1 Overview
1.1 Dispute
The Applicants lodged a claim under their home insurance policy with the Financial
Services Provider (FSP) after their home was damaged by fire in November 2014.
The FSP accepted the claim, undertook make safe repairs and obtained a scope of
works for the repair of the property. However, the FSP elected to cash settle the
Applicants for the estimated cost of the repairs instead of authorising its builder to
undertake the necessary repairs.
The Applicants say the FSP misled them to believe it would arrange for the repair of
the fire damage, provided they had the property restumped to address pre-existing
issues.
The Applicants say the cash settlement offered by the FSP is insufficient to allow
them to carry out the necessary repairs and the FSP should undertake the repairs
itself. The Applicants are also dissatisfied with the manner in which the FSP has
handled their claim.
1.2 Issues and key findings
Is the FSP required to repair the Applicants’ home ?
The FSP is entitled to elect to cash settle the claim (and is not required to undertake
repairs), given the pre-existing issues with the property.
Is the FSP required to increase the cash settlement amount?
The cash settlement amount should be increased by an additional amount of
$13,932.60 to reflect the reasonable costs of repairing the damage to the property
caused by the fire (and associated events).
Are the Applicants entitled to compensation?
The Applicants are entitled to compensation for non-financial loss suffered as a result
of the FSP’s failure to clearly communicate the proposed settlement arrangements
during the claim process.
Case No: 409990 Determination Page 2 of 11
1.3 Determination
This Determination is partly in favour of the Applicants.
The FSP is to pay the Applicants the following amounts in full and final settlement of
their claim:
the amount of $122,589.71 for the damage to the building; and
an amount equivalent to temporary accommodation benefits for a period o f 150
days, calculated on the same basis paid to date.
The FSP is not required to pay interest on the above amounts.
The FSP is to pay the Applicants an additional amount of $1,000 as compensation
for non-financial loss.
Case No: 409990 Determination Page 3 of 11
2 Reasons for Determination
2.1 Is the FSP required to repair the Applicants’ home?
FSP may decide how to settle claim
Under the terms of the policy, the FSP may settle a claim for damage to the
Applicants’ property by arranging for its contractors to repair the damage or by
paying the Applicants the cost (to the FSP) of doing so.
It is clear from the terms of the policy that the FSP has the discretion to decide which
settlement method to adopt.
However, once an insurer makes an election to repair an insured property (rather
than to cash settle the policyholder for the cost of the repairs), it is generally obliged
to complete the repairs in accordance with the terms of the policy unless
circumstances arise which make the conduct of repairs by the insurer untenable.
In such cases, it is reasonable for the insurer to seek to cash settle the claim,
provided the cash settlement is sufficient to allow the policyholder to engage a
builder directly to complete the necessary repairs.
FSP is entitled to cash settle claim
The FSP’s builder (A) was unabl e to guarantee the replacement of the concrete roof
tiles which had been damaged in the fire, due to the poor overall condition of the roof
at the time of the fire.
The FSP’s roofing contractor (SR) advised that the roof tiles were over 50 years old
and had exceeded their usual life span. SR reported that the entire roof needed to be
replaced, as the tiles had become brittle and cracked.
The Applicants accept that the roof repairs should be cash settled, as they intend to
replace the tiles with a new Colourbond roof. However, they consider that the FSP
should be required to arrange for its builder to carry out the remainder of the repairs.
The reports provided by the FSP’s assessors indicate that the Applicants’ property
had pre-existing movement and cracking issues related to the deterioration of the
original stumps over the 50 year life of the property.
On the advice of the FSP’s assessor, the Applicants arranged for the property to be
restumped in or around May 2015. However, when the assessor reinspected the
property following completion of the restumping, he reported that additional cracking
damage and further movement (including displacement of the roof gutters) had
occurred as a result of these works.
It is not uncommon for there to be a further period of movement and consolidation
immediately following restumping works, which may result in additional damage.
Restumping quotations usually provide for a subsequent reinspection of the property
around six to twelve months later, to allow for further adjustments to be made. It is
Case No: 409990 Determination Page 4 of 11
generally recommended that the repair of any internal movement or cracking damage
be delayed until after this period has elapsed.
The FSP’s builder (A) has advised that it is un able to guarantee the internal repairs
required as a result of the fire damage, because of the potential for ongoing
movement issues following the recent restumping works.
Accordingly, the FSP was not in a position to provide a lifetime guarantee of the
claim-related repairs, in accordance with the terms of the policy.
In these circumstances, I consider the FSP acted reasonably in electing to cash
settle the Applicants for the estimated cost of carrying out the repairs.
FSP did not clearly communicate proposed settlement approach
The Applicants say they were misled by the FSP to believe that it would arrange for
the repair of the fire damage once the property had been restumped, and they
undertook the restumping works on this basis.
Having carefully reviewed the claim history, I accept that the Applicants did not
appreciate that the FSP may decide not to complete the claim-related repairs, at the
time they undertook the restumping works.
It appears from the FSP’s claim records that:
the FSP’s assessor (C S) identified the movement and restumping issues when
he first inspected the property several days after the fire; and
these issues were first raised with the Applicants on 25 November 2014, when
the FSP advised that the claim may need to be cash settled if the movement
issues were found to be pre-existing.
The FSP’s assessor also discussed the restumping issues with the Applicants during
a site visit on 13 February 2015.
However, while the report prepared by the assessor following that meeting refers to
the potential effect such issues may have on the claim-related repairs, it does not
clearly indicate that the FSP was strongly considering cash settling the claim.
It appears from the claim notes that the FSP did not make a final decision to cash
settle the claim until May 2015, after its assessor reinspected the property following
completion of the restumping works.
I am satisfied that the FSP did not deliberately mislead the Applicants about the
manner in which their claim would be settled but rather left the issue unresolved until
the restumping works had been carried out.
However, it would have been preferable for the FSP to have clearly indicated to the
Applicants on regular occasions during the claim process that it was highly likely the
claim would be cash settled, given the extent of the restumping required.
Had the FSP done so, the Applicants may have been better prepared for the FSP’s
ultimate decision to cash settle the claim.
Case No: 409990 Determination Page 5 of 11
Nevertheless, the available information establishes that it was necessary for the
property to be restumped before the repairs to the fire damaged areas could
commence.
Accordingly, the Applicants have not suffered any additional financial loss as a result
of carrying out the restumping in the mistaken belief that the FSP would
subsequently arrange for the claim-related repairs.
In these circumstances, the FSP is entitled to exercise its discretion under the policy
to cash settle the Applicants for the cost of repairing the fire damage.
However, in determining the amount of the cash settlement, the FSP was required to
ensure that this amount was sufficient to allow the Applicants to repair the damage to
their property caused by the fire in November 2014.
2.2 Is the FSP required to increase the cash settlement amount?
FSP must settle claim for cost of repairing property to pre-existing condition
Under the terms of the policy, the FSP is required to cash settle the Applicants for the
cost (to the FSP) of repairing the property to a similar condition to that the building
was i n before the fire occurred (unless the FSP elects to repair on a “new for old”
basis).
The policy provides that the FSP will not pay extra to repair the property to a better
standard, specification or quality or to fix a fault that existed before the fire occurred.
Applicants consider cash settlement amount is insufficient
The FSP engaged a building consultant (S) to prepare a scope of works for the repair
of the fire damage to the property, following which it obtained quotations from two
builders for the cost of carrying out the repairs set out in S’s scope of works.
The FSP initially offered to cash settle the Applicants for the amount of $97,707.11
(including GST), based on a quote provided by the successful builder (A). A’s quote
included an allowance for site supervision costs of $1,500 and a builder’s margin of
approximately 15%
The Applicants obtained a quotation for $164,059.50 from their builder (MB), which
was made up of $118,189.50 for the repairs set out in S’s scope of works, plus an
additional amount of $45,870 for items which MB considered not been included in the
scope of works.
After reviewing MB’s quotation, the FSP increased the cash settlement amount to
$108,657.11. However, the Applicants believe this amount is still insufficient to allow
them to carry out the necessary repairs.
FSP’s scope of works and quotation are generally appropriate
As outlined above, the cash settlement amount offered by the FSP was based on a
scope of works prepared by its building consultant (S) and a quotation provided by its
builder (A).
Case No: 409990 Determination Page 6 of 11
Having carefully reviewed S’s scope of works, I am satisfied that it generally provides
an accurate assessment of the damage caused by the fire and a detailed breakdown
of the works required to restore the property to its pre -existing condition.
The repairs included in S’s scope of works are generally consistent with the claim -
related damage to the property as identified in the reports prepared and the
photographs taken during the initial assessments of the property.
The fact that the Applicants’ builder (MB) has quoted a higher amount for the repairs
set out in the scope of works does not of itself establish that the amo unt quoted by
the FSP’s builder (A) is inadequate.
Having said that, I consider that there are various areas in which A’s quotation should
be increased in order to better reflect the reasonable cost of undertaking the claim -
related repairs.
Settlement amount should be increased to reflect additional GST amounts
The items identified by the Applicants’ builder (MB) as having been omitted from S’s
scope of works include costs totalling $9,950 for a building surveyor, engineer and
draftsperson.
The FSP has accepted that the cash settlement amount should be increased to
reflect these costs. However, in calculating the revised settlement amount, the FSP
failed to include the GST of $995 payable on these amounts.
MB also identified an additional amount of $8,220 for the costs of removing and
replacing the floating timber floor at the property.
The scope of works prepared by S (and the quotation provided by A) included an
allowance for the replacement of the floating floor in the kitchen.
However, the FSP agreed to increase the settlement amount by an additional $1,000
to allow for the replacement of the floating floor in the hallway and bathroom. This
amount was calculated based on the cost per square metre reflected in A’s quotation
but also failed to include GST.
Accordingly, the cash settlement amount should be increased by an additional
amount of $1,095 to reflect the GST component of the costs for which the FSP has
accepted liability.
Settlement amount should be increased to allow for repairs to plaster
The Applicants’ builder (MB) also advised that S’s scope of works failed to provide for
the repair of damage to the plaster ceilings and walls in the hallway and front rooms
of the property. MB quoted an amount of $13,420 (including GST) for these repairs.
The hallway and front rooms of the property were not directly damaged by the fire,
which occurred in a room at the rear of the property.
However, the Applicants say the plaster in these rooms has sustained water damage
due to the actions taken by the fire brigade to extinguish the fire, as well as ongoing
water entry to the building through the poorly tarped roof following the make safe
repairs carried out by the FSP’s contractors.
Case No: 409990 Determination Page 7 of 11
The FSP says it is not liable for the repair of all of the damage to the plaster in the
hallway and front rooms, as this damage was not caused solely by the fire or
associated events. Specifically, the FSP says that:
the undulating and cracking damage to the plaster is consistent with the age of
the building and the type of plaster used; and
the plaster also had pre-existing damage caused by water leaking through the
roof due to the poor condition of the concrete tiles.
The photographs provided by both parties confirm that the damage to the plaster in
the front part of the property has worsened significantly since the fire in November
2014 (to the extent that sections of the ceiling have now collapsed).
However, it is difficult to determine with any certainty the cause of this damage.
When the FSP’s assessor (CS) inspected the prop erty shortly after the fire, he
confirmed that the front rooms had suffered smoke damage but did not specifically
identify any issues with the plaster (whether pre -existing or caused by the fire). The
photographs included with CS’s report do not clearly sh ow the condition of the plaster
in these rooms.
Following a subsequent inspection of the property in February 2015, CS identified
pre-existing undulating and cracking issues with the plaster throughout the house.
Photographs taken by the FSP’s building consultant (S) in March 2015 show
reasonably extensive water damage to the ceilings and walls in the hallway and front
rooms of the property.
In his report, S indicated that the water damage to the lounge room and bedroom 1
pre-existed the fire, but may have been exacerbated by the water sprayed into the
ceiling cavity by the fire brigade.
However, by this stage, the property had been exposed to further water damage over
a period of some months, due to problems experienced in tarping the roof (and
additional damage to the roof tiles) following the make safe repairs.
The FSP’s assessor (CS) advised that further cracking damage to the ceilings in the
front section of the property had occurred following the restumping repairs in May
2015.
The quotation provided by the FSP’s builder (A) (based on the scope of works
prepared by S) includes an allowance for the replacement of the plaster ceiling and
cornice in the lounge room.
The FSP says A’s quotation also provides for the repair of the plaster in the other
rooms at the front of the property. However, this allowance appears to be limited to
the costs of repainting rather than replastering.
Based on the available information, I consider that it likely that the damage to the
walls and ceilings at the front of the property has occurred due to a combination of
factors relating to the fire and pre-existing issues. However, I am satisfied that the
damage has worsened significantly over the course of the claim.
Case No: 409990 Determination Page 8 of 11
In light of the above, I consider it is fair in all the circumstances that the FSP be
required to increase the cash settlement by an additional amount of $7,000 to allow
for the repair of the water-damaged plaster in the front part of the property.
The FSP’s assessor (CS) reinspected the property in June 2015 and confirmed that
any additional damage to the property caused by continued exposure to the elements
was restricted to items which already required repair or replacement as a result of the
fire damage. Accordingly, no additional allowance is required for these items.
Appropriate allowance has been made for other items identified by MB
The scope of works approved by the FSP included an amount of $9,900 (including
GST) for the replacement of 50% of the concrete roof tiles (plus the roof gutters).
The FSP’s roof specialist (SR) inspected the roof in February 2015 and confirmed
that there was extensive damage to the roof tiles at the north-west corner of the
house, representing approximately 25% of the total area of the tiled roof. The
photographs included in SR’s report confirm this damage.
The Applicants’ builder (MB) considers the cash settlement should be increased to
include 100% of the cost of replacing the existing roof with a new Colourbond roof.
However, I do not consider that the FSP should be required to fund the full cost of a
replacement roof, given only one section of the roof was damaged in the fire. The
need for the entire roof to be replaced has arisen due to the pre-existing poor
condition of the roof tiles, rather than any damage caused by the fire.
MB’s quotation includes an amount of $1,800 for home warranty insurance. However,
there is no information to establish that the lesser amount for home warranty
insurance included in A’s quotation is insuffici ent.
Settlement amount should be increased by an additional 5%
For the reasons outlined above, I consider the FSP is entitled to cash settle the
Applicants’ claim, given the pre -existing issues with their property.
However, given the claim history, I consider the cash settlement amount should be
increased by an additional 5%, to ensure that it better reflects the amount required to
allow the Applicants to engage a builder to carry out the necessary works.
While the FSP did not at any stage expressly elect to repair the Applicants’ property,
it failed to clearly advise the Applicants of its decision to cash settle the claim until
more than six months after the fire, when they had already completed the restumping
works. The FSP’s internal claim notes indicate it was strongly considering cash
settling the claim from the outset.
It is also reasonable to assume that the quote provided by the FSP’s builder (A) was
prepared taking into account volume discounts and rebates which are commonly
made available to insurers and therefore underestimates the actual cost to the
Applicants of undertaking the building works.
Case No: 409990 Determination Page 9 of 11
Given the nature of the damage to the property, it is possible that additional costs will
be incurred during the course of the repairs as a result of damage which is not
currently apparent.
In the circumstances, I consider it is appropriate that the FSP be required to increase
the cash settlement amount by an additional 5%.
In arriving at this amount, I have taken into account the delays experienced during
the course of the claim. Accordingly, the FSP is not required to pay interest on the
cash settlement amount.
FSP is required to settle building claim for $122,589.71
In accordance with the above, the cash settlement amount should be increased to
$122,589.71.
This amount reflects the FSP’s existing offer of $108,657.11 plus:
an additional amount of $1,095 to reflect the GST component of the
professional costs for which the FSP has previously accepted liability;
an additional amount of $7,000 for the repair of the water-damaged plaster in
the front part of the property; and
a further amount of $5,837.60, reflecting an increase of 5% to allow for
additional costs incurred during the course of the repairs.
Applicants are entitled to temporary accommodation benefits for 150 days
The FSP has agreed to pay the Applicants temporary accommodation benefits for
the period reasonable required to complete the repairs.
The quotations provided by the FSP’s builder (A) and the Applicants’ builder (MB) do
not include an estimate of the timeframe for the repairs.
However, the FSP’s claim notes include an estimate of 150 days, which appears
reasonable given the nature and extent of the repairs.
Accordingly, the FSP is required to cash settle the Applicants for an amount
equivalent to temporary accommodation benefits for a period of 150 days, calculated
on the same basis paid to date.
2.3 Are the Applicants entitled to compensation?
Applicants are entitled to compensation for non-financial loss
Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation
(capped at $3,000) for non-financial loss where an applicant has suffered an unusual
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with their expectation of enjoyment or peace of mind.
Having carefully reviewed the claim history, I am satisfied that the FSP managed the
claim reasonably overall.
Case No: 409990 Determination Page 10 of 11
While there were delays in resolving the claim, for the most part these delays were
due to the pre-existing issues with the property, including asbestos which needed to
be removed from the building before a scope of works could be prepared.
The FSP sought to address the Applicants’ concerns about the claim settlement
amount, by reviewing the quotation provided by their builder (MB) and carrying out
further inspections of the property.
The FSP also acted reasonably promptly to address ongoing issues with the
tarpaulin covering the property, which was affected by weather events during the
course of the claim.
Further, the FSP has paid the Applicants temporary accommodation benefits during
the dispute process, over and above the limits provided under the policy.
However, as outlined above, I consider the FSP could have more clearly
communicated to the Applicants the likelihood that the claim would be cash settled.
I accept that the FSP’s failure to do so has caused the Applicants significant
additional stress, as they did not realise that the FSP would not be arranging for the
repair of the property until relatively late in the claims process.
In these circumstances, I consider the FSP should be required to pay the Applicants
the amount of $1,000 as compensation for non-financial loss.
Case No: 409990 Determination Page 11 of 11
3 Supporting information
3.1 FOS approach to this dispute
FOS has considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
dispute. Accordingly, this dispute has not been the subject of a FOS Preliminary View
and has proceeded directly to Determination.
This case has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.