Home / Financial Firm (Unknown - Insurer) / Determination 409815

Determination 409815

Claim denial under flood exclusion for stock and contents

FirmFinancial Firm (Unknown - Insurer)
Decided2016-07-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for stock and contents damaged in an April 2015 storm, and the FSP denied the claim as flood damage, which is excluded. AFCA found the flood exclusion applied and ordered nothing. Business interruption was outside AFCA's terms of reference.

Water escaped from the normal confines of Two Mile Creek, which meets the policy definition of flood, and the policy did not include the optional flood extension.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 409815 Determination Page 1 of 5 Case number: 409815 18 July 2016 1 Overview 1.1 Dispute This matter involves a claim by the applicant under her Business Insurance policy, held with the Financial Service Provider (FSP), following a significant weather event in April 2015 which caused damage for which she lodged claims for contents, removal of debris and business interruption. The applicant acknowledges that the claim in respect of business interruption is outside the Terms of Reference of this Service and will not be considered as part of this dispute. The FSP has denied the applicant’s claim on the basis that the loss and damage was the result of flood which is excluded from cover under the terms of the policy. 1.2 Issue and key findings Is the FSP entitled to deny the applicant’s claim on the basis of the terms and conditions of the policy? The FSP is entitled to deny the applicant’s claim on the basis of the terms and conditions of the policy. 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to deny the applicant’s claim on the basis of the terms and conditions of the policy. Case No: 409815 Determination Page 2 of 5 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material exchanged. This Determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principals, terms of the policy, good industry practice and where applicable, prior determinations. On 1 July 2016 the Ombudsman attended onsite with the applicant and representatives of the FSP. This determination is made on the basis of the information obtained at the onsi te visit together with all information exchanged in the course of this dispute. The determination is to be made by a Panel consisting of the Ombudsman together with a representative with extensive experience in consumer claims and a representative with extensive experience in the insurance industry. 2.1 Is the FSP entitled to rely upon the terms of the policy to deny the applicant’s claim ? Coverage of the policy The applicant’ s Business Insurance Policy provides coverage for loss and damage caused by a number of defined events which are detailed within the Product Disclosure Statement (PDS). This means that not all loss and damage is automatically covered but rather, only loss and damage caused by the defined events which are listed within the policy. The PDS details: ‘ Defined events cover We cover You for loss or damage at the Business Premises caused by the following defined events: … 7. Storm, tempest, rainwater, snow, sleet, wind, hail but not: (a) by water from or action of the sea, tidal wave, storm surge, high water or Flood. …’ In addition to the eight defined events listed in the PDS there is also coverage in respect to accidental damage and the PDS details: ‘ Accidental damage cover We will cover You for accidental loss or damage to Your Business Property at the Business Premises other than the events or items listed in ‘What You are not covered for under Accidental damage cover’. The maximum amount We will pay for accidental damage cover for any occurrence is the lesser of $250,000 or the total sum insured for Buildings and Contents unless a higher amount is specified in the current Policy Schedule as the accidental damage sum insured. …’ Case No: 409815 Determination Page 3 of 5 However, the accidental damage coverage is limited by the terms of the PDS: ‘ What You are not covered for under Accidental damage cover We will not pay for claims under ‘Accidental damage cover’ for: 1. loss or damage caused by any defined events cover in this section 2. loss or damage caused by events or to the items listed under general exclusions 3. loss or damage insurable under any other section or sections of this Policy 4. Business Property to the extent insurable under the General Property cover section ’ The PDS also includes a number of exclusions to coverage under the Business Property section of the policy. The PDS details: ‘ What You are not covered for under this section 1. We will not pay for loss or damage under the Business Property cover section caused by: … (h) Flood …’ The PDS also includes an optional extension to the Business Property cover for loss and damage caused by flood and the PDS details: ‘ Optional extension to the Business Property cover Flood When ‘Flood’ is shown in the current Policy Schedule, We will cover loss of or damage to Business Property caused by Flood. ’ The evidence exchanged confirms that the policy schedule applicable to the applicant does not record that the optional extension to the Business Property cover for flood has been included in the policy coverage. The PDS provides a definition for flood which is: ‘ Words with special meaning Some words have special meaning wherever they appear in the Policy: … Flood the inundation of normally dry land by water escaping or released from the normal confines of any natural watercourse or lake (whether or not they have been altered or modified) or from any dam, reservoir or canal. ’ Having reviewed the policy documentation and the evidence available, the Panel is satisfied that the policy selected by the applicant in this matter does not provide coverage in the event that the loss and damage was caused by flood. Circumstances of the applicant’s loss and claim It is not in dispute that in April 2015 there was a significant weather event i n the local area which resulted in damage to the applicant’s stock and contents. A dispute has arisen between the parties as to whether the cause of the damage to the stock and contents can properly be described as flood, which is excluded under the policy, or alternatively storm or rainwater, for which cover is provided under the policy. Case No: 409815 Determination Page 4 of 5 The FSP arranged for an assessor to attend on-site, who engaged a consulting engineer and hydrologist, all of whom have provided reports. The Panel has had access to an ad ditional engineer’s report, provided in the building loss dispute numbered 410738. The Panel has been greatly assisted by the material exchanged which has included relevant photographs and videos taken during the course of the significant weather event. Having considered all of the exchanged material, the Panel is satisfied that the water which entered the car park and the building on-site was substantially water from the Two Mile Creek and the unnamed tributary of Two Mile Creek that passes beneath (C) Drive. The evidence confirms that Two Mile Creek passes underneath the (NE) Highway via culverts and then under the car park and building site via further culverts. On the basis of the evidence exchanged, the Panel is also satisfied that once the ability of the culverts beneath the car park and building site was exceeded, the water from Two Mile Creek and the unnamed tributary inundated the site car park and flowed into the building on the site. The Panel accepts that given the slope of the NE Highway in the direction of the building site, there would have been some stormwater runoff towards the location but the Panel is satisfied that this stormwater runoff would have flowed to the area in between NE Highway and the car park and building location. This area has been described as a basin and forms part of the Two Mile Creek as it progresses underneath the NE Highway, through the basin and then underneath the car park and building site. The applicant maintains that the water within Two Mile Creek was forced on to normally dry land because its usual path was blocked by the debris in the trash rack. The Ombudsman observed and the exchanged material confirms that there is a trash rack designed to stop debris, travelling along the Two Mile Creek, from proceeding underneath the car park and building location site. The applicant says that the trash rack was blocked and despite previous complaints to the local Council, had not been cleared. The applicant says that immediately subsequent to the damage to the property, there was machinery and workers on-site clearing the debris from the trash rack. The applicant assumes that the workers and machines were engaged by the local Council. The applicant maintains that the debris which had accumulated within the trash rack prevented the waters within the Two Mile Creek from proceeding along their normal path and were forced out of the Creek into the car park and building. Whilst the applicant maintains that complaints had been made to the Council, there is no direct evidence of the extent of the debris or blockage, immediately prior to the significant weather event. Case No: 409815 Determination Page 5 of 5 The Panel accepts that it may be possible that the trash rack became blocked during the course of the significant weather event as a result of the debris which was proceeding along the Two Mile Creek within the forceful water flow. However, even if it could be established that the trash rack was blocked prior to the significant weather event, the Panel is satisfied that the policy definition for ‘flood’ captures the circumstances of the applicant’s loss. The policy definition for flood, detailed above, involves ‘… water escaping or released from the normal confines of any natural watercourse…’ Whilst it has been said that the water has not escaped but rather has been forced on to dry land because its usual path was blocked, the Panel is satisfied that this effectively amounts to the water escaping from the natural watercourse; the cause of the escape may just as well have been the volume of water, as much as the possibility that the usual path was blocked. The Panel is satisfied that the concerns held by the applicant in regard to the actions of the local Council and their failure to clear the trash rack, whilst arguably being a matter for complaint by the applicant against the Council, does not assist the applicant in her dispute regarding the coverage of the policy. The Panel is satisfied that regardless of the cause, water has escaped from the normal confines of Two Mile Creek and has entered the car park and building causing damage. The result is that the FSP is entitled to deny the applicant’s claim on the basis of the exclusion for ‘flood’. Finally, the Panel notes the applicant could have elected to add the option of ‘flood cover’ to her policy; however, that is not a matter for this dispute or, in this instance the FSP, but it may well be a matter between the applicant and her insurance broker.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.