Determination 415553

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2016-01-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$7,500
SourceAFCA PDF

Summary

The applicant claimed for storm damage to a home, and the FSP accepted and offered $8,870.18 for storm-related damage but declined the upper veranda floor tiles. AFCA found the tile damage was caused by excluded factors, so the FSP was not required to cover it.

Consultant evidence established the tile damage resulted from defective installation, deterioration and absence of a membrane, which the policy excludes.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 415553 Determination Page 1 of 4 Case number: 415553 7 January 201 6 1 Overview 1.1 Dispute The Applicant held a home building insurance policy (the policy) with the Financial Services Provider (FSP). A claim was lodged for storm damage to the insured property which has been accepted by the FSP to the extent of damage it assessed to be storm related. The Applicant remains dissatisfied with the extent of liability accepted by the FSP under the claim. The Applicant in disputing the FSP’s decision has sought the assistance of ‘J’. Both the Applicant and J will be referred to as ‘the Applicant’ for the purpose of the Determination. 1.2 Issues and key findings Is the FSP obliged to cover the damage veranda tiles under the claim? The FSP is not obliged to cover the damage to the veranda floor tiles under the claim. The available information establishes this damage was not related to the storm giving rise to the claim. Rather, the damage is due to circumstances excluded from cover under the policy. 1.3 Determination This Determination is in favour of the FSP. The FSP is not required to cover the Applicant for the cost to repair/replace the damaged veranda floor tiles. Case No: 415553 Determination Page 2 of 4 2 Reasons for Determination I note this dispute has been subject of a preliminary view provided to the parties by FOS. I note during the course of the preliminary view a majority of the concerns raised by the Applicant were resolved and no longer form part of this dispute. The only outstanding issue relates to the FSP’s deci sion to exclude cover for the damaged upstairs veranda floor tiles. Accordingly, consideration under the Determination will be limited to this aspect of the Applicant’s dispute lodged with FOS. 2.1 Is the FSP obliged to cover the damage to the veranda floor tiles? The damage to the floor tiles was not due to the event giving rise to the claim The policy covers the insured property for loss or damage arising from the listed insured events. Cover however is subject to the specified policy limitations and exclusions. Storm is one of the listed insured events and it is not in dispute the insured property did suffer damage due to a significant storm, establishing a valid claim. Further, it is also not in dispute the FSP has accepted the Applicant’s claim for storm damage and a settlement in the amount of $8,870.18 was offered to the Applicant for damage the FSP assessed to be storm related. The only component of the Applicant’s claim that remains in dispute is the cost to repair/replace the floor tiles to the upper veranda. The parties have both obtained and rely upon reports made available by the various consultants appointed to the claim. These reports have bee n referred to in greater detail within Section 3 of this Determination. Consultants ’ reports establish loss due to factors excluded from cover I have carefully considered the available consultants’ reports. I find the detailed assessment report submitted by ‘IT’ to be the more comprehensive and compelling . I note this report is based on a comprehensive assessment of the tiled flooring in question. IT concludes the damage to the tiled area was not due to the storm giving rise to the claim. Rather, IT states the damage was due to a combination of factors including defective installation (inadequate adhesive, laid straight to sheeting), differential movement and an absence of intermediate movement joints and waterproof membrane. The consultant ‘SE’ appointed to the claim by the Applicant in its report also confirms a contributing factor for the damage is movement and the fact the tiles had been laid directly on top of the floor sheeting using glue (adhesive). SE in its report also refers to the recommended manner in which the tiles would need to be installed including the requirement of a sand and cement bed and a waterproof membrane. Case No: 415553 Determination Page 3 of 4 I acknowledge consultants ‘MG’ in its report does provide comment supporting water damage to the tiles area. However, in saying that MG has also made reference to and noted concerns with the manner in which the tiles had been installed. Accordingly, in the absence of substantiating evidence to the contrary, I am satisfied the FSP has been successful in establishing , on balance, the damage to the veranda floor tiles was not due to the storm event. Rather, the damage to the veranda floor tiles, on balance, has been shown to be due to deterioration over time, defective installation and the absence of a waterproof membrane and intermediate movement joints. The policy clearly excludes loss or damage arising from faulty workmanship, wear, tear and gradual deterioration. Therefore, the FSP was entitled to exclude this aspect of the Applicant’s claim in line with the policy. 3 Supporting information 3.1 Consultants’ reports Record Key points FSP’s expert (MG ) Report 17 June 2015  upon inspection the found water damage to the bathroom ceiling, front guttering, snapped awning, water marks to whole front of veranda ceiling, damage to rear security door and decorative glass panels  MG also noted tiles on the upstairs veranda floor had f allen off the edge of the veranda  MG provides it appeared water had gotten under the tiles. Noted they were not actually tiles on concrete rather they had been laid onto a fibro base which may have sustained water damage  MG formed the view that the damage to the insured property had been caused by severe weather event and hailstones filling and blocking all the guttering. FSP’s expert (IT ) Report 19 August 2015  attended the insured property on 14 August 2015  inspected the upper level veranda tiles and note d the tiled area measured 13m x 1.65m.  the veranda floor was of timber framed construction with a covering of compressed fibre cement floor sheets (sheets/sheeting) overlaid with patterned ceramic tiles  the floor tiles has been adhesive fixed to the sheeting and there was no waterproof membrane in place between the tiles and the surface of the sheeting substrate  at the time of IT’s inspection it was not ed that the floor tiles had de - bonded in isolated locations but only along the out er edge of the ver anda  the floor tiles exhibited evidence of previous repair attempts where the original thicker sheeting was overlaid with a thinner Case No: 415553 Determination Page 4 of 4 fibre cement sheet and in turn overlaid with matching ceramic floor tiles which had subsequently de - bonded  there was no evid ence to suggest the floor tiles had sustained any storm damage  the fact ceramic tiles were used in water immersed constructions such as fountains and swimming pools establishes they are designed to be exposed to the elements  IT not es the cause for the dama ge being the quantity of adhesive used was too slender and as a consequence the tiles were not sufficiently embedded int o the adhesive to ensure long term proper bond to the sheeting.  this defect accounts for the bond failure along the sun exposed veranda edge  there were no intermediate movement joints in the veranda tiles to accommodate differential movement as well as thermal growth of the tiles exposed to direct sunshine  IT det ermined: - the overall veranda tiles were in degraded condition solely as a res ult of workmanship considerations, specifically improper installation for reasons noted above - noted previous localised repairs had been attempt ed - there was no evidence of storm related damage. Applicant’s expert (SE ) Report and Quote 11 November 2015  the existing tiles on balcony have been laid straight down on glue on top of 20m fibro cement sheeting  the existing tiles have popped up from movement of balcony and heavy rain has damaged the tiles and fibro sheeting board underneath  there need to be sand and cement bed to be laid on top of plastic and chicken wire to allow no damage to tiles in the long run and if any movement happens it will not harm the tiles.  estimated total cost to repair area $7,500

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.