Determination 414939

Lost rent claim: repair delay after malicious tenant damage

FirmFinancial Firm (Unknown - Insurer)
Decided2016-01-22
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' investment property was damaged by tenants and they sought lost rent for the repair period, arguing the FSP unreasonably delayed repairs. AFCA found no uninsured lost rent was payable under the policy and no unreasonable delay or non-financial loss attributable to the FSP.

Lost rent under the landlord extras cover is not payable, and any delay claim requires proof that reasonable handling would have completed repairs sooner, which was not shown.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 414939 Determination Page 1 of 6 Case number: 414939 22 January 2016 1 Overview 1.1 Dispute The Applicants’ claim for malicious damage to their investment property was accepted by their insurer, the Financial Services Provider (FSP). The FSP completed the claim related repairs on or around 12 September 2015. The Applicants are seeking lost rent for the duration of the claim period on the basis the FSP has not completed the works within a reasonable timeframe. The FSP has disputed this. 1.2 Issues and key findings Are the Applicants entitled to lost rent? The Applicants are not entitled to compensation for lost rent because:  the policy does not cover this loss when the property is uninhabitable due to malicious damage by tenants, and  the evidence does not demonstrate the timeframe between when the claim was lodged and repairs completed was unreasonable. Should the FSP pay non-financial loss due to the claims handling? The Applicants are not entitled to compensation for the claims handling because:  the undue degree of inconvenience and interference suffered by the Applicants was due to the fact they were uninsured for lost rent in these circumstances, and  the degree of inconvenience suffered due to other factors were within the normal degree for a claim this size 1.3 Determination This Determination is in favour of the FSP. The Applicants are not entitled to any compensation due to the FSP’s handling of the claim. Case No: 414939 Determination Page 2 of 6 2 Reasons for Determination 2.1 Are the Applicants entitled to lost rent ? Policy does not cover lost rent in these circumstances These relevant facts are not in dispute:  the tenancy began on 15 November 2014  the policy was incepted on 7 February 2015  the Applicants lodged a claim for malicious damage on 23 February 2015  the FSP accepted the claim on 22 April 2015  repairs were completed on 12 September 2015  the FSP paid 10 weeks of lost rent under the Rent Default cover  the FSP paid over $40,000 for the building claim The policy does provide cover for lost rent if the property needs to be repaired pursuant to an insured event. However, this type of cover does not extend to claims lodged under the “Landlord Extras cover”. There is no dispute the Applicants’ claim falls within this extra cover given malicious damage caused by tenants is only payable there. As such, I am satisfied that under the terms of the Applicants’ insurance contract with the FSP, they are not entitled to lost rent during the period of repairs. This does not appear to be disputed by the Applicants. However, their argument is that the repairs were unreasonably delayed. Therefore, they are seeking reimbursement of all the lost rent under this basis. FSP paid 10 weeks rent due to other factors The fact the policy does not respond to this type of loss is significant. The effect of this is that the Applicants are uninsured for any lost rent when they are unable to rent the home due to malicious damage caused by a tenant. Therefore, if the property suffers substantive damage, the uninsured lost rent can be extensive. The fact the Applicants were paid ten weeks under the policy was not associated with this scenario. Instead, it was payable under the rent default provisions which is engaged in certain scenarios, namely:  when the tenant leaves the building before the end of the rental agreement and does not provide the required notice, or  does not pay rent owing and leaves the building without the required notice, or  is legally evicted. As such, if the tenants had vacated the property after giving the required notice with rent fully paid, then the Applicants would not have been entitled to any lost rent under the policy. Case No: 414939 Determination Page 3 of 6 Applicants must establish loss occurred due to FSP breaching policy The effect of this is that any entitlement the Applicants could have for lost rent cannot arise under the terms of the cover. Instead, it is only a loss they can claim if they can establish that:  the FSP breached the contract of insurance is some way, and  this breach caused the loss they are claiming for. An unreasonable delay in the handling of the claim could constitute a breach of the contract. However, any loss that follows would only be relevant to the extent of the delay, not for the whole claim. For instance, if the evidence demonstrates that a reasonable handling of the claim would have resulted in the repairs being completed within 20 weeks, then the Applicants would only be entitled for lost rent that exceeded this. In determining whether the claim was handled reasonably, careful consideration of the individual facts of the case is required. FSP’s decision to investigate the claim was reasonable Part of the delay was due to the FSP’s decision to investigate the claim. This resulted in the claim being accepted on 22 April 2015. The policy responds to malicious damage only if the event occurs during the period of insurance. In this case, the tenancy began on 15 November 2014 and the claim was lodged just over two weeks after the policy began. Given this, I accept it was reasonable for the FSP to investigate the claim to ensure that all of the damage claimed did occur during the period of insurance. Further, there is nothing to state that the period of time it took to investigate the claim was unreasonable given:  the decision to accept the claim was within two months of the claim being lodged, and  the timeframe is within the maximum time limit set out by the General Insurance Code of Practice. Therefore, I do not accept the evidence establishes the FSP unreasonably delayed the claim during this period. FSP not required to pay more than two additional weeks After the claim was accepted, the FSP engaged a building consultant to complete a scope of works. Following which, quotations were secured by a number of builders before builder TBS was authorised to conduct the works. It appears TBS commenced repairs on or around 18 July 2015. This is almost three months after the FSP accepted the claim. Whilst this period appears long on the face of it, the chronologies provided by the parties set out the following activities being conducted in this timeframe: Case No: 414939 Determination Page 4 of 6 Date s Action 22/4/15 – 12/5/15  Building consultant engaged  Report and scope of works received 13/5/15 – 12/6/15  Quotes were obtained  TBS quote sent to the Applicants  Applicants asked if they wanted a cash settlement 29/6/15  Applicants advised they would prefer the FSP to repair the damage 30/6/15  FSP authoris ed TBS to proc eed with repairs 7/7/15  TBS made contact with Applicants to arrange repairs 10/7/15  Electrician attended – had to await aut hority from power supplier to reconnect power 18/7/15  Repairs commenced The FSP allowed two weeks of lost rent for this period. This was due to the fact it took more than four weeks to secure quotations when arguably it should have taken between two to three weeks. This is reasonable in the circumstances. In regards to the balance, I cannot accept there was any unreasonable delay given the following:  three weeks had lapsed to arrange the scope of works – this is reasonable given the extent of damage  two and a half weeks passed whereby the FSP awaited the Ap plicants’ instructions as to whether they wished to accept a cash settlement or proceed with repairs  the FSP authorised TBS within one day of receiving the Applicants’ response  TBS made contact with the Applicants within a week to arrange repairs  a week delay occurred due to awaiting authority from the power supplier – no basis to conclude this was due to the FSP’s fault No evidence that timeframe for repairs was unreasonable The authorised repairs were completed and signed off by the Applicants on 12 September 2015. This is under 2 months from when repairs were commenced. The total cost of the repairs conducted by TBS was $38,870.73. The Applicants have not provided any evidence to support that other builders could have completed the repairs sooner in these circumstances. Therefore, I do not accept the repair period constitutes an unreasonable delay. Case No: 414939 Determination Page 5 of 6 The Applicants have highlighted issues during this time period, such as a dispute regarding replacing the oven and rangehood and a delay in issuing a cash settlement for the ducted heating. I note the oven and rangehood was ultimately accepted by the FSP and subject to a variation in TBS’s quote on or around 31 August 2015. There is nothing to suggest that if there was no dispute about these items, the repair process would have been shorter. The issue with the ducted heating was subject to some confusion. The FSP cash settled this aspect on 31 August 2015 but withheld $624 based on works already conducted. This $624 was paid on 15 October 2015. Whilst I accept there was a shortfall of $624 for the ducted heating, I cannot accept this caused the Applicants to suffer a loss of rent. This is because according to their chronology:  they paid contractors to conduct these works, and  these works were completed on or around 8 September 2015, being one week before TBS completed the authorised repairs Therefore, after careful consideration of all the evidence and arguments, I cannot accept the Applicants have demonstrated that a reasonable handling of the claim would have resulted in the repairs being completed sooner. Given this, I do not accept the Applicants have demonstrated any entitlement to lost rent due to the FSP breaching any obligation under the insurance contract. 2.2 Should the FSP pay non-financial loss due to the claims handling? FOS awards non-financial loss conservatively Under paragraph 9.3(b)(i) of FOS’s Terms of Reference, I can award up to $3,000 for non-financial loss if the Applicants suffered an unusual degree or extent of:  physical inconvenience,  time taken to resolve the situation, or  interference with the Applicants’ expectation of enjoyment or peace of mind. Such an award can be provided if the FSP’s handling of the claim satisfies the above criteria. However, the Operational Guidelines to this paragraph state that FOS takes a conservative approach in awarding this. Further, FOS expects a party to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs. Stress mainly due to the Applicants being uninsured For reasons explained, I am not satisfied the evidence demonstrates the period of time between claim lodgement and repairs being completed was unreasonable. Case No: 414939 Determination Page 6 of 6 Whilst I accept the Applicants have suffered an unusual degree of inconvenience and interference, I am not satisfied this was caused by the FSP. It is clear that the stress and inconvenience suffered was predominantly associated with the fact the Applicants were uninsured for the lost rent whilst the claim was ongoing. This was due to the fact they were uninsured for lost rent in circumstances when the building was uninhabitable due to the malicious acts of the tenant. FSP has established the Applicants were informed regularly I note the Applicants have raised other issues, such as the FSP’s failure t o keep them continually informed, the FSP initially refusing liability for the oven and delays in processing cash payment. The FSP has provided evidence, including notes from its assessor, that support its position the Applicants were updated within every 20 business days This timeframe is consistent with the standards set in the General Insurance Code of Practice. Given this, I do not accept there was any undue failure to keep the Applicants updated. Other factors fall within the normal degree of inconvenience for a claim this size For the other aspects, I do not accept these issues constitute an unusual degree or extent of inconvenience, interference or delay. As explained above, FOS takes a conservative approach in awarding non-financial loss and expects parties to be moderately robust. In this case, I have not accepted the overall timeframe for the claim was unreasonable. Whilst isolated issues appeared to have arisen, these are within the normal range of inconvenience expected of a claim this size. Given this, I therefore do not accept there is sufficient basis to award non-financial loss under paragraph 9.3(b)(i) of the Terms of Reference.