Text of the determination
Determination
Case No: 415598 Determination Page 1 of 13
Case number: 415598 19 October 2016
1 Overview
1.1 Dispute
The applicant holds a home and contents insurance policy with the FSP. The
applicant’s home and contents were damaged in a storm on 25 April 2015.
Various payments and offers have been made to the applicant by the FSP for storm
damage to the building and contents. The FSP says the offers are made on the basis
of the available evidence which establishes most of the damage claimed was caused
by excluded events and taking into account the policy limits for contents at the time of
the loss was $43,680.The applicant says the payments and offers made are
inadequate. The applicant acknowledges the contents cover at the time of the loss
was $43,680 but says this was because of an error b y the FSP’s branch staff, and it
should have been at least $140,000. She also says her expert builder supports her
claim the damage was caused by the storm event.
1.2 Issues and key findings
Is the FSP’s offer for damag e to the building reasonable?
The FSP’s offer of $27,940 for damage to the building is not reasonable.
The preponderance of expert opinion is that most of the damage to the building was
caused by gradual deterioration, wear and tear, faulty design or workmanship or
previous damage that had not been properly repaired. These are causes which are
excluded from cover.
However, the expert opinion has also established that the storm cracked the glass
over the rear of the building and damaged the iron roof and two skylights over the
rear ensuite. The expert opinion establishes this damage was probably caused by
hail in the storm or by attempts by the applicant to mitigate this storm damage.
Is the FSP’s offer for damage to the contents reasonable ?
The FSP’s basi s for its offer is correct as the certificates of insurance clearly state the
sums insured for contents were $40,000 in the 2013-2014 policy year and $43,680 in
the 2014-2015 policy year. Noting the policy safety net, the maximum amount
payable on the claim for damaged contents at the time of the loss was $54,600.
Taking into account the policy excess of $5,000 and earlier payments made to the
applicant, the FSP’s contents offer is reasonable and in accordance with policy terms
and conditions at the time of the loss.
Case No: 415598 Determination Page 2 of 13
Is the applicant entitled to other costs claimed?
Noting FOS’s Terms of Reference, and that some reports were useful in
understanding the dispute, it is fair in the circumstances for the FSP to contribute to
the expert professional costs of the applicant’s builder and electrician. This is subject
to the applicant producing proof of payment or invoices to the FSP. Other amounts
claimed are either repair costs or do not warrant an award of compensation.
Is the applicant entitled to compensation?
It is fair in all the circumstances the FSP pay the applicant $1,000 compensation as
the FSP has paid insufficient attention to the many elements and details of this claim
leading to inaccuracies in offers made and contentions proffered. In the
circumstance s of this dispute, the FSP’s conduct and claims handling has contributed
to the time taken to resolve the matter and has interfered with the applicant’s
expectation of enjoyment or peace of mind.
1.3 Determination
This determination is partly in favour of the applicant.
Should the applicant accept this determination then within 14 days of acceptance of
the determination the FSP is to:
pay to (or on behalf of) the applicant $27,940 being the amount it originally
offered for damage to the building
repair or pay the reasonable cost of repairs to the two skylights over the ensuite
and the cracks in the glass roof over the rear of the building
repair or pay the reasonable cost of repairs to recoat or repaint the corrugated
roof sheets to provide an adequate protective coating
re-inspect the property to ascertain damage (if any) caused to the interior of the
property from water which may have leaked through the cracks in the glass roof
over the rear of the building and the ensuite skylights since the storm event in
April 2015 and forthwith indemnify the applicant for further damage (if any)
pay to the applicant $46,306 for the contents claim (assuming the policy excess
of $5,000 is deducted from this payment)
pay the applicant $1,550 for expert reports (subject to proof of payment or
invoices from the applicant)
pay the applicant $330 for the electrician’s make safe
pay the applicant $1,000 compensation
In relation to cash settlements of the claim, the FSP is to pay statutory interest as
follows:
on the building claim from 21 July 2016 until date of payment
on $1,550 and $330 from the date of payment of these amounts by the
applicant until the date of reimbursement by the FSP
The FSP is entitled to deduct $5,000 excess from the first cash settlement.
Case No: 415598 Determination Page 3 of 13
2 Reasons for determination
2.1 Is the FSP’s offer for damage to the building reasonable?
FSP offered $27,940 for damage to the building
By letter dated 21 July 2016, the FSP wrote to the applicant advising it intended to
cash settle the claim after her home was damaged in the incident on 25 April 2015.
The settlement amount offered was $27,940.
The FSP’s policy provides cover for certain listed events including storm. In addition,
because of the type of policy held by the applicant, the FSP’s policy automaticall y
covers the applicant for accidental damage.
Accidental damage covers an insured for:
“Mishaps around the home that are caused unintentionally.”
Under accidental damage cover, damage caused by inherent and structural defects
is not covered; these are also exclusions applying to the listed event of storm.
Whether damage caused by accident or storm, policy exclusions apply
Whether the damage claimed is accidental damage or storm damage, certain
exclusions apply to all cover under the policy. Specifically, the policy does not cover
loss or damage arising from gradual deterioration, wear and tear, faulty design or
workmanship or previous damage that has not been repaired.
The applicant contends every qualified building professional who has viewed the
property agrees the damage outlined in various reports was caused by the hailstorm
in April 2015.
She says the only exception is the FSP’s builder (M) who attended five months after
the incident. The applicant submits roofers have not advised of any problems with the
roof save that the box gutters could be wider. To make the box gutters wider, she
says she would need to rebuild the whole roof. In these circumstances, she kept the
gutters clear (she cleaned them every two weeks and on the day of the storm), made
regular inspections, and resealed if necessary. After the storm event, the box gutters
leaked in one spot.
She submits the intensity of the storm was too much for any roof to take and hail
blocked the gutters. In statutory declarations about the claim, she describes torrential
rain and hail which piled up on the corrugated iron and tile roofs blocking the gutters.
She claims water had never entered the property like this before this event. She
admits she had prior water entry through the chimney and box gutters but had kept
this controlled by clearing the gutters regularly.
She also notes the roof was constructed before she purchased the property, and was
constructed with council’s approval and from the design of an engineer and architect.
She claims damage to the corrugated iron roof, flashing, box gutters, chimney and
chipped tiles. She says the skylights, barrel vault and glass conservatory roof were
Case No: 415598 Determination Page 4 of 13
damaged by hail stones although she admits there was a small crack in the skylight
prior to the storm event. She also claims numerous small cracks and chips on some
other glass panels. She says this damage and damage to windowpanes was
confirmed by the glazier E as emanating from the storm event.
The applicant also claims internal damage and mould damage.
Comprehensive reports provided by the applicant’s builder and FSP’s builder
The applicant has provided reports which attribute damage to the hailstorm but they
contain very little detail as to how these conclusions are reached. In these
circumstances, the panel finds the bare conclusions in the reports insufficiently
persuasive.
The panel considers the more persuasive evidence about the cause of damage is
provided by the FSP’s builder M and the applicant’s builder D. Both reports provide a
comprehensive description and photographs of the damage and the building.
The FSP’s builder M inspected the building and took numerous photographs on 7
and 9 September 2015. M concluded the rain water permeation and subsequent
damage to the inside of the house in the hall, kitchen, sunroom, bathroom and
laundry is due to:
“A n inadequate box gutter, inadequate metal roof covering system with gaps,
inadequate roof flashing system and external masonry wall surface (outside the
kitchen) …”
The damage to the rear bedroom and ensuite has similar causes save for the
absence of an inadequate box gutter.
He also says the design does not comply with Australian Standards and good
building practice and the rain water permeation has been an ongoing issue and did
not only occur in the storm claim event. For example, he said the damage to the
timber skirtings and kitchen cupboards had been ongoing for a very long time.
M reported the cracked roof sheets to the barrel vaulted roof of the hall is due to
some form of impact damage, inadequate access for foot traffic, but was not caused
by hail. He draws the same conclusion in relation to the cracked glass panels to the
sunroom extension.
As for the rain water permeation to the ceiling lining of the passage immediately
below th e “Widows Walk”, M says this is due to an inadequate pitched flat roof and
roof sheet joints with gaps to the flat roof. He says this flawed design also does not
comply with Australian Standards and good building practice.
M took moisture content readings of the floor and wall surfaces to various rooms at
the front of the house which returned nil moisture content at the time of inspection.
He noted no storm created openings evident in the roof planes.
M concluded any reinstatement to ceiling linings, painting, and electrical systems
should only be conducted after adequate reinstatement of the box gutters, roof
coverings, the various flashing systems, and the rainwater discharge system so they
comply with applicable Australian Standards and good building practice.
Case No: 415598 Determination Page 5 of 13
The FSP referred M’s report to its assessor who assessed the reinstatement costs
scoped by M at $27,940 and made its offer to the applicant accordingly.
The panel has considered carefully the annotated photographs attached to M’s
report. The panel co nsiders the photographs (in the main) support M’s opinion.
The applicant’s builder’s report is in broad agreement with the FSP’s report
The applicant arranged for her own expert builder (D) to provide an opinion.
D inspected the property on 6 October 2015. D also provided a comprehensive report
and photographs. However, the panel is not persuaded the report supports the bulk
of the applicant’s contentions.
Specifically, D says the electrical appliances and clothesline damage are not
consistent with hail damage. He says he has insufficient expertise to comment on the
damaged security and fresh air system.
As for the damage to the kitchen and chimney, he describes this as a maintenance
issue and notes the kitchen is in an overall aged condition.
Although D says the roof tiles in the area of the Widows Walk are in generally sound
condition, he describes evidence of repair attempts to prevent water entry.
Importantly, the panel notes D agrees with M when he says:
“ An inspection of the roof above (the rear hallway) revealed that a standard sized quad
gutter has been installed between the dome roof and the roof of the bathroom area and
then continues to an external gutter. A quad gutter is designed as an external gutter to
a building and is not intended as a box gutter or a gutter to carry a volume of water.
This, in our opinion, is incorrect construction and does not allow for a build-up of hail or
water and under extreme conditions has allowed water entry. This is the cause of the
majority of the water damage… . ”
As for damage to the front veranda, D attributed tree roots to be a major contributing
factor to remedial works required there.
Further, in relation to mould in the bathroom and ensuite, D says this is typical for
bathroom areas and is not as a result of water entry. D also inspected the rear
bedroom and noted the report regarding mould. D says dampness in the bedroom is
caused by inadequate floor construction as described and not by hail damage.
As for the dome vaulted roofing over the rear hallway, D said it showed typical signs
of crazing due to age throughout all panels which is not as a result of hail damage. D
noted two star pattern cracks but could not determine if the cracks were as a result of
hail damage or not.
Builders’ reports establish most of the damage arose from excluded causes
Having considered the comprehensive reports and photographs from M and D, while
the panel accepts hail may have built up on the roof and in the gutters, nonetheless,
the panel is satisfied the expert reports establish the bulk of the claimed loss and
damage arose from excluded causes.
Case No: 415598 Determination Page 6 of 13
The panel is satisfied, on the balance of probabilities, the bulk of the claimed damage
to the building was caused by faulty design or workmanship, wear and tear, and
failure to maintain the home in good repair which causes of damage are excluded
from cover.
While the panel accepts the 2012 Fair Trading report shows some repairs were
undertaken to the property, nonetheless, both reports from D and M establish to the
panel’s satisfaction that repairs, if any, were inadequate.
Storm damage was caused to the iron roof, skylights and the glass roof
However, the panel considers D supports the applicant in regard to some matters.
The panel notes D reports there was no hail damage to the roof over the rear lounge,
kitchen and rear bedroom and ensuite but describes “ surface scratching to the
roofing material” which D says is as a result of the applicant mitigating damage due
to water entry in the storm. In her first statutory declaration, the applicant says hail on
the roof and gutters was cleared using shovels and trowels.
D recommends the corrugated roof sheets be recoated or repainted to provide an
adequate protective coating.
The applicant arranged for a heritage adviser and builder (AM) to inspect the
property in May 2015. AM also noted dents in the corrugated iron roof due to foot
traffic when removing hail and scraping the roof.
M notes parts of the metal roof covering was damaged by inadequate access for foot
traffic. He says the flashing and roof covering were not damaged by hail and the
serviceability of the metal surface has not been compromised.
The panel accepts there is no significant hail damage to the corrugated iron roof.
However, in circumstances where the iron roof was damaged when removing hail,
the panel is satisfied it is fair in all circumstances the FSP indemnify the applicant to
recoat or repaint the corrugated roof sheets as recommended by D.
D also inspected two skylights above the rear ensuite and noted cracks and damage
to external corners consistent with hail impact. He says the skylights require
replacement. In recent correspondence, the applicant mentioned the roofer had
made the skylights safe but it is not known what work was done in this regard or the
cost of the work.
The photographic evidence provided by D and M is contradictory. D has provided a
photograph which shows a large crack in a corner of a skylight. The photographs of
the skylights provided by M show no cracks in the skylights .
However, in his report, earlier in time, AM noted fresh cracks in the skylights caused
by hail.
On the information provided, the panel accepts the preponderance of the evidence is
the claimed cracks in the skylight were probably caused by hail. The panel considers
it fair in all the circumstances the FSP indemnify the applicant and replace the
skylights.
Case No: 415598 Determination Page 7 of 13
D also says the cracked glass over the rear of the building requires replacement. D
describes this damage as a star impact crack caused by hail impact and storm
damage. M says the cracked glass panels were not damaged by hail. AM made no
comment regarding these glass panels.
Photographs provided by both D and M show the glass sunroof is cracked in places.
The panel has reviewed the photographs and considers it is improbable this damage
was caused by foot traffic as it is unlikely people would walk on a glass roof. From
the information provided, the panel is satisfied on the balance of probabilities the
cracked glass over the rear of the building was caused by hail.
The applicant has provided quotations from EG dated 25 May 2015 and 29 February
2016. However, the material provided does not establish with sufficient certainty the
costs to replace the two skylights over the rear ensuite and replace the cracked glass
over the rear of the building.
In January 2016, the applicant advised the FSP water had leaked through the glass
roof and the skylights. The FSP is to reinspect the property to ascertain damage (if
any) caused to the interior of the property from water which has leaked through the
glass roof at the rear of the building and the two skylights since the storm event in
April 2015. The panel considers it is fair in all the circumstances the FSP indemnify
the applicant for this further damage (if any).
FSP to undertake repairs or pay the reasonable cost of repairs
The FSP’s policy provides if it agrees to cover a claim under building insurance then
it will choose to settle the claim by arranging for the home to be repaired or paying
the reasonable cost to repair the home.
Should the applicant accept this determination, then within seven days of
acceptance, the FSP is to choose how it will settle the claim and forthwith make the
necessary arrangements to undertake repairs or pay the reasonable cost of repairs.
It remains necessary for the amount of any cash settlement to be agreed. The panel
encourages the parties to this dispute to resolve any issues which might arise
regarding repairs or the cost of repairs. However, the parties can return to FOS if
they are unable to resolve any issues arising from repairs and/or the cost of repairs.
This issue is of course separate from and in addition to the FSP’s offer, already
made, to settle the applicant in the cash amount of $27,940 for building damage.
Although the applicant complains of damage caused by mould and the failure of the
barrel vault roof tarpaulin, on the information provided, the panel is not satisfied the
FSP is obliged to indemnify the applicant for these claims. This is because the
information provided does not establish the mould damage has been caused by an
insured event. Further, as the panel is satisfied the FSP is not liable for the damage
to the barrel vault roof, it follows the FSP is also not liable for the claimed failure of
the tarpaulin.
Case No: 415598 Determination Page 8 of 13
2.2 Is the FSP’s offer for damage to contents reasonable?
$46,306 has been offered by the FSP
By letter dated 25 July 2016, the FSP sent a cheque to the applicant for $46,306 to
settle the contents claim. The FSP says the offer took into account the maximum
amount payable on the claim of $54,600, the excess of $5,000 and earlier payments
made to the applicant of $375 for a knife block and $2,919 for David Jones gift cards
to replace some contents.
The applicant initially claimed $117,024. Earlier this year, in correspondence with
FOS, the applicant advised the total amount claimed for contents was up to
$178,757.
Applicant says the sum insured should be at least $140,000
The applicant says the contents sum insured was not $43,680 but should be at least
$140,000 plus the usual yearly increase plus the safety net allowed in the policy.
She says the FSP made a mistake about the contents cover when the policy re-
commenced in late 2013. The building cover was increased and the contents cover
should also have been increased to $140,000 as the cover the year before was
$129,384. She says the attendance with the FSP in late 2013 was lengthy as she
reassessed her insurance needs. At that time, the applicant says she did not notice
the contents cover was dropped to $40,000 because she was upset and stressed. A
year later, upon renewal, again she did not notice the sum insured for contents was
$43,680. She says she simply looked at the amount due to be paid and paid it.
She says she suffers from a mental condition and stress and submits material in
support from her treating psychologist.
In correspondence with FOS she says she did a quote online on the FSP’s website
earlier this year and its system showed a minimum insurable amount of $69,500 for
contents. She says the maximum the system would allow for contents was $208,500.
Nonetheless, she points out the FSP accepted insurance for amounts both below
and above these amounts.
The applicant contends the amount for which she insured her contents was always
based on the FSP’s advice, its contents calculator and the policy’s automatic yearly
increments. She says the only time she decreased cover was when she was
overseas in 2009.
The applicant also says there are errors and inconsistencies in the certificates of
insurance and other material submitted by the FSP. She says this supports her
contention the FSP made a mistake about the amount of the contents sum insured.
FSP says claim settled in accordance with policy terms
At the time of the claim, the FSP says the policy limit for contents was $43,680.
Taking into account the safety net, it says the maximum payment of $54,600 has
been made on the contents claim.
Case No: 415598 Determination Page 9 of 13
It submits there is no evidence an error in the sum i nsured was recorded when the
applicant incepted the policy in the branch on 12 December 2013. It says the
certificate of insurance, product disclosure statement (PDS) and policy booklet were
handed to the applicant when the policy commenced in the branch o ffice of the FSP.
And it says the applicant was again sent a certificate of insurance on renewal of the
policy in November 2014.
The FSP contends the 2013-2014 certificate of insurance clearly noted the contents
sum insured was $40,000. And the 2014-2015 certificate of insurance clearly noted
the contents sum insured was $43,680. It says it provided instructions should the
applicant wish to change these details but the applicant did not contact the FSP to
make any changes after receiving the insurance documents in 2013 and in 2014. It
also says the applicant has previously reduced the contents sum insured.
The FSP denies inconsistencies or errors in the sum insured. It says inconsistencies
noted by the applicant are due to the applicant referring to “amendment documents”
which were sent after the applicant made changes to the policy.
Certificates of insurance shows contents sum insured is $40,000 and $43,680
The renewal letter from the FSP to the applicant dated 22 September 2013 shows
the due date was 27 October 2013, the sum insured for contents was $135,853 and
the excess for buildings and contents $500 each. Apparently the policy lapsed as a
premium instalment was not paid in time.
The cover with the FSP recommenced on 12 December 2013. The material p rovided
by both parties shows that while the policy summary included an increased sum for
buildings cover, that contents cover was only $40,000. Premium of $1,980.52 was
due to be paid by 2 January 2014. The receipt provided by the applicant shows the
premium was paid on 27 December 2013.
The material provided also includes a letter from the FSP to the applicant dated 9
November 2014. The letter invited renewal of the home buildings and contents policy.
The applicant was invited to check the details on the policy document and call or go
online to renew the policy. The premium was due 12 December 2014. Payment of
premium was made by the applicant on 18 November 2014.
Attached to the letter was the 2014 - 2015 certificate of insurance. The certificate of
insurance show the contents sum insured was $43,680. The certificate also says:
“ Sum insured
Each year we increase your sum insured to take into account rising building costs and
the increased prices for replacing household contents. Please check that the amounts
below cover the replacement value of your home and all of your contents. Visit
(FSP).com.au/calculators for assistance.
Buildings $1,338,750
Contents $43,680
General Contents $43,680. ”
Case No: 415598 Determination Page 10 of 13
Applicant had time to carefully check insurance documentation
FOS asked the FSP to provide the branch notes/policy notes for the 2013-2014
policy regarding the applicant’s instructions to reduce the sum insured. The FSP
advised no notes were found. Accordingly, there is no other material to corroborate
what happened when the policy re-commenced in December 2013.
The applicant does not deny receiving the certificates of insurance and policy
documents in December 2013 and again when the policy was renewed for the 2014 -
2015 year. The material provided by her shows receipts for payments of the premium
in both years attached to the certificates.
The panel notes the parties’ submissions regarding the FSP’s online quote system
and the errors and inconsistencies in material submitted by the FSP. The panel
accepts it is more likely than not the applicant wanted greater cover for contents in
view of the amount of cover in the immediate preceding years. Nonetheless,
whatever the reason for the sum insured for contents being noted at $40,000 and
$43,680 on the certificates, it is not in dispute the applicant received both certificates
of insurance. Further, both certificates clearly noted the contents sum insured. And
both certificates invited the applicant to check the amounts in relation to cover for
contents.
The panel has con sidered carefully the supporting letter from the applicant’s
psychologists. They report the applicant has suffered ill health and has been under
significant stress for several years which results in poor concentration and memory.
They explain in her stressed state the applicant had not picked up the change from
$140,000 to $40,000. They say when an individual is under extreme stress, then
focus on close detail is challenging and it is understandable the applicant did not
attend to the finer detail and pick up the incongruities.
The panel accepts the challenges facing the applicant. Nonetheless, the panel also
accepts an insured must carefully check insurance documentation to ensure the
documents are correct and complete. The attendance at the FSP’s branch was in
December 2013. The policy was renewed in November 2014. The storm event was
not until 25 April 2015. Even accepting the applicant’s challenges, because of her
stressed state, the panel considers there was ample and adequate time to carefully
check the insurance documentation to ensure the contents sum insured was correct.
Although acknowledging the applicant’s situation, the panel is satisfied the contents
sum insured at the time of the insured event was $43,680. Taking into account the
safety net allowance in the policy, the panel is satisfied the maximum amount
payable on a contents claim at the time of the insured event was $54,600.
The FSP has made a number of payments to the applicant in relation to the contents
claim. Taking into account those payments and the policy excess of $5,000, the
panel is satisfied the FSP’s offer of $46,306 is reasonable and in accordance with the
policy terms and conditions at the time of the loss.
Case No: 415598 Determination Page 11 of 13
If both building and contents claims, insured pays the higher excess
The 2014-2015 certificate of insurance sets out the basic excess for buildings at
$5,000 and contents at $500. The certificate makes it clear if an insured makes a
claim for loss or damage under both building and contents insurance, an insured
pays only one excess whichever is the highest.
As there have been claims for both contents and buildings, pursuant to the policy
terms and conditions, the FSP is entitled to apply one excess of $5,000 to the claims.
On the information provided, and for the reasons stated, the panel is satisfied the
remainder of the amount payable to the applicant for the contents claim is $46,306
which takes into account the policy excess payable of $5,000.
2.3 Is the applicant entitled to other costs claimed?
Fair in all the circumstances the FSP contribute to report costs of $1,550
The applicant claims $3,898.60 costs in the dispute as follows:
D’s building report $1,230
Electrician’s report $320
Ventilation system report and repair $1,797
Skylight silicon repair $110
Postage printing and USB cost $111.60
Emergency electrician call out on the day after the hailstorm $330
The FSP has not commented on this aspect of the claim.
Paragraph 9.4 of FOS’s Terms of Reference say FOS may decide the FSP contribute
to professional costs incurred by an applicant in the course of a dispute. Unless
exceptional circumstances apply, FOS will not require the FSP to contribute more
than $3,000 to these costs.
The panel found both reports from the electrician and D useful in the understanding
of this dispute. Further, the panel considers it is fair for the FSP to contribute to
expert professional costs which have assisted the applicant in some part to establish
her claim.
Therefore, the panel is satisfied it is fair in all the circumstances the FSP pay to the
applicant $1,230 and $320 for the reports.
Further, the FSP is to pay the applicant statutory interest on the said amounts from
the date the applicant incurred the report fees until the date the FSP reimburses the
applicant.
The FSP has now agreed with FOS to indemnify the applicant for the emergency
electrician call out on the day after the hailstorm in the sum of $330.
It is not the practice of FOS to allow for postage costs etc. and these amounts are not
payable by the FSP.
Case No: 415598 Determination Page 12 of 13
The other amounts claimed are either repair costs which have been dealt with earlier
in this determination or do not warrant an award of compensation as they have not
assisted the applicant to establish her case.
2.4 Is the applicant entitled to compensation?
Compensation is paid in certain circumstances
The Terms of Reference also allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the a pplicant’s expectation of
enjoyment or peace of mind.
The panel considers the FSP has paid insufficient attention to the many elements
and details of this claim leading to inaccuracies in offers made and contentions
proffered. In the circumstances of this dispute, the panel considers the FSP’s
conduct has contributed to the time taken to resolve the matter and has interfered
with the applican t’s expectation of enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss. However,
the panel is satisfied it is fair in all the circumstances the FSP pay to the applicant
$1,000 compensation for non-financial loss.
Case No: 415598 Determination Page 13 of 13
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
The determination is made by a panel consisting of the ombudsman together with an
industry representative who has extensive experience in consumer claims and an
industry representative who has had extensive experience in the insurance industry.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law an insured bears the onus to
establish on the balance of probabilities they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities an
exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
P olicy extracts are referred to in the FSP’s Notice of Response received 28 October
2015. Both the policy and the Notice have been exchanged with the applicant.
3.3 Other relevant material considered and relied on
Parties’ submissions, letters, emails, photographs, videos, statutory
declarations, reports, quotes, invoices and all attachments to all submissions,
letters, and emails from the parties
Certificates of Insurance (various)
Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.