Home / Financial Firm (Unknown - Insurer) / Determination 409593

Determination 409593

Storm water damage claim declined under policy exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2016-03-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The applicants' storm water damage claim to their home and contents was declined on policy exclusions for structural and inherent defects. AFCA upheld the decline and ordered $2,000 for claims handling delays, which the FSP had already offered.

Expert evidence showed water entered through building deficiencies that the policy excludes, but the FSP's unusual delays justified non-financial loss compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 409593 Determination Page 1 of 10 Case number: 409593 7 March 2016 1 Overview 1.1 Dispute The Applicants hold Home Buildings, Contents and Valuables Policy (the policy) with the Financial Services Provider (FSP). They lodged a claim under the FSP‟s policy on 22 March 2015 after water ingress was noted during a storm event. The FSP arranged for experts to inspect the Applicants‟ property . On 5 May 2015, whilst awaiting the relevant reports, the Applicants reported additional damage to the property after further storm activity. The Applicants‟ claim for storm damage to their building and contents was denied by the FSP on the basis the cause of damage is a structural defect, which is an exclusion from cover under the policy. The Applicants rely on a report which says the damage was caused by storm and seek a review of the FSP‟s decision on this basis. 1.2 Issues and key findings Have the Applicants established a prima facie claim? The Applicants have not established a prima facie claim under the terms of the policy because:  the Applicants‟ policy provides cover for damage to the building and/or contents caused by storm, rain or flood if the water has entered through an opening in the wall or roof made directly by the storm or rain or as a direct result of it  the Applicants have failed to persuasively demonstrate the water ingress and subsequent damage was the result of a storm or a storm related opening. Is the FSP entitled to decline the claim? Had the Applicants provided sufficient material to establish a prima facie claim, the FSP would still have been entitled to decline the claim because:  the available expert material establishes the water ingress is the result of building deficiencies when the home was relocated from another site  water entry to the ground floor had been occurring over an extended period of time with work apparently being carried out in the past in an attempt to resolve these issues  the policy expressly excludes claims for damage to the building caused by water penetrating or entering a building as a result of a design fault, structural defect or defective workmanship and Case No: 409593 Determination Page 2 of 10  the policy also expressly excludes any claim arising from an inherent defect. Are the Applicants entitled to compensation? The FSP has acknowledged in its Notice of Response dated 10 September 2015 its representatives did not act in a timely fashion in responding to the Applicants‟ communications, and in particular to requests to have the matter escalated. In light of this, the FSP has made an offer to the Applicants of $2,000 compensation in respect of the claims handling issues. This offer is fair in all the circumstances and should be accepted by the Applicants. 1.3 Determination This Determination is substantially in favour of the FSP. The FSP is not obliged to indemnify the Applicants for any water damage to their building or contents, nor for the cost of rectifying the building defects which have been identified. If the Applicants accept this Determination within seven days of acceptance, the FSP is to pay to the Applicants:  $2,000 being the compensation amount offered by the FSP for the delays in claims handling and poor service standards which it has acknowledged. Case No: 409593 Determination Page 3 of 10 2 Reasons for Determination 2.1 Is the FSP entitled to deny the claim? Cause of loss was building deficiencies and/or inherent defects The Applicants must establish on the balance of probabilities the claimed damage to the building and contents was caused by the insured event of storm, rain or flood. The Applicants say water entered the building and damaged it and contents due to an unusual weather event and unusually heavy rain. They say there is nothing wrong with the building as water has not entered the building before. They say water ingress does not occur during normal rain. In support of their claim, the Applicants have provided a report which says the seal in a joint between the slab and the block wall was damaged during the recent storm event causing water to flow through the joint. The author of the report does not state his qualifications. The letterhead indicates the business includes waterproofing. The report says: “We recommend injecting the cold joint between the slab and the block wall. From my observation, the seal was damaged during the recent storm event and caused water to flow through the joint. Once damaged, the joint will leak even during normal rain events.” The FSP provided reports from its assessor and a building consultant. The assessor noted there was significant drainage at the property which appeared to be in working order and could find no obvious reason for the water entry. In the circumstances, the assessor appointed a building consultant to determine the cause. The building consultant (CD) attended the site in April 2015. The Applicants contend his examination of the property was cursory and he did not conduct sufficient testing. The building consultant says he was on-site for 1.7 hours, discussed the nature of the water ingress, inspected the lower floor level and made numerous observations. Having considered both reports, the photographs taken, and observations made, I am satisfied the examination of the property was not cursory and proper investigations were carried out. I am also satisfied as building consultants and engineers, CD has the necessary qualifications and expertise to comment on the cause of damage. Contrary to the opinion of WS, CD concluded the water ingress to the rooms (identified in the reports) did not occur via a storm created opening. He said it was as a direct result of prior building deficiencies when the home was relocated and building deficiencies with the construction methods used during works carried out by unknown persons between 2008 and 2014. (This was prior to the purchase of the home by the Applicants). He reported to the FSP: “I am of the opinion that the water ingress which recently occurred into the Staircase Storage area, the Wine Room, the Rumpus Room, Storage Room number 2 and the Case No: 409593 Determination Page 4 of 10 Master Bedroom during the recent March 2015 rain storm event is as a direct result of the following; a) The absence of a suitable seal being provided at the overlapping junction point between the base of the concrete block wall and the edge of the concrete wall slab. b) The absence of a suitable seal being provided at all concrete infill slab to concrete block wall junction points. c) The absence of suitable subterranean drainage system located in behind the Eastern, Southern and Western concrete block wall construction to the invert level of the concrete wall slab. d) The absence of suitable waterproofing system to the concealed back faces of the Eastern, Southern and Western Concrete Block Walls.” I note the observations made by CD in relation to WS‟s report. CD notes the report did not lay out any observations, testing or investigations which were carried out by WS. While CD agrees water entered the dwelling at the floor/wall junction, CD says this is because of the building deficiencies. CD contests the opinion the seal at the floor/wall junction had been damaged by water ingress as CD says no seal was installed. The Applicants contend the FSP‟s decision was based on the ill -informed and unqualified assumptions made by the assessor. However, the FSP is entitled to rely on the opinion of the building consultant, CD. The reports and photographs provided by CD are far more comprehensive than the report provided by WS. Further, I do not know the nature of the expertise of WS. Whereas, I am satisfied a building consultant has the necessary expertise to provide opinion on the cause of damage. On this basis, I prefer the FSP‟s material. I am therefore unable to accept the Applicants have discharged the onus of establishing the water ingress has occurred as a result of an insured event namely by storm, rain or flood. Policy excludes claims arising from structural and inherent defects The policy terms are clear. The FSP will not cover water damage to a building caused by rain seeping into the building unless the water entered through an opening in the wall or roof which had been made directly by the storm or rain or as a direct result (my emphasis). On the material provided, whilst I accept following heavy rain, the Applicants found water had entered through the walls in the lower section of the property, I am not satisfied the material establishes on the balance of probabilities water entered through an opening in the wall which had been made directly by the rain. Nor am I satisfied the proximate cause of the damage was storm. Rather, the material establishes water penetrated or entered the building because of structural defect or inherent defects. Both causes are excluded from cover. Therefore, even if I was to accept the Applicants had established a prima facie claim, I note as outlined in the reports provided by CD on behalf of the FSP: “The water ingress to the above identified rooms has not occurred via a storm created opening however, is a direct from prior building deficiencies when the home was re- located. Water entry into the lower ground floor of the residence has been occurring repeatedly over an extended period of time. Case No: 409593 Determination Page 5 of 10 The relocation of the Storage Room number 2 walls to create the open service/drainage duct, all associated waterproofing, creation of a ground spoon drains and a drainage sump and the installation of a submersible pump are considered as rectification type works and are all tell-tale signs of the prior Owner from between 2008- 2014 to address the failure of the original waterproofing and drainage system. The works performed during the alterations and additions fail to comply with the Building Code of Australia Performance Requirement P2.2.2 which states – A roof and external wall (including openings around windows and doors) must prevent the penetration of water that could cause – (a) unhealthy or dangerous conditions, or loss of amenity for occupants; and (b) undue dampness or deterioration of building elements.” The Applicants say their house passed building and pest inspections on each occasion the house was bought and sold since the house was put on the block of land (around 12 years) and this kind of damage never occurred before the severe storms in 2014. However, the Applicants have produced no material regarding past building inspections. Further, the nature of the works to the home, in particular the installati on of additional drainage and pump systems by prior owner(s) are indicative of an attempt to remediate an existing problem with waterproofing and drainage and supports the contention this issue has probably been ongoing over time. The policy expressly excludes claims in relation to both the building and contents for: “damage caused by water penetrating or entering your building ….as a result of a design fault, structural defect or because of defective workmanship;” The policy also contains a general exclusion for any incident arising from or connected with: “damage caused by ….inherent defect.” In the absence of persuasive material to the contrary, I accept CD‟s expert opinion that water entered the building and caused damage to the building and contents because of structural and/or inherent defects. Therefore , I am satisfied the FSP was entitled to rely on policy exclusions and deny the claim. 2.2 Are the Applicants entitled to other compensation? An unusual amount of time was taken to resolve the situation FOS‟s Terms of Reference enable FOS to compensate Applicants for non -financial loss. The compensation is capped at $3,000. Compensation for non-financial loss is limited to certain circumstances. FOS may decide an FSP should compensate an Applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the Applicant‟s expectation of enjoyment or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. When deciding whether a remedy should be provided, FOS will do what in its opinion is fair in all the circumstances having regard to legal principles, industry codes, practice guides, good industry practice and previous FOS decisions. Case No: 409593 Determination Page 6 of 10 The Applicants say the FSP failed to respond to any method of communication and the time which passed was unacceptable. The FSP says the claims area was under the impression the Applicants would be submitting further reports and this expectation contributed to delay. Nonetheless it acknowledges there were delays in its claims handling process and has offered the Applicants compensation of $2,000. The material provided shows the Applicants contacted the FSP on 22 March 2015 regarding the flooding in their home. The FSP‟s assessor attended the property 2 April 2015 and reported 8 April 2015. The FSP‟s expert attended the property 20 April 2015 and reported 22 April 2015. However, there is no indication of any claims decision about this time. On 1 May 2015 there was another storm and on 5 May 2015, the Applicants contacted the FSP again. Despite this, the material indicates it was not until 29 May 2015 the Applicants were told of the FSP‟s decision to deny the claim. The Applicants‟ expert provided a report dated 29 May 2015. On 9 June 2015 the Applicants provided a copy of this report to the FSP. However, there was still no contact from the FSP until early August 2015. The Terms of Reference limit an award of compensation to $3,000. An amount of $3,000 is awarded in only the most extreme and unusual circumstances. I am not satisfied the circumstances of this claim are the most extreme and unusual. Nonetheless, I accept there was an unusual amount of time taken to resolve the situation and communicate with the Applicants and this would have interfered with the Applicants‟ expectation of enjoyment or peace of mind. Having considered the material provided, I am satisfied the FSP‟s offer to pay to the Applicants $2,000 compensation is fair in all the circumstances. Case No: 409593 Determination Page 7 of 10 3 Supporting information 3.1 FOS Approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. There has been a full exchange of all material information relied on for the purposes of this Determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this Determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous Financial Ombudsman Service (FOS) decisions. While the parties have raised numerous issues in their submissions, for the purposes of this Determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law an insured bears the onus to establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy provisions “ Definitions (the meaning of some words) Some words and expressions in this Policy have a specific meaning which is given below. Word or term Definition … Damage or damaged when an item insured by this policy is physically harmed. Damage does not include wear and tear. … S torm violent weather and high winds, sometimes accompanied by rain, hail or snow including cyclone or tornado.” “ What we will cover as your building Your building means  the main residential building you own and lease to a tenant at the site:  outbuildings at the site if able to be secured; and  fixtures (items permanently attached to or fixed to your building or site) such as: o a fixed spa, sauna, barbecue, clothes line, room heater, stove, air conditioner, ceiling fan, lighting fixtures permanently secured to the building, hot water system; o … o kitchen cupboards, built in furniture ” “ Policy Coverage Summary You can choose to insure your building, your contents or both under the [FSP policy name] and if this Policy insures your contents, you can also choose to insure your valuables away from the home. Your building and/or contents will be covered for loss or damage caused by one (1) of the thirteen (13) insured events. In addition, there are also standard benefits you may be entitled to at no extra cost.” “What you are covered for Case No: 409593 Determination Page 8 of 10 Your [FSP name] Policy insurers you up to the amount of the sum insured for loss or damage to your building and/or contents caused by an insured event listed below. Your Policy Schedule will indicate if you have insured your building, your contents or both. Insured event We will cover damage to your building and/or your contents caused by storm, rain or flood We will not cover - water damage to your building caused by storm or rain seeping or otherwise entering your building unless the water entered through an opening in the wall or roof that had been made directly by the storm or rain or as a direct result of it; - damage caused by water penetrating or entering your building because it has not been properly maintained or as a result of a design fault, structural defect or because of defective workmanship; …” “When you are not insured You are not insured under any section of this Policy if the incident arises from or is connected with: … - wear and tear, depreciation, deterioration; - damage caused by atmospheric conditions, mould, mildew, insects, vermin, action of light, rot or inherent defect” “ Your building and contents We will not pay: - to modify your building to rectify a fault that is causing loss or damage to your building under this Policy.” 3.3 Expert material relied on Record Key points FSP’s Assessor First report 8 April 2015  Attended/photographed property 2/4/15 with female Applicant .  Noted property was two - storey timber and brick property with an iron roof originally built in the 60s, renovated since, well maintained .  Applicant advised assessor that following heavy rain in the last week she had found water has been entering through the walls in th e lower section of the property.  Water seems to be coming from underground .  Purchased property October 2014 - leaking occurs when there is heavy rain .  Described damage noted in the site visit to storeroom, lounge, bedroom and contents .  Significant drainage at the property which appears to be in working order; the Applicants reported hearing the bilge pump kick in during the first heavy rainfall; asked FSP to engage a building con sultant regarding causation . FSP’s expert building consultant and engineer (CD) 22 April 2015  Inspected property 20 April 2015 in the presence of the male Applicant .  Leaks only occurs in mentioned locations when sustained torrential rainfall occurs .  CD c oncluded that the water ingress was the result of building and construction deficiencies by the builder who undertook the alteration and addition works during Case No: 409593 Determination Page 9 of 10 the period between 2008 and 2014 .  Works performed during the alterations and additions fail to co mply with the Building Code of Australia Performance Requirement P2.2.2 which states – A roof an external wall (including openings around windows and doors) must prevent the penetration of water that could cause : 1. unhealthy and dangerous conditions, or loss of amenity for occupants; and 2. undue dampness or deterioration of building elements.  No damage identified as a result of water ingress .  In response to the allegations made by the Applicants that he failed to att end their home and/or failed to carry out a full and proper assessment, the expert has confirmed the time and date of his attendance at the Applicants‟ property and detailed the steps undertaken in the course of his inspection .  In response to the report o f WS (outlined below) CD states: “The report does not layout any observations testing or investigations that were carried out as part of their investigation. We agree that the water has entered the dwelling at the floor/wall junction however it is out st rong opinion that this is the result of building deficiencies with the construction methods used during the alterations and additions carried out by unknown persons during the period between 2008 and 2014. We disagree with [WS] opinion that the seal at th e floor/wall junction has been damaged by the water ingress as there was no „seal‟ installed, We disagree with [WS] proposed method of repair to inject the floor/wall joint. This scope of Works makes the assumption that the walls and infill concrete slab on ground are both waterproof and that the sub - soil drainage system behind the wall is installed correctly and is operating as intended. This method of repair might prevent water from emanating from the floor/wall junction, if installed correctly, however there is a strong possibility that the ground water will be forced to another area of the structure resulting in further damages to other areas of the dwelling” .  CD concluded as the construction of the lower level is masonry block walls and polished concr ete floors, there was no apparent damage at the time of inspection .  CD did not agree that the floor/wall junction is considered to be resultant damage rather than the cause .  CD said to rectify the water ingress the external ground behind the lower level m asonry retaining wall is excavated, a suitable sub - soil drainage system is installed below the internal floor level and discharged to the existing stormwater system, along with the installation of a positive membrane system on the outside of the walls comb ined with a vertical drainage cell and protection layer, then backfilled with free draining material. Surface drainage should also be Case No: 409593 Determination Page 10 of 10 installed on the high side of the dwelling to restrict the amount of water that is impacting the dwelling . Applicant’s expert (WS) Report 29 May 2015  Reported regarding leak sealing works at the insured property and inspected the property on a date unknown .  Described a Scope of Works to inject the floor/wall joint (19Lm) at a cost $4,750 .  “Recommendation: We recommend i njecting the cold joint between the slab and the block wall. From my observation, the seal was damaged during the recent storm event and caused water to flow through the joint. Once damaged, the joint will leak even during normal rain events.” FSP’s expe rt (CD) Claim Review, report and photographs dated 19 June 2015 “The Owner also informed us that the residence is a re - located home from another site. The current owner purchased the property in 2005 and sold in 2008. The current Owner repurchased the property in 2014. Since the original ownership of the residence had undergone a number of improvements/renovations… I am of the opinion that the water ingress which recently occurred into (various rooms) during the recent March 2015 rain storm event is as a direct result of the following: e) The absence of a suitable seal being provided at the overlapping junction point between the base of the concrete block wall and the edge of the concrete wall slab. f) The absence of a suitable seal being provided at all concrete infill slab to concrete block wall junction points. g) The absen ce of suitable subterranean drainage system located in behind the Eastern, Southern and Western concrete block wall construction to the invert level of the concrete wall slab. h) The absence of suitable waterproofing system to the concealed back faces of the Eastern, Southern and Western Concrete Block Walls. The water ingress to the above identified rooms has not occurred via a storm created opening however, is a direct from prior building deficiencies when the home was re - located. Water entry into the lowe r ground floor of the residence has been occurring repeatedly over an extended period of time. The relocation of the Storage Room number 2 walls to create the open service/drainage duct, all associated waterproofing, creation of a ground spoon drains and a drainage sump and the installation of a submersible pump are considered as rectification type works and are all tell - tale signs of the prior Owner from between 2008 - 2014 to address the failure of the original waterproofing and drainage system. The works performed during the alterations and additions fail to comply with the Building Code ….”

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.