Summary

The applicant claimed for storm damage to an investment property roof and internal water damage, and the FSP declined most of it. AFCA ordered $6,750 towards the internal damage, $660 representative costs, and a reinspection of the poorly repaired roof sections.

The roof was damaged in two storm events and a prima facie claim was established, but the FSP is only liable for the damaged parts of the roof and for the share of internal damage caused by its contractor's poor repairs.

Issues

Subjects and remedies

pay claimpay compensationreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 415136 Determination Page 1 of 8 Case number: 415136 21 July 2016 1 Overview 1.1 Dispute The applicant formerly held Home Insurance for his investment property with the financial services provider (FSP). The applicant lodged a claim in December 2013 for damage caused when palm fronds fell on the roof in Cyclone Oswald in January 2013 and damaged asbestos roof sheets. The applicant also claims there was further impact damage from falling palm fronds in the weeks leading up to the claim. In February 2015, Cyclone Marcia caused further damage to the property. The applicant‟s current insurer denied liability for damage to the roof because it says the damage was pre-existing and is a maintenance issue. This is not an issue under consideration in this dispute. The FSP denies the claim for repairs to the roof because the roof had pre-existing damage and previous poor repairs. The FSP says it conducted make safe works only and advised the applicant to replace the roof at the time of the claim. The applicant claims the FSP is liable to replace his entire roof as it is an asbestos roof and because of poor repairs conducted by its repairer (M). Alternatively, he claims if the FSP is obliged to affect proper roof repairs which do not necessitate the entire roof replacement but do comply with Government requirements, then this is an acceptable solution. 1.2 Issues and key findings Is the FSP entitled to decline the applicant’s claims? The FSP is entitled to decline most of the applicant‟s claim for the cost of internal work as the material provided establishes the poor work undertaken by M is not the sole cause of the internal damage claimed by the applicant. The material provided estab lishes the applicant‟s plumber also did poor work, the general condition of the roof is poor and these factors have also caused the claimed internal damage. The FSP is not liable to pay to replace the entire roof as the material provided establishes less than 20% of the roof was damaged or repaired in the two claimed events in 2013. However, the material also establishes the work to the roof has been undertaken poorly. In these circumstances, the FSP is to arrange for the FSP‟s engineer and a suitably qualified roofing expert to reinspect the part of the roof damaged and repaired in the 2013 events. Upon receiving expert reports, the FSP is to either authorise the necessary work to the roof or pay the cost to properly repair the roof based on the expert reports. Case No: 415136 Determination Page 2 of 8 Is the FSP required to pay the applicant’s costs of $660? In view of the time since the original claim, the amount in dispute, and the involvement of another insurer, it is fair in all the circumstances the FSP pay to the applicant‟s costs as the di spute is more complex than the usual storm damage claim. 1.3 Determination This determination is partly in favour of the applicant. Should the applicant accept this determination, then within 14 days, the FSP is to pay the applicant:  $660 for costs  $6,750 towards the claim for internal damage. The FSP is entitled to deduct a policy excess from the payment. Within 14 days, the FSP is also to arrange for its engineer and a suitably qualified roofing expert (a Queensland licensed asbestos removalist) to reinspect the part of the roof damaged and repaired in the 2013 events. Upon receiving the experts‟ reports, the FSP is required to either authorise the necessary work to the roof or pay the cost to properly repair the parts of the roof damaged in the 2013 even ts based on these experts‟ reports. Case No: 415136 Determination Page 3 of 8 2 Reasons for determination 2.1 Is the FSP entitled to decline the applicant’s claims? Applicant must establish prima facie claim The applicant must establish he has suffered a loss caused by an event or events to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the FSP to prove it can rely on the policy exclusions of gradual deterioration, wear and tear and faulty workmanship. It says if the applicant‟s roof needs replacement, it is due to long -term deterioration. Further, in the case of two previously poorly repaired roof sheets, faulty workmanship has caused damage. The FSP‟s policy covers the applicant‟s home for accidental loss or damage. That is, the policy covers damage to the home caused by an unintentional act, or a n unforeseen and uncontrollable incident. The policy also covers the applicant‟s home for loss or damage as a result of storm, flood, rain water or wind. The applicant contends the roof on the home was damaged by two insurable events between January 2013 and January 2014. He says cyclone or storm events caused palm fronds to fall and break asbestos sheets on the roof. He submits the entire roof requires replacement in order to properly facilitate the removal and replacement of the broken asbestos sheets. The applicant owned the property for a number of years prior to a cyclone event in January 2013. He says there was no damage to the roof and no requirement for repairs prior to the cyclone event. However, he has no photographic evidence of the condition of the roof prior to the January 2013 cyclone event. As a result of the January 2013 event, the applicant contacted a plumber who did what was described by the applicant as a temporary make safe. He says the make safe entailed covering holes with soft flashing type material and the use of silicon sealant. As he paid cash, no invoice was generated. Further, he is now unable to contact the plumber who did this make safe. Although the applicant says he advised his broker of the event, no claim was actually made until December 2013. And although the applicant says the make safe repairs ensured the property was waterproof, the FSP‟s file note instructing its repairer M after the claim was made indicates as follows: „ The friend who lives in the property did advise the insured that the roof continued to drip water during heavy rain since.‟ As a result of the claim in December 2013, the FSP instructed the repairer, M. The FSP‟s claim notes show water was entering the building for three days via the roof. M photographed and inspected the property in January 2014. M provided a roof report and an email to the FSP in January 2014. Having considered the report, the email and the photographs I am satisfied they establish: Case No: 415136 Determination Page 4 of 8  palm fronds had fallen onto the roof damaging the sheeting and leaving holes in the roof  rain came through the holes causing damage in the rooms below  the applicant was told the palm tree must be removed as this was the second time the tree had damaged the roof and it would happen again in the future  the roof had been previously repaired (as shown in M‟s photographs)  M undertook work which he described as “new flat sheeting installed over the existing asbestos sheeting as shown in the photos”  M told the FSP he told the applicant a full replacement roof was not required “due to only 2 sheets damaged that don‟t require removal”  M told the FSP work will be done by M‟s plumber and no asb estos removers will be required. M provided photographs of the work conducted by him in January 2014 and work conducted by the applicant‟s plumber at an earlier time. M said the roof had holes on the left-hand side and holes on the right hand side and described the ensuing damage in the rooms below the holes in the roof. He quoted to repair the damage. He invoiced the FSP $4,288.20 for the cost to repair the damage to the rooms below the holes in the roof. Although M reported to the FSP in October 2015 the roof required replacement in January 2014, his contemporaneous email does not support this contention. Further, although the FSP and M describe the work undertaken by M as a “make safe”, M also describes the work done by him to the applicant‟s roof as “repairs” . M provided further comment to the FSP in January 2016. Again, he says he told the applicant at the time of repair that at some stage in the near future a new roof would be required. And M provided photographs of the work done to the roof by the applicant‟s plumber and by M. He provides what he describes as a Repair Report as follows: „ Our initial repairs for the broken asbestos sheeting before re-sheeting consists of encapsulating the area with glue/water mixture to all edges. Then the metal flashings were installed over the roof sheeting and sealed water tight with Sikaflex. …‟ The FSP arranged for an engineer to inspect and photograph the roof on 29 October 2015. The engineer reports the 2013 damage had been covered with a combination of metal flashing and lead flashing over the top of the existing roof sheeting. The engineer‟s photographs show work undertaken by both the applicant‟s plumber and by M. The FSP‟s engineer says the repairs to the damaged roof are poor and likely to leak. Further, the FSP‟s engineer indicates the broken sheets should have been removed during the initial repairs. He goes on to comment the general condition of the roof is poor and susceptible to leaking. He describes mould exhibited throughout the ceilings of the house as typical of moisture ingress into old nailed roofs. He says although water would have come in to the roof because of the 2015 cyclone, it would also have occurred during any rain event. Case No: 415136 Determination Page 5 of 8 Roof damaged in the storm events in January and December 2013 Having considered the material provided, I am satisfied on the balance of probabilities the roof was damaged at least twice: once in January 2013 and in again December 2013 when, after a storm event, palm fronds impacted the roof and caused damage to it. The policy provides cover for accidental damage and storm damage. I am satisfied a prima facie claim is established for damage to the roof. FSP not liable for all the damage claimed As a result of the damage to the roof, the FSP‟s contractor undertook work to the roof. While the material establishes the work was not done well and highly likely to allow water ingress, the material also establishes the poor work referred to by the FSP‟s engineer were done both by the applicant‟s plumber and by the FSP‟s contractor. Further, having considered the expert report from the FSP‟s engineer, and the numerous photographs of the roof taken by M in 2014 and the FSP‟s engineer in 2015, I am satisfied the general condition of the roof is poor and the damage seen in the house is typical of moisture ingress because of the general poor condition of the roof. The applicant has provided an invoice claiming $20,500 to remove water damaged ceilings and repaint all new work. However, for the reasons stated above, I am not satisfied the poor work undertaken by M is the sole cause of the damage claimed by the applicant. As the applicant‟s plumber also undertook poor repairs, and as the general condition of the roof is poor, I am satisfied it is fair in the circumstances the FSP make a contribution of $6,750 only to the claimed damage. FSP not liable to pay to replace all the roof The applicant also claims $28,000 to remove and replace the roof. The applicant relies on a report from T who inspected the roof in June 2015. T reports: „While on the roof we have sited several patches on the asbestos roof which in our opinion should not have been patched. The roof should have been replaced at the time. We also noticed that all of the roof was very loose which we both put down to cyclone Marcia. Past experience on asbestos roofs says all the roof needs replacing .‟ (sic) However T does not state with sufficient particularity as to how his past experience translates to the conclusion in this dispute that all the roof needs replacing. While the FSP‟s engineer criticises the repairs undertaken by the FSP‟s contractor M, and by the applicant‟s plumber, he does not a gree the roof should be replaced unless more than 20% of the roof was damaged or repaired. I have considered the photographs provided. I am not satisfied more than 20% of the roof was damaged or repaired in the two claimed events in 2013. Although the parties have provided extensive material about the repair of buildings which contain asbestos, the FSP‟s engineer also states there are no guidelines for repair of asbestos roofs. In these circumstances, on the information provided, I am not satisfied the FSP is liable to pay for the cost to replace all the roof. Case No: 415136 Determination Page 6 of 8 While the applicant has referred to previous decisions of FOS with a different outcome, I have made this determination on the basis of the information provided in this dispute and relevant to this dispute. FSP only obliged to repair the part of the roof which actually sustained damage The FSP‟s policy provides if the roof was damaged, then the FSP will decide whether to repair or pay the cost to repair the damage. The FSP is only obliged to repair t he part of the building which actually sustained damage. It must try to match any material used to repair with the original materials or nearest equivalent. The relevant schedule shows cover included replacement benefit. In these circumstances, the FSP must repair the parts of the roof damaged in the events in 2013 to a condition as close as possible to new, but not better. I am satisfied the parts of the roof which were damaged in these 2013 events are agreed by the parties and are those parts of the roof repaired by the applicant‟s plumber and by M and shown in the photograph in paragraph h) of the applicant‟s letter to FOS dated 16 January 2016 and the phot ographs attached to M‟s report to the FSP dated 13 January 2016. FSP’s engineer establishes the roof was repaired poorly I am satisfied the material from the FSP‟s engineer establishes the repairs to the roof have not been undertaken in accordance with policy terms. Even though some repairs were undertaken by the applicant‟s plumber, once the FSP‟s contractor was engaged, I am satisfied it is fair in all the circumstances the damage to the roof caused in the 2013 events, should have been repaired by M as described by the FSP‟s engineer. While the FSP argues prejudice because of delay, I consider as M inspected the roof in January 2014, he was able to make an assessment of the damage to the roof at that time, but, having done so, did not properly repair the damage to the roof. FSP to arrange further expert reports In view of the FSP‟s engineer‟s opinion about the work conducted by M, and his description of the appropriate method of fixing the roof, the FSP is to arrange for the engineer and a suitably qualified roofing expert to reinspect the part of the roof damaged in the 2013 events within 14 days. The roofing expert should be a Queensland licensed asbestos removalist who can address all statutory and safety requirements. Upon receiving the experts‟ reports , the FSP is required to either authorise the necessary work to the roof or pay the cost to properly repair the parts of the roof damaged and repaired in the 2013 events based on these experts‟ reports. While the FSP relies on a policy term which states repair work on the damage must start within six months of the damage occurring, or otherwise it is entitled to repair the building to the condition it was in just before the damage occurred, the repair work to the roof did start within six months of the loss occurring (or close to it), but, the FSP‟s engineer establishes the repair work to the roof was not undertaken Case No: 415136 Determination Page 7 of 8 properly. In the circumstances, I am not satisfied it is fair or reasonable for the FSP to rely on this policy term. As the applicant now relies on two events, if the applicant accepts this determination, a further policy excess is payable to the FSP by the applicant. 2.1 Is the FSP required to pay the applicant’s costs of $660? As the dispute was complex, the FSP is obliged to pay the applicant’s c osts The applicant was assisted in this dispute by a representative. An invoice from the representative for the work done is provided in the amount of $660. FOS‟s Terms of Reference provide FOS may decide to contribute to the legal or other professional costs incurred by an applicant in the course of the dispute. FOS decides whether the FSP should make a contribution by considering what is fair in the circumstances. FOS takes into account a number of factors including the complexity of the dispute. In view of the time since the original claim, the amount in dispute and the involvement of another insurer, I consider the dispute was more complex than the usual claim regarding storm damage. In all the circumstances, I am satisfied it is fair the FSP pay to the applicant $660 for the representative‟s fee in assisting the applicant in the dispute. Case No: 415136 Determination Page 8 of 8 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. A dispute resolution agent represents the applicant. For the purpose of this determination, any references to the applicant will include his dispute resolution agent. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP‟s Notice of Response and submissions to FOS. Both the policy document, the Notice and submissions have been exchanged with the applicant. 3.3 Material considered and relied on  Parties‟ various submissions, emails, photographs and reports .  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.