Determination 412026

Defective PDS and misleading representations about property project value and promoter's experience

FirmFinancial Firm (Unknown)
Decided2016-07-22
ProductInvestments · Managed investment
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A corporate trustee of an SMSF, acting through a director, complained that a property development PDS was defective and that the promoter's representatives misled it about the project. AFCA found no defect or misleading conduct established and ordered no compensation.

The PDS clearly disclosed that no independent valuation was obtained and the limits of the promoter's market assessment, and FSP1 took reasonable steps, so the complaint fails.

Issues

Subjects and remedies

smsfno remedy

Related

All Financial Firm (Unknown) determinations · Find similar determinations

Text of the determination

Determination Case No: 412026 and 412113 Determination Page 1 of 12 Case number: 412026 and 412113 21 July 2016 1 Overview 1.1 Dispute The applicant is a corporate trustee of a self-managed superannuation fund (SMSF). Mr D has lodged these disputes in his capacity as a director of the SMSF. The disputes relate to a property development project (Project). Financial services provider 1 (FSP1) was the responsible entity for the Project and issuer of a product disclosure statement (PDS) in March 2012. The applicant says that the PDS was defective. Mr W and Mr M were authorised representatives of financial services provider 2 (FSP2), which was the promoter of the Project. Mr W and Mr M were also directors of the development manager for the Project (Development Manager). The applicant says Mr W and Mr M misled it about the Project. 1.2 Issues and key findings Should the Financial Ombudsman Service consider this dispute? There is nothing unique about this dispute that could not be fairly addressed by the procedures of the Financial Ombudsman Service (FOS). Accordingly it is appropriate for FOS to consider this dispute. Was the PDS defective or misleading about the P roject’s value ? Parts 1 and 2 of the PDS clearly set out the valuation policy and that the policy was not followed, which complies with relevant regulatory requirements. The inclusion of the Development Manager’s market assessment did not cause the PDS to be defective. The failure to include details of Mr W’s lifetime ban did not cause the PDS to be defective or misleading because it was not known to FSP1 at the time. Did FSP2 mislead Mr D into investing in the Project? While the panel accepts that the representatives of FSP2 spoke about the Project at a presentation, it has not been shown that the statements made by the representatives were misleading or deceptive. 1.3 Determination This determination is in favour of FSP1 and FSP2. No compensation is payable to the applicant. Case No: 412026 Determination Page 2 of 12 Case No: 412026 Determination Page 3 of 12 2 Reasons for determination 2.1 Should the Financial Ombudsman Service consider this dispute? FSP1 and FSP2 have objected to FOS jurisdiction FSP1 and FSP2 (FSPs) have objected to FOS considering the dispute. They say that the courts would be a more appropriate forum because:  any findings on the adequacy of the PDS would apply not only to this dispute but also about 40 other disputes, involving a total claim amount of $3.4 million  while most or all individual claims would be under FOS’s $500,000 jurisdictional limit, the total amount at stake means the FSPs should be entitled to the benefit of a formal court process, and  given the nature of the allegations (misleading and deceptive conduct) the FSPs should be entitled to have those claims tested through discovery and cross- examination procedures, which are only available in court and by use of expert witnesses. The dispute falls within FOS jurisdiction While FOS can exclude a dispute because the courts are a more appropriate forum, this is at FOS’s discretion. FOS does not exercise its discretion to exclude a dispute on this basis lightly. There is nothing unique about the misleading and deceptive conduct claims lodged on behalf of the applicant that cannot be considered by FOS applying its usual processes. Although FOS has limited ability to obtain expert evidence or cross examine that, of itself, does not make FOS an inappropriate forum. The panel is satisfied that the nature of the applicant’s claim can be appropriately considered based on the information provided by the parties. Further, it is the role of FOS to consider each dispute on its merits. It is therefore premature to conclude that a decision in this dispute would necessarily apply to other disputes yet to be lodged. The information provided and circumstances of the parties in other disputes may result in different outcomes. The panel therefore does not accept the FSPs’ objections to this matter being considered by FOS. 2.2 Was the PDS defective or misleading about the Project’s value? FSP1 was responsible for the content of the PDS FSP1, as the responsible entity of the Project when the Project was offered for investment, was responsible for the content of the PDS. The PDS had two parts:  Part 1, which sets out details of the management investment scheme (Scheme), and  Part 2, which sets out details of the Project within the Scheme. Case No: 412026 Determination Page 4 of 12 The PDS is defective if it omits information that an investor would reasonably require to decide whether to acquire the product. However, a financial services provider is not liable if it takes reasonable steps to ensure its product disclosure statement is not defective. The PDS is also defective if its content is misleading or deceptive. A statement of opinion is misleading and deceptive if the financial services provider had no reasonable basis for that statement when it was made. The fact that an opinion is proven wrong by subsequent events does not necessarily prove it was unreasonable to hold that opinion at the time. The PDS had to set out the approach to valuation At the time the PDS was issued, Australian Securities and Investments Commission (ASIC) Regulatory Guide 46 (RG 46) specified that responsible entities of property development schemes should disclose, at a minimum, the following information on the valuation of direct property investments: (a) how often they obtain valuations for direct investments in real property, including how often they obtain independent valuations; (b) if independent valuations are not regularly obtained, the reason for this; and (c) whet her valuations are in accordance with relevant industry standards. If a proper ty under development is valued on an ‘as if complet e’ basis, the ‘as is’ basis of the valuation should be disclosed. The responsible entity should also disclose the risks associated with ‘as if complete’ valuations, including the risk that assumptions on w hich such valuations are based may prove to be inaccurate. RG 46 also required responsible entities to inform investors if they fail to follow their valuation policy. The PDS complied with RG 46 Part 1 of the PDS set out FSP1’s valuation policy. Relevantl y the policy required:  independent valuations to be obtained for each project to be undertaken by the Scheme  the valuation to be obtained prior to the purchase of the development property and when required under the Scheme constitution or accounting standards  valuations to be on an ‘as is’ and ‘on completion’ basis, and  valuations to be conducted by independent qualified valuers. Part 2 of the PDS set out FSP1’s valuation approach in relation to the Project including: Development Manager’s asse ssment of market value In the Development Manager’s view, the market value of the Property, assuming a gross realisation ‘as if complete’ based on individual sales valuation methodology, is $4,441,348 (ex of GST). The Development Manager has not provided an assessment of the market value of the Property on an ‘as is’ basis. The Development Manager is not a registered valuer . Information about matters underlying the Development Manager’s mark et value assessment are contained in section 3 of Part 2. You should read this information prior to deciding to invest in this Offer. We have not obt ained an independent valuation of the Property. … Valuation policy [FSP1] has not obtained an independent valuation of the Property. Case No: 412026 Determination Page 5 of 12 The Development Manager’s assessment of the Property is on an ‘as if complete’ basis and no assessment of the market value on an ‘as is’ basis has been provided or obtained. … Valuation Risk … No assessment of the market value on an ‘as is’ basis has been provided. The Development Manager is not a valuer. There is a risk the purchase price of the Property may exceed its current value, on an ‘as is’ basis. Cons equently, if the Development did not proceed and the Property was sold, we may not recover the purchase price which may result in a loss for investors. … We recommend prospective investors should make their own further enquiries regard the development manage rs assessment of the market value of the property…[sic]. Parts 1 and 2 of the PDS read together clearly set out:  the valuation policy for the Scheme  the valuation policy was not followed in relation to the Project, instead the Development Manager’s assessm ent of market value was provided  the Development Manager was not a valuer and its assessment was not a valuation  the Development Manager’s assessment was given on an ‘as if complete’ basis, and  the risks of accepting the Development Manager’s assessment. The panel is satisfied that the above disclosures complied with the then requirements of RG 46. The Scheme valuation policy was outlined in Part 1 of the PDS. However Part 2 of the PDS disclosed that a different approach was taken in relation to the Project. The nature of that approach together with its limitations and risks was set out. Investors were recommended to make their own enquiries. More generally ASIC explains that valuation requirements in RG 46 are for investors to understand how the Project was being valued and to assess the reliability of that approach. 1 The panel considers the PDS was sufficiently clear that there was no valuation and that the applicant was on notice to satisfy himself on the value of the Project. Accordingly, the PDS was not defective in its explanation of how the Project was valued. It has not been shown that FSP1 misrepresented the market assessment Broadly, to succeed in a claim for misleading or deceptive conduct relating to a financial product or service, the applicant must be able to show that:  FSP1 made a statement or engaged in conduct that was false or misleading (misrepresentation), and  the applicant relied on the misrepresentation to its detriment. A representation is deemed to be misleading if it is about a future matter and the person did not have reasonable grounds for making the representation. This means that a statement of opinion or forecast will be misleading or deceptive if the person, at the time, did not actually hold the opinion or believe that the forecast was accurate but not merely because it turns out to be wrong. 1 RG 46.73 Case No: 412026 Determination Page 6 of 12 The applicant says that the Development Manager’s assessment of the market value of the Project was unreasonably high. As the assessment was about a future matter the onus is on the Development Manager to show it had a reasonable basis for its opinion. Unfortunately, the Development Manager is not a party to this dispute so the basis upon which it formed its assessment cannot be tested. It has therefore not been demonstrated that the Development Manager’s assessment was defective or misleading. The inclusion of the Development Manager’s market assessment in the PDS does not make it a representation by FSP1. It was the Development Manager and not FSP1 that provided the market assessment. Under ASIC Regulatory Guide 55 (RG 55) the Development Manager is liable for loss or damages caused by its statement, provided that FSP 1 took reasonable steps to ensure the inclusion of the market assessment did not cause the PDS to be defective. FSP 1 took reasonable steps to ensure the PDS was not defective FSP 1 had an obligation to ensure that the PDS was not defective. RG 55 states that an issuer has a defence to a defective disclosure if they can prove that they reasonably relied on the information provided or took reasonable steps to ensure that the PDS was not defective. FSP 1 says Company L had valued the Project at $3.9 million based on a lettable area of 1088m 2 . That valuation was prepared for the prior owner of the Project and was to justify a land value for the sale of the property on which the Project was to be developed. FSP 1 says the Development Manager reached its market assessment of $4.4 million after making enquiries of real estate agents and identifying an increase in the lettable area to in excess of 1100m 2 . Before including the Development Manager’s market assessment, FSP 1 undertook its own research on the rental returns in the local market. What constitutes reasonable steps needs to be considered in the context of events at the time. Relevantly:  the difference between the Company L valuation and the Development Manager’s market assessment was approximately $500,000, which represents a difference of slightly over 11%  the Development Manager had identified additional lettable space  FSP 1 had done some market review of rental returns, albeit rudimentary, and  the references in the PDS to the Development Manager’s market assessment were heavily qualified. In light of the above factors, on balance the panel is satisfied that FSP 1 took reasonable steps to ensure that the inclusion of the Development Manager’s market assessment did not cause the PDS to be defective. The difference between that market assessment and the Company L valuation was not large and could readily be explained by the increase in lettable space. Significantly, the PDS clearly advised Case No: 412026 Determination Page 7 of 12 investors to form their own view as to market assessment and that it was not a valuation. Further, it has not been shown that in the circumstances that the market assessment was defective. While the Project was sold for $640,000, what is relevant is the value of the Project in 2012. The applicant has not provided information to show that at that time, the market assessment was incorrect. The applicant has only been able to show that the market assessment was higher than the Company L valuation. The reasons set out above explain why that may have been the case. In any event, even if that could be established that FSP1 had failed to take reasonable steps in relation to the inclusion of the market assessment (which is not the case), it is likely that the applicant would have difficulty showing he relied upon the market assessment given the limitations and risks about the assessment outlined in the PDS. Notably, the applicant only raised the issue of the Project valuation late in his submissions. Prior to then the applicant said: 2 The representation that the [Project] would be free of debt was the primary concept that got me interested in the [Project]. The Company L valuation need not be disclosed The applicant says that the Company L valuation should have been disclosed. The PDS was not defective by reason of the non-disclosure of the Company L valuation. That valuation had been provided solely for the use of the prior owner of the Project. The Company L valuation was not available to FSP1 to disclose in the PDS. 2.3 Was the PDS defective in its description of Mr W’s experience? The statement about the Development Manager’s experience related to Mr W Part 2 of the PDS contained the following statement: Development Manager The principals of the Development Manager have over 20 years’ experience in the investment and property development space. When the PDS was issued, Mr W was the only principal of the Development Manager with property development experience. At that time, he had more than 20 yea rs’ experience in property development. The above statement was correct in that context. However, Mr W had been the subject of a three year ban from managing companies from 2007 to 2010. Mr W was also the subject of a life ban from managing licensed building companies in the state in which the Project was to occur. 2 Letter from the applicant to FOS dated 3 February 2016. Case No: 412026 Determination Page 8 of 12 The ASIC ban had expired and was not sufficiently material FSP1 says it was aware that Mr W had been banned as a company director for three years. However, that ban had expired two years before the PDS was issued and Mr W was not part of the management of FSP1, the responsible entity. Given that the ASIC ban had expired two years prior to the issue of the PDS and Mr W was not involved in the management of the responsible entity, the panel accepts that the ASIC ban was not sufficiently material that it needed to be disclosed in the PDS. FSP1 was not aware of Mr W’s life time ban from managing licensed builders Mr W’s life ban from managing licensed builders in the relevant state was more significant and should have been disclosed. This is because of Mr W’s role as a director of the Development Manager which was responsible for the appointment of the builder, quantity surveyor and management of the development. However, under section 1013C(2) of the Corporations Act, failure to include relevant information is not a breach of disclosure duties if neither the issuer of the PDS nor anyone else involved in its preparation knew that information. The existence of Mr W’s ASIC ban should have put FS P1 on notice to make due enquiries into Mr W’s experience. The issue is whether the enquires made by FSP1 were reasonable in the circumstances. FSP1 was asked what enquiries it made about Mr W’s experience and qualifications. FSP1 responded that it was unaware of Mr W’s life ban from managing builders despite having:  carried out searches and due diligence through a number of parties  considered all of the professional organisations that could possibly hold relevant information and contacted a number of these, and  searched Mr W’s surname on the building authority’s website. FSP1 provided a report from an information technology and communication consultant. The consultant undertook a search of the internet which included a scan of web pages deleted from p ublic view but which remained on the website’s hosting platform. The consultant concluded that Mr W had undertaken ‘reputation management’ to prevent negative information about himself from being readily accessible on the internet. During the course of this dispute, FOS conducted a comprehensive Google search. That search revealed an indirect reference to Mr W’s life ban in a 2008 newspaper article. It is concerning that the FSP did not discover the reference to Mr W’s life ban through a Google search. However, this needs to be viewed in the context of what was available at the time. It may be that due to Mr W’s purported ‘reputation management’ a Google search conducted in early 2012 would not have readily revealed the 2008 newspaper article. Also of significance is that a search of the website of the building authority that issued the life ban did not reveal Mr W’s circumstances. Case No: 412026 Determination Page 9 of 12 The availability of information about Mr W’s life ban from current internet searches is not conclusive as to what would have been revealed in 2012. It may be that expert evidence about internet search capabilities in 2012 could show that FSP1 should have been aware of Mr W’s life ban. However, no such information has been provided. It is clear to the panel that the life ba n from managing licensed building companies seriously impugned Mr W’s credibility and undermines any promotion of his expertise, through the Development Manager, as part of the Project. The matter for the panel, however, is what knowledge FSP1 had about that ban at the time the PDS was issued. On the information made available in this dispute, the panel is persuaded that on balance it is more likely than not that FSP1 was unaware of Mr W’s life ban after making reasonable efforts to establish Mr W’s bona fides. The failure to disclose Mr W’s bans did not make the PDS mislea ding The Development Manager was responsible for the management of the Project. It was not itself a licensed builder but could (and did) engage licensed builders. The statement in the PDS about the experience held within the Development Manager was factually correct. It did not in fact name Mr W. Therefore, the statement would only be misleading if it needed qualification and that qualification was not provided. Qualification may have been required if Mr W’s experience was represented to be a particular asset to the Project and of benefit to investors. For example, in Dispute 212722, half a page in a product disclosure statement was spent extolling the experience and qualifications of, and positions held by, the managing director of the relevant responsible entity. The nature of that disclosure was sufficient to put the managing director’s character in issue. In contrast, there was a single sentence in the PDS which did not refer to Mr W directly. The panel considers a reasonable person would not rely upon such a limited reference when deciding whether or not to invest in the Project. The FSPs are not responsible for the Development Manager’s promotional material A promotional leaflet produced by the Development Manager provided a more fulsome descriptio n of Mr W’s experience. The leaflet failed to mention Mr W’s ASIC ban or life ban, which may have rendered it misleading. However, the promotional leaflet was not part of the PDS, nor is there any evidence that it was endorsed by either FSP1 or FSP2. Accordingly the promotional leaflet could not reasonably be viewed as a misrepresentation by either FSP. Case No: 412026 Determination Page 10 of 12 2.4 Did FSP2 mislead Mr D into investing in the Project? The panel accepts Mr D’s version of the March 2012 presentation meeting FSP2 says:  Mr W provided a presentation on 24 March 2012  the presentation slides and Mr W’s verbal presentation were limited to general advice about investment in property and did not cover the Project, and  Mr M did not attend the presentation. Mr M’s diary shows that he was on holiday in a different state on 23 March 2012. However, this was the day before the presentation. Mr M could have attended the presentation on 24 March 2012. In any case, Mr W was present as a representative of FSP2 at the time. FSP 2 was therefore responsible for statements either individual made. Mr D says that the presentation went beyond a general discussion of property investment and included discussion of the Project. He argues it is unlikely Mr W would travel interstate to just make a generic presentation about property investment. This has some merit given Mr M and Mr W were representatives of FSP2 which was the promoter of the Project. Mr D has provided personal diary notes, which show:  both Mr W and Mr M provided the presentation on 24 March 2012, and  the presentation covered the Project. The diary notes are contemporaneous records. Mr D’s version of what was said is also supported to some extent by statements from his accountant, who hosted the presentation. Given the information provided, the panel accepts that:  Mr M and Mr W gave the presentation on 24 March 2012  the presentation covered the Project, and  either Mr M or Mr W made statements to the effect recorded in Mr D’s diary notes. The representations about Mr W’s experience were not shown to be misleading Mr D’s diary notes said: Interesting presentation from [Mr M] FINANCE [and Mr W] ‘PROPERTY DEV.’ …I do not know much about project in [the applicable state] but these guys obviously clever. [Mr W] comes across as very experienced and [Mr M] seems to know his stuff on finance…They mentioned 15 and 10 years experience in [the applicable state.]…experienc e…[Mr M] 10 years. [Mr W] 15 years… [sic] It would appear from Mr D’s notes that at the presentation Mr W held himself out as being experienced in property development with 15 years’ experience in the applicable state. As referred to earlier in this determination, the life ban from managing licensed building companies seriously impugned Mr W’s credibility and undermines any promotion of his expertise. It could therefore be said that any unqualified statements at the presentation about Mr W’s experience were inaccurate. Case No: 412026 Determination Page 11 of 12 However, for the statements about Mr W’s experienc e to be misleading it must also be shown that Mr D relied upon them when deciding to invest in the Project. The information available shows that Mr D’s decision to invest in the Project was significantly influenced by the debt free nature of the Project. Further, as set out below, Mr D acknowledges he wanted to undertake further research before investing. Accordingly, the panel is not satisfied that such a brief statement of Mr W’s experience made at the presentation of itself misled Mr D to invest in the Project. The representation about returns where not shown to be misleading Mr D says Mr W and Mr M misled him about the likely investment returns for the Project. Mr D’s diary notes state: Suggestion was a 20% return on investment over 12 months…They sug gested a very low risk investment with 20% return in 12- 18 mont hs…Return : 20 - 25% over 2 years… Mr D says: I do recall some statistics about the land value and the agreed purchase pric e of the land. However I do not recall any final value of property bei ng substantiated…If there were more information about how the investment return was calculated then I would have been better able to reconfirm the figure to ensure it was arrived at using reasonable assumptions and the data which was available allowed conf idence in the return calculations…Without more information it was impossible to substantiate the returns... [sic] Importantly, Mr D acknowledges that he did not have confidence in Mr W and Mr M’s calculations of returns at the relevant time. It would appear that there was not enough said by Mr W or Mr M at the meeting to influence the applicant to invest in the Project. It is therefore likely that Mr D considered other information in forming a view of the likely return of the Project. Further, Part 2 of the PDS set out the risks associated with the Project. After reading those risks Mr D could not reasonably have thought the Project was ‘very low risk’ as purportedly represented by Mr W and Mr M. It has not been shown that the representations about the investment returns were anything more than qualified estimates. In any event, even if the representations were shown to be inaccurate (which has not been shown), it is unlikely that the applicant relied on them alone when investing the Project because, as Mr D states, he did not have adequate information at the time to form a view. Based on the reasons outlined, the information available has not shown that Mr W and Mr M’s March 2012 presentation contained sufficient information so as to mislead the applicant to invest in the Project. Case No: 412026 Determination Page 12 of 12 3 Supporting information 3.1 Decision basis and process This dispute has been the subject of a recommendation in favour of FSP1 and FSP2, which was not accepted by the applicant. The panel has considered all the material submitted by the parties, both before and after the recommendation was issued, in order to reach its decision. The panel is satisfied that the material it has relied upon in reaching its findings has been exchanged between the parties. Wording from the recommendation has been included in this determination where considered relevant. The panel has done what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance as to practice, good industry practice and previous relevant decisions of FOS or its predecessors (though it is not bound by these).

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.