Determination 415221

Subsidence damage claim declined under exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2016-04-29
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$20,152
Non-financial loss$1,500
Amount claimed$20,152
SourceAFCA PDF

Summary

The applicants' strata building claim for subsidence damage was partly denied by the FSP under two exclusions. AFCA found the exclusions did not apply, and ordered payment of $20,152 with interest, $1,500 for non-financial loss, and acceptance of the building damage claim.

The FSP bears the onus of proving an exclusion applies, and it did not establish that the subsidence was caused by faulty design or workmanship.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 415221 Determination Page 1 of 6 Case number: 415221 21 April 2016 1 Overview 1.1 Dispute The applicants are beneficiaries under a strata insurance policy covering their residential address. On 13 August 2014 a claim was lodged under the policy for damage to external paving and internal cracking. After considering the claim, the FSP determined that the cause of the damage was due to subsidence, which is specifically excluded from the terms of cover. The FSP agreed to accept the resultant damage to the paving and flooring however has declined to cover the cost of remediation of the subterranean soil issues. 1.2 Issues and key findings Is the FSP entitled to limit its liability for the claim? No, because the FSP has not established that the subsidence was caused by action of the sea, high water, tidal wave, design error or faulty workmanship. 1.3 Determination This determination is in favour of the applicant. The FSP must:  Pay the applicants $20,152, together with interest in accordance with the Insurance Contracts Act from 30 September 2015.  Accept the claim in respect of the damage to the internal and external parts of the building. If the FSP elects to cash settle this aspect of the claim, the FSP must obtain an up to date quote for these works.  Pay the applicants $1,500 for non-financial loss. Case No: 415221 Determination Page 2 of 6 2 Reasons for determination 2.1 Is the FSP entitled to limit its liability for the claim? The FSP must establish an exclusion applies The policy covers the applicants for “ physical loss or damage to Your Building and Common Contents occurring during the Period of Insurance ” . The FSP has accepted that damage has occurred to the building. It seeks to limit its liability by relying on two exclusions in the policy. The FSP has the burden of establishing that such exclusions apply. In order to determine whether an exclusion applies, the proximate cause of the loss must first be determined. DP and IC considered the damage was caused by “solution holes” PB (structural engineers) were engaged to investigate possible causes of building movement. PB concerned that the settlement of the building‟s floor was causing the internal cracking of the floor tiles. PB went on to say: “It is very unusual for a buildi ng of more than 20 years to suddenly develop cracking due to settlement of the ground. It would appear that the cracking has been initiated by the sink hole or holes that have appeared around the unit.” PB explained that given leaking pipes or cracked sewers had been ruled out, they were at a loss as to what has initiated the problem. The applicants then engaged geotechnical engineers “DP” to determine the cause of the damage. DP noted that the soil composition of the site is characterised as „cemented dur i- crust‟. Solution holes, formed by the flow of groundwater, are quite common in duri-crust soils and can act like a natural pipe in the ground. DP noted the pavers had been removed over part of the area which had subsided and a void was observed below the area. The applicants explained the void had previously been filled with sand but the sand had washed away. The void appeared consistent with a solution hole. The interior of the home which exhibited damage was where the void was present. Although further investigations were required, the evidence suggested the subsidence and damage had been caused by a series of solution holes present. These had formed either by geological processes or from decay of large tree roots (that were possibly left below the building at the time of construction). DP recommended that remedial works in the form of backfilling the solution holes with grout be undertaken, although further solution holes and subsidence may still occur which would then lead to underpinning being required. The FSP commissioned building consultants “IC” to determine the cause of the damage. IC inspected the premises and undertook a review of DP‟s report. IC Case No: 415221 Determination Page 3 of 6 essentially agreed with DP‟s conclusions as to both the cause of the damage and the proposed remedial works. JW considered the soil had not been sufficiently compacted After some drilling works had commenced, further damage was identified and the FSP appointed consulting firm “JW” to inspect the property. JW noted there were areas of distress to the residence. JW stated: “…it would appear that during construction that the fill soil and natural ground soil was not compacted sufficiently with the end result the soil settled taking the floor slab with it. It would be assumed that the topping was then placed on top of the floor slab to bring up to the correct level but over time the slab has further settled.” The cause of the damage is subsidence All experts agree that the damage has been caused by the subsidence of the soil. The subsidence was caused by solution holes that resulted from either:  Geological processes  The decay of large tree roots, or  A failure to sufficiently compact the soil prior to construction. The exclusions identified by the FSP do not apply The FSP seeks to deny the claim by relying on two exclusions within the policy. They are: We do not insure You against loss or damage caused directly or indirectly by or arising out of: 5. Erosion, subsidence, earth movement or collapse resulting from the action of the sea, high water, tidal wave. … 11. error or omission in design, plan, specification, failure of design, faulty material or faulty workmanship. Exclusion 5 only applies where the subsidence results from the actions of the sea, high water or tidal wave. There is no evidence that any of these were present and as such this exclusion does not apply. In order to rely on exclusion 11, the FSP is required to demonstrate that the cause of the solution holes at the site was due to an error in design or faulty workmanship. The FSP has not demonstrated, on the balance of probabilities, that there was such an error. There are three possible causes of the sink holes (as identified above) and the FSP has not produced evidence to support one theory over another. For example, no documentation has been provided to establish that there was a fault with the designs given the soil type. Nor has any evidence been supplied that there were trees removed around the time of construction. Accordingly, the FSP‟s theory of a failing in the original design and/or construction is not sufficient to establish that the exclusion applies. The FSP is therefore not entitled to deny the claim. Case No: 415221 Determination Page 4 of 6 The FSP must compensate the applicants The applicants have produced an invoice for $20,152 in respect of the costs incurred to treat the foundations and underseal the on-ground slab. The FSP must reimburse the applicants for these costs, together with interest in accordance with the Insurance Contracts Act from 30 September 2015 (the date of the invoice) to the date payment is made. The applicants also seek rectification of damage to the building. The FSP obtained quotes for this work in July 2015 ranging from $21,918.28 to $26,398. The FSP must obtain an up to date quote and either cash settle or repair the property. Given settlement will be based on an up to date quote, in the event the FSP elects to cash settle the claim, no interest is payable. The applicants are entitled to non-financial loss The applicants made submissions of the long and drawn out process they have endured with the FSP. This included the FSP initially denying the claim, then accepting it, then placing it on hold once initial works had been undertaken and then denying all but the resultant damage to the paving and flooring (being $21,918.28 worth). I note that the applicants had obtained reports from PB and DP prior to lodging their claim. DP‟s report was specifically accepted by the FSP‟s expert, IC. The FSP therefore had sufficient information to consider the claim by the time it authorised the repairs in February 2015. Instead, the applicants explained that they have endured holes in the slab (resulting in ant infestation) and have been concerned for their baby who attempts to eat the putty used to fill the holes. It is fair in all the circumstances for the FSP to compensate the application $1,500 for this unusual degree of inconvenience or peace of mind. Case No: 415221 Determination Page 5 of 6 3 Supporting information 3.1 FOS approach to this dispute I have determined this dispute based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties. I am satisfied the documentation I have relied on has been provided to both parties and each party has had an opportunity to address the issues raised. This dispute has been expedited to a determination. No recommendation was issued. 3.2 Chronology of events Date Event 1984  Occupancy certificat e issued for unit September 2013  The paving at the front of the unit suddenly sank, leaving a large hole.  The body corporate filled the hole with sand 30 November 2013  Policy renewed J a nuary 2014  The ground again sunk away  Body corporate engaged a plumber who advis ed it was not plumbing related.  Invoice $1050 M a rch 2014  PB performed an inspection and report ed the underlying problem was ground movement and suggested a geo - technical engineer should investigate further. 1 May 2014  PB‟s report 5 May 2014  Engineering investigation into building movement, including ground and footing report ($990+ $330 = $1320) 26 June 2014  DP‟s report 13 August 2014  Date claim lodged with FSP 2 Decem b e r 2014  IC report 1 8 Decembe r 2014  IC report 2 – concurred with DP. Solution holes in the foundation material are not uncommon and may have been also influenced by rotting tree roots is feasible. 29 December 2014  S report on extent of damage 2 February 2015  Repairs to external pavers and damaged in ternal floor tiles were authori sed. FSP ‟s repairers found evidence of further possible failure , so ceased repairs. 15 April 2015  JW‟s report (engineers) Case No: 415221 Determination Page 6 of 6 Date Event 1 May 2015  C ‟s soil tests  No commentary was provided in respect of these tests 20 July 2015  FSP‟s builders quote $24,398 for rectification of resultant damage 21 July 2015  FSP‟s builders quoted $21, 918. 28 for rectification of resultant damage. 3 September 2015  Partial denial of claim by FSP 30 September 2015  Works carried out by U as suggested by DP for cost of $20,152 (invoice supplied). 21 October 2015  Final denial of claim by FSP

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.