Home / Financial Firm (Unknown - Insurer) / Determination 415953

Determination 415953

Refusal to rebuild fire-damaged sunroom to current building requirements, and cash settlement offer

FirmFinancial Firm (Unknown - Insurer)
Decided2016-10-24
ProductGeneral Insurance · Landlord
OutcomeFor the complainant
Amount awarded—
Non-financial loss$750
Amount claimed—
SourceAFCA PDF

Summary

After a fire damaged the sunroom at the applicant's rental property, the FSP refused to rebuild it to current requirements because the sunroom was an unpermitted construction. AFCA ordered the FSP to rebuild or cash settle the sunroom at the applicant's election, excluding illegal-construction fees, and to pay $750 non-financial loss; the loss of rent claim was refused.

An insurer that elects to repair must complete the repairs under the policy, and it bears the onus of proving the extent of any exclusion for building requirements in force when the building was constructed.

Issues

Subjects and remedies

home or building damagepay claimpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 415953 Determination Page 1 of 10 Case number: 415953 20 October 2016 1 Overview 1.1 Dispute The applicant lodged a claim under her landlord insurance policy with the financial services provider (FSP) for damage caused by a fire which started in the sunroom at the rear of the property in September 2015. The FSP accepted the claim and engaged a builder to provide a scope of works for the repair of the property. However, the FSP subsequently advised that it would not repair the sunroom because planning permission had not been obtained when the sunroom was initially constructed. The FSP has offered to cash settle the applicant for the cost of rebuilding an open- sided verandah (for which planning approval) had been obtained. However, the applicant says the FSP should be required to rebuild the sunroom in compliance with current planning requirements. The applicant also seeks compensation for loss of rent suffered as a result of the FSP‟s delay in undertaking the necessary repairs. 1.2 Issues and key findings Is the FSP required to rebuild the sunroom? The FSP is required to rebuild the sunroom to comply with current building requirements. The FSP is not entitled to rely on the exclusion for non-compliance with building requirements at the time the sunroom was built, as it has not provided any information to establish the applicable building requirements at that time. However, the FSP is not liable for any additional professional fees required as a result of the sunroom being in part an illegal construction (that is, exceeding the scope of the planning permit for an open-sided verandah obtained in 1976). Is the applicant entitled to any additional amounts? The applicant is not entitled to compensation for loss of rent as she did not suffer a ny loss of rent, either due to the property being uninhabitable following the fire or the FSP‟s delay in completing the repairs. However, the applicant is entitled to compensation for non-financial loss suffered due to the manner in which the FSP handled her claim. Case No: 415953 Determination Page 2 of 10 1.3 Determination This determination is substantially in favour of the applicant. The FSP is required to, at the applicant‟s election, arrange for the rebuilding of the sunroom in compliance with current requirements or cash settle the applicant for the costs of doing so, on the terms set out in section 2.1 below (provided that the applicant will be liable for any additional professional fees as specified in section 2.1 ). In addition, the FSP is required to pay the applicant the amount of $750 as compensation for non-financial loss. Case No: 415953 Determination Page 3 of 10 2 Reasons for determination 2.1 Is the FSP required to rebuild the sunroom? Policy sets out how building claims will be settled The policy provides that the FSP will settle claims for damage to the applicant‟s property by, at its election, either arranging for the repair of the property or paying the applicant the reasonable cost of doing so. As well as damage caused by the insured event (in this case, the fire), the policy covers a range of additional costs which may be incurred in connection with the insured event, under the heading “Other cover”. The items dealt with under „Other cover‟ include rebuilding fees and the cost of meeting building regulations, subject to certain exclusions. The FSP has relied on these exclusions to argue that it is not required to rebuild the sunroom in its current form because the necessary permit was not obtained when the sunroom was built. FSP had previously agreed to replace the sunroom in its current form Following lodgement of the claim, the FSP appointed a builder (AJ) to inspect the damage and prepare a scope of works for the necessary repairs. AJ prepared a scope of works for the repair of fire-related damage to the interior of the property (other than the sunroom). However, AJ advised that he would be unable to guarantee the repairs to the sunroom because it was in poor condition and did not appear to be compliant with current building regulations. Accordingly, the FSP sought to cash settle the applicant for the cost of repairing the damage to the sunroom (estimated at $8,771). However, the applicant disputed the proposed settlement method and sought to have the FSP carry out the repairs. In an attempt to resolve the dispute, the FSP appointed a second builder (UB) who confirmed that he would be able to demolish the existing sunroom and replace it with a similar construction. The applicant signed a building contract for these repairs in March 2015, based on the scope of works prepared by UB. There was a delay of several months in undertaking the repairs, due to concerns raised by the FSP about the safety of its contractors, in light of hostility shown by the applicant‟s tenant. After the tenant was evicted in June 2015, the applicant and the FSP agreed that the repairs would commence. In July 2015, the applicant signed a new building contract based on an updated scope of works provided by UB. Case No: 415953 Determination Page 4 of 10 Proposed repairs could not be undertaken as sunroom was non-compliant Once the new building contract had been signed, the FSP‟s building surveyor (FD) sought to obtain a permit for the replacement sunroom so the works could commence. However, FD‟s attempts were unsuccessful because the proposed sunroom did not comply with current building requirements (such as the need for wall and ceiling insulation and a waterproofed concrete slab). The local council advised t hat a permit had never been obtained for the existing sunroom as a habitable room. In August 2015, the FSP advised the applicant that it was unable to rebuild the sunroom in its current form. Further, the FSP advised that it was not responsible for the costs of upgrading the structure to comply with current building requirements because a permit had not been obtained at the time of construction. The FSP offered to settle the claim by, at the applicant‟s election:  replacing the sunroom with an open-sided verandah (for which a permit could be obtained) and cash settling the applicants for the cost of any works required to enclose the verandah;  repairing the fire damage to the sunroom, subject to the applicant first undertaking the repairs necessary to bring it into compliance with current building regulations; or  cash settling the applicant for the amount of $51,824.19, based on the updated scope of works prepared by UB for the replacement of the sunroom (which did not include any costs required to bring the sunroom into compliance with current requirements). The applicant rejected the FSP‟s offer and lodged a dispute with FOS seeking reinstatement of the sunroom. Subsequent enquiries with the local council have revealed that a permit for the construction of a verandah in the same location as the sunroom was obtained by the previous owner in 1976. The permit provided for an open-sided verandah comprising an aluminium roof supported by three poles encased in concrete. The FSP now says its liability is limited to the cost of rebuilding an open-sided verandah, as provided for in the original permit (at an estimated cost of $22,563.53) based on a quotation provided by UB in May 2016. The applicant says the FSP should be required to rebuild the sunroom in compli ance with current building requirements because the cost of doing so does not exceed the maximum sum insured under the policy. However, while the FSP is liable for the fire damage to the sunroom, it is entitled to rely on the terms of the policy (including any relevant exclusions) in determining how the claim should be settled. FSP is entitled to exclude cover for professional fees relating to sunroom As outlined above, the applicant‟s policy provides cover for the repair of fire damage to the insured building, including the sunroom. Case No: 415953 Determination Page 5 of 10 However, the specific exclusions contained in the „Other cover‟ section limit the cover provided for rebuilding fees and costs incurred in complying with current building regulations. In relation to rebuilding fees, the policy provides additional cover for certain fees which a policyholder may need to pay in order to repair or rebuild their property. The categories of fees which are covered are fees for architects, engineers and surveyors, as well any additional fees required to meet the requirements of a statutory authority. However, there is no cover for any fees required to rebuild any part of the property which was an illegal construction. Based on the information provided by the local council, I am satisfied that the applicant‟s sunroom was an illegal construction, to the extent that it exceeded the scope of the planning permit obtained in 1976. Accordingly, the FSP is entitled to exclude cover for fees of the kind which would otherwise be covered under the „Rebuilding fees‟ heading of the „Other cover‟ section. However, the FSP has sought to rely on this exclusion to deny cover for any costs related to the rebuilding of the sunroom (over and above the costs of building an open-sided verandah). In my view, this is clearly inconsistent with the scope of the exclusion, having regard to the context in which it appears. The exclusion appears in a section of the policy which provides cover for certain clearly identified additional costs, over and above the general cover for damage to the property caused by an insured event. Accordingly, the exclusion does not apply to costs which are covered under o ther sections of the policy. The FSP has not referred to any general exclusion which has an equivalent effect. FSP has not established extent of additional compliance costs The „Other cover‟ section of the policy provides cover for additional costs requir ed to satisfy current building regulations when repairing or rebuilding the damaged part of the property. However, there is no cover for any costs required to meet building regulations that were already in place when the property was built (or renovated). Accordingly, in the present case, the FSP is not liable for any additional costs incurred in meeting current building regulations, to the extent that the relevant building regulations were in force when the sunroom was built (assumed to be in or around 1976). As the FSP is seeking to rely on the relevant exclusion, it bears the onus of establishing the nature and extent of any such additional costs. Case No: 415953 Determination Page 6 of 10 In its submissions, the FSP has referred to various additional measures required to ensure the sunroom complies with current building requirements (such as the costs of installing a waterproof concrete slab and insulating the room). However, the FSP has not provided any information which establishes which of these requirements were in force when the sunroom was constructed approximately forty years ago. The fact that the previous owner failed to obtain an appropriate permit for the sunroom does not of itself establish whether or not the manner in which the sunroom was constructed complied with applicable building requirements at the time. Accordingly, it is not possible to determine the extent to which the costs incurred in bringing the sunroom up to current building requirements reflect an increase in those requirements, as opposed to a failure to comply with the applicable requirements at the time the sunroom was built. FSP is liable for costs of rebuilding sunroom (less additional professional fees) As outlined above, the FSP previously offered to arrange for the rebuilding of the sunroom by its builder (UB), who entered into a building contract with the applicant in respect of the repairs. Once an insurer makes an election to repair the insured property (rather than to cash settle the policyholder for the cost of the repairs), it is generally obliged to complete the repairs in accordance with the terms of the policy. For the reasons outlined above, I have found that the FSP is not entitled to reduce its liability to reflect the additional costs incurred in bringing the sunroom up to compliance with current building standards (as the FSP has failed to establish the extent of such additional costs). However, the FSP is entitled to deny cover for any fees required to rebuild the sunroom, to the extent it is an illegal construction (that is, it exceeds the open-sided verandah for which a permit was obtained in 1976). The FSP‟s builder (UB) has estimated the cost of plans and permits for an open - sided verandah at $2,750. Accordingly, the applicant is required to bear the cost of any fees for architects, engineers and surveyors (or any fees otherwise necessary to meet the requirements of a statutory authority), to the extent those fees exceed $2,750. Accordingly, the FSP is required to, at the election of the applicant, either:  arrange for the rebuilding of the sunroom in a manner compliant with current building requirements (subject to the applicant paying the additional professional fees referred to above); or  cash settle the applicant for the cost of doing so, based on an actionable quotation provided by an appropriately qualified and experienced builder (less the additional professional fees referred to above). Case No: 415953 Determination Page 7 of 10 2.2 Is the applicant entitled to any other amounts? Policy provides cover for loss of rent where property is uninhabitable The policy provides cover for loss of rent in circumstances where the damage to the applicant‟s property caused by an insured event is such that her tenants are unable to live in it and need to move out while repairs are carried out. Cover is provided for the rent lost during the reasonable time it takes to repair the property. The applicant‟s tenant continued to live in the property for around eight months after the fire in September 2015, before being evicted by the applicant on 20 June 2015. The applicant seeks cover for loss of rent from that date onwards. However, the available information does not establish that the damage caused by the fire in the sunroom was so extensive as to make the property unable to be lived in. The builders‟ reports and photographs provided confirm that the damage was confined primarily to the affected room with the remaining damage being largely cosmetic. Further, the tenant continued to reside in the property for a significant period of time after the fire. The applicant has referred to disruption to the electricity and water supply in the period following the fire (November and December 2014). However, the applicant has not indicated that her tenant stopped paying rent during that period. In these circumstances, I am not satisfied that the applicant incurred any loss of rent as a result of the property being uninhabitable following the fire. Accordingly, she is not entitled to benefits under the policy. FSP did not unreasonably delay repairs As outlined above, the applicant‟s claim relates to loss of re nt for the period from 20 June 2015 onwards. She has provided a copy of an email from her real estate agent advising that the property was unable to be re-let until the fire damage was repaired. Accordingly, I have considered whether the FSP‟s delay in und ertaking the repairs has caused or contributed to the applicant‟s loss of rent during this period. As noted above, the initial delay in the FSP undertaking repairs occurred due to concerns about the safety of its contractors as a result of the tenant being hostile and unco-operative. The applicant says the tenant‟s attitude was caused by the delay in undertaking the repairs to the property. However, the FSP‟s first builder (AJ) commented on the hostility shown by the tenant towards the applicant during his initial inspection of the property. In these circumstances, I accept that it was reasonable for the FSP to delay the repairs until they could be carried out safely following the eviction of the tenant in June 2015. The applicant rejected the FSP‟s offer of a cash settlement, which was made in order to avoid further delay. Case No: 415953 Determination Page 8 of 10 The subsequent delays in undertaking the repairs occurred largely due to the need for the FSP to make further enquiries to determine whether the previous owner had obtained a permit for the sunroom, in order to determine its liability under the policy. In September 2015, the applicant requested that the internal repairs be progressed, pending resolution of the dispute regarding the sunroom. The FSP acted promptly to complete these repairs. In these circumstances, I do not consider that the FSP should be required to compensate the applicant for loss of rent following 20 June 2015. Applicant is entitled to compensation for non-financial loss Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. In the present case, the FSP has incorrectly applied the terms of the policy in seeking to reduce its liability for the applicant‟s claim. Further, while this dispute was being investigated by FOS, the FSP retracted the settlement offer made to the applicant in August 2015 and substituted a considerably lower offer. While the FSP says its earlier offer was made in good faith in an attempt to resolve the dispute, the offer not expressed as being in any way conditional, and was reiterated in the FSP‟s initial submissions to FOS. I consider that the applicant has suffered additional stress and inconvenience as a result of the manner in which the FSP has handled her claim. Accordingly, she is entitled to compensation of $750 for non-financial loss. Case No: 415953 Determination Page 9 of 10 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to an Ombudsman for determination, in line with the Operational Guidelines to the FOS Terms of Reference. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only. 3.2 Terms of policy Subject Terms Insured even t – fire You can make a claim if an listed event takes place and causes loss or damage to your home or contents during the policy period. Fire If loss or damage is caused by a fire. Other cover We may also provide „other cover‟ for your home or contents during the policy period. In this section, we outline any specific exclusions and conditions that apply to the „other cover‟. Rebuilding fees If a listed event causes loss or damage to your home and you need to pay certain fees to repair or rebuild your home. Covered under Buildings Insurance  the reasonable fees for architects, engineers or surveyors  any fees we agree you need to pay to meet the requirements of a statutory authority Not covered  fe es to rebui ld any part of your home which was an illegal construction … Meeting building regulations If a listed event causes loss or damage to your home and you need to meet current building regulations to repair or rebuild the part of your home that was damaged. Covered under Buildings Insurance Case No: 415953 Determination Page 10 of 10 Subject Terms  the costs to meet current building regulations to repair or rebuild the part of your home that was damaged. Not covered  costs to meet building regulations … that were already in place when your home was built, renovated or alt ered … Settlement of building claims We will choose to settle your claim for loss or damage to your home or „other cover‟ in one of the following ways:  arrange for repairers, builders or suppliers to repair or rebuild your home  …. pay you the reasonable cost to repair or rebuild your home Loss of rent for landlords If a listed event causes loss or damage to your home and we agree that your tenants can‟t live in it and need to move out so it can be repaired or rebuilt. Covered under Buildin gs Insurance  the rent you lose during the reasonable time it should take to repair or rebuild your home.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.