Summary

The applicant claimed under an accidental home damage policy for storm damage to the roof, and the FSP declined roof damage as maintenance related. AFCA found the broken tiles were covered and must be settled with interest from 17 September 2015, but upheld the exclusions for the remaining roof damage.

The FSP bore the onus to prove an exclusion, and it did not establish that the broken tiles resulted from wear, tear or gradual deterioration, while the other damage fell within the maintenance, workmanship and gradual deterioration exclusions.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 414322 Determination Page 1 of 5 Case number: 414322 20 April 2016 1 Overview 1.1 Dispute The applicant held an Accidental Home Damage Policy with the financial service provider (FSP). On 19 May 2015, she lodged a claim for damage following a storm event on 1 May 2015. The FSP accepted liability for the resultant damage to the premises including water damage to the gym room, external rear patio and a crack to the window sill. The FSP also accepted liability for damage caused to the applicant‟s retaining wall. Liability for damage to the roof of the property was declined. The damage was considered due to maintenance issues and not consistent with storm. The applicant disputes the FSP‟s decision and maintains the entire damage w as due to storm. 1.2 Issues and key findings Has the applicant established a claim under the terms of the policy? The applicant has established a valid claim under the terms of the policy as the policy provides cover for accidental damage. There is no dispute that the damage sustained to the applicant‟s property during the storm was accidental. The onus is therefore on the FSP to establish an exclusion. Has the FSP established the application of an exclusion under the terms of the policy? The FSP has established that most likely the damage to the lead flashing, box guttering and condition of the painted roof tiles was due to wear or tear or faulty workmanship, which is excluded under the policy. The FSP has not established the exclusions apply with respect to the broken tiles and are liable to meet the costs associated with the repair of the broken tiles. 1.3 Determination This Determination is partly in favour of the applicant.  The FSP is to settle the applicant‟s claim for damage to broken roof tiles, in accordance with the terms and conditions of the policy. Case No: 414322 Determination Page 2 of 5  If the FSP cash settles the claim, it is to pay interest on the settlement amount in accordance with section 57 of the Insurance Contracts Act 1984 , from 1 7 September 2015 to the date of settlement of the claim . Case No: 414322 Determination Page 3 of 5 2 Reasons for determination 2.1 Has the applicant established a claim under the terms of the policy? The applicant has established a claim under the terms of the policy The onus is on the applicant to establish a claim on the balance of probabilities a claim that falls within the terms of the policy. The policy provides cover for accidental loss or damage to a number of exclusions including exclusions relating to structural defects or faulty workmanship as well as exclusions relating to rust, corrosion, gradual deterioration, depreciation and wear or tear. Whilst the policy does not define „accidental‟, the ordinary accepted meaning of the term is damage that is unintended, unexpected and unforeseen. The onus is therefore on the applicant to establish that the damage sustained to her property was unintended, unexpected and unforeseen. There is no dispute that the applicant‟s property was hit by a severe storm on 1 May 2015. Following the storm, water entered the property. The FSP‟s assessor ID inspected th e property on 22 June 2015 and identified damage caused in part by the ingress of water driven through sections of the roof, areas of water ingress due to broken roof tiles that had been part repaired with silicone due to cracking, possibly due to storm and other related issues. To this extent, I am satisfied that the applicant has established on the balance of probabilities accidental damage. 2.2 Has the FSP established the application of an exclusion under the terms of the policy? The FSP has not established the exclusion applies for the broken tiles The FSP bears the onus to establish on the balance of probabilities the application of a relevant exclusion. The FSP argues the roof damage was caused by maintenance issues, which are not consistent with the incident claimed. The FSP has quoted two specific policy exclusions for “rust, corrosion, gradual deterioration, depreciation, wear or tear” and “a defect in an item, faulty workmanship, structural defects or faulty design”. The applicant has provided a quota tion from her repairer SPR. The quotation notes the opinion that the roof showed damage consistent with storm and heavy rain activity. The applicant has also provided a number of reports from a solar panel installer SAE. SAE has indicated that it installed solar panels on the applicant‟s roof in September 2013. SAE provided particulars of the relevant inspections required prior to the Case No: 414322 Determination Page 4 of 5 installation of solar panelling and notes there was no evidence of any prior damage to the applicant‟s roof. The FSP has pro vided a building assessor‟s report from PID and a roofer‟s report from AR. AR was the roofer for PID. Whilst the FSP has noted that there was silicone applied to some broken roof tiles to stop the leaks, it has not commented specifically on the cause of the broken tiles. There is a suggestion that the silicone had been applied prior to the insured event. It is not clear how this finding was reached. The applicant maintains that her husband inspected the roof after observing the internal damage and identified a number of broken tiles which he patched prior to the FSP attending the property. The FSP suggests that in these circumstances, the applicant‟s delay in reporting the matter has prejudiced its ability to assess this damage. I do not agree with this. In my view, it was open to the FSP to provide a more detailed report as to the cause of the damage to the broken tiles. There is no evidence that the damage to the broken tiles was due to wear or tear or gradual deterioration. On balance, the damage was most likely accidental damage within the terms and conditions of the policy. I am satisfied the FSP is liable to meet the cost of repair or replacement of the broken tiles. The FSP has established exclusions apply to the remainder of disputed damage PID and AR note the remainder of the roof damage as related to maintenance. More specifically:  PID says the lead flashing is old and deteriorated and the box guttering need extra storm sealing or overflow device fitted to stop water ingress during extremely heavy rai n  AR says the deterioration of the painting of the roof is due to inadequate preparation prior to painting. SAE does not offer any specific opinion on the box guttering or lead flashing. SAE‟s information suggests the roof was in good condition in 2013. Ho wever, this does not negate the possibility of gradual deterioration in the last two years or inadequate preparation of tile surface was the proximate cause of damage. The only specific opinion as to the deterioration of the painted surface of the roof til es is AR‟s. Based on this information, I am satisfied the FSP can rely on:  the exclusion for faulty design/faulty workmanship to exclude the damage to the box guttering and the deterioration in the paint surface of roof tiles  the exclusion for gradual deterioration to exclude damage to the lead flashing. I am satisfied, on the balance of probabilities that the only loss in dispute that should be covered is the replacement of all broken tiles (whether previously siliconed or not). Case No: 414322 Determination Page 5 of 5 3 Supporting information 3.1 Summary of expert evidence on causation Expert Opinion on causation Applicant‟s repairer (SBR)  The roof shows damage consistent with storm and heavy rain activity. Applicant‟s solar panel installer (S)  The roof condition in September 2013, prior to installation of solar panels, showed no evidence of brok en, cracked, damaged or previously repaired tiles or missing roof screws, washers, silicon repairs, rust, holes or damage.  NearMaps images show the tiles were in perfect condition in September 2013, before and after installation of solar panels. FSP‟s building assessor (P)  FSP‟s roofer (AR) had informed applicant of maint enance related issues associated with the roof. Damage has been caused by ingress of heavy and wind driven rain during the storm ev ent, due to roof maintenance issues.  Maintenance issues are: 25 broken roof tiles, old and det eriorated lead flashings, box guttering requiring extra storm sealing or overflow device. FSP‟s roofer (AR)  The roof was painted about 5 - 6 years ago and it was [ not] prepared properly as the paint has already started to perish.  There are about 25 brok en roof tiles, some have silicone to stop leaks.  The lead flashing above the garage needs sealing, as wat er is possibly blown back under it. The box gutter was leakin g due to a volume of wat er which it was unable to handle.  There is no storm related damage. There are maintenanc e works required such as replacement of broken roof tiles, sealing of lead flashing and storm sealing of box gutter. 3.2 Relevant material relied upon  Product Disclosure Statement dated 1 July 2009.  Certificate of Currency for the period 1 July 2014 to 1 July 2015.  S‟s onsite hazard management report dated 2 September 2013.  SBR‟s quotation and amended quotation dated 10 May 2015.  AR‟s report dated 15 June 2015.  P‟s report dated 22 June 2015.  S‟s letters dated 1 and 22 December 2015 and 21 March 2016.  Various photos provided by both parties of the property and the roof.  Parties‟ submissions .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.