After a 20 April 2015 storm the Applicant claimed for roof and internal damage. The FSP accepted the internal damage but denied the roof claim and relied on its builder's scope and costing, and AFCA found the FSP entitled to do so.
The Applicant did not establish storm damage to the roof, and the only credible evidence of the internal scope of works was the FSP's builder report.
Issues
- Claim denial primary · not upheld“The FSP is entitled to deny the further aspects of the Applicant's claim.”
- Claim amount dispute secondary · not upheld“The FSP is entitled to rely upon the scope of works and the costing provided by its builder.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 411905 Determination Page 1 of 5
Case number: 411905 4 January 2016
1 Overview
1.1 Dispute
This matter involves a claim by the Applicant under his Home Buildings & Contents
Insurance Policy, held with the Financial Service Provider (FSP), following damage to
the Applicant‟s home in a storm.
The FSP has accepted the Applicant‟s claim in respect to the internal damage to the
home.
The FSP has denied the Applicant‟s claim in respect to the roof and a dispute has
arisen as to th e extent of the FSP‟s obligations under the policy in regard to the
internal damage.
1.2 Issue and key findings
Has the FSP met its obligations under the terms and conditions of the policy?
The FSP has met its obligations under the terms and conditions of the policy and it is
entitled to deny the further aspects of the Applicant‟s claim .
1.3 Determination
This Determination is in favour of the FSP.
The FSP is entitled to deny the further aspects of the Applicant‟s claim .
Case No: 411905 Determination Page 2 of 5
2 Reasons for Determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This Determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principals, terms of the policy, good industry practice and where applicable, prior
Determinations.
2.1 Has the FSP met its obligations under the terms and conditions of
the policy?
Coverage of the policy
The Applicant‟s Home Buildings & Contents Insurance Policy provides coverage for
loss and damage as a result of certain listed events.
The Policy Product Disclosure Statement (PDS) details:
The events we cover
We cover your home or contents when certain things happen. These are known as
„listed events‟. You can make a claim if a listed event takes place and causes loss or
damage to your home or contents during the policy period.
In this section, we tell you what events you‟re covered for and any specif ic exclusions
and conditions that apply to the event. General exclusions may also apply – see
Section 5.
…..
Table 3.1 – Listed events
Listed events Buildings Insurance Contents Insurance
Storm ✓ ✓
….
Storm
If loss or damage is caused by a storm.
For example, hail damages your roof or a storm in your local area may cause water to
build up in your street gutters.
Covered
► violent wind, cyclone or tornado
► thunderstorm, hail, rain or snow
► sudden, excessive run-off of water as a direct result of a storm in your local area.
Case No: 411905 Determination Page 3 of 5
The Policy also details:
Exclusions for all cover
These exclusions apply to all cover under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
….
Maintaining and occupying your home
We don‟t cover loss, damage, injury or death arising from:
► faulty design or workmanship
It is accepted insurance law that the Applicant carries the initial onus to establish that
the loss and damage is covered by the terms and conditions of the policy.
The Applicant‟s ob ligations include establishing the loss and damage arises from an
event listed within the policy and the extent of the loss and damage suffered.
Circumstances of the loss
The Applicant says that the building has suffered damage as a result of a storm
which occurred on 20 April 2015.
The Applicant has provided excerpts from a number of media outlets and the Bureau
of Meteorology in respect to the ferocity of the storm, the level of winds and the
damage caused.
The Applicant has also provided photographs of the damaged home.
There is no dispute that the storm which occurred on 20 April 2015, in the area of the
Applicant‟s home, was significant.
Reports as to the damage
The FSP has provided a report from a builder which confirmed that the roof condition
of the building was good for the age of the property and shows evidence of regular
maintenance.
Following an inspection, the builder found lead flashing that had been temporarily
repaired and concluded that the lead flashing was a contributing factor to the loss
and damage, but “ wind driven rain helped ” .
A subsequent report from a roofing contractor, concluded that the cause of the leak
was due to “ lead (flashing) not being installed correctly ” .
The Applicant has not provided any reports to support the position that there is
damage to the roof as a result of the storm, which has led to the internal damage.
On the other hand, the Applicant has provided a receipt from a roofing contractor for
works performed at the property. The receipt does not detail the works that were
performed, but is dated 10 October 2011.
Case No: 411905 Determination Page 4 of 5
The Applicant also says that the roof was regularly maintained and this is confirmed
by the FSP‟s builder. However, there is no evidence in respect to the work that was
performed as part of this regular maintenance.
The FSP‟s roofing expert specifically detailed that there was no storm damage to the
roof and the FSP‟s builder only detailed damage to the internal ceiling of the home
and not the roof itself.
The Applicant has not produced any evidence of damage to the roof itself.
The only evidence regarding a problem with the roof and as detailed by the FSP‟s
roofing contractor and its builder, is in respect of the lead flashing, which had been
installed by a contractor, engaged by the Applicant, but at an unknown earlier date.
The result is that the Applicant has not established damage to the roof as a result of
the storm and the FSP is, on the basis of the evidence it has provided, entitled to
deny the Applicant‟s claim in regard to the roof.
Damage to the internal area of the home
The FSP says that it “…. accepted the claim for internal damage to the Insured‟s
home in good faith ….”
However, the FSP‟s builder specifically says , under the heading “ Cause –
Circumstances (How Damage Occurred and Causes) ” , that “ It is my opinion that
the damage was due to storm and the resultant damage is a claim under policy
agreement.”
Further and as previously stated, the builder also says, “the lead flashing was a
contributing factor but wind driven rain helped”.
The only specific evidence regarding maintenance to the home is the receipt from
2011.
On the other hand, there is no evidence that the home suffered any loss and damage
during the period 2011 to 20 April 2015, the date of the storm.
Thus, the Service is satisfied it is reasonable to conclude that the proximate cause of
the loss and damage to the internal area of the home was the storm event on 20 April
2015. In those circumstances the FSP is not entitled to rely upon its exclusion for
faulty design or workmanship, insofar as it relates to the internal damage to the
home.
As such, the Service does not agree that the claim for internal damage to the insured
home was a matter of good faith. Rather it was an obligation of the FSP under the
terms and conditions of the policy.
That said, the only evidence in respect to the scope of works for the internal damage,
comes from the FSP‟s builder.
Within an email, the Applicant has provided some details of what is regarded as the
required works and the cost of that required work.
However, the Applicant has not presented any evidence to support this position.
Case No: 411905 Determination Page 5 of 5
In the circumstances and given the contents of the builder ‟ s report and scope of
works, the Service is satisfied that the FSP is entitled to rely upon the scope of works
and the costing provided by its builder.