Alleged misleading conduct about construction loan approval and loan assessment errors
Text of the determination
Determination
Case No: 415065 Determination Page 1 of 7
Case number: 415065 15 June 2016
1 Overview
1.1 Dispute
The Applicants say that the FSP misled them about whether a construction loan had
been approved, and made other errors in its loan assessment. The Applicants say
they incurred costs based on the alleged misleading conduct.
The case manager provided the parties with a Recommendation on the issues in
dispute. The Recommendation was in favour of the FSP. A copy of the
Recommendation is attached to this Determination.
1.2 Issues and Key findings
Were the findings of the Recommendation correct?
The findings contained in the Recommendation were correct and are adopted in this
Determination . Further submissions provided after the Recommendation have been
considered.
Did the FSP mislead the Applicants about the loan approval?
Prior to the May 2015 video conference, the Applicants had primarily discussed an
owner builder loan with the FSP. This indicates the FSP had not told the Applicants it
had unconditionally approved a construction loan to finance construction by a
licensed builder.
The case manager‟s findings in relation to the May video conference and pre-
approval correspondence were correct.
It was reasonable for t he FSP‟s officers to be positive about the chances of approval.
This was not misleading based on the information they had available, which did not
yet include the valuation. While there are some queries about the valuation, we do
not have the power to r eview the FSP‟s decision to accept the valuation and decline
the loan.
1.3 Determination
This Determination is in favour of the FSP.
I agree with the case manager‟s reasons for the Recommendation. The Applicants
have not shown that they were misled by the FSP, and the FSP is not required to pay
compensation to the Applicants.
Case No: 415065 Determination Page 2 of 7
Case No: 415065 Determination Page 3 of 7
2 Reasons for Determination
2.1 Were the findings in the Recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
Recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s Recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
2.2 Did the FSP mislead the Applicants about the loan approval?
The Applicants say that construction loan discussions pre-dated May 2015
The Recommendation stated that:
There was no information available to show that the FSP misled the Applicants
prior to the May 2015 video conference.
The available information indicates discussions were about a possible owner
builder construction loan.
The Applicants say that:
1. They had more meetings with the FSP prior to the May 2015 video conference
than are recorded in the FSP‟s file notes. These meetings included detailed
discussion of a construction loan.
2. It was not appropriate for the case manager to split his analysis into before and
after the May 2015 video conference.
3. The FSP had consistently told the Applicants it would approve a construction
loan since late 2014.
The FSP has provided its available diary notes
The FSP has informed us that the file notes it has provided are the only notes it has
which records its contact with the Applicants. These file notes were provided to the
Applicants prior to the Recommendation, and a summary of relevant entries was
included in the Recommendation. The full contents of the relevant diary notes are set
out in full in Section 3.1 below.
The file note dated 20 March 2015 records that the Applicants had phoned to make a
booking to discuss a loan “top - up” for building. An appointment was made with the
FSP‟s officer (EM). On 26 March 2015, EM made a note he had met with the
Applicants. They had enquired about an owner builder loan, and EM had told them
the FSP would not provide an owner builder loan.
EM‟s note implies that this was the first time he had dealt with the Applicants about a
construction loan. This conflicts with the Applicants‟ recollection that they first met
with EM in 2014 to discuss a construction loan. The Applicants have not been able to
Case No: 415065 Determination Page 4 of 7
provide any documents to support their recollections. The FSP‟s file notes were
made at the time of the events in dispute, and therefore hold more weight than the
Applicants ‟ unsupported recollection.
Discussions prior to the video conference were about an owner builder loan
The FSP‟s file notes , combined with the initial discussion at the start of the video
conference, supports that communication prior to the video conference was primarily
about an owner builder loan.
The FSP‟s file note dated 26 March 2015 records that the Applicants enquired about
paying out their existing home loan when the FSP told them it would not provide an
owner builder loan. There is no record of a discussion about a construction loan to
finance construction by a licensed builder until the May video conference.
Despite this, it is possible that - in March 2015 - the FSP and the Applicants also
discussed the FSP‟s requirements for a construction loan to pay a licensed builder.
However, even if the FSP provided information about its requirements, and was
positive about the Applicants ‟ chances of approval, this alone would not be
misleading conduct.
For the Applicants to show that the FSP had misled them, they would need to show
that:
The FSP had told them that the loan was unconditionally approved when this
was incorrect.
The FSP had led them to believe it would approve the loan when the FSP was
aware that it would in fact decline the loan.
The FSP did not tell the Applicants it had unconditionally approved the loan
As outlined above, discussions prior to the May video conference were primarily
about an owner-builder loan. This is significant because a lender‟s process for
approving an owner builder loan will be different than for loans to fund a licensed
builder.
The Applicants ‟ claim is that the FSP “100% guarantee d ” that it would approve a
construction loan. However, the file notes show that discussions about an owner
builder loan in March 2015 did not go beyond a first interview. It was highly unlikely
that the FSP would provide a general unconditional approval for a construction loan
when the type of construction loan had not yet been decided.
In relation to the May 2015 video conference and the pre -approval letters, the case
manager found that the FSP had not provided unconditional approval. The pre-
approval letters stated that the FSP‟s conditional approva l was subject to a
“satisfactory valuation”. The word “satisfactory” was sufficient disclosure that the FSP
would be considering the results of a valuation, and that this was not a mere
procedural step. The Applicants have not provided any new information which shows
that the Recommendation‟s findings about this were incorrect.
Case No: 415065 Determination Page 5 of 7
It was reasonable for the FSP to be positive about the likelihood of approval
The May 2015 video conference included a detailed analysis of the Applicants‟
borrowing capacity. The A pplicants had a strong financial position, and the FSP‟s
officer (AB) was confident the Applicants would pass a loan servicing test for the loan
amount they required. It is likely that EM would have responded in a similar way in
the March 2015 meeting if h e reviewed the Applicants‟ income verification
documents. However, borrowing capacity is only one aspect of a construction loan
assessment. A lender will also consider whether it has adequate security.
AB was confident about the Applicants ‟ ability to service the required loan amount,
and the chances of loan approval. Further, AB‟s estimate of the potential „as if
complete‟ value indicated it was likely there would be sufficient security. AB had
estimated the potential value using a common method. Therefore, for the FSP ‟s
officers to have been positive about the chances of loan approval was not
misleading.
The FSP eventually declined the loan application due to inadequate security based
on the valuation . The FSP‟s officers could not have known, ahead of t ime, the
outcome of the valuation.
We do not have the power to review the FSP’s decision to accept the valuation
The valuer stated that the „as if complete‟ value was $410,000. The Applicant s have
noted that this value does not correspond with the contents of the valuation report.
The Applicants ‟ point is reasonable. The valuer notes comparable dual occupancy
sales of $620,000 plus, and uses a „ capitalisation rate ‟ value of $710,000.
The FSP immediately queried the valuation when it received it from the valuer. The
valuer confirmed his view that dual occupancy properties in the area were thinly
traded. The FSP‟s decision s to accept the valuation and decline the loan application
were credit risk decisions about the loan security. Under the FOS Terms of
Ref erence, I do not have the power to consider a dispute about the FSP‟s credit risk
decision.
If the Applicants still wish to pursue the construction project, they have the option of
obtaining a valuation from another valuer, or applying to a different lender.
The Applicants have not suffered a loss from signing the building contract
The Applicants say that the FSP simply asked for a building contract. They say they
were inexperienced with the process, and could not have known they could provide
an unsigned contract for the purposes of the loan assessment.
The FSP could have been more specific about its requirements for obtaining a
valuation. However, the Applicants also have a responsibility to protect their own
interests. If the Applicants were unfamiliar with the process, they could have asked
clarifying questions, or used the services of an independent mortgage broker or
solicitor.
The Applicants signed the building contract before they had unconditional approval.
The Applicants were under the mistaken belief that the construction loan was all but
Case No: 415065 Determination Page 6 of 7
approved except for a few formalities. However, as outlined above and in the
Recommendation, we have not found tha t the FSP caused the Applicants‟ mistaken
understanding.
Even if the FSP did make an error by not specifying that the Applicants did not yet
have to provide a signed building contract, they have not shown they suffered a loss.
The Recommendation observed that they had not received any demands from the
builder, and we cannot award compensation for damage to reputation. The
Applicants have not provided information to change this view.
Case No: 415065 Determination Page 7 of 7
3 Supporting information
3.1 Contents of relevant file notes made by the FSP
D ate Contents of file note
20 - 03 - 2015 “S Existing property P subdivision building – top up A 100K top up D NA – E MA is
full time public servant, FA paid int o CBA account. Client phoned to book
appointment for top up. They are building and subdividing . Pla ns have already been
appro ved. Clients have done borrowing cap in the past. Appt booked with [EM]
Thurs day 26/03 at 12.30. Clients have been advise what to bring in. ”
26 - 03 - 2015 “client has been interviewed face to face, client has been identified as per [FSP‟s
system]. I have spoken to [Applicants]. they would like to complete an Owner
Builder construction on their existing property and then sub - divide. I told them we
are not able to do HL‟s for owner builder. They have requested a payout figure so
they c an explore other options.”
31 - 03 - 2015 “Home Loan payout request”
1 - 4 - 2015 “Tried to email [Applicants].but the email address on file is incorrect. Ad hoc sent
Please call [EM at branch] in regards to early payout of your home loan. The email
on file is incorrect”
Recommendation
Case No: 415065 Recommendation Page 1 of 6
Case number: 415065 19 February 2016
4 Overview
4.1 Dispute
The Applicants applied to the FSP for a construction loan to build a second dwelling
on their property ( the K Property ). The Applicants say that the FSP misled them
about whether the construction loan had been approved, and made other errors in its
loan assessment. The Applicants say they incurred costs based on the alleged
misleading conduct.
4.2 Issues and key findings
Did the FSP mislead the Applicants prior to May 2015?
The Applicants have not established that the FSP told them, prior to May 2015, that a
construction loan was approved. The available information indicates that the
Applicants enquired about an owner-builder loan, but the FSP told them that it did not
provide this type of loan.
Did the FSP mislead the Applicants after 25 May 2015?
The FSP did not provide a firm assurance about the K Property‟s likely value, but
provided an estimate. The FSP informed the Applicants that its loan approval was
conditional on various matters, including a satisfactory valuation. The wording of the
FSP‟s pre -approval email was confusing, but it was not misleading.
Did the FSP make errors in its loan assessment process?
The method the FSP officer used to estimate the „as if complete‟ value of the K
Property was not unusual. The independent valuer later made a specific assessment
of the market value of dual occupancy properties in the location of the K Property.
The FSP could not have known the outcome of the valuation before it was
completed.
The FSP acted in line with usual practice by asking for documents, such as building
contract and plans, so that the FSP could obtain a valuation. However, the FSP did
not yet need a signed building contract. The Applicants have not shown that signing
the building contract caused them a loss.
4.3 Recommendation
This Recommendation is in favour of the FSP, and no compensation is payable.
Case No: 415065 Recommendation Page 2 of 6
5 Reasons for Recommendation
5.1 Did the FSP mislead the Applicants prior to May 2015?
Our approach to disputes about misleading conduct
We can investigate a claim that a financial services provider misled a customer and
caused the customer to suffer loss. If we find that the customer was misled, we
assess how much worse off they are as a result of relying on the representation. The
remedy for misleading conduct is not to make the promise come true.
When assessing whether conduct was misleading, we will consider the overall
circumstances in which the conduct occurred. We will consider whether a reasonable
person would have been misled by the conduct.
We do not have the power to take or test evidence on oath, nor require third parties
to give evidence. We consider available documents, the recollections of the parties
and all relevant circumstances. We give most weight to documentary information.
The Applicants say that the FSP has misled them since late 2014
The Applicants say that, from late 2014, the FSP told them:
The K Property would be worth over $800,000 when the second dwelling was
built.
Based on the Applicants‟ strong financial position, it was “100% guaranteed”
that the construction loan would be approved.
Based on this information, the Applicants incurred costs related to the proposed
construction. These costs included building plans, development and planning
approval, architectural fees and other related costs.
The available documents do not support the Applicants’ recollection
The Applicants have not provided any documents to support their recollection of
events prior to May 2015.
The FSP have not been able to obtain a statement of recollection from the officer
(EM) that dealt with the Applicants at that time. This is because he no longer works at
the FSP. However, the FSP‟s file notes record the following:
Date File note
20 March 2015 Client phoned to book appointment for top - up loan for building.
26 March 2015 The FSP tells the Applicants that it does not provide owner - builder loans. The
Applicants ask for a payout figure so they can explore other options.
1 April 2015 The FSP tries to email payout figures to the Applicants, but do not have correct
email address
From the information available, the discussions prior to May 2015 related to a
potential owner-builder loan. This is also supported by the recorded conversation on
Case No: 415065 Recommendation Page 3 of 6
25 May 2015, in which the parties started by discussing the limited availability of
owner-builder loans.
Based on the information available, the Applicants have not shown that the FSP told
them it had approved a construction loan prior to May 2015.
The FSP is not liable for the Applicants’ costs incurred prior to May 2015
The Applicants request compensation for costs they claim to have incurred based on
the F SP‟s alleged misrepresentation. The Applicants incurred most of these costs
prior to May 2015. The Applicants have not established that the FSP engaged in
misleading conduct prior to May 2015. Therefore, the FSP is not liable to
compensate the Applicants for their costs prior to 25 May 2015.
5.2 Did the FSP mislead the Applicants after May 2015?
The parties had a video conference on 25 May 2015 about a construction loan
The purpose of the video conference was for the FSP to take a construction loan
application from the Applicants. The FSP‟s assessment was that the Applicants could
service a new loan of approximately $430,000, which was more than the Applicants
required. The parties discussed the required loan amount, and the amount the
Applicants would need to contribute to avoid lenders‟ mortgage insurance (LMI).
The FSP did not assure the Applicants of the K Property value
To estimate the Applicants‟ contribution to avoid LMI, the FSP officer first estimated
the prospective value of the K Property after the second dwelling was built. He did
this by adding the estimated construction cost to the Applicants‟ estimate of the
current value of the K Property. Based on this, the FSP officer estimated that the K
Property would be worth $805,000.
However, after completing the estimation, the FSP officer said to the Applicants:
“Is this right?” (27 th minute)
This reflected that the FSP officer was relying on assumptions and estimates
provided by the Applicants which were yet to be tested. The FSP officer‟s statements
and overall conduct did not convey that he was providing a strong assurance about
the K Proper ty‟s prospective value.
The FSP officer had been positive about the Applicants‟ chances of obtaining the
loan, and had used phrases such as “this is definitely something we can do for you”
(25 th minute). However, this related to the loan servicing assessment. Later in the
telephone conversation (42 nd minute), the FSP officer stated that these estimates
“hinged” on the valuation, and that this was a “major thing”. The FSP officer
emphasised that the valuation was a significant step in the loan assessment process.
The Applicants say that they left the video conference believing the construction loan
had been approved, and that the remaining steps were mere formalities. However,
this was not a reasonable conclusion to have formed based on the overall
conversation.
Case No: 415065 Recommendation Page 4 of 6
The pre-approval letter stated that approval was conditional on a valuation
Following the video conference, the FSP sent the Applicants an email with an
attached letter about its pre-approval. The letter stated that the FSP would finalise
the application when various conditions were met, including income verification and a
valuation. The letter stated that the loan offer would be subject to a satisfactory
valuation.
The Applicants say that they thought these matters were mere formalities to be
completed. As outlined above, if the Applicants had this view, it was not caused by
misleading conduct by the FSP.
The FSP’s pre -approval email was confusing, but not misleading
The FSP‟s email dated 25 May 2015 stated that:
“This pre -approval is valid for 6 months and you can start to negotiate with real estate agents
and vendors to purchase your next property. Pre-approval is ideal for showing vendors that
you‟re serious about making an offer…”
The Applicants say that the reference to “ideal for showing” and “negotiate” with
“vendors” was a representation by the FSP. The Applicants say it was a
representation that they could be confident incurring costs and entering contracts.
The paragraph quoted above relates to pre -approvals for customers wishing to
purchase property. For this reason, it is understandable if the Applicants were
confused by this. They had applied for a construction loan to build on a property they
already owned. Information about purchasing property did not relate to them.
However, conduct which is merely confusing does not amount to misleading conduct.
It is necessary for the conduct to contain or convey a misrepresentation. That is, to
be misleading, the conduct must create a false impression that leads the receiver of
the information astray.
The paragraph quoted above refers to dealing with vendors and real estate agents
about purchasing property. While this is confusing in the context of a construction
loan application, it is not misleading. The Applicants overall dealings with the FSP at
the time included the video conference, the pre-approval letter and the remainder of
the pre-approval email. In the context of these overall dealings, the above paragraph
from the FSP‟s email does not convey a misrepresentation that the construction loan
was approved.
5.3 Did the FSP make errors in its loan assessment process?
The FSP could not have predicted the outcome of the valuation
An „as if complete‟ valuation for a construction loan is an estimate of what the
property will be worth after construction is completed. As outlined above, the FSP
estimated the K Property‟s „as if complete‟ value by adding the estimated
construction cost to the estimated current value.
However, when the FSP later obtained a valuation, the Valuer specifically reported
on the market value of dual occupancy properties in the location of the K Property.
Case No: 415065 Recommendation Page 5 of 6
The Valuer reported that there was a minimal market for such properties, and that
this significantly reduced the market value of such properties.
The Applicants says that the large difference between the FSP‟s pre -estimate and
the independent valuation represents an error by the FSP. However, the method
used by the FSP to produce its estimate was not unusual. Adding the value of
dwellings to the land value is a common way of estimating the overall value of a
property. This has been confirmed by a FOS Banking Specialist. The Banking
Specialist has had extensive experience in the banking and financial services
industry, and especially in construction finance.
The FSP could not have predicted the outcome of the independent valuation before it
actually received the valuation. The FSP was surprised by the low valuation, as
shown by the fact it immediately contacted the Valuer to seek clarification. The
Valuer confirmed his view that dual o ccupancy properties in this location were “thinly
traded”.
The FSP asked for documents in accordance with its loan assessment process
The Applicants complain that:
The FSP asked them for building plans and specifications before it obtained the
valuation.
Obtaining these documents cost the Applicants money, and the FSP should
have obtained its valuation before it asked the Applicants to incur these costs.
It is usual industry practice for a lender to ask a construction loan applicant for
building plans/spec ifications and a building contract. It is also required by the FSP‟s
lending policy relating to construction loans.
These types of documents are required as the independent valuer will assess this
information when completing their valuation. Therefore, the FSP could not obtain a
valuation before obtaining these building related documents from the Applicants. In
any event, while the Applicants did incur costs preparing these documents, much of
this cost had been incurred prior to 25 May 2015. Planning approval had been given
on 5 March 2015, and development approval on 13 May 15. The Applicants incurred
these costs before the FSP requested information in its pre -approval correspondence
dated 25 May 2015.
The FSP asked for a signed building contract
In the video conference, the FSP officer states that a signed building contract is
required before funding, and then states that a building contract is required for the
valuation. The FSP‟s lending policy states a signed building contract is required
befor e it will provide unconditional approval and a „commencement letter‟. However,
the FSP could have obtained a valuation based on an unsigned contract.
In any event, the Applicants have not shown that they suffered any financial loss from
signing the building contract. The provisions for breach of the building contract mainly
relate to the builder recovering unpaid costs and labour. The Applicants were paying
costs as they arose, and have not provided any information about a claim against
them from the Builder.
Case No: 415065 Recommendation Page 6 of 6
The Applicants claim a loss of reputation amongst local builders because they did not
proceed. We are not a court and cannot take evidence from third parties, such as
local builders. Therefore, we cannot test this claim. We do not award compensation
for loss of reputation.