Determination 413415

claim_amount_dispute

FirmFinancial Firm (Unknown - Insurer)
Decided2016-08-15
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$149,394
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

SMSF trustees with commercial property damaged by storms disputed cash settlements reduced under underinsurance clauses. AFCA ordered the FSP to pay a further $129,661.28 for property damage and $19,732.86 for loss of rent, plus interest, applying a 13% underinsurance reduction rather than 32.93%.

The underinsurance clause only reduces liability in proportion to a properly determined full insurable value and annual income, and the FSP's estimates were overstated.

Issues

Subjects and remedies

business interruptionnatural disastersmsfpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 413415 Determination Page 1 of 13 Case number: 413415 11 August 2016 1 Overview 1.1 Dispute The applicants are the trustees of a self-managed superannuation fund which owns a commercial property in regional Australia. The applicants insured the property under a commercial property insurance policy with the financial services provider (FSP), which was arranged through a broker. The applicants lodged a claim under the policy after the property was damaged by severe storms in April 2015. The FSP accepted the claim and cash settled the applicants for the estimated cost of repairing the damage, based on an estimate provided by the applicants ’ builder. The FSP also cash settled the applicants for rent lost due to the damage caused by the storm. For the purposes of settling the claim, the FSP applied the underinsurance provisions in the policy, which reduced the amounts payable to the applicants for property damage and loss of rent. The applicants dispute the FSP’s reliance on thes e provisions. They also say that the estimated repair cost used to determine the cash settlement amount underestimates the actual repair costs. 1.2 Issues and key findings Is the FSP required to increase the cash settlement for property damage? The available information establishes that, in determining its liability for property damage, the FSP overestimated the full insurable value of the property and underestimated the costs of repairing the damage caused by the storm in April 2015. Accordingly, the FSP is required to increase the cash settlement amount for property damage. Is the FSP required to increase the cash settlement for loss of rent? The available information establishes that, in determining its liability for loss of rent, the FSP overestimated the annual rental income of the property. Further, the actions of the FSP and its contractors unnecessarily delayed the settlement of the claim. Accordingly, the FSP is required to increase the cash settlement amount for loss of rent. Case No: 413415 Determination Page 2 of 13 1.3 Determination This determination is partly in favour of the applicants. The FSP is to increase the cash settlement amount paid to the applicants:  in respect of the damage to the property, to $346,606.33; and  in respect of loss of rent, to $39,059.03. The FSP is to pay to the applicants the difference between the above amounts and the cash settlement amounts previously paid, together with interest on such additional amount as set out in sections 2.1 and 2.2 below. Case No: 413415 Determination Page 3 of 13 2 Reasons for determination 2.1 Is the FSP required to increase the cash settlement for property damage? Underinsurance clause applies where property sum insured is too low Section 1 (Property) of t he applicants’ policy provides cover for physical loss or damage to the insured property during the period of insurance, subject to the conditions and exclusions set out in the policy. Section 1 contains an underinsurance clause which provides that, where the sum insured for the property shown in the schedule is less than 80% of the “Full Insurable Value” of the property, the FSP is entitled to reduce its liability for damage to the property by a proportionate amount. For the purposes of the policy, the “Full Insurable Value” of the property is defined to mean the amount required to fully indemnify the applicants for damage to the property in accordance with Section 1. Section 1 provides that the FSP will settle claims for damage to the property by paying the Replacement Cost, being the cost of replacing, repairing or rebuilding the property to a condition substantially the same as when new. When they took out the policy, the applicants specified a sum insured of $1.6 million for the property. Accordingly, the FSP will be entitled to apply the underinsurance clause if the cost of rebuilding the property to a condition substantially the same as when new exceeds $1.6 million by 20% or more. For the purposes of applying the underinsurance clause, the estimated cost of rebuilding the property is to be determined as at the start of the relevant period of insurance (being May 2014). FSP applied underinsurance clause to reduce liability by 32.93% The FSP says that it is entitled to reduce its liability for the damage caused by the storms in April 2015 because the sum insured of $1.6 million specified by the applicants was less than 80% of the full insurable value (ie the cost of rebuilding the property as at May 2014). Based on estimates provided by its quantity surveyors, the FSP says the cost of rebuilding the property as at May 2014 is $2,982,115 (excluding GST). Using this estimate, the 80% threshold which triggers the application of the underinsurance clause is $2,385,692. The sum insured of $1.6 million represents 67.07% of the threshold amount. Accordingly, the FSP says it is entitled to reduce its liability for the damage to the applicants ’ property by 32.93% of the cost of repairing the damage. Case No: 413415 Determination Page 4 of 13 There is conflicting information about the cost to rebuild the property The rebuilding cost of $2,982,115 adopted by the FSP was based on an estimate of $2,617,115 provided by the FSP’ s quantity surveyor (M), plus an additional amount of $365,000 for the cost of carpets and fitouts. The FSP also obtained an estimate from another quantity surveyor (S), who estimated the rebuilding cost as $2,801,215. The FSP adopted the estimate provided by M as this was more favourable to the applicants. Having carefully reviewed the estimates provided, the Panel is not satisfied that it was appropriate for the FSP to include the additional amount of $365,000 for carpets and fit out in determining the building cost. The estimates provided by both M and S include an allowance for floor coverings (including carpet), as well as the basic arcade fit-out. To the extent that additional costs would be incurred in fitting out specific tenancies, without reviewing the terms of the lease agreement, it is not clear that these costs would necessarily be incurred by the applicants as landlord. The applicants dispute the accuracy of the replacement cost estimates provided by the FSP. They say that the FSP’s quantity surveyors have consistently overestimated the rebuilding cost. The initial estimate of $4.6 million provided by S was subsequently shown by the applicants to be based on manifestly incorrect assumptions about the property, while later estimates were prepared as at the date of the estimate (which is inconsistent with the terms of the underinsurance clause). The applicants purchased the property for approximately $1.6 million (including land value) in or around April 2014. In connection with the purchase, they obtained a valuation from a certified practising valuer (H), who assessed the market value of the property as $1.57 million. The valuation provided by H was obtained by the applicants for the purpose of seeking bank approval to finance the purchase. The valuation of $1.57 million provided by H was based primarily on the income-generating ability of the property (in accordance with the bank’s interest in ensuring the serviceability of the loan). On this basis, the Panel accepts that the valuation of $1.57 million provided by H does not accurately represent the “Full Insurable Value” of the property for the purposes of the underinsurance clause. However, the valuation provided by H also includes a figure of $1.98 million which is stated to represent the estimated cost of replacing the property in the event it was destroyed. The amount of $1.98 million is described in the valuation report as an “i nsurance estimate ” of the “Replacement with New Value” of the property as at 26 February 2014. It is clearly differentiated from the estimated market value of the property. Case No: 413415 Determination Page 5 of 13 The FSP says that, as a certified practising valuer, H is less qualified to provi de an accurate estimate of the likely cost of rebuilding the property than a quantity surveyor (such as M and S). The Panel acknowledges that the estimates prepared by the FSP’s quantity surveyors are based on itemised breakdowns of the cost to rebuild the property. However, in the context of applying the underinsurance clause, the Panel also considers that the “insurance estimate” provided by H should be given some weight , given H ’s qualifications and experience and the fact that the valuation was obtaine d prior to (and independent of) the current claim. For the reasons outlined above, the Panel considers it is fair in all the circumstances to adopt a value of $2,298,557 as the full insurable value of the property for the purposes of applying the underinsurance clause (being half way between the estimate provided by M and the insurance valuation provided by H). FSP is entitled to reduce liability by 13% Based on a full insurable value for the property of $2,298,557, the 80% threshold which triggers the application of the underinsurance clause is $1,838,846. The sum insured of $1.6 million represents 87% of the threshold amount. Accordingly, the FSP is entitled to reduce its liability for the damage to the applicants ’ property by 13% of the cost of repairing the damage. The applicants have disputed the FSP’s ability to rely on the underinsurance clause at all. They say that, at the time they took out the policy, the FSP told them that it would not undertake its own valuation of the property and would accept the valuation obtained by the applicants. However, the applicants have not provided any information which suggests that the FSP was provided with a copy of the H valuation prior to the inception of the policy and expressly agreed to accept the amounts shown in the valuation as representing the full insurable value of the building. The inclusion of an underinsurance clause is a relatively common feature of commercial insurance policies and is included to prevent the policyholder obtaining a benefit disproportionate to the premium paid (which is calculated based on the sum insured). In the present case , the applicants’ policy was arranged through a broker and it appears that all discussions with the FSP prior to policy inception were carried o ut by the broker. In these circumstances, it was the broker’s responsibility to advise the applicants of the potential risks associated with the underinsurance clause and the steps they should take in order to mitigate this risk. It was the applicants’ re sponsibility to specify an appropriate sum insured, in light of this advice. While outside the scope of this determination, the Panel notes that any failure by the broker to advise the applicants about the underinsurance clause may constitute a breach of duty. Case No: 413415 Determination Page 6 of 13 For the reasons outlined above, the Panel considers the FSP is entitled to apply the underinsurance clause but only to the extent of reducing its liability for property damage by 13%. Applicants say repairs need to be conducted outside business hours The FSP calculated the settlement amount based on an estimated total repair cost of $323,460.48. Approximately 50% of the total costs reflected an amount of $162,364.80 for building reinstatement works to be carried out by the applicant’s builder (DC ). The remainder reflect the cost of various additional items including plastering, air conditioning and floor coverings. The applicants say the repair cost adopted by the FSP significantly underestimates the actual cost of undertaking the necessary repairs. The applicants say the FSP assumed the repairs could be undertaken during ordinary business hours, whereas in fact the repairs needed to be carried out after hours, in order to comply with the applicant’s legal obligations . Applicants have provided information establishing easement exists The applicants say the property is subject to an easement, which provides neighbouring property owners with pedestrian access. The applicants say it is not legally permissible for them to block off the right of way during business hours, in order to carry out the necessary repairs. They also say that the need to remove and replace large panes of glass during the course of the repairs created an unacceptable risk to users of the easement. The valuation report prepared by H confirms the existence of an easement which provides access to adjoining properties from the public car park at the rear of the applicants’ property. The report includes copies of a title search and the deposited plans for the property which reflect the existence of the easement. The FSP says that the information provided by the applicants is insufficient to establish the nature of the easement and the extent to which it may affect the conduct of the storm-related repairs. The Panel acknowledges that the information provided by the applicants does not conclusively establish the effect of the easement on the conduct of the repairs. Even if the easement restricted certain aspects of the works, it is possible that other aspects could have been completed during ordinary business hours. Nevertheless, the Panel considers that the information provided by the applicants was sufficient to warrant further investigation on the part of the FSP, in order to accurately determine the extent of its liability under the policy. Instead, the FSP has dismissed the applicants’ statements about the existence of an easement as purely speculative. The applicants’ builder (DC) provided a quotation for $312,240 to undertake the building reinstatement works outside business hours and on weekends (which Case No: 413415 Determination Page 7 of 13 includes the costs of removing any scaffolding erected prior to the start of business the following day). In light of the above, the Panel considers it is fair in all the circumstances to increase the FSP’s estimate of the total repair cost by $74,937.60, being 50% of the difference between the amount quoted by DC for carrying out the repairs outside business hours (as opposed to during business hours). This results in a total repair cost of $398,398.08. FSP is required to increase settlement amount for property damage For the reasons outlined above, the FSP is entitled to apply the underinsurance clause to reduce its liability for the cost of repairs by 13% (based on a total repair cost of $398,398.08). Accordingly, the FSP’s liability for the damage to the property is $346,606.33. The FSP has previously agreed to cash settle the applicants for property damage for a total of $216,945.05, which includes an additional amount of $1,271.10 offered in March 2016 (although it is unclear whether this amount has yet been paid). The FSP is required to pay the applicants the difference between the amount of $346,606.33 and the total amount already paid. The FSP is required to pay interest on the difference at the rate determined in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), for the period from 23 October 2015 (when the FSP’s IDR response was due) until the payment date. The Panel notes the concerns raised by the FSP that the applicants did not provide a copy of H’s valuation report until relatively recently. However, based on the claim records, the Panel is satisfied that the FSPs loss adjuster (CL) was aware of the information contained in the valuation report in September 2015. 2.2 Is the FSP required to increase the cash settlement for loss of rent? Underinsurance clause applies where sum insured is too low Section 2 (Loss of Income) of the applicants’ policy provides cover for “Income” lost as a result of damage to the insured property, subject to the conditions and exclusions set out in the policy. For this purpose, “Income” refers to the gross amount receivable by the applicants under lease agreements existing at the time of the damage. Section 2 contains an underinsurance clause which is broadly similar to the clause in relation to property damage discussed in section 2.1 above. This clause provides that, if the sum insured for loss of income (as shown in the schedule) is less than 80% of the Annual Income , then the FSP is entitled to reduce its liability for loss of rent by a proportionate amount. Case No: 413415 Determination Page 8 of 13 The “Annual Income” means the income during the 12 months immediately prior to the date of the loss or damage, subject to adjustment for any events which would have otherwise affected the income after that date. When they took out the policy, the applicants specified a sum insured of $200,000 for loss of income in respect of the property. Accordingly, the FSP will be entitled to apply the underinsurance clause if the rent received for the property during the 12 months from April 2014 to April 2015 exceeds $200,000 by 20% or more. FSP applied underinsurance clause to reduce liability by 31.57% The FSP says that it is entitled to reduce its liability for rental income lost by the applicants due to the storms in April 2015 because the sum insured of $200,000 specified by the applicants was less than 80% of the annual rental income for the property. The FSP calculated the settlement amount for loss of rent based on an annual rental income of $365,360.80, derived from figures in a tenancy schedule provided by the applicants. Using this amount, the 80% threshold which triggers the application of the underinsurance clause is $292,288.64. The sum insured of $200,000 represents 68.43% of the threshold amount. Accordingly, the FSP says it is entitled to reduce its liability for loss of rent by 31.57%. FSP did not determine annual income over 12 month period As outlined above, the “Annual Income” figure to be used for the purpose of applying the underinsurance clause is the annual rent received from tenants during the 12 months prior to the storms in April 2015. The applicants say the figure of $365,360.80 adopted by the FSP overestimates the actual rent received during this period because it does not take into account the fact that some of the tenancies were vacant when they purchased the property in or around April 2014. The tenancy schedule provided by the applicants and used by the FSP for the purpose of determining the settlement amount shows the income generated by the property at a particular point in time (namely, May 2015). Accordingly, it does not necessarily reflect the income received over the previous 12 month period. The valuation report prepared by H in February 2014 includes a summary of the lease arrangements at that time. H’s summary reflects a gross annual rental income of $312,503. The difference from the position as at May 2015 appears to be primarily due to the fact that three tenancies were vacant in February 2014. This is consistent with the information provided by the applicants. On this basis, the Panel considers that the annual rental income figure adopted by the FSP over estimates the “Annual Income” to be used for the purposes of applying the underinsurance clause. Case No: 413415 Determination Page 9 of 13 It is not clear from the information provided at what stage during the relevant twelve month period the vacant tenancies were leased (and/or rent reviews resulting in an increase in rent were carried out). In the absence of any more definitive information, the Panel considers it is fair in all the circumstances to adopt a value of $338,931.90 as the annual rental income, being half way between the gross rental income as at February 2014 and the gross rental income as at May 2015. FSP is entitled to reduce liability for loss of income by 26.24% Based on an annual income for the property of $338,931.90, the 80% threshold which triggers the application of the underinsurance clause is $271,145.52. The sum insured of $200,000 represents 73.76% of the threshold amount. Accordingly, the FSP is entitled to reduce its liability for loss of income by 26.24%. As outlined above, it was the applicants’ responsibility to specify an app ropriate sum insured for loss of income. However, it was the applicants’ broker’s responsibility to advise them of the potential risks associated with the underinsurance clause and the steps they should take in order to mitigate this risk. Any failure by the broker to do so may constitute a breach of duty. FSP’s actions unnecessarily delayed repairs The FSP assessed the loss of rent likely be incurred by the applicants as a result of the storm damage as $28,242.25, based on the repair period of eight weeks estimated by the applicants’ builder . As outlined above, the initial report obtained by the FSP from its quantity surveyor (S) was manifestly inaccurate. An updated version of the report was not obtained until approximately seven weeks later. This necessarily extended the time taken to settle the claim. In these circumstances, the Panel considers that the applicants’ loss of income should be assessed based on a total period of fifteen weeks. On this basis, the FSP’s total potential liability is $52 ,954.22. FSP is required to increase settlement amount for loss of rent For the reasons outlined above, the FSP is entitled to apply the underinsurance clause to reduce its liability for loss of rent for the eight week repair period by 26.24%. Accordingly , the FSP’s liability for loss of rent is $39,059.03. The FSP has previously cash settled the applicants in the amount of $19,326.17 for loss of rent. Accordingly, the FSP is required to pay the applicants an additional amount of $19,732.86 for loss of rent. Case No: 413415 Determination Page 10 of 13 The FSP is required to pay interest on this additional amount at the rate determined in accordance with section 57 of the Insurance Contracts Act 1984 (Cth), for the period from 23 October 2015 until the payment date. Case No: 413415 Determination Page 11 of 13 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a FOS recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.2 Terms of policy Su bject Terms Cover for property damage We cover you for the physical loss, destruction or damage to the Property that occurs at the Situation during the Period of Insurance. Property damage - u nderinsurance Underinsurance / Average (a) You should insure your Buildings and Contents and Specified items for their Full Insurable Value. (b) In the event of physical loss, destruction or damage insured under Section 1, we will not be liable for more than that proportion of the physical loss, destructio n or damage which the Sum Insured for Buildings and Contents and Specified items at the Situation to which the loss, destroyed or damaged item or items belong bears to 80 percent of the Full Insurable Value of all such property as at the time of the commen cement of the Period of Insurance. For the purposes of the application of this Special Clause, the Sum Insured for the item at the Situation will not include any allowance for the costs and expenses for which cover is provided as an Additional Benefit unde r this section … Example: Item value $200,000 80 per cent of value = $160,000 Sum insured $144,000 Therefore if a $100,000 loss occurs we would pay $144,000 x $100, 000 = $90,000 Case No: 413415 Determination Page 12 of 13 Su bject Terms $160,000 We would pay $90,000 (less any applicable Excess). Property damage – settlement of claims In the event of a claim for:  Building and Contents … we will pay the Replacement Cost Property damage – relevant definitions Full Insurable Value means the amount necessary to fully indemnify you with in the terms of this section 1 [Property] . … Replacement Cost means the cost necessary to replace, repair or rebuild the Property Ins ured to a condition substantially the same as but not better or more extensive than its condition when new. Cover for loss of income We will cover you if the Business is interrupted or interfered with as a result of physical loss, destruction or damage occurring during the Period of Insurance to … Property insured under … Section 1 – Property … for which a claim has been paid or liability admitted … Limitation The most we will pay is the Sum Insured for each item at the Situation shown in your Schedule, less the applicable Excess. Loss of income - s ettlement of claims We will, after taking into account any sum saved during the Indemnity Pe riod for charges and expenses of the Business that may cease or be reduced in consequence of the interruption or interference, pay you: Item 1. Loss of Income  The amount by which the Income falls short of the Standard Income during the Indemnity Period as a cons equence of the physical loss, destruction or damage, after Adjustment; and  The additional expenditure necessa rily and reasonably incurred by you for the sole purpose of avoiding or minimising the reduction in Income during the Indemnity Period in con sequenc e of the physical loss, destruction or damage, but not exceeding the reduction in Income avoided because of that. Loss of income - underinsurance If at the date of the physical loss, destruction or damage the Sum Insured as shown in the Schedule fo r Loss of Income at the Situation is less than eighty per cent (80 per cent ) of the Annual Income … then we will only pay that portion of the claim whic h the Sum Insured bears to 80 per cent of the value, in accordance with the formula: Loss of Income x Sum Insured 80 per cent of Annual Income Loss of income – relevant definitions Annual Income means the Inc ome during the 12 months immediately before the date of the physical loss, destruction or damage, after Adjustment. Income means the total of:  the amount receivable by you in accordance with a lease or agreement existing at the time of the physical loss, destruction or damage to the Property;  the amount paid or payable by you for services rendered; and  all other sources of income received in the cour se of the Business. Case No: 413415 Determination Page 13 of 13 Su bject Terms Adjustment means adjustment as nec essary to provide for the trend of the Business and variations in, or ot her circumstances:  affecting the Business, either before or after the date of the physical loss, destruction or damage; or  which would have affected the Business had the physical loss, destruction or damage not occurred; so that the adjusted figure represents as nearly as may be reasonable practicable the results that, but for the physical loss, destruction or damage, would have bee n obt ained during the relative period after the physical loss, destruction or damage.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.