Home / Financial Firm (Unknown - Insurer) / Determination 415134
Determination 415134
Quality of repairs to submerged boat and cash settlement of rectification costs
Summary
The applicant's boat was repaired after a submersion claim, but disputes over repair quality and total loss remained. The Panel found the boat was not a total loss, ordered $7,136.13 in additional rectification costs and $1,000 for non-financial loss.
Repairs were poorly managed and the FSP is liable for rectification costs it should have covered, but pre-existing maintenance and age issues limit its liability to specified items.
Issues
- Repairs or contractors primary · upheld
“The FSP is liable to meet the costs of additional rectification works.”
- Claim amount dispute secondary · not upheld
“The Panel is satisfied that the boat should not be assessed as a total loss.”
- Delay secondary · upheld
“The Panel is satisfied that the delays have caused considerable distress to the applicant.”
Subjects and remedies
pay claimpay non financial loss
Text of the determination
Determination
Case No: 415134 Determination Page 1 of 9
Case number: 415134 22 July 2016
1 Overview
1.1 Dispute
The applicant held a Marine Pleasure craft Policy the Financial Services provider
(FSP) and lodged a claim for damage sustained to her boat after it was partially
submerged on the evening of 15 March 2014.
The FSP accepted liability and proceeded to repair the boat however issues arose as
to the quality of the repairs and the condition of the boat on its return to the applicant.
Although the FSP agreed to rectify some of the repair issues, there is continuing
dispute as to the condition of the boat.
Due to the issues involved in this dispute, it has been expedited to a Panel in
accordance with the Terms of Reference.
1.2 Issues and key findings
Should the boat be assessed as a total loss?
The Panel is satisfied that the boat is not a total loss and that the FSP was entitled to
attend to the repair of the boat in accordance with the terms and conditions of the
policy.
Is the FSP liable for further rectification works?
The FSP is liable to meet the cost of some additional rectification works. Based on
the available information, the Panel is satisfied that the FSP is entitled to cash settle
the applicant for the cost of those repairs in the sum of $7,136.13.
Is the applicant entitled to compensation for non-financial loss?
The applicant has experienced an unusual degree of inconvenience in the resolution
of the claim. The Panel is satisfied that an award of compensation pursuant to
paragraph 9.3 of the Terms of Reference of $1,000 is appropriate in the
circumstances.
1.3 Determination
This determination is partially in favour of the applicant. The FSP is liable to meet the
additional rectification costs of repairs of $7,136.13 and pay $1,000 for non-financial
loss pursuant to paragraph 9.3 of the Terms of Reference. The FSP is otherwise
entitled to refuse payment of the balance of the applicant’s claim.
Case No: 415134 Determination Page 2 of 9
Case No: 415134 Determination Page 3 of 9
2 Reasons for determination
The applicant is represented by her father in this dispute. Any reference in this
determination to the applicant includes reference to the representative.
There has been a full exchange of material and each party has had the opportunity of
addressing the issues that arise from the material exchanged.
An independent assessment of the boat was arranged by the service with CL has
been exchanged in addition to the various reports provided by the applicant and FSP.
This determination by the panel follows consideration of all information exchanged
and is based on what is fair in the circumstances having regard to the relevant legal
principles, good industry practice including codes of practice, terms of the policy and
prior determinations where relevant.
2.1 Should the boat be assessed as a total loss?
The boat should not be assessed as a total loss
The Panel is satisfied that the boat should not be assessed as a total loss.
The applicant as part of the complaints raised suggested that the boat is toxic and
the extent of damage such that the boat may not be repairable.
The applicant provided a report from GS. GS conducted an inspection of the boat on
7 January 2016 and raised a number of issues relating to the quality of repairs to the
boat.
Whilst GS makes the comment, and the Panel agrees that the boat should not be put
to sea with suspect primary equipment, there is no suggestion in the report that the
boat should be considered a total loss.
The Service appointed CL to review the documentation provided, discuss the issues
with the applicant and the FSP, complete a survey of the boat and make
recommendations. Again, whilst CL identified a number of issues of concern with the
repairs, there is no suggestion that the boat be considered a total loss.
Other information provided includes a pre purchase report from HM, invoices and
reports from MA, BM, LMM, MPM and FM. The invoices and reports detail the work
performed on the boat.
The Panel accepts based on the available information and in particular the reports
from GS and CL that the boat is repairable and the FSP is entitled to repair the boat
in accordance with the terms and conditions of the policy.
2.2 Is the FSP liable to meet the costs of additional rectification works?
The FSP is liable to meet the costs of additional rectification works
The Panel has assessed the available information and is satisfied that the FSP is
liable to meet additional rectification totalling $7,186.13.
Case No: 415134 Determination Page 4 of 9
The applicant provided a detailed account of the issues with the boat in
correspondence to the FSP on 4 May 2015 and sought reimbursement of $7,075.75
covering costs incurred of $7,385.85 offset by contributions of $318.10.
In response the FSP obtained a report from MA on 25 June 2015. MA considered
that most of the items claimed were associated with age, depreciation o r pre-existing
issues. It made note that owing to the age of the boat (30 years old), continuous
maintenance was required.
On 4 January 2016 the applicant supplied a document entitled LA Independent
Assessment. This document covers the various issues. The document covers the
areas of concern for the applicant including electrical, mechanical and damage due
to the failure to properly moor the boat.
The applicant also provided a report from an independent specialist technical
consultant GS (7 January 2016). He considered the true identification of damage and
management of the repairs was poorly handled and recommended that a qualified
independent person assess the damage and repairs.
As a result the Service arranged for an independent assessment by CL. That report
was received on 9 May 2016 with a supplementary email received on 26 May 2016.
The applicant has criticised the report from CL and made a number of allegations as
to the conduct of the assessor. The applicant has requested that a further
independent assessor be appointed.
The Panel does not accept these allegations. There is no evidence to support them.
The Panel is satisfied that CL was appropriately qualified to provide an independent
expert report with respect to the condition of the boat and has done so in good faith.
The Panel is satisfied based on the available information it is in a position to
determine the issues in dispute. The Panel has taken into account not only the report
from CL but also the report from GS and the other reports provided in this dispute.
The Panel is satisfied based on the available information the following:
Batteries
Based on the findings of CL and MC, the FSP is liable to meet the costs of
replacement of the batteries. The Panel notes the FSP has offered to replace the
batteries.
Alternators
The Panel accepts based on the available information that the alternators require
replacement. The Panel notes that the invoice from FM dated 28 April 2015 includes
replacement of new alternator. The Panel notes that CL recommends the FSP pay
100% of the invoice for FM.
Fridge
LMM invoice indicates replacement refrigerator accepted 20 April 2014 quote, whilst
subsequent email indicates refrigerator issues were not with submersion and the unit
Case No: 415134 Determination Page 5 of 9
had been decommissioned years prior to the loss. MA indicated refrigerator was not
connected to pre loss.
CS refers to the compressor having flooded twice and at least requires a flush and
replacement bearings. It is unclear when the second flooding occurred.
The Panel is not satisfied the evidence establishes the refrigerator was damaged in
the incident.
Fresh water pump, shower tray pump, rear bilge pump, front section bilge
pump
It is unclear based on the available information how these issues are related to the
submersion event or workmanship conducted by the FSP.
CS considered the vessel had insufficient bilge pump system and considered these
were the owner’s responsibility. The Panel accepts these findings.
Wiring of lights, instrument panel, power points
LMM believed the issues with the electricals were not due to the submersion event.
GS considered the electrical components should be tested and replaced and
considers applicant’s view that this is due to poor workmanship as accurate.
CL notes that the electrical issues were checked and found to be in order.
The evidence is unclear as to the relationship between the electrical issues and the
submersion event and/or repairs conducted. The Panel notes that CL has
recommended a contribution of $500 to the electrical wiring which the Panel belie ves
is reasonable in the circumstances.
Furniture, coverings, beddings in bedroom and bunkroom
GS considers there is a need for general owner maintenance but notes some
damage to floor covers and lower sections of joinery. CL recommends contribution to
repairs of $250. The Panel accepts this as reasonable in the circumstances.
Toxic stagnant water
GS notes the lack of pump out ability is a matter of maintenance for the owner. As for
toxic stagnant water he noted there were no limber holes in the floors.
CL noted a stench which was considered a maintenance issue as the boat had been
left unattended. CL noted “sloshing’ from a watertight compartment. He could not
identify any crack in the deck area. CL recommended that a hole be cut in the deck
to allow the water to be removed by a bilge pump and on completion a sealable
spinout fitting be fitted to allow future access.
CL also believes that replacement of the batteries will assist. CL has recommended
contribution of $440 towards the removal of the water. The Panel accepts this is
reasonable in the circumstances.
Case No: 415134 Determination Page 6 of 9
Floor tiles, carpets, rear sliding door jams, shower tray cracked, matting and
carpet wrecked
An invoice from MPM dated 7 April 2014 indicates new underlay supplied and
carpets and the interior cleaned. There is no evidence when the shower tray crack
occurred or that it was related to water inundation.
Toilet outlet leaks and repairs to front section
CL reports indicate new cracks have been located.
Genset damage
The available information whilst acknowledging the generator was submersed
indicates there were pre loss servicing issues and that the generator was out of
action pre-loss.
GS has not commented on the genset damage. CL has recommended a contribution
of $200 to these repairs.
Bimini covers damaged
The pre purchase inspection indicates that the covers were in very good condition.
GS considers that at least some of the damage to the covers could have occurred
from lack of securing the boat on part of the repairer/tradespeople. The applicant
maintains in a letter in November 2014 that there were problems with the security
and weathering of the boat whilst it was with MPM.
The reports from GS, MA and CL confirm that the fly bridge area and Bimini cover
were damaged but are unclear as to whether this was due to the lack of maintenance
by the applicant or the failure to properly secure the boat by the FSP.
The Panel notes CL has recommended a $250 contribution. The Panel accepts that
the rapid deterioration of the covers would have been contributed to by the manner in
which the boat was secured whilst under repair. The Panel considers it would be fair
in the circumstances to allow $500 contribution to the repair of the covers.
Conclusion
Having considered the various reports, the Panel is satisfied that the FSP should
contribute to the rectification costs.
In the absence of any further information, the Panel is satisfied that it is fair in the
circumstances that the FSP pay the following:
25% of the cost to replace the exhaust elbow and welded hose - $250
100% of invoice paid to FM on 29 April 2015 - $3,996.13
Cost of four replacement batteries - $1,000
Contribution to genset repairs - $200
Contribution to remove the water - $440
Contribution to repair of covers - $500
Contribution to furnishings - $250
Electrical wiring - $500
Total - $7,186.13
Case No: 415134 Determination Page 7 of 9
In so far as the applicant claims for the theft of fuel the Panel is not satisfied that
there is evidence to support this occurred. No evidence is a vailable to indicate when
or how this would have occurred.
Is the applicant entitled to compensation for non-financial loss?
The Terms of Reference under which the Service operates provides a compensation
payment of up to $3,000 may be awarded for non-financial loss where there is an
unusual degree or extent of inconvenience or time taken or interference with
expectation of enjoyment or peace of mind during the claims process.
The time line of events surrounding repairs to the vessel extends from when the
claim was lodged by the applicant on 17 March 2014 and it is clear from the
information provided that a number of the issues arose due to the failure by the FSP
to repair the boat. This has caused considerable stress to the applicant.
Whilst the Panel accepts there is dispute as to the extent to which damage identified
on the boat is associated with the incident, the Panel is satisfied that the delays have
caused considerable distress to the applicant.
In the circumstances, the Panel is satisfied that a compensation of $1,000 should be
paid to the applicant.
Case No: 415134 Determination Page 8 of 9
3 Supporting information
3.1 Relevant policy wording
‘ Words with special meanings
To understand this Policy, You need to know what We mean by certain words. We
explain the meaning We give these important terms below:
‘ Accidental Loss or Damage ’ means physical loss and/or damage which occurs by
accident. An accident is a happening that is unforeseen and unintended by You.
…
‘ Repairers Negligence ’ means loss or damage to Your Boat caused by the negligence
of any repairer engaged by Us to repair Your Boat in relation to a previous claim on Your
Policy. This does not include cover for Section 2 of the Policy (Liability to other people).
…
Section 1 – Accidental Loss or Damage to Your Boat
What We cover
We will cover You, for Accidental Loss, Damage, Fire and/or Explosion and Theft to Your
Boat which occurs during the Period of Insurance...
…
At Our option set out below, We will (subject to payment of the relevant Excess, if any):
Repair or replace Your Boat; or
Pay You the reasonable cost of repairing or replacing Your Boat;
…
In respect of the repair or replacement of property, We will reimburse You for the cost of
reasonable repairs and/or replacements required to bring the property as near as
possible to its appearance and condition immediately prior to the claimed loss or
damage.
We can deduct an amount for wear and tear and depreciation (We may consider the
condition of the property prior to the claim).
…
What We don’t cover
We will not cover You:
…
For loss or damage caused by wear and tear, deterioration, vermin, corrosion,
electrolysis, mould, inherent vice and/or, lack of maintenance;
General exclusions
These exclusions apply to all Sections of the Policy.
Case No: 415134 Determination Page 9 of 9
…
Wear and tear
Any claim in respect of loss or damage caused by wear and tear, mould, deterioration,
vermin, corrosion, electrolysis or inherent vice.