Text of the determination
Determination
Case No: 414163 Determination Page 1 of 8
Case number: 414163 11 May 2016
1 Overview
1.1 Dispute
The Applicants lodged a claim upon their Home Insurance policy, with the Financial
Service Provider (FSP), for damage to the insured property subsequent to Cyclone
Marcia in February 2015.
The FSP rejected the claim for damage to the Applicants‟ pool on th e basis it was
excluded under the terms and conditions of the policy.
1.2 Issues and key findings
Is the FSP entitled to deny the Applicants’ claim?
No, because the available evidence establishes:
the damage was caused by excessive rain on 19, 20 and 21 February 2015
the Applicants did not know or should not have known about any alleged
structural defects in the pool
the proximate cause of the seepage and water running through the earth was
the excessive rain
the FSP‟s expert describes the actions of the Applicants as merely a
contributing factor to the damage and acknowledges other causes of the
damage including the insured event and the alleged structural defect in the pool
(about which the Applicants did not know or should not have known) .
The FSP is to settle the claim in accordance with the policy terms and conditions and
as set out under the heading in the Determination “FSP to arrange Scope of Works.”
Are the Applicants entitled to compensation?
The Applicants are entitled to $1,500 compensation as the material establishes there
has been physical inconvenience, time taken to resolve the situation, and
interference with the Applicants‟ expectation of enjoyment and peace of mind.
1.3 Determination
This Determination is in favour of the Applicants.
Within seven days of acceptance of this Determination by the Applicants, the FSP is
to pay $1,500 compensation to the Applicants and settle the claim as set out in the
Determination under the heading “FSP to arrange Scope of Works.”
Case No: 414163 Determination Page 2 of 8
2 Reasons for Determination
2.1 Is t he FSP entitled to deny the Applicants’ claim?
The Applicants have established a prima facie claim
The Applicants bear the onus to establish on the balance of probabilities they have
suffered a loss caused by the storm event. This is known as a prima facie claim.
The FSP concedes the cyclone was a significant and damaging storm event and the
swimming pool sustained damage as a result of the event.
In support of their position, the Applicants relied on a report from a leak detection
specialist A. A attended the insured property and inspected the pool a few days after
the storm event. He noted the damage to the pool and the large crack in the
fibreglass shell. He reported the hydrostatic valve was in good condition. A said the
damage was caused by excessive rain on 19, 20 and 21 February 2015.
The Applicants have provided material from the Bureau of Meteorology which shows
there was significant rainfall of 8.2mm, 132mm and 197.6mm on 19, 20 and 21
February 2015.
I am satisfied the Applicants have established a prima facie claim.
Not established the Applicants knew or should have known about any alleged
structural defects in the pool
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny or limit its liability for the loss.
The FSP arranged for an engineer to inspect the pool on 6 March 2015.
Relying upon the engineer‟s report, the FSP first denied the claim on the basis the
damage to the pool was due to a defect, structural fault or design fault which cause is
excluded from cover.
The FSP explained it did not continue to rely on this policy exclusion as there was not
sufficient evidence to suggest the Applicants were aware of the structural issues. It
did not rely explicitly on this ground in its IDR review.
However, in its Notices of Response to FOS, the FSP revives the argument it is
within its rights to rely on the expert opinion of its engineer which concluded the
damage to the pool was caused by a combination of factors including the defects in
the installation of the pool.
While the FSP‟s policy has a policy exclusion which deals with defects, structural
faults or design faults, the policy exclusion says the FSP will not pay for damage
which is caused by a defect, structural fault or design fault which an insured kne w
about or should reasonably have known about (my emphasis).
The material provided establishes the Applicants‟ pool was built before the Applicants
bought the house and the Applicants made all the usual enquiries when p urchasing
the house. The FSP has the onus to establish the policy exclusion. No material is
Case No: 414163 Determination Page 3 of 8
provided which establishes the Applicants knew or should have known about the
alleged defects in the pool.
I am satisfied the FSP was correct in its earlier assessment that there was not
sufficient evidence the Applicants knew of the alleged defects. Therefore I am
satisfied from the material provided reliance on this policy exclusion is not made out
on the balance of probabilities by the FSP.
Proximate cause of leaking and seepage is the storm event
The FSP continued to deny the claim as it submitted the damage was caused by a
policy exclusion relating to seepage of water. It says it is not liable to repair the
damage to the pool as the policy has a general exclusion for loss or damage to
swimming pools which is caused by, arises from or involves water seeping or running
down the sides or underneath swimming pools causing them to move, change shape,
lift or leak through their hydrostatic valves.
The FSP also submits the damage occurred as the Applicants pumped water out of
the pool on four occasions during the rain event. It says both its expert and the pool‟s
manufacturer advised the Applicants the pumping out of the water was the main
contributor to the pool cracking and the cause of damage. It says this is the
proximate cause of the damage to the pool.
The Applicants say they pumped water out of the pool to prevent further damage to
the insured property.
The FSP‟s policy covers loss or damage caused by a sto rm. The policy does not
cover loss or damage to swimming pools caused by water leaking down the sides,
against the sides or getting underneath swimming pools.
When considering the application of the policy exclusions dealing with leaking and
seepage, there must be an examination of the proximate cause of the loss. Case law
establishes the proximate cause of loss is the dominant or effective or operative
cause of the loss whether or not that be the last in time or the sole cause.
I consider the material provided establishes the active or proximate cause of the
damage was the significant rainfall caused by the cyclone. Without the significant
rainfall, the water would not have leaked down the side, against the sides or
underneath the pool. Without the significant rainfall, water would not run through the
earth causing hydrostatic movement.
Alleged pool operator error a contributing factor only
The FSP‟s engineer summarised the causes of damage to the pool. He said the
damage to the pool was caused by a combination of the cyclone rain event, critical
pool installation defects and pool operation errors made by the Applicants.
In other words, the FSP‟s expert opinion identifies three causes of damage; one is
the insured event; one is an exclusion upon which the FSP no longer relied (and is
not made out); and one is pool operator error by the Applicants.
Case No: 414163 Determination Page 4 of 8
The FSP‟s engineer concluded the provision of uncemented backfill and the
installation and drainage issues to be critical defects in the pool‟s original install ation
which directly contributed to the damage of the pool shell.
The FSP‟s engineer also said the Applicants‟ actions of pumping out the internal pool
water during the rain event to be a contributing factor to the damage to the pool shell.
The engineer says he was told by the Applicants between 300mm was pumped out
on the first occasion and about 200mm pumped out of the pool on the last three
occasions during the passing of the cyclone.
In a lengthy submission to the FSP, the Applicants say they conducted backwash
operations on the night of 19 February and on the next day when they observed
about 10cm to 15cm of water covering the entire property. They say no sooner had
the pool level slightly lowered just beneath the usual operating water level, before it
was again quickly filled. As the rainfall increased significantly , they say they “gave
up” and did not conduct any further backwashing after 20 February 2015.
They submit the heavy rain continued. This is supported by the material from the
Bureau of Meteorology. On 21 February 2015, rainfall measured 197mm. The
Applicants say the rain lessened over the night of 21 February and by the morning of
22 February not only had the rain lessened but the surface run-off had abated. It was
during 22 February the Applicants say they noticed the previously observed
overflowing water level within the pool had lowered below the skimmer box.
The Applicants contend they merely estimated the level of backwashing. While they
were backwashing, they say the pool was overflowing and above the normal
swimming pool water level. They say they backwashed the overflowing pool on three
occasions not four times as reported by the FSP‟s engineer. In all the circumstances,
including the significant rainfall, the immense surface run-off and overflowing storm
water drainage pit outside the fences, they contend their actions were reasonable.
The material from the Bureau of Meteorology shows there was abnormally high rain
over the three days 19, 29 and 21 February 2015. A total of 337.8mm fell in that
period particularly on the latter two days. I accept th e Applicants‟ submission there
was abnormally high rain soaking into and saturating the surrounding land and
causing immense surface run-off. In the circumstances, noting the depth of the pool,
the likely amount pumped out of the pool, the amount of rain which fell in a short
period of time, the surface run- off and the Applicants‟ observations , the pool level
only slightly lowered just beneath the usual operating water level before it was again
quickly filled, I am not satisfied on the balance of probabilit ies the Applicants‟ actions
are the proximate cause of the damage to the pool.
While the Applicants say in an email to the FSP the pool‟s builder advised the
backwashing was the main contributor to the pool cracking, as there is no written or
considered op inion from the pool‟s builder, I am not satisfied this is sufficiently
compelling material to substantiate the FSP‟s opinion the proximate cause of the loss
was the Applicants‟ actions.
Further, the FSP‟s engineer describes these actions as merely a contr ibuting factor
to the damage to the pool shell while he describes the pool installation issues as
directly contributing to the damage to the pool shell.
Case No: 414163 Determination Page 5 of 8
As for the general policy exclusion, the FSP has not established water was leaking
through the hydrostatic valves. The material establishes the hydrostatic valve was in
good condition. Rather, water leaked through the crack in the pool wall and floor
caused ultimately by the incorrect installation methods.
As for water running through the earth (referred to in the FSP‟s policy as hydrostatic
water seepage), I am satisfied the water was running through the earth because of
the extraordinary rain event. That is, the proximate cause of the water running
through the earth was the insured event of storm.
Having carefully considered all the material, I am not satisfied on the balance of
probabilities the FSP has established the damage to the pool was caused by the
policy exclusions it relies on.
Moreover, its own expert acknowledges three causes of damage one of which is the
insured event and one of which the FSP no longer relied on and cannot make out.
Whilst the FSP attributes the Applicants‟ actions as the proximate cause of the
damage, its own expert describes the actions of the insured as merely a contributing
factor to the damage. In the circumstances, I am not satisfied the Applicants‟ actions
were the proximate cause of the loss as I am not satisfied they were the dominant or
effective or operative cause of the loss.
FSP to arrange Scope of Works
The FSP is therefore to settle the claim in accordance with the policy terms and
conditions.
The FSP‟s expert says it will be necessary to remove and replace the damaged pool
shell with a new pool structure. The engineer says this will require partial demolitio n
and replacement of the rendered masonry boundary fence and complete demolition
and replacement of the tiling and paving slabs around the pool and the pool itself. It
also states careful consideration will need to be given to the stability of the adjacent
residence during the repair of the pool. He says the installation of sheet piling may be
required between the pool and the adjacent residence to prevent any slumping and
settlement of the residence during the repair of the pool.
The Applicants obtained a quote from N Pools in the sum of $53,544. The quote
appears to be comprehensive but it is not clear it addresses the FSP‟s concern
regarding the adjacent property. Further, the quote is over a year old and the quote
was valid for 30 days only.
At the FSP‟ s cost, within fourteen days of acceptance of this Determination by the
Applicants, the FSP‟s engineer is to prepare a Scope of Works to remedy all the
damage. The Scope is also to include all the matters discussed in the report under
“7.0 Rectification Measures.”
Within fourteen days of receipt of the Scope of Works, a builder is to be appointed to
cost the Scope of Works. The FSP is to tender the Scope of Works both to its own
contractor and to a contractor of the Applicants‟ choice.
Case No: 414163 Determination Page 6 of 8
Within seven days of receipt of the Scope of Works and the costings for the Scope,
at its option, the FSP will then decide if it will undertake all necessary repairs and
rectification measures or whether it will pay the Applicants the cost of the repairs and
rectification measures.
If the FSP elects to cash settle the claim, within seven days of election to cash settle,
the FSP is to pay the claim.
It remains necessary for the amount of the cash settlement to be agreed, based on
the Scope of Works to be prepared by the FSP‟ s engineer and the builder. FOS
encourages the parties to this dispute to resolve any issues which might arise during
that process. However, the parties can return to FOS if they are unable to resolve
any issues arising from the Scope of Works and/or the costing of the work.
If the FSP elects to undertake all necessary repairs and rectification measures, within
seven days of making this election, the FSP is to appoint the agreed builder and
otherwise ensure the rectification works are undertaken promptly and within a
reasonable time.
2.2 Are the Applicants entitled to compensation?
Compensation awarded in certain circumstances
The Applicants say the entire process and methodology in processing the claim has
created enormous stress and anxiety.
The Terms of Reference allows FOS to direct the FSP compensate an Applicant for
non-financial loss where there is an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with the Applicant‟s
expectation of enjoyment or peace of mind.
The maximum amount of compensation for non-financial loss is $3,000.
$1,500 compensation is fair in all the circumstances
The material shows the dispute has been ongoing since February 2015. Further, the
Applicants have not been able to enjoy their pool but instead experienced the
unpleasant sight of the damaged pool.
In addition, the FSP was not clear in its reasons for denying the claim. While it is
recognised this was a complex claim, and the FSP has apologised for any confusion
it may have caused, I am satisfied there has been physical inconvenience, time taken
to resolve the situation and interference with the Applicants‟ expectation of enjoyment
and peace of mind.
Taking all matters into account, I consider it is fair in the circumstances the FSP pay
$1,500 compensation to the Applicants.
Case No: 414163 Determination Page 7 of 8
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this Determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant Policy Provisions
„ What you are covered for – Insured events
If you have a [Policy Name] insurance policy, we cover your home and cont ents when covered
under this policy for loss or damage at the insured address caused by an ins ured event during
the period of insurance.
There are some things we do not cover and these are shown on the „We do not cover‟ section
of the following tables on pages 17 to 25 and in the „General exclusions‟ on pages 58 to 62.
Storm
We do not cover
loss or damage to swimming pools or underground tanks caused by wat er leaking down
the sides, against the sides or getting underneath them;"
"General exclusions
You are not covered under any section of this policy for damage, loss, cost or legal liability that
is caused by, arises from or involves:
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or should reasonably have known
about) and did not fix before the loss or damage occurred (e. g. if there are signs that a defect
previously caused damage, we will not pay a later claim for further damage from this defect)."
“You are not covered under any section of this policy for damage, loss, cost or legal liability that
is caused by, arises from or involves:
Seepage of water
water seeping or running:
Case No: 414163 Determination Page 8 of 8
through the eart h (hydrostatic water seepage);
down the sides of earth or eart h fill that is up against your home;
down the sides or underneath swimming pools or spas causing them to move, change
shape, lift or leak through their hydrostatic valves;
against or through retaining walls and forcing them to move or crack;
from agricultural pipes. ‟
3.3 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of
the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
3.4 Material considered and relied on
Correspondence between the parties.
Applicants‟ submissions, reports, photographs and attachments .
FSP‟s submissions, reports and attachments .
Extracts Bureau of Meteorology.
FSP‟s file notes .
Applicants‟ report from A dated 24 Febr uary 2015.
FSP‟s engineer‟s reports dated 11 March 2015 and 19 August 2015 .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.