Home / Financial Firm (Unknown - Insurer) / Determination 415496

Determination 415496

Storm damage claim denied for defective roof; delay in claims decision

FirmFinancial Firm (Unknown - Insurer)
Decided2016-05-18
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed$19,800
SourceAFCA PDF

Summary

Owners claimed $19,800 for storm-related roof and interior water damage, which the FSP denied under policy exclusions. AFCA found the defective roof was the proximate cause and upheld the denial, but ordered $500 compensation because the FSP took too long to decide the claim and review it.

The proximate (dominant) cause of the loss determines whether an exclusion applies, applying the Wayne Tank principle.

Issues

Subjects and remedies

pay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 415496 Determination Page 1 of 7 Case number: 415496 10 May 2016 1 Overview 1.1 Dispute In March 2015, the strata managing agent lodged a claim on the FSP’s Residential Strata insurance policy (the policy) for storm damage to the applicants’ unit. The applicants’ claim the cost of repairing the roof and the cost of repairing the water damaged interior of the property. The FSP refused to pay the claim relying on policy exclusions. The applicants’ claim the FSP’s policy responds to the claim. 1.2 Issues and key findings Is the FSP entitled to deny the applicants’ claim? The FSP is entitled to deny the applicants’ claim because the material provided establishes that although the interior of the applicants’ property was damaged by water ingress after rain, the proximate cause of the loss was the defective build and installation of the roof. Such cause of loss is excluded by the policy terms and conditions. Are the applicants entitled to compensation? The applicants are entitled to compe nsation. The claim was not complex and yet too much time was taken to make a claims decision and review the claims decision which caused physical inconvenience and interfered with the applicants’ expectation of enjoyment and peace of mind. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is not required to take any further action in relation to the claim. Should the applicants accept this determination, within seven days of acceptance, the FSP is to pay the applicants $500 compensation. Case No: 415496 Determination Page 2 of 7 2 Reasons for determination 2.1 Is the FSP entitled to deny the applicants’ claim? On or about 16 March 2015, the applicants lodged a claim with the FSP. They claimed as a result of stormwater entering the roof cavity, following storm activities over a period, there was damage to internal gyprock ceiling and wall sheeting and the wooden surrounds of six double glazed windows. They say as a result of particularly severe storm in early December 2014, the inflow of water was so severe two Persian carpets were left floating, wall-to-wall carpet sodden and some curtains were water stained. This water damage was paid by the contents insurer. The applicants advise the roof leaked after significant rainstorms and they attempted various remedies, unsuccessfully. After a number of failed attempts to find and isolate a single problem, the roof, guttering and down pipes were replaced. The applicants seek reimbursement of $8,500 paid to repair the roof and $11,300 being the quoted cost to repair internal water damage. The FSP denied the claim relying on policy exclusions. It submits no “one event” has been established by the applicants which gave rise to roof damage resulting in water ingress in each subsequent rain event. Rather, they contend the claimed damage was as result of identified accepted building defects and lack of maintenance as evidenced by the water ingress over several years. The FSP further contends its policy terms do not extend to cover damage which resulted through deterioration, over time. The FSP also submitted the decay to the timber framing would have been visible and the cracki ng of the plasterboard wall ceiling junctions is because of the recent works. The material establishes at the time of the claim the applicants had been living in the property about 16 years. When they purchased the property, they obtained an inspection report which indicated the roof was in good condition. Nonetheless, over the years, stormwater still entered the property even after attempts to fix the roof and make repairs to interior water damage. After a particularly severe storm in December 2014, further attempts were made to identify and remedy the problems with the roof. The roof was repaired not long thereafter at a cost of $8,500. The applicants say the roof has not leaked since. As a result of his roof inspection on 14 February 2015, the applicants ’ roofer wrote a report. It is clear from the report the entire roof area required rectification. The roofer said the roof did not meet standards or code. The roofer reported the existing roof batons were too far apart which caused the roof to sag which in turn allowed moisture ingress; the existing installation had been cut too short causing moisture and condensation to track into the roof; and the existing roof sheeting was incorrectly installed which also allowed water to flow into the roof space. Case No: 415496 Determination Page 3 of 7 Prima facie claim established for interior damage The FSP’s policy insures the applicants against accidental loss or damage to the insured property which occurs during the period of insurance. The policy does not define “accidental”. In the circumstances, it is usual practice to adopt a dictionary definition. The Macquarie dictionary defines “accidental” to mean: “happening by chance or accident, or unexpectedly” The Oxford dictionary defines the word to mean: “happening by chance, unintentionally, or unexpectedly” The applicants must establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. From the material provided, I am satisfied on the balance of probabilities there was accidental loss or damage to the insured property when water came into the applicants’ property after storms in each period of insurance. In particular, in relation to the 2014-2015 period of insurance, I am satisfied accidental damage occurred to the interior of the property after the storm event in December 2014. Damage to the roof not accidental but caused by defective roof build and installation The applicants have not established on the balance of probabilities accidental loss or damage occurred to the roof of the property as a result of storms. There is no material provided which establishes there were storm created openings in the roof. Rather , the material from the applicants’ builder establishes the damage to the roof was caused by defective roof design and installation. Proximate cause of damage to the interior was the defective roof Once a prima facie claim is established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. The policy terms relied on by the FSP are set out in its IDR letter. Specifically, the FSP’s policy says it will not pay fo r loss or damage: “c. caused by lack of maintenance, wear, tear… gradual deterioration… or failure to maintain (the) insured property in a reasonably good state of repair d. caused by non-rectification of an insured property defect, error or omission that you were aware of, or should reasonably have been aware of.” The material establishes the interior of the applicants’ property was damaged by water ingress after rain. The material also establishes rain entered the property because the roof was built and installed in such a way that it did not meet standards or code. The Wayne Tank principle provides that, where damage is caused by two or more concurrent and interdependent proximate causes and one of these causes is Case No: 415496 Determination Page 4 of 7 excluded while the others are not, the FSP may rely on the relevant exclusion to deny the claim. The principle requires the examination of the proximate cause of the damage. The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause. In the circumstances of this matter, I am satisfied the dominant cause of the loss is the defectively built and poorly installed roof. Had the roof been properly built and installed, the rain would not have entered into the app licants’ property. Since the roof has been rectified, the applicants say no water has ingressed into the property. I acknowledge when the applicants purchased the property, they obtained of report which said the roofing was in good condition. However, it was plain the roof was not in a reasonably good state of repair and had gradually deteriorated as, over the years, on many occasions, the roof leaked during and after storm events. Further, although the applicants were not necessarily aware of the exact nature of the defect in the roof, they were aware the roof was not waterproof. Whilst I acknowledge the many attempts the applicants made to rectify the issues with the roof, nonetheless, the roof was not properly rectified until early 2015 when, in the meantime, water damage had occurred to the inside of their property. In all the circumstances, I am satisfied the FSP is entitled to rely on the policy exclusions and is entitled to deny the applicants’ claim. 2.2 Are the applicants entitled to compensation? Compensation awarded in certain circumstances The applicants say the FSP’s claims handling caused delay and inconvenience as while they waited the claims decision, their property had been in turmoil waiting for repairs and repainting. Photographs provided substantiate this. The Terms of Reference allows FOS to direct the FSP compensate an applicant for non-financial loss (capped at $3,000) where there is an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the applicant’s expectation of enjoyment or peace of mind. $500 compensation is fair in all the circumstances The material shows the following chronology in 2015:  16 March claim made  9 April assessor appointed and inspected property  23 April asses sor’s report  25 May causation engineer inspected the property  18 June causation report provided  23 June assessor reported to FSP  22 July claim denied  5 August applicant disputed denial  9 September IDR letter Case No: 415496 Determination Page 5 of 7 This is not a complex claim. I consider too much time was taken to make a claims decision and to review the claims decision. I am satisfied the time taken to resolve the matter caused physical inconvenience and would have interfered with the applicants’ expectation of enjoyment and peace of mind . Taking all matters into account, I consider it is fair in the circumstances the FSP pay $500 compensation to the applicants. Case No: 415496 Determination Page 6 of 7 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP’s IDR review letter dated 9 September 2015. Both the policy document and the letter have been exchanged with the applicants. 3.3 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause. 3.4 Material considered and relied on  Correspondence between the parties Case No: 415496 Determination Page 7 of 7  Applicants’ submissions including all material p rovided  FSP’s submissions including all material provided

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.