Text of the determination
Determination
Case No: 416682 Determination Page 1 of 9
Case number: 416682 8 July 2016
1 Overview
1.1 Dispute
The applicants lodged a claim under their home insurance policy with the financial
services provider (FSP) after their property was damaged when they accidentally
reversed their boat into a window at the front of the house.
The FSP accepted the claim and arranged for its contractors to repair the property.
However, the applicants are dissatisfied with the quality of the repairs carried out by
the FSP’s contractors to date.
The applicants also dispute the FSP’s denial of liability for additional damage to
certain steel lintels at the property, which they believe was caused by the impact of
the boat and/or the initial repairs to the window carried out by the FSP’s contractors.
The applicants are also seek compensation for stress and inconvenience suffered as
a result of the manner in which the FSP handled their claim.
1.2 Issues and key findings
Is the FSP required to replace the front window installed by its builder?
The FSP is required to provide for the installation of a new window as part of the
rectification repairs to the front window and surrounding areas. The reuse of the
existing window is not appropriate, given the poor quality of the initial repairs and the
nature of the further works required.
Is the FSP required to repair the garage and rumpus room lintels?
The available information establishes that the deflection of the garage and rumpus
room lintels was not caused by the incident in February 2015 or the subsequent
repairs carried out by the FSP’s contractors. Accordingly, the FSP is not required to
repair these items.
Are the applicants entitled to compensation?
The applicants are entitled to compensation for stress and inconvenience due to the
manner in which the FSP handled their claim.
Case No: 416682 Determination Page 2 of 9
1.3 Determination
This determination is partly in favour of the applicants.
The FSP is to provide for the installation of a new window as part of the rectification
repairs and pay the applicants the amount of $1,000 as compensation for non-
financial loss.
The FSP is not required to repair the garage and rumpus room lintels.
Case No: 416682 Determination Page 3 of 9
2 Reasons for determination
2.1 Is the FSP required to replace the front window ?
Dispute concerns quality of repairs
The impact damage to the applicants’ property occurred in February 2015, when the
applicants accidentally reversed their boat into a large window at the front entry of
their property. The hydrofoil on the outboard motor at the rear of the boat impacted
with the window, damaging the glass and the window frame.
Based on a report from its assessor (BM), the FSP accepted liability for the damage
to the window but deferred its decision regarding liability for cracking damage to the
surrounding brickwork and plaster, pending a report from its engineer (FE) confirming
the cause of the damage.
In the interim, the FSP authorised the replacement of the damaged window, which
was completed by its builder (H) in March 2015.
The applicants say that the works carried out by H were not completed to an
acceptable standard. In particular, they say that:
H’s failure to adequately prop the steel lintel (sup port beam) above the window
prior to removing the window frame caused the lintel to deflect or sag during the
repair process; and
in an attempt to accommodate the deflected lintel, the replacement window
installed by H was cut down too far, resulting in a sizeable gap between the top
of the window and the lintel. The applicants say this gap has been poorly filled
with packing and flashing, causing the window to leak.
FSP accepts certain rectification repairs are required
The FSP has acknowledged that the repairs undertaken by H were not completed to
an adequate standard and caused further damage to the applicants’ property. In
particular, the FSP has accepted liability for the repair of additional cracking to the
brickwork which occurred in the course of the window replacement works.
During the course of the dispute, the FSP also accepted liability for repairing the lintel
over the damaged window, based on the findings of its engineer (FE).
In his report dated 31 March 2015, FE confirmed that the lintel had deflected beyond
acceptable limits. FE stated that the deflection appeared to have occurred because
the window uprights were (unusually) providing support to the lintel, causing the lintel
to sag when the damaged window frame was removed.
In May 2015, FE prepared a scope of works for the rectification of the window
repairs, as well as the repair of certain additional damage which he confirmed had
been caused by the initial impact of the boat in February 2015.
This scope of works (which was approved by the FSP) included measures to rectify
the deflection of the lintel beam above the damaged window, by jacking and propping
the lintel and surrounding brickwork and installing a stiffening plate.
Case No: 416682 Determination Page 4 of 9
During the internal dispute resolution (IDR) process, FE advised that he no longer
considered the deflection of the lintel had been caused by the window repairs. FE
based his change of position on photographs which he had not reviewed prior to
providing his earlier view, and which indicated that the deflection of the lintel had
occurred before the window frame was removed.
However, it does not appear that the FSP has sought to amend FE’s scope of works
to remove the repairs required to remedy the deflection of the lintel.
In my view, it is appropriate that the FSP be required to undertake these repairs,
given it had previously approved the scope of works.
While the applicant has queried the effectiveness of the repair method proposed by
FE, I am satisfied that it is appropriate for the lintel to be repaired in accordance with
FE’s advice.
FSP is required to provide replacement window
The applicants say that, as part of the proposed rectification works, the FSP should
be required to replace the new window which was installed by its builder (H) in March
2015.
The provision of a new window is not included in the approved scope of works, which
provides for the existing window to be reinstalled once the damage to the
surrounding areas has been repaired.
The available information confirms that the replacement window initially installed by
the FSP’s builder (H) had to be returned to the manufacturer to be cut down in order
to fit the available space. The applicant says H also ground down the surrounding
brickwork.
The applicant has provided a number of close-up photographs which clearly show
the sizeable gap between the lintel and the top of the window frame, as well as the
packing and flashing used to cover this gap. There is evidence of water staining to
the surrounding area, which suggests that water is leaking in around the window
frame.
The FSP’s engineer (FE) has advised that the existing window does not need to be
replaced but can be removed and reinstalled as part of the proposed rectification
repairs. However, FE has confirmed that alternative packers and flashings may be
required.
Having carefully reviewed the information provided by the parties, I consider that, in
the circumstances, the FSP should be required to replace the window as part of the
rectification repairs.
The initial repairs carried out by the FSP’s builder (H) were clearly inadequate to
repair the damage caused by the incident in February 2015, and in fact caused
further damage to the brickwork at the property.
There are also ongoing water entry issues around the replacement window, either
due to the window having been cut down too far and/or the area around it having
been inadequately sealed.
Case No: 416682 Determination Page 5 of 9
Further, given the existing window was cut down for the express purpose of
accommodating the deflected lintel, I am not satisfied that the existing window will be
appropriately sized once this issue has been addressed.
In these circumstances, and in light of the acknowledged inadequacy of the initial
repairs, I consider the FSP should be required to provide a replacement window as
part of the rectification repairs, modified as necessary to accommodate the repaired
lintel.
The FSP is also required to rectify the damage to the property caused by water
entering around the window frame.
2.2 Is the FSP required to repair the garage and rumpus room lintels?
Applicants have established a prima facie claim
As outlined above, the FSP accepts that the applicants’ property was damaged by
the impact of the boat in February 2015.
The FSP also accepts that, in addition to the damage to the front window, the impact
caused cracking damage to the brickwork in a number of areas at the front of the
house.
The applicants say the FSP should also be liable for repairing the steel lintels located
above the garage window located to one side of the front entry and the rumpus room
window located to the other side.
While neither of these windows were directly impacted by the boat, the applicant
says that:
the deflection of the garage window occurred due to the effect of the impact;
and
the deflection of the rumpus room lintel occurred due to the failure by the FSP’s
builder (H) to properly support the front window lintel when he was carrying out
the window repairs.
Given the nature and extent of the damage caused by the impact and the poor
quality of the window repairs, I am satisfied that the applicants have established a
prima facie claim for the damage to the garage and rumpus room lintels.
In these circumstances, the FSP bears the onus of establishing that, on the balance
of probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to
deny the applicants’ claim.
The FSP says it is not liable for the deflection of the garage and rumpus room lintels
because this damage pre-existed the incident with the boat in February 2015 and the
subsequent repairs.
FSP is not liable for damage to garage and rumpus room lintels
Having carefully reviewed the extensive information provided by the parties,
I consider that, on the balance of probabilities, the damage to the garage and rumpus
room lintels pre-existed the incident in February 2015.
Case No: 416682 Determination Page 6 of 9
The FSP’s engineer (FE) measured the deflection ratios of the lintels and confirmed
that these ratios remained within applicable building standards (in contrast to the
lintel above the damaged front window, which was found to have deflected
excessively).
Further, FE advised that the nature and extent of the deflection to the lintels was not
consistent with having been caused by the impact in February 2015 or the
subsequent window repairs. Among other matters, FE noted that the lateral impact of
the boat would not have caused the vertical deflection of the lintels.
Accordingly, FE concluded that the deflections may have been present since the
property was built or may have developed gradually over time, as a result of the
loads applied by the surrounding building materials.
FE confirmed that both the garage and rumpus room lintels remained serviceable
subject to replacing the steel spacer bars over the garage lintel, which showed signs
of corrosion (as is evident from the photographs included in FE’s report).
I accept that, as a structural engineer, FE is appropriately qualified to determine the
cause of the observed deflection of the garage and rumpus room lintels.
The applicants have provided photographs of the front of the property which were
taken in 2010 and 2012. However, in my view, these photographs do not clearly
establish whether (and, if so, to what extent) the garage and rumpus room lintels had
already deflected at this time.
The applicants say the fact that FE did not note the deflection of the rumpus room
lintel in the report prepared following his first inspection establishes that this damage
only occurred after the impact with the boat.
However, given the deflection remained within acceptable limits, I am not satisfied
that FE would necessarily have included this matter in his observations of the
damage, assuming it were present at the time.
I acknowledge that the applicants strongly disagree with t he findings in FE’s report
regarding when and how the deflection of the lintels occurred. However, the
applicants have not provided any independent information which refutes FE’s
findings (for example, a report from an equivalently qualified engineer).
In these circumstances, I am satisfied that the deflections to the garage and rumpus
room lintels pre-existed the incident in February 2015 and the subsequent repairs.
Case No: 416682 Determination Page 7 of 9
2.3 Are the applicants entitled to compensation?
Applicant is entitled to compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
The applicants have raised a number of concerns about the manner in which the
FSP has managed their claim. Among other things, the applicants say the FSP and
its contractors have:
failed to adequately address the initial poor repairs;
omitted information from their reports, altered their position on a number of
occasions and failed to provide a reasonable basis for their opinions;
failed to promptly progress the claim and keep them updated during the claim
process; and
lied to them and questioned their integrity.
Having carefully reviewed the claim history, I agree that there are several aspects of
the claim which the FSP could have handled better.
During the IDR process, the FSP reversed its initial decision to accept liability for
cracking damage to the brickwork in various areas of the property, which its own
engineer (FE) had previously confirmed had been caused by the impact of the boat in
February 2015.
The FSP’s reversal of its position was based on a report obtained from a second
engineer (MC) which attributed the bulk of the cracking damage to naturally occurring
earth movement. The FSP subsequently departed from the findings in MC’s report.
Based on the claim records, the appointment of MC appears to have been partly
driven by the views of a second assessor who was appointed to the claim in mid-
2015, and who considered much of the cracking damage was likely to be pre-existing
(despite FE’s earlier findings to the contrary).
The involvement of an additional engineer widened the scope of the dispute and
caused additional and unnecessary delays in the resolution of the claim. This further
exacerbated the stress and inconvenience experienced by the applicants during the
claim process.
However, I am not satisfied that the available information establishes serious
misconduct on the part of the FSP or its contractors (such as the deliberate falsifying
of information) as asserted by the applicants.
Further, I am not satisfied that the FSP was responsible for all of the delays
experienced during the claim process.
To some extent, the delay in resolving the claim has been due to the applicants
having disputed the cause of damage to the garage and rumpus room lintels (in
respect of which I have found the FSP is not liable, for the reasons outlined above).
Case No: 416682 Determination Page 8 of 9
In the circumstances, I consider that an award of $1,000 as compensation for non-
financial loss is appropriate.
Case No: 416682 Determination Page 9 of 9
3 Supporting information
3.1 FOS approach to this determination
This Determination follows the review of a recommendation issued on behalf of the
Financial Ombudsman Service (FOS) on 26 February 2016. The recommendation
was rejected by the applicants.
This case has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.