Quality of storm-related window repairs and lintel damage

FirmFinancial Firm (Unknown - Insurer)
Decided2016-07-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The applicants' home was damaged when a boat hit a front window, and the FSP's builder's replacement work was inadequate. AFCA ordered a replacement window and rectification, declined the garage and rumpus room lintel claim, and awarded $1,000 for stress and inconvenience.

Inadequate initial repairs by the FSP's builder required a replacement window, and the FSP must pay non-financial loss for poor claim handling.

Issues

Subjects and remedies

home or building damagepay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 416682 Determination Page 1 of 9 Case number: 416682 8 July 2016 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy with the financial services provider (FSP) after their property was damaged when they accidentally reversed their boat into a window at the front of the house. The FSP accepted the claim and arranged for its contractors to repair the property. However, the applicants are dissatisfied with the quality of the repairs carried out by the FSP’s contractors to date. The applicants also dispute the FSP’s denial of liability for additional damage to certain steel lintels at the property, which they believe was caused by the impact of the boat and/or the initial repairs to the window carried out by the FSP’s contractors. The applicants are also seek compensation for stress and inconvenience suffered as a result of the manner in which the FSP handled their claim. 1.2 Issues and key findings Is the FSP required to replace the front window installed by its builder? The FSP is required to provide for the installation of a new window as part of the rectification repairs to the front window and surrounding areas. The reuse of the existing window is not appropriate, given the poor quality of the initial repairs and the nature of the further works required. Is the FSP required to repair the garage and rumpus room lintels? The available information establishes that the deflection of the garage and rumpus room lintels was not caused by the incident in February 2015 or the subsequent repairs carried out by the FSP’s contractors. Accordingly, the FSP is not required to repair these items. Are the applicants entitled to compensation? The applicants are entitled to compensation for stress and inconvenience due to the manner in which the FSP handled their claim. Case No: 416682 Determination Page 2 of 9 1.3 Determination This determination is partly in favour of the applicants. The FSP is to provide for the installation of a new window as part of the rectification repairs and pay the applicants the amount of $1,000 as compensation for non- financial loss. The FSP is not required to repair the garage and rumpus room lintels. Case No: 416682 Determination Page 3 of 9 2 Reasons for determination 2.1 Is the FSP required to replace the front window ? Dispute concerns quality of repairs The impact damage to the applicants’ property occurred in February 2015, when the applicants accidentally reversed their boat into a large window at the front entry of their property. The hydrofoil on the outboard motor at the rear of the boat impacted with the window, damaging the glass and the window frame. Based on a report from its assessor (BM), the FSP accepted liability for the damage to the window but deferred its decision regarding liability for cracking damage to the surrounding brickwork and plaster, pending a report from its engineer (FE) confirming the cause of the damage. In the interim, the FSP authorised the replacement of the damaged window, which was completed by its builder (H) in March 2015. The applicants say that the works carried out by H were not completed to an acceptable standard. In particular, they say that:  H’s failure to adequately prop the steel lintel (sup port beam) above the window prior to removing the window frame caused the lintel to deflect or sag during the repair process; and  in an attempt to accommodate the deflected lintel, the replacement window installed by H was cut down too far, resulting in a sizeable gap between the top of the window and the lintel. The applicants say this gap has been poorly filled with packing and flashing, causing the window to leak. FSP accepts certain rectification repairs are required The FSP has acknowledged that the repairs undertaken by H were not completed to an adequate standard and caused further damage to the applicants’ property. In particular, the FSP has accepted liability for the repair of additional cracking to the brickwork which occurred in the course of the window replacement works. During the course of the dispute, the FSP also accepted liability for repairing the lintel over the damaged window, based on the findings of its engineer (FE). In his report dated 31 March 2015, FE confirmed that the lintel had deflected beyond acceptable limits. FE stated that the deflection appeared to have occurred because the window uprights were (unusually) providing support to the lintel, causing the lintel to sag when the damaged window frame was removed. In May 2015, FE prepared a scope of works for the rectification of the window repairs, as well as the repair of certain additional damage which he confirmed had been caused by the initial impact of the boat in February 2015. This scope of works (which was approved by the FSP) included measures to rectify the deflection of the lintel beam above the damaged window, by jacking and propping the lintel and surrounding brickwork and installing a stiffening plate. Case No: 416682 Determination Page 4 of 9 During the internal dispute resolution (IDR) process, FE advised that he no longer considered the deflection of the lintel had been caused by the window repairs. FE based his change of position on photographs which he had not reviewed prior to providing his earlier view, and which indicated that the deflection of the lintel had occurred before the window frame was removed. However, it does not appear that the FSP has sought to amend FE’s scope of works to remove the repairs required to remedy the deflection of the lintel. In my view, it is appropriate that the FSP be required to undertake these repairs, given it had previously approved the scope of works. While the applicant has queried the effectiveness of the repair method proposed by FE, I am satisfied that it is appropriate for the lintel to be repaired in accordance with FE’s advice. FSP is required to provide replacement window The applicants say that, as part of the proposed rectification works, the FSP should be required to replace the new window which was installed by its builder (H) in March 2015. The provision of a new window is not included in the approved scope of works, which provides for the existing window to be reinstalled once the damage to the surrounding areas has been repaired. The available information confirms that the replacement window initially installed by the FSP’s builder (H) had to be returned to the manufacturer to be cut down in order to fit the available space. The applicant says H also ground down the surrounding brickwork. The applicant has provided a number of close-up photographs which clearly show the sizeable gap between the lintel and the top of the window frame, as well as the packing and flashing used to cover this gap. There is evidence of water staining to the surrounding area, which suggests that water is leaking in around the window frame. The FSP’s engineer (FE) has advised that the existing window does not need to be replaced but can be removed and reinstalled as part of the proposed rectification repairs. However, FE has confirmed that alternative packers and flashings may be required. Having carefully reviewed the information provided by the parties, I consider that, in the circumstances, the FSP should be required to replace the window as part of the rectification repairs. The initial repairs carried out by the FSP’s builder (H) were clearly inadequate to repair the damage caused by the incident in February 2015, and in fact caused further damage to the brickwork at the property. There are also ongoing water entry issues around the replacement window, either due to the window having been cut down too far and/or the area around it having been inadequately sealed. Case No: 416682 Determination Page 5 of 9 Further, given the existing window was cut down for the express purpose of accommodating the deflected lintel, I am not satisfied that the existing window will be appropriately sized once this issue has been addressed. In these circumstances, and in light of the acknowledged inadequacy of the initial repairs, I consider the FSP should be required to provide a replacement window as part of the rectification repairs, modified as necessary to accommodate the repaired lintel. The FSP is also required to rectify the damage to the property caused by water entering around the window frame. 2.2 Is the FSP required to repair the garage and rumpus room lintels? Applicants have established a prima facie claim As outlined above, the FSP accepts that the applicants’ property was damaged by the impact of the boat in February 2015. The FSP also accepts that, in addition to the damage to the front window, the impact caused cracking damage to the brickwork in a number of areas at the front of the house. The applicants say the FSP should also be liable for repairing the steel lintels located above the garage window located to one side of the front entry and the rumpus room window located to the other side. While neither of these windows were directly impacted by the boat, the applicant says that:  the deflection of the garage window occurred due to the effect of the impact; and  the deflection of the rumpus room lintel occurred due to the failure by the FSP’s builder (H) to properly support the front window lintel when he was carrying out the window repairs. Given the nature and extent of the damage caused by the impact and the poor quality of the window repairs, I am satisfied that the applicants have established a prima facie claim for the damage to the garage and rumpus room lintels. In these circumstances, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny the applicants’ claim. The FSP says it is not liable for the deflection of the garage and rumpus room lintels because this damage pre-existed the incident with the boat in February 2015 and the subsequent repairs. FSP is not liable for damage to garage and rumpus room lintels Having carefully reviewed the extensive information provided by the parties, I consider that, on the balance of probabilities, the damage to the garage and rumpus room lintels pre-existed the incident in February 2015. Case No: 416682 Determination Page 6 of 9 The FSP’s engineer (FE) measured the deflection ratios of the lintels and confirmed that these ratios remained within applicable building standards (in contrast to the lintel above the damaged front window, which was found to have deflected excessively). Further, FE advised that the nature and extent of the deflection to the lintels was not consistent with having been caused by the impact in February 2015 or the subsequent window repairs. Among other matters, FE noted that the lateral impact of the boat would not have caused the vertical deflection of the lintels. Accordingly, FE concluded that the deflections may have been present since the property was built or may have developed gradually over time, as a result of the loads applied by the surrounding building materials. FE confirmed that both the garage and rumpus room lintels remained serviceable subject to replacing the steel spacer bars over the garage lintel, which showed signs of corrosion (as is evident from the photographs included in FE’s report). I accept that, as a structural engineer, FE is appropriately qualified to determine the cause of the observed deflection of the garage and rumpus room lintels. The applicants have provided photographs of the front of the property which were taken in 2010 and 2012. However, in my view, these photographs do not clearly establish whether (and, if so, to what extent) the garage and rumpus room lintels had already deflected at this time. The applicants say the fact that FE did not note the deflection of the rumpus room lintel in the report prepared following his first inspection establishes that this damage only occurred after the impact with the boat. However, given the deflection remained within acceptable limits, I am not satisfied that FE would necessarily have included this matter in his observations of the damage, assuming it were present at the time. I acknowledge that the applicants strongly disagree with t he findings in FE’s report regarding when and how the deflection of the lintels occurred. However, the applicants have not provided any independent information which refutes FE’s findings (for example, a report from an equivalently qualified engineer). In these circumstances, I am satisfied that the deflections to the garage and rumpus room lintels pre-existed the incident in February 2015 and the subsequent repairs. Case No: 416682 Determination Page 7 of 9 2.3 Are the applicants entitled to compensation? Applicant is entitled to compensation for non-financial loss Under the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. The applicants have raised a number of concerns about the manner in which the FSP has managed their claim. Among other things, the applicants say the FSP and its contractors have:  failed to adequately address the initial poor repairs;  omitted information from their reports, altered their position on a number of occasions and failed to provide a reasonable basis for their opinions;  failed to promptly progress the claim and keep them updated during the claim process; and  lied to them and questioned their integrity. Having carefully reviewed the claim history, I agree that there are several aspects of the claim which the FSP could have handled better. During the IDR process, the FSP reversed its initial decision to accept liability for cracking damage to the brickwork in various areas of the property, which its own engineer (FE) had previously confirmed had been caused by the impact of the boat in February 2015. The FSP’s reversal of its position was based on a report obtained from a second engineer (MC) which attributed the bulk of the cracking damage to naturally occurring earth movement. The FSP subsequently departed from the findings in MC’s report. Based on the claim records, the appointment of MC appears to have been partly driven by the views of a second assessor who was appointed to the claim in mid- 2015, and who considered much of the cracking damage was likely to be pre-existing (despite FE’s earlier findings to the contrary). The involvement of an additional engineer widened the scope of the dispute and caused additional and unnecessary delays in the resolution of the claim. This further exacerbated the stress and inconvenience experienced by the applicants during the claim process. However, I am not satisfied that the available information establishes serious misconduct on the part of the FSP or its contractors (such as the deliberate falsifying of information) as asserted by the applicants. Further, I am not satisfied that the FSP was responsible for all of the delays experienced during the claim process. To some extent, the delay in resolving the claim has been due to the applicants having disputed the cause of damage to the garage and rumpus room lintels (in respect of which I have found the FSP is not liable, for the reasons outlined above). Case No: 416682 Determination Page 8 of 9 In the circumstances, I consider that an award of $1,000 as compensation for non- financial loss is appropriate. Case No: 416682 Determination Page 9 of 9 3 Supporting information 3.1 FOS approach to this determination This Determination follows the review of a recommendation issued on behalf of the Financial Ombudsman Service (FOS) on 26 February 2016. The recommendation was rejected by the applicants. This case has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only.