Text of the determination
Determination
Case No: 413415 Determination Page 1 of 13
Case number: 413415 11 August 2016
1 Overview
1.1 Dispute
The applicants are the trustees of a self-managed superannuation fund which owns a
commercial property in regional Australia. The applicants insured the property under
a commercial property insurance policy with the financial services provider (FSP),
which was arranged through a broker.
The applicants lodged a claim under the policy after the property was damaged by
severe storms in April 2015. The FSP accepted the claim and cash settled the
applicants for the estimated cost of repairing the damage, based on an estimate
provided by the applicants ’ builder. The FSP also cash settled the applicants for rent
lost due to the damage caused by the storm.
For the purposes of settling the claim, the FSP applied the underinsurance provisions
in the policy, which reduced the amounts payable to the applicants for property
damage and loss of rent. The applicants dispute the FSP’s reliance on thes e
provisions. They also say that the estimated repair cost used to determine the cash
settlement amount underestimates the actual repair costs.
1.2 Issues and key findings
Is the FSP required to increase the cash settlement for property damage?
The available information establishes that, in determining its liability for property
damage, the FSP overestimated the full insurable value of the property and
underestimated the costs of repairing the damage caused by the storm in April 2015.
Accordingly, the FSP is required to increase the cash settlement amount for property
damage.
Is the FSP required to increase the cash settlement for loss of rent?
The available information establishes that, in determining its liability for loss of rent,
the FSP overestimated the annual rental income of the property. Further, the actions
of the FSP and its contractors unnecessarily delayed the settlement of the claim.
Accordingly, the FSP is required to increase the cash settlement amount for loss of
rent.
Case No: 413415 Determination Page 2 of 13
1.3 Determination
This determination is partly in favour of the applicants.
The FSP is to increase the cash settlement amount paid to the applicants:
in respect of the damage to the property, to $346,606.33; and
in respect of loss of rent, to $39,059.03.
The FSP is to pay to the applicants the difference between the above amounts and
the cash settlement amounts previously paid, together with interest on such
additional amount as set out in sections 2.1 and 2.2 below.
Case No: 413415 Determination Page 3 of 13
2 Reasons for determination
2.1 Is the FSP required to increase the cash settlement for property
damage?
Underinsurance clause applies where property sum insured is too low
Section 1 (Property) of t he applicants’ policy provides cover for physical loss or
damage to the insured property during the period of insurance, subject to the
conditions and exclusions set out in the policy.
Section 1 contains an underinsurance clause which provides that, where the sum
insured for the property shown in the schedule is less than 80% of the “Full Insurable
Value” of the property, the FSP is entitled to reduce its liability for damage to the
property by a proportionate amount.
For the purposes of the policy, the “Full Insurable Value” of the property is defined to
mean the amount required to fully indemnify the applicants for damage to the
property in accordance with Section 1.
Section 1 provides that the FSP will settle claims for damage to the property by
paying the Replacement Cost, being the cost of replacing, repairing or rebuilding the
property to a condition substantially the same as when new.
When they took out the policy, the applicants specified a sum insured of $1.6 million
for the property.
Accordingly, the FSP will be entitled to apply the underinsurance clause if the cost of
rebuilding the property to a condition substantially the same as when new exceeds
$1.6 million by 20% or more.
For the purposes of applying the underinsurance clause, the estimated cost of
rebuilding the property is to be determined as at the start of the relevant period of
insurance (being May 2014).
FSP applied underinsurance clause to reduce liability by 32.93%
The FSP says that it is entitled to reduce its liability for the damage caused by the
storms in April 2015 because the sum insured of $1.6 million specified by the
applicants was less than 80% of the full insurable value (ie the cost of rebuilding the
property as at May 2014).
Based on estimates provided by its quantity surveyors, the FSP says the cost of
rebuilding the property as at May 2014 is $2,982,115 (excluding GST). Using this
estimate, the 80% threshold which triggers the application of the underinsurance
clause is $2,385,692.
The sum insured of $1.6 million represents 67.07% of the threshold amount.
Accordingly, the FSP says it is entitled to reduce its liability for the damage to the
applicants ’ property by 32.93% of the cost of repairing the damage.
Case No: 413415 Determination Page 4 of 13
There is conflicting information about the cost to rebuild the property
The rebuilding cost of $2,982,115 adopted by the FSP was based on an estimate of
$2,617,115 provided by the FSP’ s quantity surveyor (M), plus an additional amount
of $365,000 for the cost of carpets and fitouts.
The FSP also obtained an estimate from another quantity surveyor (S), who
estimated the rebuilding cost as $2,801,215. The FSP adopted the estimate provided
by M as this was more favourable to the applicants.
Having carefully reviewed the estimates provided, the Panel is not satisfied that it
was appropriate for the FSP to include the additional amount of $365,000 for carpets
and fit out in determining the building cost.
The estimates provided by both M and S include an allowance for floor coverings
(including carpet), as well as the basic arcade fit-out.
To the extent that additional costs would be incurred in fitting out specific tenancies,
without reviewing the terms of the lease agreement, it is not clear that these costs
would necessarily be incurred by the applicants as landlord.
The applicants dispute the accuracy of the replacement cost estimates provided by
the FSP. They say that the FSP’s quantity surveyors have consistently overestimated
the rebuilding cost.
The initial estimate of $4.6 million provided by S was subsequently shown by the
applicants to be based on manifestly incorrect assumptions about the property, while
later estimates were prepared as at the date of the estimate (which is inconsistent
with the terms of the underinsurance clause).
The applicants purchased the property for approximately $1.6 million (including land
value) in or around April 2014. In connection with the purchase, they obtained a
valuation from a certified practising valuer (H), who assessed the market value of the
property as $1.57 million.
The valuation provided by H was obtained by the applicants for the purpose of
seeking bank approval to finance the purchase. The valuation of $1.57 million
provided by H was based primarily on the income-generating ability of the property
(in accordance with the bank’s interest in ensuring the serviceability of the loan).
On this basis, the Panel accepts that the valuation of $1.57 million provided by H
does not accurately represent the “Full Insurable Value” of the property for the
purposes of the underinsurance clause.
However, the valuation provided by H also includes a figure of $1.98 million which is
stated to represent the estimated cost of replacing the property in the event it was
destroyed.
The amount of $1.98 million is described in the valuation report as an “i nsurance
estimate ” of the “Replacement with New Value” of the property as at 26 February
2014. It is clearly differentiated from the estimated market value of the property.
Case No: 413415 Determination Page 5 of 13
The FSP says that, as a certified practising valuer, H is less qualified to provi de an
accurate estimate of the likely cost of rebuilding the property than a quantity surveyor
(such as M and S).
The Panel acknowledges that the estimates prepared by the FSP’s quantity
surveyors are based on itemised breakdowns of the cost to rebuild the property.
However, in the context of applying the underinsurance clause, the Panel also
considers that the “insurance estimate” provided by H should be given some weight ,
given H ’s qualifications and experience and the fact that the valuation was obtaine d
prior to (and independent of) the current claim.
For the reasons outlined above, the Panel considers it is fair in all the circumstances
to adopt a value of $2,298,557 as the full insurable value of the property for the
purposes of applying the underinsurance clause (being half way between the
estimate provided by M and the insurance valuation provided by H).
FSP is entitled to reduce liability by 13%
Based on a full insurable value for the property of $2,298,557, the 80% threshold
which triggers the application of the underinsurance clause is $1,838,846.
The sum insured of $1.6 million represents 87% of the threshold amount.
Accordingly, the FSP is entitled to reduce its liability for the damage to the applicants ’
property by 13% of the cost of repairing the damage.
The applicants have disputed the FSP’s ability to rely on the underinsurance clause
at all. They say that, at the time they took out the policy, the FSP told them that it
would not undertake its own valuation of the property and would accept the valuation
obtained by the applicants.
However, the applicants have not provided any information which suggests that the
FSP was provided with a copy of the H valuation prior to the inception of the policy
and expressly agreed to accept the amounts shown in the valuation as representing
the full insurable value of the building.
The inclusion of an underinsurance clause is a relatively common feature of
commercial insurance policies and is included to prevent the policyholder obtaining a
benefit disproportionate to the premium paid (which is calculated based on the sum
insured).
In the present case , the applicants’ policy was arranged through a broker and it
appears that all discussions with the FSP prior to policy inception were carried o ut by
the broker.
In these circumstances, it was the broker’s responsibility to advise the applicants of
the potential risks associated with the underinsurance clause and the steps they
should take in order to mitigate this risk. It was the applicants’ re sponsibility to specify
an appropriate sum insured, in light of this advice.
While outside the scope of this determination, the Panel notes that any failure by the
broker to advise the applicants about the underinsurance clause may constitute a
breach of duty.
Case No: 413415 Determination Page 6 of 13
For the reasons outlined above, the Panel considers the FSP is entitled to apply the
underinsurance clause but only to the extent of reducing its liability for property
damage by 13%.
Applicants say repairs need to be conducted outside business hours
The FSP calculated the settlement amount based on an estimated total repair cost of
$323,460.48.
Approximately 50% of the total costs reflected an amount of $162,364.80 for building
reinstatement works to be carried out by the applicant’s builder (DC ). The remainder
reflect the cost of various additional items including plastering, air conditioning and
floor coverings.
The applicants say the repair cost adopted by the FSP significantly underestimates
the actual cost of undertaking the necessary repairs.
The applicants say the FSP assumed the repairs could be undertaken during
ordinary business hours, whereas in fact the repairs needed to be carried out after
hours, in order to comply with the applicant’s legal obligations .
Applicants have provided information establishing easement exists
The applicants say the property is subject to an easement, which provides
neighbouring property owners with pedestrian access.
The applicants say it is not legally permissible for them to block off the right of way
during business hours, in order to carry out the necessary repairs. They also say that
the need to remove and replace large panes of glass during the course of the repairs
created an unacceptable risk to users of the easement.
The valuation report prepared by H confirms the existence of an easement which
provides access to adjoining properties from the public car park at the rear of the
applicants’ property. The report includes copies of a title search and the deposited
plans for the property which reflect the existence of the easement.
The FSP says that the information provided by the applicants is insufficient to
establish the nature of the easement and the extent to which it may affect the
conduct of the storm-related repairs.
The Panel acknowledges that the information provided by the applicants does not
conclusively establish the effect of the easement on the conduct of the repairs. Even
if the easement restricted certain aspects of the works, it is possible that other
aspects could have been completed during ordinary business hours.
Nevertheless, the Panel considers that the information provided by the applicants
was sufficient to warrant further investigation on the part of the FSP, in order to
accurately determine the extent of its liability under the policy. Instead, the FSP has
dismissed the applicants’ statements about the existence of an easement as purely
speculative.
The applicants’ builder (DC) provided a quotation for $312,240 to undertake the
building reinstatement works outside business hours and on weekends (which
Case No: 413415 Determination Page 7 of 13
includes the costs of removing any scaffolding erected prior to the start of business
the following day).
In light of the above, the Panel considers it is fair in all the circumstances to increase
the FSP’s estimate of the total repair cost by $74,937.60, being 50% of the difference
between the amount quoted by DC for carrying out the repairs outside business
hours (as opposed to during business hours). This results in a total repair cost of
$398,398.08.
FSP is required to increase settlement amount for property damage
For the reasons outlined above, the FSP is entitled to apply the underinsurance
clause to reduce its liability for the cost of repairs by 13% (based on a total repair
cost of $398,398.08).
Accordingly, the FSP’s liability for the damage to the property is $346,606.33.
The FSP has previously agreed to cash settle the applicants for property damage for
a total of $216,945.05, which includes an additional amount of $1,271.10 offered in
March 2016 (although it is unclear whether this amount has yet been paid).
The FSP is required to pay the applicants the difference between the amount of
$346,606.33 and the total amount already paid.
The FSP is required to pay interest on the difference at the rate determined in
accordance with section 57 of the Insurance Contracts Act 1984 (Cth), for the period
from 23 October 2015 (when the FSP’s IDR response was due) until the payment
date.
The Panel notes the concerns raised by the FSP that the applicants did not provide a
copy of H’s valuation report until relatively recently. However, based on the claim
records, the Panel is satisfied that the FSPs loss adjuster (CL) was aware of the
information contained in the valuation report in September 2015.
2.2 Is the FSP required to increase the cash settlement for loss of rent?
Underinsurance clause applies where sum insured is too low
Section 2 (Loss of Income) of the applicants’ policy provides cover for “Income” lost
as a result of damage to the insured property, subject to the conditions and
exclusions set out in the policy.
For this purpose, “Income” refers to the gross amount receivable by the applicants
under lease agreements existing at the time of the damage.
Section 2 contains an underinsurance clause which is broadly similar to the clause in
relation to property damage discussed in section 2.1 above.
This clause provides that, if the sum insured for loss of income (as shown in the
schedule) is less than 80% of the Annual Income , then the FSP is entitled to reduce
its liability for loss of rent by a proportionate amount.
Case No: 413415 Determination Page 8 of 13
The “Annual Income” means the income during the 12 months immediately prior to
the date of the loss or damage, subject to adjustment for any events which would
have otherwise affected the income after that date.
When they took out the policy, the applicants specified a sum insured of $200,000 for
loss of income in respect of the property.
Accordingly, the FSP will be entitled to apply the underinsurance clause if the rent
received for the property during the 12 months from April 2014 to April 2015 exceeds
$200,000 by 20% or more.
FSP applied underinsurance clause to reduce liability by 31.57%
The FSP says that it is entitled to reduce its liability for rental income lost by the
applicants due to the storms in April 2015 because the sum insured of $200,000
specified by the applicants was less than 80% of the annual rental income for the
property.
The FSP calculated the settlement amount for loss of rent based on an annual rental
income of $365,360.80, derived from figures in a tenancy schedule provided by the
applicants. Using this amount, the 80% threshold which triggers the application of the
underinsurance clause is $292,288.64.
The sum insured of $200,000 represents 68.43% of the threshold amount.
Accordingly, the FSP says it is entitled to reduce its liability for loss of rent by
31.57%.
FSP did not determine annual income over 12 month period
As outlined above, the “Annual Income” figure to be used for the purpose of applying
the underinsurance clause is the annual rent received from tenants during the 12
months prior to the storms in April 2015.
The applicants say the figure of $365,360.80 adopted by the FSP overestimates the
actual rent received during this period because it does not take into account the fact
that some of the tenancies were vacant when they purchased the property in or
around April 2014.
The tenancy schedule provided by the applicants and used by the FSP for the
purpose of determining the settlement amount shows the income generated by the
property at a particular point in time (namely, May 2015). Accordingly, it does not
necessarily reflect the income received over the previous 12 month period.
The valuation report prepared by H in February 2014 includes a summary of the
lease arrangements at that time. H’s summary reflects a gross annual rental income
of $312,503. The difference from the position as at May 2015 appears to be primarily
due to the fact that three tenancies were vacant in February 2014. This is consistent
with the information provided by the applicants.
On this basis, the Panel considers that the annual rental income figure adopted by
the FSP over estimates the “Annual Income” to be used for the purposes of applying
the underinsurance clause.
Case No: 413415 Determination Page 9 of 13
It is not clear from the information provided at what stage during the relevant twelve
month period the vacant tenancies were leased (and/or rent reviews resulting in an
increase in rent were carried out).
In the absence of any more definitive information, the Panel considers it is fair in all
the circumstances to adopt a value of $338,931.90 as the annual rental income,
being half way between the gross rental income as at February 2014 and the gross
rental income as at May 2015.
FSP is entitled to reduce liability for loss of income by 26.24%
Based on an annual income for the property of $338,931.90, the 80% threshold
which triggers the application of the underinsurance clause is $271,145.52.
The sum insured of $200,000 represents 73.76% of the threshold amount.
Accordingly, the FSP is entitled to reduce its liability for loss of income by 26.24%.
As outlined above, it was the applicants’ responsibility to specify an app ropriate sum
insured for loss of income.
However, it was the applicants’ broker’s responsibility to advise them of the potential
risks associated with the underinsurance clause and the steps they should take in
order to mitigate this risk. Any failure by the broker to do so may constitute a breach
of duty.
FSP’s actions unnecessarily delayed repairs
The FSP assessed the loss of rent likely be incurred by the applicants as a result of
the storm damage as $28,242.25, based on the repair period of eight weeks
estimated by the applicants’ builder .
As outlined above, the initial report obtained by the FSP from its quantity surveyor (S)
was manifestly inaccurate. An updated version of the report was not obtained until
approximately seven weeks later. This necessarily extended the time taken to settle
the claim.
In these circumstances, the Panel considers that the applicants’ loss of income
should be assessed based on a total period of fifteen weeks.
On this basis, the FSP’s total potential liability is $52 ,954.22.
FSP is required to increase settlement amount for loss of rent
For the reasons outlined above, the FSP is entitled to apply the underinsurance
clause to reduce its liability for loss of rent for the eight week repair period by
26.24%.
Accordingly , the FSP’s liability for loss of rent is $39,059.03.
The FSP has previously cash settled the applicants in the amount of $19,326.17 for
loss of rent. Accordingly, the FSP is required to pay the applicants an additional
amount of $19,732.86 for loss of rent.
Case No: 413415 Determination Page 10 of 13
The FSP is required to pay interest on this additional amount at the rate determined
in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), for the
period from 23 October 2015 until the payment date.
Case No: 413415 Determination Page 11 of 13
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the Panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.2 Terms of policy
Su bject Terms
Cover for property
damage
We cover you for the physical loss, destruction or damage to the Property
that occurs at the Situation during the Period of Insurance.
Property damage -
u nderinsurance
Underinsurance / Average
(a) You should insure your Buildings and Contents and Specified items for
their Full Insurable Value.
(b) In the event of physical loss, destruction or damage insured under
Section 1, we will not be liable for more than that proportion of the
physical loss, destructio n or damage which the Sum Insured for
Buildings and Contents and Specified items at the Situation to which the
loss, destroyed or damaged item or items belong bears to 80 percent of
the Full Insurable Value of all such property as at the time of the
commen cement of the Period of Insurance.
For the purposes of the application of this Special Clause, the Sum Insured
for the item at the Situation will not include any allowance for the costs and
expenses for which cover is provided as an Additional Benefit unde r this
section …
Example:
Item value $200,000
80 per cent of value = $160,000
Sum insured $144,000
Therefore if a $100,000 loss occurs we would pay
$144,000 x $100, 000 = $90,000
Case No: 413415 Determination Page 12 of 13
Su bject Terms
$160,000
We would pay $90,000 (less any applicable Excess).
Property damage –
settlement of
claims
In the event of a claim for:
Building and Contents … we will pay the Replacement Cost
Property damage –
relevant definitions
Full Insurable Value means the amount necessary to fully indemnify you
with in the terms of this section 1 [Property] . …
Replacement Cost means the cost necessary to replace, repair or rebuild
the Property Ins ured to a condition substantially the same as but not better or
more extensive than its condition when new.
Cover for loss of
income
We will cover you if the Business is interrupted or interfered with as a result of
physical loss, destruction or damage occurring during the Period of Insurance
to … Property insured under … Section 1 – Property … for which a claim has
been paid or liability admitted …
Limitation
The most we will pay is the Sum Insured for each item at the Situation shown
in your Schedule, less the applicable Excess.
Loss of income -
s ettlement of
claims
We will, after taking into account any sum saved during the Indemnity Pe riod
for charges and expenses of the Business that may cease or be reduced in
consequence of the interruption or interference, pay you:
Item 1. Loss of Income
The amount by which the Income falls short of the Standard Income during
the Indemnity Period as a cons equence of the physical loss, destruction or
damage, after Adjustment; and
The additional expenditure necessa rily and reasonably incurred by you for
the sole purpose of avoiding or minimising the reduction in Income during
the Indemnity Period in con sequenc e of the physical loss, destruction or
damage, but not exceeding the reduction in Income avoided because of
that.
Loss of income -
underinsurance
If at the date of the physical loss, destruction or damage the Sum Insured as
shown in the Schedule fo r Loss of Income at the Situation is less than eighty
per cent (80 per cent ) of the Annual Income … then we will only pay that
portion of the claim whic h the Sum Insured bears to 80 per cent of the value,
in accordance with the formula:
Loss of Income x Sum Insured
80 per cent of Annual Income
Loss of income –
relevant definitions
Annual Income means the Inc ome during the 12 months immediately before
the date of the physical loss, destruction or damage, after Adjustment.
Income means the total of:
the amount receivable by you in accordance with a lease or agreement
existing at the time of the physical loss, destruction or damage to the
Property;
the amount paid or payable by you for services rendered; and
all other sources of income received in the cour se of the Business.
Case No: 413415 Determination Page 13 of 13
Su bject Terms
Adjustment means adjustment as nec essary to provide for the trend of the
Business and variations in, or ot her circumstances:
affecting the Business, either before or after the date of the physical loss,
destruction or damage; or
which would have affected the Business had the physical loss, destruction
or damage not occurred;
so that the adjusted figure represents as nearly as may be reasonable
practicable the results that, but for the physical loss, destruction or damage,
would have bee n obt ained during the relative period after the physical loss,
destruction or damage.