Home / Financial Firm (Unknown - Insurer) / Determination 413806
Determination 413806
Roof repair and further ceiling water damage claim declined under design, workmanship and maintenance exclusions
Summary
The applicants asked the FSP to pay to repair their roof and further ceiling damage after the FSP had paid for earlier ceiling repairs. AFCA found the roof faults were excluded design, workmanship and maintenance issues and that the FSP acted fairly, with no compensation.
The engineer evidence showed design faults and maintenance issues caused the water ingress, and the applicants had been told in 2009 that roof repairs were not covered.
Issues
- Claim denial primary · not upheld
“The policy does not cover damage as a result of, or caused by, maintenance issues, faulty workmanship or faulty design. Therefore the FSP is not required to pay for the rectification.”
- Poor communication secondary · not upheld
“The applicants were advised in April 2009 and in May 2009 that the roof repairs were not covered.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 413806 Determination Page 1 of 6
Case number: 413806 21 April 2016
1 Overview
1.1 Dispute
Water entered via the applicants‟ roof and damaged ceilings. The financial services
provider (FSP) partially accepted the applicants‟ claim. It authorised repairs to the
ceilings, but not to the roof.
The applicants claim after the repair, there was further damage to the ceilings. The
applicants say the FSP is responsible for the roof repair and the further damage to
the ceilings.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP.
The FSP accepted the recommendation but the applicants did not accept it. In the
circumstances, the dispute was referred to me for determination .
1.2 Issues and Key findings
Is the FSP entitled to deny the claim?
The material provided establishes on the balance of probabilities the roof has design
and workmanship issues which allowed water to enter through the roof and damage
the ceilings. The policy clearly states damage caused in this way is not covered.
Did the FSP act fairly in the circumstances?
From the information exchanged, the applicants have not established on the balance
of probabilities the FSP prejudiced them in any way. Instead, the information shows
the applicants knew about the issues with the roof, knew it was not covered by the
policy but still insisted the FSP should cover the cost to repair it. In the
circumstances, the FSP acted fairly and reasonably toward the applicants.
Are the applicants entitled to compensation?
The material provided does not establish the applicants are entitled to compensation.
The claim was assessed promptly and the insured damage (repairs to the ceilings)
was carried out in a satisfactory timeframe.
1.3 Determination
This determination is in favour of the FSP. The FSP is not required to take any
further action in relation to the claim or the dispute.
Case No: 413806 Determination Page 2 of 6
2 Reasons for Determination
2.1 Is the FSP entitled to deny the claim?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
No new material provided after the recommendation
After the recommendation was rejected, the applicants made a further submission
essentially reiterating their position. No new material was provided.
Damage caused by faulty design and workmanship and lack of maintenance
The FSP appears to have accepted the insured property was storm damaged in July
2008. The applicants made a claim in April 2009. They claimed rain was coming
through the roof into certain rooms in the house. The FSP inspected and assessed
the damage to the ceilings and arranged for water damaged ceilings to be repaired.
The FSP‟s file notes show the repairs to the ceilings were completed in July 2009.
No work was done by the FSP to the insured property‟s roof.
In all the circumstances, I am satisfied a prima facie claim exists. That is, I am
sati sfied the FSP accepted storm damage occurred to the insured property‟s ceilings
in the claim made in April 2009.
The onus is on the FSP to show on the balance of probabilities if an exclusion
applies to deny or limit the claim. If an exclusion applies, the FSP can decline the
claim for damage to the roof and further damage to the ceilings.
The only expert evidence available as to the cause of damage is from the FSP‟s
experts. A roof plumber inspected the roof in September 2010 and reported there
were several reasons why water entered the ceiling including:
the fasteners which hold the gutter up are leaking and should be replaced
the roof iron sheets were too short into the gutter, allowing water to draw back
and enter into the roof space
lack of fall on the gutter so water would dam and then overflow
As a result of further submissions by the applicants to the FSP, the FSP also
obtained a report from an engineer
The engineer inspected the roof and provided a report in February 2011.
Although the engineer do es not use words which specifically reflect the FSP‟s policy
wording, I am satisfied the report establishes the damage to the insured property was
caused by causes which are excluded from cover.
Although the engineer considered the roof sheeting and associated flashing were by
this time in order, the engineer said there were problems with the gutter and down
Case No: 413806 Determination Page 3 of 6
pipe arrangement which caused build up and blockage by debris. As the gutter was
subject to build up of debris, the gutter overflowed and flooded into the dining area
ceiling below. The engineer suggested slots be provided to the front of the gutter line.
As for the damage over the atrium, the engineer took photographs which indicated
the gutter was subject to build-up and debris. He considered the gutter was backing
up with stormwater here also, flowing into the roof space and into the plaster ceiling.
He recommended the gutter be cleaned and the gutter line also be provided with
slots to enable the build-up of storm water to escape.
The engineer also identified the lack of adequate waterproofing to the satellite dish
fixings and associated cables which had been installed a couple of years before his
inspection.
The applicants provided no expert opinions to rebut the FSP‟s position about the
cause of the water ingress. Instead, when rejecting the recommendation, in a further
submission, they say the water has not entered into the roof because of any work
done by the roofer. They say:
the water ingress into the dining room occurred before they requested a roofer
re-screw the roof sheets
their roofer did not replace the iron roofing, but just re -screwed the existing
sheets and may have applied some sealant
the roofer did not shorten or alter the existing structure
the water continued to enter the property in the same dining room area after the
roofer did the work
the damage on the other side of the house is caused by the cable installer not
sealing the area correctly when installing an antenna
Having carefully considered the applicants‟ further submissi on, I do not find their
submission, without further expert opinion, is sufficiently compelling to challenge the
FSP experts‟ opinions on the cause of the water ingress.
When the assessor inspected the insured property in April 2009, the assessor noted:
„ in sured has already had roof done‟ . There is no material from the roofer or otherwise
describing exactly what work the roofer did.
In relation to the faulty design of the roof, the applicants admit the water ingress
occurred before they appointed a roofer to re-screw the roof. The roofer did not alter
the design or structure of the roof, but only re-screwed it. Therefore, any design faults
with the roof allowing water ingress would have continued after the roofer re-screwed
the roof. This is consistent with the FSP‟s position that the roof sheets were too short
(faulty design) and this allowed water to enter into the roof space.
In relation to other areas of damage, the applicants admit this was caused by the
incorrect installation of an antenna by the cable installer. Incorrect installation is faulty
workmanship. The policy clearly states damage caused faulty workmanship is not
covered.
Further, the engineer also identified other problems with the roof which caused water
ingress, which causes are excluded from cover. The gutter and down pipe
arrangement causing debris build-up is a faulty design. The requirement for gutters to
Case No: 413806 Determination Page 4 of 6
be cleaned is a maintenance issue. The lack of provision of slots in the front of the
gutter line to enable the build-up of storm water to escape is also a faulty design
issue.
The policy does not cover damage as a result of, or caused by, maintenance issues,
faulty workmanship or faulty design. Therefore the FSP is not required to pay for the
rectification of faults with the roof, or the resultant water damage caused by it.
2.2 Did the FSP act fairly in the circumstances?
In April 2009 the applicants were aware the FSP declined to repair the roof
The applicants claim the FSP initially accepted their insurance claim and employed
builders to see to the water damage issues at the insured property. They say the
repairs were completed, but the builder did not fix the roof problem or advise the
applicants of the problem. They say they were not made aware of issues with the
roof, and the FSP had an obligation to warn them of such issues. They also say they
did not know the repairs carried out by the FSP‟s builder did not include the repairs to
the roof. They say, not knowing the issues with the roof were not repaired, water
continued to come into the ceilings and the ceilings were re-damaged.
In the applicants‟ further submission, they also say they did not give the FSP‟s
builder an impression they had already carried out roof repairs. They say they had no
communication with the builder. They say the “true position was not unveiled” until
they were provided with the FSP‟s engineer report.
Having carefully reviewed the information exchanged, I do not accept the applicants‟
submissions.
The information provided shows the applicants were aware there were issues with
the roof. At the time the applicants first claimed, they already carried out roof repairs.
The initial claim notification recorded on the FSP‟s system states:
“Applicant advises that due to rain coming in thru flat roof over dining room, stairwell
and above lights in kitchen the ceilings are stained. Applicant has had roof re-screwed
and resealed to prevent more damage”
This is consistent with the FSP‟s builder‟s report, where the builder noted the
applicants had advised they „already had roof done‟.
In relation to the applicants‟ claim they were not aware of the issues with the roof, the
information exchanged shows the applicants contacted the FSP to request payment
for ceiling damage and roof repairs. This indicates the applicants were aware there
were continuing issues with the roof which required repair.
The information exchanged also shows the FSP explained to the applicants only the
internal ceiling damage would be covered by the claim. The FSP‟s file note 13 May
2009 clearly demonstrates the applicants were told:
„…insurance covers the resultant damage but not the cause of the damage so the cost
to re- screw his roof is not claimable….”
Case No: 413806 Determination Page 5 of 6
Further, the assessor‟s report also indicates the assessor was advised the applicants
already had the roof done. In April 2009 the assessor advised the applicants
maintenance/prevention work was not covered.
On the material provided, I am satisfied the applicants were advised in April 2009
and in May 2009, although the FSP would repair the damage to the ceilings in the
insured property, the roof repairs were not covered.
In those circumstances, the FSP and or its builder was not obliged to fix the roof or
advise the applicants of the specific issues with the roof.
Rather, in all the circumstances of the matter, I am satisfied the applicants were on
notice in 2009 that if water continued to come into the ceilings in the insured
property, then having arranged once to repair the roof, the responsibility continued to
lie with the applicants to investigate and rectify the issues with the roof which
continued to cause water ingress.
In light of all of the information exchanged, I am satisfied the FSP acted fairly and
reasonably towards the applicants.
2.3 Are the applicants entitled to compensation?
FSP acted in a timely way to resolve claim
FOS‟s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the a pplicant‟s expectation of
enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss.
The material provided shows the applicants contacted the FSP on 28 April 2009
claiming in July 2008 rain entered the roof and caused damage. The FSP arranged
an assessor in a matter of days. The applicants were advised of the claims outcome
on 13 May 2009. The repairs covered by insurance were completed by 6 July 2009.
The claim was re-opened by the applicants in September 2010, January 2011 and
March 2013. On each occasion, the FSP was pro-active in investigating the
a pplicants‟ concerns by sending out the builder, a plumber, an engineer and an
investigator to assess and report on the damage.
In the circumstances of this dispute, I do not consider compensation is warranted.
Case No: 413806 Determination Page 6 of 6
3 Supporting information
3.1 FOS Approach
This dispute has previously been the subject of a FOS recommendation. The
applicant rejected the recommendation. Therefore, the matter has proceeded to a
determination in line with the operational guidelines to the FOS Terms of Reference.
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to FOS. For the purpose of this
determination, commentary is restricted to only those issues considered relevant to
the outcome.
3.2 Policy Extracts
The relevant policy extracts are referred to in correspondence between the parties
and in the FSP‟s Notice of Response.
3.3 Relevant information considered and relied on
Correspondence between the parties
Applican ts‟ submissions
FSP‟s submissions and attachments
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.