Determination 409793

Water ingress claim and quality of 2013 repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2016-07-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for water ingress into his home and disputed the quality of 2013 storm repairs, and the FSP's independent assessment was inadequate. AFCA ordered a fresh independent expert inspection, with FSP-liable repairs to follow, and $1,500 for non-financial loss.

The applicant had the onus to link the damage to the 2013 event or poor workmanship, but the FSP's inadequate and delayed assessment warranted an independent expert inspection and non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 409793 Determination Page 1 of 10 Case number: 409793 21 June 2016 1 Overview 1.1 Dispute The applicant lodged a claim in April 2015 after noticing water entering the insured premises into the attic and the ensuite bathroom. Whilst the FSP says this is a maintenance related issue, the applicant contends it is related to impact damage to the roof in 2013 when the property sustained significant damage following a severe weather event. The applicant also raises other issues with the quality of works undertaken in 2013. During the claims investigation process, the FSP accepted liability for minor issues like some paintwork and a light fitting. In November 2015, the parties agreed on a dispute resolution mechanism. The parties agreed the FSP would arrange for a new builder to conduct an independent review of the works completed by the FSP‟s builder in 2013 and assess all information to determine whether the 2013 works have been completed properly and whether the current complaints are linked to the 2013 works. The report was not provided until February 2016 and the FSP acknowledges the report was inadequate. The applicant has become frustrated and lost all confidence in the FSP. He seeks a determination from FOS regarding the claim and his complaints. 1.2 Issues and key findings Is the claimed damage as a result of poor workmanship in 2013? On the material provided, and in the absence of a report from the applicant, it is acknowledged the applicant has probably not fulfilled his onus in establishing the damage claimed was due to the insured event in 2013 or due to the poor workmanship of the FSP‟s repairer after the 2013 claim. However, as set out in this determination, there are areas of ambiguity and uncertainty. Further, the FSP relies on the assessor who in turn relies on the FSP‟s 2013 builder who is not independent. The FSP provides a lifetime guarantee on the repairs and the FSP agreed a mechanism to resolve the dispute but the independent assessment was inadequate. In all the circumstances, an inspection of the insured premises and a written report by a suitably qualified independent expert is the most effective and fair way to resolve this dispute and establish if the claimed damage and other issues are as a result of the insured event in 2013 or poor workmanship in 2013. Case No: 409793 Determination Page 2 of 10 Is the applicant entitled to compensation? It is fair in all the circumstances the FSP pay the applicant $1,500 compensation for non- financial loss as the FSP‟s conduct has interfered with the applicant‟s expectation of enjoyment or peace of mind. Further, the FSP‟s failure to adequately address the concerns raised by the applicant and provide an adequate independent assessment report has resulted in an unusual amount of time taken to resolve the situation. 1.3 Determination This determination is substantially in favour of the applicant. If the applicant accepts this determination, and upon the FSP being advised of acceptance, the parties are:  to agree upon a suitably qualified independent expert to undertake a detailed inspection of the insured premises and report in accordance with the process and timelines outlined in the part of this determination headed “further independent expert report to be obtained”  to agree the appointed expert‟s opinions are final and not subject to appeal Within seven days of acceptance of this determination by the applicant, the FSP is also to pay $1,500 compensation to the applicant for non-financial loss. Case No: 409793 Determination Page 3 of 10 2 Reasons for determination 2.1 Is the claimed damage as a result of poor workmanship in 2013 ? Applicant must establish claimed damage as a result of poor workmanship The FSP does not dispute the applicant‟s property has been damaged as a r esult of water entering the property. The dispute is as to whether the water ingress occurred as a result of previous poor repairs in 2013 or as a result of new events. If as a result of a new event, a new claim would be made. The material provided shows a standard excess of $5,000 applies to any new claim. The applicant must establish on the balance of probabilities the damage he now claims was caused in the 2013 event or as a result of poor workmanship in 2013. In April 2015, the applicant contacted the FSP to advise he discovered water leaking in the ensuite bathroom. Upon entering the attic, the applicant discovered the walls were wet. As a result, the FSP arranged for its assessor and R, the 2013 builder, to inspect the claimed damage which included o ther issues. Based on the reports from its assessor and R, the FSP accepted a minor amount of the damage. The FSP advised, although the water damage would be accepted under a new claim, the applicant was responsible for addressing issues with the roof. Further, the applicant would be liable to pay $5,000 excess under a new claim. The applicant did not accept the FSP‟s position. The applicant said the FSP‟s position was not independent but determined by an assessor who was not independent and the 2013 builder who was biased in his own favour. FSP agreed to independent assessment but it was incomplete The applicant indicated to FOS he required an independent assessment of the issues. The FSP agreed and acknowledges the independent assessment it arranged was incomplete or inadequate. As a result of enquiries made so far, the FSP is willing to arrange for R to repaint the paintwork on the rear concrete pier. An issue with a light fitting in the kitchen has been rectified by R. The FSP said it was also willing to perform further tests on the balcony to determine if water is entering the insured premises as a result of poor drainage or poor workmanship. However the bulk of issues in dispute remain unresolved. The issues are set out below. Vibration of fencing The fence was replaced by R in 2013. The applicant says the colour bond fence rattles or vibrates which it did not do prior to the 2013 event. He says this can be Case No: 409793 Determination Page 4 of 10 confirmed by the neighbours. He also asserts following its replacement, the fence collapsed. He says it was then affixed to the house with horizontal support bars. R and the assessor say the fence was built to the manufacturer‟s standard and braced. They say the fence was very exposed to a wind tunnel between the two houses. They also assert most fences rattle and move in high wind. The 2013 material provided shows a photograph of a storm damaged fence running closely between two houses. R‟s costing on the scope of work included fencing in the amount $1,360. Photographs provided by the assessor in his reinspection report in June 2015 show a fence has been installed, but unusually, the fence is braced against the side of the house. Although the FSP agreed to an independent assessment, the assessment fails to make any comment on this issue. In the absence of an explanation about the fence bracing, I am not satisfied the original manufacturer‟s standards would require the horizontal fixing supports now seen. Prima facie , this suggests an issue with original workmanship by R. Patio tiles lifting The applicant alleges some tiles on the patio are lifting. The 2013 specification shows damaged tiles were to be replaced. Neither the assessor nor R refer to this issue. Although the FSP agreed to an independent assessment, the assessment also fails to make any comment on this issue. Balcony sliding doors to bedrooms 3 and 4 The applicant claims during heavy rain, carpet near the sliding doors in bedrooms 3 and 4 becomes wet. The 2013 scope of works shows new aluminium framed sliding doors were to be installed to bedrooms 3 and 4. Upon inspection, R said movement under extreme conditions would be normal as the house faces south east and is very exposed. R said the door installation meets manufacturer‟s standards. Photographs taken by the FSP‟s assessor are annotated saying they show water marks from a possible leaking balcony above. The assessor recommended a builder be appointed to flood test the balcony to confirm if water is entering by the balcony or through the door flashings. The independent assessor inspected the area in January 2016 and noted no resultant damage evident to this area at the time of inspection. No flood test was conducted. It is not surprising no damage was noted as the assessor had dried the carpet when he attended several months earlier. Although the FSP agreed to an independent assessment, no flood test was conducted, and the FSP agrees the assessment is inadequate. Roof water ingress The FSP‟s assessor noted and photographed water staining on ceilings from the leaking roof above the master bedroom and ensuite. The air conditioning vent was Case No: 409793 Determination Page 5 of 10 also loose in this area. The assessor recommended R inspect roof tiles and rectify the air conditioning vent. Rectification of the vent was attended to. As for water staining to the ceilings and walls of bedroom 1, R said this is a building defect due to the original poor flashing detail. R took photographs of the roof, roof tiles and flashings and says the photographs show all building related issues relate back to the original construction. R also photographed the new tiled area for which R admitted responsibility but said no defects were noted in this area. Upon review, the FSP‟s assessor stated t his area of the roof was not on the original scope of works. Accordingly, the FSP indicated the applicant would be required to rectify maintenance issues with the roof prior to any repair being carried out by the FSP to the ceiling below in the master bedroom and ensuite. The FSP agreed to an independent assessment. The builder reported that he inspected the master bedroom/ensuite area and advised: „… water ingress had occurred to this area via the areas directly above where t wo valley irons feed into rainw ater head/drainage system.‟ The FSP acknowledges the response provided was inadequate but contends the information provided from all builders involved indicates the damage to bedroom 1 was not as a result of the 2013 work performed by R. The 2013 scope of works shows the requirement to replace 20m2 of water damaged section of ceiling in the master bedroom. Further, R quoted for roof flashing and repairs in the amount of $1,600. Whilst the FSP relies upon issues with the roof which it says are unrelated to the 2013 damage or 2013 repairs, to explain the new water ingress, a recent photograph taken by R depicts an „old chipped tile not in area R worked on and obviously chipped for many years‟. However, it is unclear why R did not identify this in 2013. The findings support the applicant‟s contention of impact damage during the storm not previously identified. On the other hand, if the water ingress did result from some form of impact damage in 2013, it is unclear why the water ingress only became apparent in 2015. While the applicant has the onus of proof, the FSP agreed to an independent assessment and the FSP acknowledges the independent assessment was inadequate. A proper independent assessment is to take place to identify if the roof was damaged by storm or by impact in 2013, or whether the roof has inherent defects not associated with storm damage or impact damage in 2013 or R‟s poor workmanship. If the roof has inherent defects, then the applicant is liable to repair the roof before the FSP is obliged to repair ceiling stains from the leaking roof above the ceilings. Water damage in attic The assessor noted the wall lining to the front elevation below the windows appeared to be wet. He also noted the air conditioning duct to the return vent had become loose. Case No: 409793 Determination Page 6 of 10 R reported there was no evidence of dampness on its inspection but this was several months after the claim was made. R said it did not do any repairs to the return vent or replace the window or the wall cladding externally to this wall. As a favour, R instructed its tradesman to re-tape the air duct to the return air grille but takes no responsibility for the item. The FSP‟s assessment says the 2013 scope of works refers to the replacement of the window to the southern end of the attic. I have examined the 2013 scope of works. It provided for two new skylights and one new aluminium framed window to the attic. The assessor says this window is in the area where the wall appears to be damp. As the window was installed in 2013, the assessor reported recent water entered the attic during heavy wind and rain and not because of any defect. The assessor indicated a new claim should be made by the applicant. While the applicant has the onus of proof, the FSP agreed to an independent assessment and the latest assessment fails to make any comment on this issue. Air-conditioning issues The assessor noted the air conditioning vent in the master bedroom was loose and the air-conditioning ducting to the return vent in the attic had become loose. R re-attended and clipped the air conditioning vent in the master bedroom. Although R agreed to re-tape the air duct in the attic, R says this was not its responsibility as it did not do any repairs to the return vent. It says it only replaced one length of ducting within the roof void on the eastern elevation which was crushed by tiles. R photographed the new ducting in the eastern void and noted there was no problem. R said it did not do any work to any ducting in the northern void area. R photographed what R described as old ducting in the northern void area. However, the 2013 scope of works shows item 4 under Attic: „ Remove and replace damaged flexible A/C ductwork and reconnect‟. In 2013, R quoted $3,800 for air-conditioning repairs. After its recent inspection, R engaged a tradesman to re-clip the bedroom supply air diffuser and remove the air grille and reconnect the return air duct work located in the attic area. The tradesman reported: „ This part of the A/C ductwork did not form any part of the original rectification works carried out in July 2013. It‟s just wear and tear…‟ The photographs taken by R indicate old duct tape falling away from the duct to the vent junction. The trade also reported the unit was not heating but was cooling even though the heating mode was selected. Possible causes of this were identified including the controls/thermostat/PC board might require replacement. Case No: 409793 Determination Page 7 of 10 He noted the unit operates on old phased out gas. Further, he said the outdoor condenser is not upright. The FSP‟s assessor agrees the scope of works indicated for ducting to be replac ed but he could not confirm if „ this area was new or existing ‟ but relies on R‟s report. The applicant says he still has no effective air-conditioning. He contends due to the recent repairs conducted by R‟s tradesman, the unit no longer works. While the applicant has the onus of proof, the FSP agreed to an independent assessment, and the latest assessment fails to make any comment on this issue. Further independent expert report to be obtained The FSP explains an unknown error occurred in its system which resulted in the independent assessor failing to receive all relevant information. The FSP acknowledges the report is inadequate. The FSP indicated if the applicant provided a report from a builder of his choice, it would be willing to take it into consideration. The applicant has not provided a report. I accept he was entitled to wait for a comprehensive and timely report from the independent assessor before arranging his own report. In the absence of a report from the applicant, it is acknowledged the applicant has probably not fulfilled his onus in establishing the damage claimed was due to the insured event in 2013 or due to the poor workmanship of the FSP‟s chosen repairer during the 2013 claim. However, as set out in this determination, there are areas of ambiguity and uncertainty. Further, the FSP relies on the assessor who in turn relies on R who is not independent. Moreover, the FSP provides a lifetime guarantee on home repairs. It guarantees the material used and standard of workmanship will be free of defects and if a defect arises, it will rectify the problem. Finally, the FSP agreed a mechanism to resolve the dispute. It agreed an independent assessment would be undertaken. It acknowledges the independent assessment was inadequate. In all the circumstances, I consider an inspection of the insured premises in the presence of the applicant and a written report by a suitably qualified independent expert is the most effective and fair way to resolve this dispute. It is also fair in all the circumstances the cost of the independent assessment report is paid for by the FSP. The FSP is to identify two independent experts who are suitably qualified to undertake a comprehensive examination of the a pplicant‟s insured premises and then provide a written report. The FSP is to email the applicant with details and qualifications of the proposed experts within 7 days of this determination being accepted by the applicant. Upon receipt of these details, the applicant is to advise the FSP within 7 days by return email of his preferred expert. Case No: 409793 Determination Page 8 of 10 Both parties are to agree the expert‟s opinions will be final and not subject to appeal. If the parties are unable to agree on an independent expert to inspect the insured premises and provide a report, the independent expert will be chosen by FOS within 7 days of notification by the parties of inability to agree. Upon receipt of the a pplicant‟s advice as to his preferred expert, the FSP is to arrange for this expert to complete an inspection and assessment of the insured premises within 14 days and further, ensure the written report is made available to both parties within a further 7 days. This inspection and assessment must conclusively address all the issues disc ussed in this determination and whether the items were damaged in the 2013 insured event, or inadequately repaired by R in 2013. The FSP is to ensure the expert is provided with all relevant material from the 2013 claim and in particular the FSP‟s assessments and photographs of the damage undertaken in 2013, the 2013 Scope of W orks, R‟s costings and R‟s invoices evidencing the work done in 2013. If it is the expert‟s opinion there is outstanding repairs or rectification works to be completed for which the expert says the FSP is liable, a t the FSP‟s cost, the expert is to prepare and cost a Scope of Works. The Scope is to address all of the damage to the insured building as at the date of this determination arising from the 2013 event and/or R‟s poor workman ship and to which the 2013 policy responded. The FSP is to arrange for any outstanding repairs or rectification works to be completed within 14 days (or a mutually agreed timeframe) of the expert‟s report being received. The only exception is if the expert determines the FSP is not liable for the claimed damage caused by the water ingress from the roof. In those circumstances, the applicant is responsible for roof repairs before the FSP is obliged to repair the claimed internal damage caused by water ingress from the roof. Any such repairs or rectification works for which the FSP is responsible, is to be re- inspected and approved in writing (with a copy sent to the applicant) by the expert. 2.2 Is the applicant entitled to compensation? Compensation awarded in certain circumstances The applicant claims there have been many occasions when the FSP has not complied with time limits. Further, he has been without air-conditioning for some periods. He also says the make safes have not been adequate and water continues to come into the home. As a result, on occasions after rain, he has had drying machines running to dry carpets, has lost use of rooms and incurred higher than usual electricity bills. Further, despite agreeing to a mechanism to resolve the dispute, the independent assessment took too long and was inadequate. The Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for Case No: 409793 Determination Page 9 of 10 such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the a pplicant‟s expectation of enjoyment or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. Fair in all the circumstances the FSP pay $1,500 compensation In the circumstances of this dispute, I consider the FSP‟s conduct has interfered with the applicant ‟s expectation of enjoyment or peace of mind. Further, to be without air- conditioning in the applicant‟s circumstances would result in an unusual amount of physical inconvenience. In addition, the claim was made in April 2015 and yet a dispute resolution mechanism was not arrived at until November 2015. Thereafter, despite agreeing to provide an independent assessment, the independent assessment was not timely and was not adequate. I consider the FSP has not adequately addressed the concerns raised by the applicant and an unusual amount of time has been taken to resolve the situation. At the suggestion of FOS, the FSP offered $500 compensation for delays which occurred because the provision of the independent assessment was not timely. However, in all the circumstances, I am not satisfied $500 compensation is adequate for all of the FSP‟s conduct during the claim and the dispute . I consider it is fair in all circumstances the FSP pay $1,500 (inclusive of the $500) compensation to the applicant. Case No: 409793 Determination Page 10 of 10 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Relevant policy extract The relev ant policy extracts are referred to in the FSP‟s Notice of Response dated 1 October 2015. Both the policy document and the Notice have been exchanged with the applicant. 3.3 Relevant material considered and relied on  Parties‟ submissions, emails and photograp hs.  Correspondence between the parties.  FSP‟s policy screens and claims screens .  FSP‟ s material from the 2013 claim.  Assessor‟s report and photographs dated 17 June 2015.  Builder‟s photographs and undated report.  Assessor‟s further report dated 26 August 2015.  FSP‟s second builder‟s report and photographs dated 12 January 2016.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.