Home / Financial Firm (Unknown - Insurer) / Determination 415221
Determination 415221
Subsidence damage claim declined under exclusions
Summary
The applicants' strata building claim for subsidence damage was partly denied by the FSP under two exclusions. AFCA found the exclusions did not apply, and ordered payment of $20,152 with interest, $1,500 for non-financial loss, and acceptance of the building damage claim.
The FSP bears the onus of proving an exclusion applies, and it did not establish that the subsidence was caused by faulty design or workmanship.
Issues
- Claim denial primary · upheld“The FSP has not demonstrated, on the balance of probabilities, that there was such an error. The FSP is therefore not entitled to deny the claim.”
- Poor claim handling secondary · upheld“initially denying the claim, then accepting it, then placing it on hold once initial works had been undertaken”
- Delay secondary · upheld“The FSP therefore had sufficient information to consider the claim by the time it authorised the repairs in February 2015.”
Subjects and remedies
home or building damagepay claimpay interestpay non financial lossrepair or rectify
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 415221 Determination Page 1 of 6
Case number: 415221 21 April 2016
1 Overview
1.1 Dispute
The applicants are beneficiaries under a strata insurance policy covering their
residential address. On 13 August 2014 a claim was lodged under the policy for
damage to external paving and internal cracking.
After considering the claim, the FSP determined that the cause of the damage was
due to subsidence, which is specifically excluded from the terms of cover. The FSP
agreed to accept the resultant damage to the paving and flooring however has
declined to cover the cost of remediation of the subterranean soil issues.
1.2 Issues and key findings
Is the FSP entitled to limit its liability for the claim?
No, because the FSP has not established that the subsidence was caused by action
of the sea, high water, tidal wave, design error or faulty workmanship.
1.3 Determination
This determination is in favour of the applicant.
The FSP must:
Pay the applicants $20,152, together with interest in accordance with the
Insurance Contracts Act from 30 September 2015.
Accept the claim in respect of the damage to the internal and external parts of
the building. If the FSP elects to cash settle this aspect of the claim, the FSP
must obtain an up to date quote for these works.
Pay the applicants $1,500 for non-financial loss.
Case No: 415221 Determination Page 2 of 6
2 Reasons for determination
2.1 Is the FSP entitled to limit its liability for the claim?
The FSP must establish an exclusion applies
The policy covers the applicants for “ physical loss or damage to Your Building and
Common Contents occurring during the Period of Insurance ” .
The FSP has accepted that damage has occurred to the building. It seeks to limit its
liability by relying on two exclusions in the policy. The FSP has the burden of
establishing that such exclusions apply.
In order to determine whether an exclusion applies, the proximate cause of the loss
must first be determined.
DP and IC considered the damage was caused by “solution holes”
PB (structural engineers) were engaged to investigate possible causes of building
movement. PB concerned that the settlement of the building‟s floor was causing the
internal cracking of the floor tiles. PB went on to say:
“It is very unusual for a buildi ng of more than 20 years to suddenly develop cracking
due to settlement of the ground. It would appear that the cracking has been initiated by
the sink hole or holes that have appeared around the unit.”
PB explained that given leaking pipes or cracked sewers had been ruled out, they
were at a loss as to what has initiated the problem.
The applicants then engaged geotechnical engineers “DP” to determine the cause of
the damage. DP noted that the soil composition of the site is characterised as
„cemented dur i- crust‟. Solution holes, formed by the flow of groundwater, are quite
common in duri-crust soils and can act like a natural pipe in the ground.
DP noted the pavers had been removed over part of the area which had subsided
and a void was observed below the area. The applicants explained the void had
previously been filled with sand but the sand had washed away. The void appeared
consistent with a solution hole.
The interior of the home which exhibited damage was where the void was present.
Although further investigations were required, the evidence suggested the
subsidence and damage had been caused by a series of solution holes present.
These had formed either by geological processes or from decay of large tree roots
(that were possibly left below the building at the time of construction).
DP recommended that remedial works in the form of backfilling the solution holes
with grout be undertaken, although further solution holes and subsidence may still
occur which would then lead to underpinning being required.
The FSP commissioned building consultants “IC” to determine the cause of the
damage. IC inspected the premises and undertook a review of DP‟s report. IC
Case No: 415221 Determination Page 3 of 6
essentially agreed with DP‟s conclusions as to both the cause of the damage and the
proposed remedial works.
JW considered the soil had not been sufficiently compacted
After some drilling works had commenced, further damage was identified and the
FSP appointed consulting firm “JW” to inspect the property. JW noted there were
areas of distress to the residence.
JW stated:
“…it would appear that during construction that the fill soil and natural ground soil was
not compacted sufficiently with the end result the soil settled taking the floor slab with it.
It would be assumed that the topping was then placed on top of the floor slab to bring
up to the correct level but over time the slab has further settled.”
The cause of the damage is subsidence
All experts agree that the damage has been caused by the subsidence of the soil.
The subsidence was caused by solution holes that resulted from either:
Geological processes
The decay of large tree roots, or
A failure to sufficiently compact the soil prior to construction.
The exclusions identified by the FSP do not apply
The FSP seeks to deny the claim by relying on two exclusions within the policy. They
are:
We do not insure You against loss or damage caused directly or indirectly by or arising
out of:
5. Erosion, subsidence, earth movement or collapse resulting from the action of
the sea, high water, tidal wave.
…
11. error or omission in design, plan, specification, failure of design, faulty
material or faulty workmanship.
Exclusion 5 only applies where the subsidence results from the actions of the sea,
high water or tidal wave. There is no evidence that any of these were present and as
such this exclusion does not apply.
In order to rely on exclusion 11, the FSP is required to demonstrate that the cause of
the solution holes at the site was due to an error in design or faulty workmanship.
The FSP has not demonstrated, on the balance of probabilities, that there was such
an error. There are three possible causes of the sink holes (as identified above) and
the FSP has not produced evidence to support one theory over another.
For example, no documentation has been provided to establish that there was a fault
with the designs given the soil type. Nor has any evidence been supplied that there
were trees removed around the time of construction. Accordingly, the FSP‟s theory of
a failing in the original design and/or construction is not sufficient to establish that the
exclusion applies.
The FSP is therefore not entitled to deny the claim.
Case No: 415221 Determination Page 4 of 6
The FSP must compensate the applicants
The applicants have produced an invoice for $20,152 in respect of the costs incurred
to treat the foundations and underseal the on-ground slab. The FSP must reimburse
the applicants for these costs, together with interest in accordance with the Insurance
Contracts Act from 30 September 2015 (the date of the invoice) to the date payment
is made.
The applicants also seek rectification of damage to the building. The FSP obtained
quotes for this work in July 2015 ranging from $21,918.28 to $26,398. The FSP must
obtain an up to date quote and either cash settle or repair the property. Given
settlement will be based on an up to date quote, in the event the FSP elects to cash
settle the claim, no interest is payable.
The applicants are entitled to non-financial loss
The applicants made submissions of the long and drawn out process they have
endured with the FSP. This included the FSP initially denying the claim, then
accepting it, then placing it on hold once initial works had been undertaken and then
denying all but the resultant damage to the paving and flooring (being $21,918.28
worth).
I note that the applicants had obtained reports from PB and DP prior to lodging their
claim. DP‟s report was specifically accepted by the FSP‟s expert, IC.
The FSP therefore had sufficient information to consider the claim by the time it
authorised the repairs in February 2015. Instead, the applicants explained that they
have endured holes in the slab (resulting in ant infestation) and have been concerned
for their baby who attempts to eat the putty used to fill the holes.
It is fair in all the circumstances for the FSP to compensate the application $1,500 for
this unusual degree of inconvenience or peace of mind.
Case No: 415221 Determination Page 5 of 6
3 Supporting information
3.1 FOS approach to this dispute
I have determined this dispute based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
FOS decisions. I have taken into account all the material submitted by the parties.
I am satisfied the documentation I have relied on has been provided to both parties
and each party has had an opportunity to address the issues raised.
This dispute has been expedited to a determination. No recommendation was issued.
3.2 Chronology of events
Date Event
1984 Occupancy certificat e issued for unit
September 2013 The paving at the front of the unit suddenly sank, leaving a large hole.
The body corporate filled the hole with sand
30 November 2013 Policy renewed
J a nuary 2014 The ground again sunk away
Body corporate engaged a plumber who advis ed it was not plumbing
related.
Invoice $1050
M a rch 2014 PB performed an inspection and report ed the underlying problem was
ground movement and suggested a geo - technical engineer should
investigate further.
1 May 2014 PB‟s report
5 May 2014 Engineering investigation into building movement, including ground and
footing report ($990+ $330 = $1320)
26 June 2014 DP‟s report
13 August 2014 Date claim lodged with FSP
2 Decem b e r 2014 IC report 1
8 Decembe r 2014 IC report 2 – concurred with DP. Solution holes in the foundation material
are not uncommon and may have been also influenced by rotting tree roots
is feasible.
29 December 2014 S report on extent of damage
2 February 2015 Repairs to external pavers and damaged in ternal floor tiles were authori sed.
FSP ‟s repairers found evidence of further possible failure , so ceased repairs.
15 April 2015 JW‟s report (engineers)
Case No: 415221 Determination Page 6 of 6
Date Event
1 May 2015 C ‟s soil tests
No commentary was provided in respect of these tests
20 July 2015 FSP‟s builders quote $24,398 for rectification of resultant damage
21 July 2015 FSP‟s builders quoted $21, 918. 28 for rectification of resultant damage.
3 September 2015 Partial denial of claim by FSP
30 September 2015 Works carried out by U as suggested by DP for cost of $20,152 (invoice
supplied).
21 October 2015 Final denial of claim by FSP