s claim and in particular
the extent of the loss suffered.
1.2 Issue and key findings
Has the FSP met its obligations under the terms and conditions of the policy?
The FSP is required to pay the applicant the additional amount of $24,000.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP is required to pay the applicant the additional sum of $24,000 to finalise its
obligations under the terms and conditions of the policy.
The FSP is not required to pay interest on the additional amount.
Case No: 416713 Determination Page 2 of 7
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the ma terial exchanged.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Has the FSP met its obligations under the terms and conditions of
the policy?
Coverage of the policy
The applicant’s Home Building Insurance Policy is an Insured Events insurance
policy.
This means that not all loss and damage is automatically covered but rather only loss
and damage caused by an insured event.
The details of the coverage provided by the policy are contained within the Product
Disclosure Statement (PDS).
The PDS details that:
‘COVER PART 1 – INSURED EVENTS
This section describes the insured events you are covered for, and the conditions and
exclusions that specifically apply to each insured event. They should be read with the
general exclusions on pages 29 – 32.
…
COVER PART 1 – INSURED EVENTS (continued)
Insure d event We will NOT cover:
6. Storm and rainwater
Including loss or damage from:
the escape of rainwater from any
water pipe, drain or gutter
surface run - off rainwater from
surrounding areas that occurs
within 24 hours of a storm or heavy
rain.
Including loss or damage caused by
erosion, subsidence, landslide, mudslide
or any other earth movement that occurs
within 72 hours of a storm or heavy rain
and as a result of that storm or heavy
rain.
× loss or damage caused by flood
× loss or damage caused by rain, ha il
or wind entering your home due to:
a design fault, structural defect or
faulty workmanship
lack of maintenance (a defect
that you knew about or should
reasonably have known about
and did not fix)
an opening that was not created
by the storm
building add itions, renovation or
alteration work.
× loss or damage to:
fences and gates that are not
structurally sound or well
Case No: 416713 Determination Page 3 of 7
maintained
garden retaining walls
garden borders, driveways, paths
or gardens
the liner and/or cover of a
swimming pool or spa
water in a swimming pool or spa
the surface of a tennis court
jetties, wharves and pontoons.’
The PDS also details an insured’s obligations when making a claim:
‘MAKING A CLAIM
What you must do
If your home or contents are lost or damaged, or an incident occurs that may result in a
claim you must:
take all reasonable precautions to prevent or minimise further loss, damage or
liability
report any incident involving theft or malicious damage to the police as soon as
possible
contact us and provide us with full details of what has happened
provide us with evidence of value and ownership of goods or property that has
been lost, stolen or damaged, if we ask for this
give us the opportunity to inspect the damaged goods or property before
conducting any repair or disposal
obtain our consent before you authorise or commence repairs, or incur any costs,
unless the repair or cost is necessary to prevent further loss
allow us, or our representative, to enter the home to investigate the cause of the
loss or damage.
…’
It is accepted insurance law that the applicant carries the initial onus to establish that
he has a claim which is covered by the terms and conditions of the policy.
The applicant’s onus extends to establishing the extent of the loss which was caused
by the insured event of storm and rainwater.
Circumstances of the claim
The applicant says that his rental property was damaged in a storm in the local area
on 27 November 2014.
There is no dispute that there was a significant storm which involved hail, rain and
strong win ds in or about the area of the applicant’s rental property on 27 November
2014.
However, the Panel notes that notwithstanding the significant storm and the damage
to the applicant’s property, the applicant did not lodge his claim with the FSP until
21 March 2015, at which time, significantly, the repairs to the property had been
completed.
Case No: 416713 Determination Page 4 of 7
The applicant says that he was away at the time of the storm and that he had
forgotten he had insurance.
In this regard, the Panel notes that the policy relevant to the c laim was incepted on
17 th day of November 2014 and commenced on 18 November 2014. As such, the
policy was incepted only 10 days prior to the storm and loss. In those circumstances,
it is difficult to accept that the applicant had forgotten that he had insurance.
That aside, there is no dispute that there was loss and damage at the rental property
as a result of the storm. Indeed the FSP accepted the applicant’s claim in respect to
damage to the front portion of the roof.
The applicant has, in addition to his claim for the front portion of the roof, provided an
invoice from (PB) in the amount of $73,480 which relates to internal building work
and some external work and an invoice from AI a roofer in the amount of $20,515,
which relates to the rear roof replacement.
These latter two invoices make up the applicant’s claim and the FSP has denied the
claim insofar as it relates to these two invoices.
Claim in regard to the rear portion of the roof
The Panel firstly notes that the FSP accepted the claim for hail damage to the front
portion of the roof.
The Panel has difficulty understanding how the front portion of the roof could be
damaged but the rear portion of the roof not damaged.
The FSP’s denial is based upon the FSP’s expert roofing specialist’s assertions t o
the effect that the rear flat corrugated roof had not been damaged by the hail.
However, the applicant has confirmed that by the time the FSP attended on site, the
rear roof had been replaced but the old damaged roof was still on site and was
available for inspection by the FSP.
The FSP has not responded to these submissions of the applicant.
In light of the fact that the FSP accepted the applicant’s claim for the front portion of
the roof, the Panel is satisfied that it is likely that the rear portion of the roof was also
damaged in the hailstorm event.
However, the Panel has two concerns.
Firstly, the invoice from AI is dated 22 April 2015 whereas the loss and damage
occurred on 27 November 2014.
In addition, the applicant has said that the roofing work at the rear of the property had
to be done as part of a make safe and reduction in ongoing damage.
The applicant has not presented an invoice which is contemporaneous to the loss of
27 November 2014.
Secondly, the applicant’s claim in respect to the front portion of the roof was
accepted and paid for by the FSP in the amount of $25,949.74.
Case No: 416713 Determination Page 5 of 7
This claim related to the front side and centre sections of the roof, yet the single rear
section invoice is in the amount of $20,515.
On the basis of the information exchanged, the Panel is not satisfied that the total
claim in respect to the rear portion of the roof is supported by the applicant’s material.
Based on its conclusion that the rear portion of the roof was likely damaged in the
storm and the evidence that the FSP paid the amount of $25,949.74 for the front
portion of the roof, the Panel is satisfied that the FSP should pay the additional
amount of $10,000 in respect to the rear portion of the roof, based on what is, in the
Panel’s view, fair in all the circum stances.
Additional external damage
As stated, the applicant’s claim for the internal damage to the building is supported
by the invoice from PB in the amount of $73,480.
The Panel notes that some of the items referred to in the above mentioned invoice
are external, including but not limited to the repair and replacement of damaged
down pipes and broken windows.
Regrettably, the invoice is not costed on an item by item basis and the contractor has
since passed away and is therefore unable to provide a breakdown.
Based upon its experience in having dealt with hundreds of similar disputes, the
Panel is satisfied that it is fair in all the circumstances to conclude that, as the
external damage was caused by the storm, then it is reasonable to allow an amount
of $4,000 in respect to the additional external damage.
Internal damage
The balance of the invoice from PB relates to internal damage.
As previously stated, the repairs had been completed at the rental property when the
FSP’s assessor attended.
The Panel also notes that the applicant has not provided any additional evidence to
support his position that there was internal damage as a result of the storm event.
The Panel notes that the photographs provided by the applicant do not depict internal
damage but rather the fact that the property had been gutted for the purposes of
renovations.
In support of its position that it has been prejudiced, the FSP relies upon the fact that
the damage occurred on 27 November 2014 but the claim was not made until 21
March 2015 and by that time the repairs had been effected.
The FSP points to the obligations detailed within the PDS and referred to above.
In particular the FSP says that the policy clearly and unambiguously provides that the
applicant must contact the FSP and provide the opportunity to inspect the damaged
property before conducting any repair or disposal. Further, the policy also expressly
states that consent must be obtained before repairs commence and the claim must
be assessed and investigated to determine the cause of the loss and damage.
Case No: 416713 Determination Page 6 of 7
The FSP says that the applicant has failed to comply with these provisions.
On the other hand, the applicant says that he commenced to make repairs to prevent
further loss and damage.
The Panel has difficulty accepting the app licant’s statement given that the repairs
were completed by the time the FSP had the opportunity to assess the site and that
any repairs to make safe or prevent further loss and damage would not require the
full extent of the repairs to the damaged home.
In addition, the Panel notes that the applicant has confirmed that he was conducting
renovations at the home. The applicant says that he started the renovations after
repairing the damage to the home but the Panel observes that the insurance
application form completed by the applicant prior to the policy being issued noted that
the house was undergoing renovations (as reflected in the insurance certificate).
The Panel is satisfied that given that the repairs were completed by the time the FSP
had the opportunity to inspect on site, the FSP was prejudiced in its ability to properly
assess what repairs and/or renovations related to the damage caused by the
hailstorm and what work was unrelated and was in respect of renovations.
That said, the assessor’s report provided by the FSP at least implies that there was
some internal damage as a result of the hailstorm which caused the roof damage.
Under the heading ‘What was damaged?’ and ‘What internal areas were affected?’
the FSP’s assessor says ‘internals have been rectified by insured at the time of our
inspection.’
The Panel notes several matters.
Firstly, had the assessor concluded that there was none, or there was unlikely to be
any internal damage, then presumably the assessor would have said that there was
none, or was unlikely to be any internal damage, but rather the assessor says that
the internal damage had been rectified.
Secondly, the invoice from AI refers to large amounts of water entering into the
property.
The difficulty for the Panel is that apart from the invoice from PB, there is no
evidence which confirms the extent of any damage to the internal section of the
rental property.
As such, the Panel is satisfied that the applicant has failed to establish the full extent
of any loss he says occurred as a result of the storm event.
On the other hand, the Panel is satisfied that it is likely some internal damage was
caused to the internal section of the rental property and will seek to assess that
damage on the basis of the information exchanged.
However, the Panel is of the view that the Scope of Works detailed within the invoice
from PB is far in excess of any damage which was likely expected from a single
storm event, albeit a single storm event of significant magnitude.
Case No: 416713 Determination Page 7 of 7
Further and as noted previously, the Panel is satisfied that the FSP has been
significantly prejudiced by the applicant’s failure to lodge the claim
contemporaneously with the loss and failure to comply with the policy provisions.
Given there is very little probative evidence contained in the information which has
been exchanged, the Panel is satisfied that it is fair in all the circumstances that the
FSP pay the applicant an additional amount of $10,000 in respect to the internal
damage to the insured property.
Conclusion
The FSP is required to pay the applicant the additional amount of $24,000 to finalise
its obligations to the applicant under the terms and conditions of the policy.
Given the lack of information available to the Panel and the conclusion that the FSP
has suffered prejudice as a result of the applicant’s failure to comply with the policy
provisions, the FSP is not required to pay interest on the additional sum of $24,000.