Summary

After a fire at the applicant's rental property, he sought the $800,000 building sum insured plus $28,600 loss of rent and other compensation. AFCA ordered the FSP to repair the property and pay loss of rent for the repair period, but rejected the full sum insured claim and compensation, while finding the liability decision was unreasonably delayed.

The policy pays the reasonable cost of repair, and the FSP's engineer and quotes showed the property could be safely repaired for far less than the sum insured, while no additional loss from the delay was established.

Issues

Subjects and remedies

home or building damagepay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 415726 Determination Page 1 of 8 Case number: 415726 3 May 2016 1 Overview 1.1 Dispute The applicant lodged a claim under his landlord insurance policy with the financial services provider (FSP) following a fire at his investment property in April 2015. The FSP investigated the claim for some time before finally accepting liability in January 2016. In the meantime, the FSP appointed contractors to assess the damage, prepare a scope of works and provide quotations for the necessary repairs. The applicant disputes the FSP’s decision that the property can be effectively repaired. He says the property needs to be completely demolished and rebuilt and seeks payment of the building sum insured ($800,000). The applicant also seeks payment for loss of rent, as well as compensation for various other financial and non-financial losses incurred during the claim process. 1.2 Issues and key findings Is the applicant entitled to payment of the full sum insured? The applicant is not entitled to payment of the full sum insured as the property can be safely and economically repaired for a significantly lower amount. Is the applicant entitled to any additional amounts? The applicant is entitled to loss of rent benefits for the period required to complete the repairs. The applicant is not entitled to any other amounts. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is not required to pay the applicant the full sum insured and is entitled to settle the claim on the basis that the property can be repaired and does not need to be completely demolished and rebuilt. The FSP is to settle the claim in accordance with the terms of the policy and the principles set out in section 2.1 below. The FSP is to pay the applicant loss of rent benefits in accordance with section 2.2 below. Case No: 415726 Determination Page 2 of 8 2 Reasons for Determination 2.1 Is the applicant entitled to payment of the full sum insured? Policy sets out how building claims will be settled The applicant’s policy provides that the FSP will settle a building claim by, at its option, paying for the reasonable cost of repairing, rebuilding or replacing the property to its condition when new (or when last renovated). The applicant’s property was insu red for a maximum building sum insured of $800,000. However, the FSP is not required to pay the applicant the full amount of the sum insured unless the cost of repairing or rebuilding his property equals or exceeds this amount. Applicant says property needs to be demolished and rebuilt Following lodgement of the claim, the FSP appointed a building consultant (S) to inspect the damage to the property and provide a scope of works for the necessary repairs. In his fire reinstatement report dated 18 May 2015, S advised that some parts of the building would require complete replacement (including the entire truss roof structure and the majority of the internal wall linings). However, S considered that other parts of the building had suffered minimal (if any) damage and could be successfully restored and re-used. Accordingly, S prepared a scope of works for the repair of the property, on the basis that components such as the concrete slab and the external face brick veneer walls could be safely and effectively re-used. The FSP’s builders (P and AB) quoted the cost of the repairs at approximately $403,303 and $408,981 respectively, based on S’s scope of works. However, the applicant was concerned that the repairs set out in S’s scope of works would not be adequate, as he considered the property was unsafe and needed to be completely demolished and rebuilt. Structural engineers have provided differing opinions After the applicant expressed concerns about the proposed repairs, the FSP appointed a structural engineer (MC) to determine whether the fire had structurally compromised the building and whether it was able to be safely repaired. In his report dated 16 July 2015, MCS concluded that the only structural damage resulting from the fire was:  damage to the timber roof structure (which needed to be replaced in its entirety); and  damage to certain wall framing timbers in the immediate vicinity of the fire (although the extent of this damage could not be confirmed until the internal wall linings were removed). Case No: 415726 Determination Page 3 of 8 MCS confirmed that neither the external face brick veneer walls nor the concrete floor slab had been structurally compromised and could be re -used (although he noted that he was unable to access the slab in the area where the fire occurred). On this basis, MC concluded that the property could be safely repaired. After reviewing the scope of works prepared by S, MC confirmed that the repairs set out in the scope of works were appropriate. The applicant disputes MC’s conclusions that the property can be safely and effectively repaired. He has provided a report from his structural engineer (XS), in which XS states that:  he had concerns about the overall stability of the building;  there was extensive fire damage to the roof truss system and wall framing, as well as extensive smoke and water damage to every room at the property;  the effect of heat on the concrete slab (including the inbuilt pipes and conduits) had not been established and the slab needed to be assessed and certified as fit for re-use once the roof and walls had been demolished; and  while some areas of the external brick walls appeared sound, the effects of heat damage were unknown and it was possible that the bricks were cracked, potentially “friable” and /or liable to lamination if reused. Further, the heat from the fire could be expected to have compromised the integrity of the cavity ties between the timber frame and the external brick veneer walls . In summary, XS concluded that, while some components of the building might be capable of being salvaged and re-used, this would be a slow and laborious process which meant that the repair of the building was likely to cost more than a complete demolition and rebuild. Available information establishes property can be safely repaired Having carefully reviewed the available information (including the engineers’ reports) , the Panel is not satisfied that the applicant’s property needs to be demolished and rebuilt in order to safely and effectively address the damage caused by the fire. As outlined above, while the FSP’s engineer (MC) advised that the property could be safely repaired, the applicant’s engineer (XS) recommended full demolition to the slab level (subject to certification of the slab for re-use). However XS’s recommendations appear to be based primarily on generally expressed concerns about possible damage to various parts of the building (such as the external brick walls), rather than any specific areas of structural damage identified during the course of his inspection. Further, XS assumed that the costs involved in the repair process would be significantly higher than for a demolition and rebuild. However, this does not appear to be the case. While the FSP’s builders have provided quotations of approximately $400,000 for the repair of the property, the quotation of $858,000 obtained by the applicant for a complete demolition and rebuild is more than double this amount. Case No: 415726 Determination Page 4 of 8 In these circumstances, the Panel considers the FSP is entitled to rely on the report provided by MC confirming the property can be safely and effectively repaired, in accordance with the scope of works prepared by S. The applicant says MC assumed that the property could be repaired (and did not need to be demolished and rebuilt) because S’s scope o f works had been prepared on that basis. However, it is clear from MC’s report that he was specifically instructed to advise as to whether the property could be successfully repaired, in light of the structural damage caused by the fire. While MC ultimately agreed with S’s findings and endorsed S’s scope of works, the Panel is satisfied that he formed his own independent opinion on this issue, based on his knowledge and experience. For the reasons outlined above, the Panel considers that the FSP is entitled to settle the claim on the basis that the property can be safely repaired and does not need to be completely demolished and rebuilt. Applicant is not entitled to payment of full sum insured As outlined above, the applicant is only entitled to payment of the maximum sum insured ($800,000) if the cost of repairing his property equals or exceeds this amount. As outlined above, the FSP’s builders have quoted amounts of just over $400,000 to carry out the repairs set out in S’s scope of works. The applicant says that the amounts quoted by the FSP’s builders are insufficient to repair the property to its condition when new. He has provided a quotation from his own builder (MJ) for $858,000 for the reinstatement of the property. However, MJ’s quotation is for a complete demolition a nd rebuild of the property, which the Panel has determined is not required for the reasons set out above. Accordingly, MJ’s quotation is not directly comparable with the quotations provided by the FSP’s builders and therefore does not establish that the am ounts quoted are inadequate to carry out the necessary works. The applicant has noted particular aspects of the scope of works and quotations which he considers are insufficient (for example, the cost of replacing the doors and French windows and the extent of electrical works required at the property). However, the Panel does not consider that the issues identified by the applicant (even if accepted as correct) would result in the total cost of the repairs exceeding the sum insured. In these circumstances, the Panel is not satisfied that the reasonable cost of repairing the fire damage to the property exceeds the building sum insured of $800,000. Accordingly, the applicant is not entitled to payment of this amount. Case No: 415726 Determination Page 5 of 8 FSP is to settle claim in accordance with terms of policy In accordance with the terms of the policy, the FSP is to settle the applicant’s claim by paying the reasonable cost of repairing the property (either by appointing its builder to undertake the necessary repairs or by paying the applicant the reasonable cost of doing so). In its submissions to FOS, the FSP has confirmed that it authorised repairs to the applicant’s property to commence in August 2015 (subject to a final decision on liability being reached). Accordingly, the FSP should proceed with the repair of the property on this basis (unless both the applicant and the FSP agree that the claim should be cash settled instead). If the FSP decides to repair the property, it is entitled to do so in accordance with S’s scope of works, subject to reviewing any specific concerns raised by the applicant about any items which may have been omitted from the scope of works. It appears these matters have not been addressed to date, pending resolution of the threshold issues raised by the current dispute. In this event, the FSP will be responsible for repairing the property to its condition when new, and will be required to ensure that the repairs are carried out to an appropriate standard. Any costs associated with doing so will be borne by the FSP. The reports provided by the various contractors indicate that additional works (in addition to those set out in S’s scope of works) may be required to restore the property to its condition prior to the fire. This is not unusual in cases of fire, whe re additional, unseen damage may become apparent during the course of the repairs. For example, the contractors’ reports obtained by the parties confirm that the extent of damage to the timber wall framing cannot be confirmed until the internal wall linings have been removed. If the FSP appoints its builder to undertake the necessary repairs, the FSP will be responsible for the costs of repairing any additional, unseen damage which is identified during the repair process. Alternatively, if the claim is cash settled, the cash settlement amount must be based on the reasonable cost of the repairs. In the circumstances, the Panel is not satisfied that the quotes obtained from the FSP’s builders to date necessarily reflect the reasonable cost of the repairs. In this regard, the Panel notes that the quotations:  were obtained in mid-2015 and therefore are unlikely to reflect current prices;  were provided by builders sourced from the FSP’s panel and are therefore likely to reflect discounts and rebates which are only available to the FSP; and  include only limited provision for any additional damage which may become apparent during the repair process. Accordingly, if the FSP cash settles the claim, it should do so based on updated arm ’s length quotations which include reasonable provision for any additional, unidentified damage. Case No: 415726 Determination Page 6 of 8 2.2 Is the applicant entitled to any additional amounts? Applicant is entitled to loss of rent during repair process The applicant seeks payment for loss of rent totalling $28,600 in respect of the 12 month period since the fire on 3 April 2015 (being the maximum period for which benefits are payable under the policy). Where the property becomes unfit to live in following an insured event, the policy provides cover for the actual rent which the applicant “lost or would have lost” up to the time the property is repaired, provided that the property was leased out or the applicant can show that he would have leased it out. The property was vacant at the time of the fire. The applicant had evicted the previous tenants in or around March 2015 and was renovating the property when the fire occurred. As, the property was vacant at the time of the fire, the applicant has not lost any rent in respect of the period immediately after the fire. The FSP’s investigators reported that the applicant had advised them that he was intending to sell the property once the renovations had been completed. However, the applicant denies this and says he was intending to re -tenant the property. Given the policy provides cover for rent which the applicant “would have lost”, the Panel considers it is fair in the circumstances that the FSP pay the applicant loss of rent benefits for the period required to complete the necessary repairs. The applicant has clearly lost the ability to generate income from the property during this time. In the event that the FSP authorises its builder to carry out the repairs, the FSP will be required to pay the applicant loss of rent benefits for the actual period it takes to complete the repairs. In the event that the parties agree to cash settle the claim, the FSP will be required to pay the applicant loss of rent benefits for the estimated period required to complete the repairs (as determined by the FSP’s builder). In either case, loss of rent benefits are to be calculated at the rate paid by the previous tenants, subject to the applicant providing reasonable evidence of this amount. Applicant is not entitled to reimbursement of legal fees The applicant seeks reimbursement for legal costs incurred during the course of this dispute. Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial services provider to contribute to legal costs incurred by an applicant in the course of their dispute. However, the FOS process is designed to be accessible to applicants without legal representation. Accordingly, FOS will not generally require a financial services provider to contribute to an a pplicant’s legal costs, unless the dispute is particularly complex or raises specific legal issues. Case No: 415726 Determination Page 7 of 8 Further, a financial services provider will generally not be required to contribute more than $3,000 to an applicant’s legal costs unless exceptional circu mstances apply. In the present case, the Panel does not consider that the issues in dispute were so complex as to require the involvement of a lawyer. Accordingly, the FSP is not required to reimburse the applicant for fees paid to his lawyer. Applicant is not entitled to compensation The applicant says the FSP unreasonably delayed its decision to accept liability for his claim and seeks compensation for financial and non-financial losses suffered as a result. In particular, the applicant says he has incurred additional interest costs on the loan used to finance the property, as he was unable to earn any rental income while the property remained unrepaired. The FSP referred the claim to an external investigator shortly after lodgement in April 2015 but did not finalise its investigations and decide to accept liability until January 2016 (after the applicant had lodged his dispute with FOS). The FSP says it deferred its decision on liability due to a continuing police investigation but has not provided any information to support this. The applicant says the police ceased investigating the fire some time earlier. There appears to be little basis to justify the extended time taken by the FSP to determine its liability for the claim, given the results of its protracted investigations. However, the Panel does not consider that the applicant has suffered any additional loss as a result of the time taken by the FSP to accept liability for the claim. As outlined above, the FSP took appropriate steps to ensure that it would be ready to settle the claim in the event that a decision to accept liability was made (by appointing contractors to assess the damage and prepare a scope of works for the necessary repairs). The applicant advised the FSP in August 2015 that he did not accept the basis on which the FSP proposed to settle the claim (that is, on the basis of a repair rather than a rebuild). He has consistently maintained this position. Accordingly, even if the FSP had decided to accept the claim at this time, the claim would not have been settled any earlier and the property would have remained unrepaired. Accordingly, the applicant is not entitled to compensation for financial or non-financial losses arising out of the FSP’s claims handling. Case No: 415726 Determination Page 8 of 8 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation or preliminary view. Due to the nature of the dispute, it has been referred directly to a Panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. During the course of this dispute, the applicant has been represented by his lawyer. For the purposes of this determination, submissions made by the applicant’s lawyer have been treated as if they had been made by the applicant himself.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.