Home / Financial Firm (Unknown - Insurer) / Determination 414398

Determination 414398

Storm damage claim cash settled at a lower amount than the applicants' repair quote

FirmFinancial Firm (Unknown - Insurer)
Decided2016-07-07
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$655
Non-financial loss—
Amount claimed$5,186
SourceAFCA PDF

Summary

Landlords claimed under their building policy for storm water damage, and the insurer accepted the storm damage but cash settled at $2,344.80 net of excess instead of repairing because it would not guarantee the works. AFCA found cash settlement was permitted but increased the settlement to $3,000 net of excess, ordering a further $655.20.

The policy gives the insurer the option of paying reasonable repair cost or an equivalent cash amount, and a cash settlement should allow for contingencies where the insurer cannot guarantee repairs.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 414398 Determination Page 1 of 3 Case number: 414398 7 July 2016 1 Overview 1.1 Dispute The applicants held a Landlord Building Insurance Policy with the financial service provider (FSP). On 12 August 2014 the applicants lodged a claim for damage sustained to the property following a storm. Whilst accepting liability for the storm related damage, the FSP identified a number of maintenance related issues that required rectification prior to completion of the repairs. After the applicants had completed the maintenance issues, the FSP authorised the repairs. During this process the FSP identified additional damage due to unrelated movement and defects. The FSP decided to cash settle the applicants for the cost to repair the insured damage as it could not guarantee the quality of works due to the unrelated damage. The applicants dispute the FSP’s position. 1.2 Issues and key findings Is the FSP entitled to cash settle the claim? The FSP is entitled to cash settle the claim as the policy p rovides the FSP the option to either pay for the reasonable cost of repair or a cash amount equivalent of what it would reasonably cost the FSP to repair or replace the property. Is the FSP’s offer to cash settle the claim reasonable? The FSP has offered $2,344 to settle the claim based on an assessment provided by its building consultant. As the consultant was not prepared to guarantee the repair work, I believe it is fair in the circumstances that the FSP increase the settlement offer to the sum of $3,000 net of the policy excess to allow for possible variations in the cost of repair. 1.3 Determination This determination is largely in favour of the FSP. The FSP is entitled to cash settle the applicants’ claim for the sum of $3,000 net of the policy excess of $150. Case No: 414398 Determination Page 2 of 3 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information obtained. The FSP has provided detailed information including expert reports from an engineer and building consultant in support of its position. The applicants have not provided any information to dispute the FSP’s experts but has provided a quotation for repairs. This determination follows consideration of all of the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the FSP entitled to cash settle the claim? The FSP is entitled to cash settle the applicants’ claim The FSP’s policy provides cover for a series of insured events including storm and hail damage. There is no dispute that the applicants’ property suffered water damage following a storm on or about 7 August 2014. The FSP appointed PI, a building consultant to assess the damage. PI identified a number of maintenance issues had contributed to the damage including:  gutters and valleys needed to be cleaned and maintained  ridge pointing needed to be partially re grouted over the alfresco area  gutter over bedroom 3 needed levelling or an additional overflow or downpipe installed. The FSP accepted liability for the water damage but denied liability with respect to the maintenance issues as these were outside the policy coverage. The applicants do not dispute this and agreed to complete the relevant maintenance rectification works. There is no dispute that these works were completed by December 2014. Upon completion of the maintenance rectification works, the FSP appointed PI to commence repairs. After commencing repairs, PI observed cracking to the property that it considered were due to structural defects. A structural engineer SE was appointed. SE considered the cracking and cornice movement observed were due to ongoing movement of the property unrelated to the storm event. Given the ongoing movement issues, the building consultant PI advised they would not guarantee their workmanship if they completed the storm related damage repairs. As a result the FSP offered to ca sh settle the applicants’ claim based on the quote from PI. The applicants do not dispute some cracking within the property was due to normal household movement but maintain other cracking observed only appeared after the storm. The applicants also believe that damage to the bulkhead was related to the water damage caused by the storm rather than effective workmanship or shrinkage as claimed by the FSP. The applicants have not provided any evidence to dispute the reports provided by PI or SE. Case No: 414398 Determination Page 3 of 3 The available evidence supports the FSP’s finding that the cracking and damage to the bulkheads and cornices is not storm related. The FSP has provided evidence from its building consultant that due to the ongoing issues with movement at the property, it could not guarantee the repair work. I accept that the ongoing movement issues and maintenance issues need to be rectified before this work could be guaranteed. As there is no evidence to establish that the damage to the cornice and bulkheads was caused by storm and as the FSP is unable to guarantee the work due to the underlying structural issues, I am satisfied that it is fair in the circumstances that the FSP exercise its discretion to cash settle the applicants’ claim. 2.2 Is the FSP’s offer to cash settle reasonable? The quote provided by the FSP’s building consultant PI covers relevant plastering and painting work to the kitchen, alfresco area and bedroom 3. The total quote is for $2,494.80. The FSP offered to cash settle the applicants’ claim for $2,344.80 net of the $150 policy excess. The applicants provided a quote from M Plastering dated 30 July 2014. That quote was for $5,185.70 but included repairing cracked and damaged roof tiles as well as the replacement of damaged plaster ceiling sections, sanding, painting and delivery of plaster board materials. There is no evidence that the roof tiles were damaged or cracked during the storm event. If this is deducted from M Plastering’s quote, the total cost of repairs would be $3,505.70. I have considered both quotations in forming my view in this matter. I am concerned that the FSP offer to cash settle the claim does not take into account possible contingencies that could arise in the repair. In my view, given the FSP is not prepared to guarantee the repairs, then an allowance should be made for possible contingencies occurring. When comparing the quotations in my view, it would be fair for the FSP to cash settle this claim for the sum of $3,000 net of the policy excess. I understand from the material exchanged that the FSP have already paid the applicants $2,344.80. The FSP is therefore liable to pay the applicants an additional amount of $655.20 in settlement of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.